HomeMy WebLinkAbout20201788 Ver 1_SAW-2020-01460 signed PJD_20210203U.S. ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
Action Id. SAW-2020-01460 County: Lee U.S.G.S. Quad: NC- Sanford
NOTIFICATION OF JURISDICTIONAL DETERMINATION
Requestor: Timmons Group
Lauren Norris -Heflin
Address: 5410 Trinity Road, suite 102
Raleigh, NC 27607
Telephone Number: 919-866-4943
E-mail: lauren.norris(&timmons.com
Size (acres) 132 Nearest Town Sanford
Nearest Waterway Gasters Creek River Basin Cape Fear
USGS HUC 03030004 Coordinates Latitude: 35.4486
Longitude:-79.1662
Location description: The project site is approximately 132 acres bisected by Tramway Road, near the town of Sanford, Lee
County, North Carolina.
Indicate Which of the Following Apply:
A. Preliminary Determination
® There appear to be waters, including wetlands on the above described project area/property, that may be subject to Section 404
of the Clean Water Act (CWA)(33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). The
waters, including wetlands have been delineated, and the delineation has been verified by the Corps to be sufficiently accurate
and reliable. The approximate boundaries of these waters are shown on the enclosed delineation map dated 7/20/2020. Therefore
this preliminary jurisdiction determination may be used in the permit evaluation process, including determining compensatory
mitigation. For purposes of computation of impacts, compensatory mitigation requirements, and other resource protection
measures, a permit decision made on the basis of a preliminary JD will treat all waters and wetlands that would be affected in any
way by the permitted activity on the site as if they are jurisdictional waters of the U.S. This preliminary determination is not an
appealable action under the Regulatory Program Administrative Appeal Process (Reference 33 CFR Part 331). However, you may
request an approved JD, which is an appealable action, by contacting the Corps district for further instruction.
❑ There appear to be waters, including wetlands on the above described project area/property, that may be subject to Section 404
of the Clean Water Act (CWA)(33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403).
However, since the waters, including wetlands have not been properly delineated, this preliminary jurisdiction determination
may not be used in the permit evaluation process. Without a verified wetland delineation, this preliminary determination is
merely an effective presumption of CWA/RHA jurisdiction over all of the waters, including wetlands at the project area, which
is not sufficiently accurate and reliable to support an enforceable permit decision. We recommend that you have the waters,
including wetlands on your project area/property delineated. As the Corps may not be able to accomplish this wetland
delineation in a timely manner, you may wish to obtain a consultant to conduct a delineation that can be verified by the Corps.
B. Approved Determination
❑ There are Navigable Waters of the United States within the above described project area/property subject to the permit
requirements of Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403) and Section 404 of the Clean Water Act
(CWA)(33 USC § 1344). Unless there is a change in law or our published regulations, this determination may be relied upon for
a period not to exceed five years from the date of this notification.
❑ There are waters, including wetlandson the above described project area/property subject to the permit requirements of Section
404 of the Clean Water Act (CWA) (33 USC § 1344). Unless there is a change in the law or our published regulations, this
determination may be relied upon for a period not to exceed five years from the date of this notification.
❑ We recommend you have the waters, including wetlands on your project area/property delineated. As the Corps may not be
able to accomplish this wetland delineation in a timely manner, you may wish to obtain a consultant to conduct a delineation that
can be verified by the Corps.
❑ The waters, including wetlands on your project area/property have been delineated and the delineation has been verified by
the Corps. The approximate boundaries of these waters are shown on the enclosed delineation map dated DATE. We strongly
suggest you have this delineation surveyed. Upon completion, this survey should be reviewed and verified by the Corps. Once
SAW-2020-01460
verified, this survey will provide an accurate depiction of all areas subject to CWA jurisdiction on your property which, provided
there is no change in the law or our published regulations, may be relied upon for a period not to exceed five years.
❑ The waters, including wetlands have been delineated and surveyed and are accurately depicted on the plat signed by the
Corps Regulatory Official identified below onDATE. Unless there is a change in the law or our published regulations, this
determination may be relied upon for a period not to exceed five years from the date of this notification.
❑ There are no waters of the U.S., to include wetlands, present on the above described project area/property which are subject to the
permit requirements of Section 404 of the Clean Water Act (33 USC 1344). Unless there is a change in the law or our published
regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification.
❑ The property is located in one of the 20 Coastal Counties subject to regulation under the Coastal Area Management Act (CAMA).
You should contact the Division of Coastal Management in Morehead City, NC, at (252) 808-2808 to determine their
requirements.
Placement of dