Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout20210244 Ver 1_Pre-Filing Acknowledgement Email_20210204Strickland, Bev
From: laserfiche@ncdenr.gov
Sent: Thursday, February 4, 2021 4:15 PM
To: Dilday, Jason L
Cc: Mitchell, Robert K
Subject: Pre -Filing Meeting Request Acknowledgement - Broadband installation along US 74
from Wilmington to Asheville - 20210244 Ver 1
Attachments: DWR Pre -Filing Meeting Request Form.pdf
The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form
for Broadband installation along US 74 from Wilmington to Asheville that you submitted on (date).
The ID number for that project is 20210244, Version 1.
Reviewer Contact Information:
Reviewer: Robert Mitchell
Reviewer Email: kevin.mitchell@ncdenr.gov
Reviewing Office: Asheville Regional Office - (828) 296-4500
When you submit your application please upload a copy of the attached document in this email.
This email was automatically generated by Laserfiche workflow. Please do not respond to this email
address, as responses are not monitored.
1
ID#* 20210244 Version* 1
Regional Office* Asheville Regional Office - (828) 296-4500
Reviewer List* Kevin Mitchell
Pre -Filing Meeting Request submitted 2/4/2021
................................................................................................................................................................................................................................................................................................................................................................
Contact Name * Jason Dilday
Contact Email Address* jldilday@ncdot.gov
Project Name* Broadband installation along US 74 from Wilmington to Asheville
Project Owner*
Project County*
Owner Address:
NCDOT
Union
Street Address
1000 Birch Ridge Drive
Address Line 2
aty
Raleigh
Rbstal / Zip Code
27604
Is this a transportation project?* r Yes r No
State / Frovince / Region
NC
Country
USA
Type(s) of approval sought from the DWR:
W 401 Water Quality Certification - F 401 Water Quality Certification -
Regular Express
r- Individual Permit r- Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Do you know the name of the staff member you would like to request a meeting with?
Kevin Mitchell
Please give a brief project description below.
NCDOT proposes to install three 1.25" diameter conduits containing
broadband fiber optic cable in the right-of-way of the 280-mile US 74
corridor from 1-140 near Wilmington to 1-40 in Asheville.
Please give a couple of dates you are available for a meeting.
Please attach the documentation you would like to have the meeting about.
pdr only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
eve 40)"1;;
Submittal Date 2/4/2021