Loading...
HomeMy WebLinkAbout20201951 Ver 1_ePCN Application_20210205 I I DWR Division of Water Resources Pre-Construction Notification (PCN) Form October 26,2020 Ver 3.3 Initial Review Has this project met the requirements for acceptance in to the review process?* 6 Yes ✓ No Is this project a public transportation project?* 0 Yes r No Change only if needed. BIMS#Assigned* Version#* 20201951 1 Is a payment required for this project?* ✓ No payment required 6 Fee received Reviewing Office* ✓ Fee needed-send electronic notification Asheville Regional Office-(828)296-4500 Select Project Reviewer* Kevin Mitchell:eads\rkmitchell Information for Initial Review 1a.Name of project: Cascade Lake Road Slide Repair 1a.Who is the Primary Contact?* Kevin Barnett lb.Primary Contact Email:* 1c.Primary Contact Phone:* khbarnett@ncdot.gov (828)333-1188 Date Submitted 2/5/2021 Nearest Body of Water Little River Basin French Broad Water Classification C Site Coordinates Latitude: Longitude: 35.223114 -82.636398 Pre-Filing Meeting Information ID# Version Pre-fling Meeting or Request Date* 11/2/2020 Attach documentation of Pre-Filing Meeting Request here:* Pre-notification.pdf 37.71KB A. Processing Information C^U County(or Counties)where the project is located: Transylvania Is this a NCDMS Project C- Yes f No Is this project a public transportation project?* 6 Yes r No Is this a NCDOT Project?* 6 Yes r No (NCDOT only)T.I.P.or state project number: WBS#(2) DF 17014.2088011 1a.Type(s)of approval sought from the Corps: f7 Section 404 Permit(wetlands,streams and waters,Clean Water Act) r Section 10 Permit(navigable waters,tidal waters,Rivers and Harbors Act) Has this PCN previously been submitted?* ✓ Yes ✓ No Please provide the date of the previous submission.* 12/16/2020 lb.What type(s)of permit(s)do you wish to seek authorization? 7 Nationwide Permit(NWP) r Regional General Permit(RGP) I—Standard(IP) 1c.Has the NWP or GP number been verified by the Corps? C- Yes f No Nationwide Permit(NWP)Number: NWP Numbers(for multiple NWPS): 1d.Type(s)of approval sought from the DWR: (7 401 Water Quality Certification-Regular r 401 Water Quality Certification-Express r Non-404 Jurisdictional General Permit r Riparian Buffer Authorization r Individual Permit le.Is this notification solely for the record because written approval is not required? * For the record only for DWR 401 Certification: C- Yes c No For the record only for Corps Permit: C- Yes a No If.Is this an after-the-fact permit application?* 6 Yes C No 1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? C- Yes f No 1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? C' Yes C No Acceptance Letter Attachment I h.Is the project located in any of NC's twenty coastal counties? C- Yes f No 1j.Is the project located in a designated trout watershed? C' Yes 6 No B. Applicant Information Id.Who is applying for the permit? 17 Owner r Applicant(other than owner) le.Is there an Agent/Consultant for this project?* C' Yes 6 No 2.Owner Information 2a.Name(s)on recorded deed: NC DOT-Division 14 2b.Deed book and page no.: 2c.Responsible party: 2d.Address Street Address 253 Webster Rd. Address Line 2 Criy State/Bovine/Region Sylva NC Fbstal/Zip Code Country 28779 US 2e.Telephone Number: 2f.Fax Number: (828)333-1188 2g.Email Address:* khbarnett@ncdot.gov C. Project Information and Prior Project History 1. Project Information lb.Subdivision name: ('f appropriate) 1c.Nearest municipality/town: Pisgah Forest 2. Project Identification 2a.Property Identification Number: 2b.Property size: 9515-61-1020-000 2c.Project Address Street Address Cascade Lake Rd. Address Line 2 coy State/Bovine/Region Pisgah Forest NC Postal/Zip Code Country 28768 US 3.Surface Waters 3a.Name of the nearest body of water to proposed project:* Little River 3b.Water Resources Classification of nearest receiving water:* C 3c. What river basin(s)is your project located in?* French Broad 3d.Please provide the 12-digit HUC in which the project is located. 060101050205 4. Project Description and History 4a.Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* Cascade Lake Rd.is a connector from the Brevard area to South of Dupont State Forest.The NC DOT maintains this road from edge of road to edge of road.In late October,2020, about a third of this 18'wide road slid making passage unavailable.Due to the narrow work area and lack of property access off our maintained ROW,we will have to temp divert a stream across Cascade Lake Rd above the soil nail activity,and fill the stream channel(road side ditch/perennial stream)with clean railroad ballast to have a platform for the equipment to sit on.An existing 25 LF 30"cmp that has failed will be replaced with the same,and the outlet(now falling onto a bedrock slab)will outlet through the newly constructed retaining wall onto the same rock slope. While performing this repair work,it was discovered that the two 25LF CMP's going south of the slide were rotten,and replaced at the same time. In summary,the impacts will be temporary in nature.60 LF of dewatered channel,filled with railroad ballast,which will be cleared of stone at the end of the project,and the replacement of a 25 LF 30"cmp(all in an unnamed trib to the Little River),and two 30"CMPs upstream(South)of the slide will be replaced.All three of the CMP's will be perched on the outlet end due to presence of bedrock under the road. 4b.Have Corps permits or DWR certifications been obtained for this project(including all prior phases)in the past?* ✓ Yes G No r Unknown 4d.Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site.(for DWR) USGS.Topo.pdf 732.17KB 4e.Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site.(for DWR) SoilSurvey.pdf 3.01MB 4f.List the total estimated acreage of all existing wetlands on the property: 0.0 4g.List the total estimated linear feet of all existing streams on the property: 300 4h.Explain the purpose of the proposed project:* To rebuild Cascade Lake Rd.and return it to a safe travel condition. 4i.Describe the overall project in detail,including indirect impacts and the type of equipment to be used:* Direction bore rig,2 track-hoes,and miscellaneous small equipment. 4j.Please upload project drawings for the proposed project. 21-071_DOT_Cascade Lake Rd slide Conc_Transylvania.pdf 282.66KB 5.Jurisdictional Determinations 5a.Have the wetlands or streams been delineated on the property or proposed impact areas?* ✓ Yes G No C Unknown Comments: 5b.If the Corps made a jurisdictional determination,what type of determination was made?* ✓ Preliminary r Approved 6 Not Verified r Unknown r N/A Corps AID Number: 5c.If 5a is yes,who delineated the jurisdictional areas? Name(if known): Kevin Barnett Agency/Consultant Company: NC DOT Other: 5d1.Jurisdictional determination upload 6. Future Project Plans 6a.Is this a phased project?* ✓ Yes allo Are any other NWP(s),regional general permit(s),or individual permits(s)used,or intended to be used,to authorize any part of the proposed project or related activity? None are anticipated. D. Proposed Impacts Inventory 1. Impacts Summary 1a.Where are the impacts associated with your project?(check all that apply): r"Wetlands 17 Streams-tributaries r Buffers ✓Open Waters r Pond Construction 3.Stream Impacts 3a.Reason for impact(?) 3b.lmpact type* 3c.Type of impact* 3d.S.name* 3e.Stream Type* 3f.Type of 3g.S.width* 3h.Impact (?) Jurisdiction* length* S1 Dewatering Temporary Dewatering UT to Little River Perennial Both 1 100 Average(feet) (linear feet) S2 Culvert Replacement Temporary Culvert UT to Little River Perennial Both 1 0 Average(feet) (linear feet) S3 Culvert Replacement Temporary Culvert UT to Little River Perennial Both 1 0 Average(feet) (linear feet) Sq Culvert Replacement Temporary Culvert UT to Little River Perennial Both 1 0 Average(feet) (linear feet) 3i.Total jurisdictional ditch impact in square feet: 0 3i.Total permanent stream impacts: 3i.Total temporary stream impacts: 0 100 3i.Total stream and ditch impacts: 100 3j.Comments: E. Impact Justification and Mitigation 1.Avoidance and Minimization 1a.Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: The dewatering was the minimum necessary to provide a safe work footprint for the equipment necessary to repair the road failure.The culvert replacements were necessary due to the bottom of the culverts being rotten and to prevent future failures. lb.Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: This is the absolute minimum amount of impact necessary to put the road back in a safe condition. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a.Does the project require Compensatory Mitigation for impacts to Waters of the U.S.or Waters of the State? ✓ Yes 6No 2b.If this project DOES NOT require Compensatory Mitigation,explain why: No new impacts.Foot for foot replacements of pipe. F. Stormwater Management and Diffuse Flow Plan (required by DWR) L) 1. Diffuse Flow Plan 1a.Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? ✓ Yes n Na If no,explain why: no new impervious surfaces were added. 2.Stormwater Management Plan 2a.Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* 6 Yes r No Comments: Project will follow NCDOT's existing permit. G. Supplementary Information 1. Environmental Documentation 1a.Does the project involve an expenditure of public(federal/state/local)funds or the use of public(federal/state)land?* ✓ Yes r No lb.If you answered"yes"to the above,does the project require preparation of an environmental document pursuant to the requirements of the National or State(North Carolina) Environmental Policy Act(NEPA/SEPA)?* ✓ Yes 6 No Comments:* Below threshold for SEPA review. 2.Violations(DWR Requirement) 2a.Is the site in violation of DWR Water Quality Certification Rules(15A NCAC 2H.0500),Isolated Wetland Rules(15A NCAC 2H.1300),or DWR Surface Water or Wetland Standards or Riparian Buffer Rules(15A NCAC 2B.0200)?* ✓ Yes (•' No 2b Provide an explanation of the violation(s): 3. Cumulative Impacts(DWR Requirement) 3a.Will this project result in additional development,which could impact nearby downstream water quality?* ✓ Yes ( No 3b.If you answered"no,"provide a short narrative description. No new impacts are anticipated as majority of property south of the repair are owned by one owner with no intention to develop at this time.(May never develop based on understanding of discussion with property owner stating the property is in a trust dictating that property shall be held for public use.) 4.Sewage Disposal(DWR Requirement) 4a.Is sewage disposal required by DWR for this project?* ✓ Yes ( Nor N/A 5. Endangered Species and Designated Critical Habitat(Corps Requirement) 5a.Will this project occur in or near an area with federally protected species or habitat?* ( Yes rNo 5b.Have you checked with the USFWS concerning Endangered Species Act impacts?* ( Yes r No 5c.If yes,indicate the USFWS Field Office you have contacted. Asheville 5d.Is another Federal agency involved?* ✓ Yes ( No r Unknown 5e.Is this a DOT project located within Division's 1-8? ✓ Yes ( No 5f.Will you cut any trees in order to conduct the work in waters of the U.S.? ( Yes r No 5g.Does this project involve bridge maintenance or removal? ✓ Yes ( No 5h.Does this project involve the construction/installation of a wind turbine(s)?* ✓ Yes ( No 5i.Does this project involve(1)blasting,and/or(2)other percussive activities that will be conducted by machines,such as jackhammers,mechanized pile drivers,etc.? ( Yes r No If yes,please provide details to include type of percussive activity,purpose,duration,and specific location of this activity on the property. 21-071_DOT_Cascade Lake Rd slide Conc_Transylvania.pdf 282.66KB 5j.What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? Consultation with Ms.Holland Youngman was performed to determine what measures were necessary. Consultation Documentation Upload 200626NC01-C-DT.pdf 1.38MB 6. Essential Fish Habitat(Corps Requirement) 6a.Will this project occur in or near an area designated as an Essential Fish Habitat?* ✓ Yes ( No 6b.What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* NOAA website 7. Historic or Prehistoric Cultural Resources(Corps Requirement) 7a.Will this project occur in or near an area that the state,federal or tribal governments have designated as having historic or cultural preservation status?* ✓ Yes ( No 7b.What data sources did you use to determine whether your site would impact historic or archeological resources?* NCSHPO 7c.Historic or Prehistoric Information Upload NCSHPO.comments.pdf 789.18KB 8. Flood Zone Designation(Corps Requirement) 8a.Will this project occur in a FEMA-designated 100-yearfloodplain?* ✓ Yes ( No 8c.What source(s)did you use to make the floodplain determination?* County GIS Maps rMiscelIaneous L) Comments Miscellaneous attachments not previously requested. Signature F7 By checking the box and signing below,I certify that: • The project proponent hereby certifies that all information contained herein is true,accurate,and complete to the best of my knowledge and belief;and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true,accurate,and complete information on this form; • I agree that submission of this PCN form is a"transaction"subject to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature;AND • I intend to electronically sign and submit the PCN form. Full Name: Kevin H Barnett Signature figVid Date 2/5/2021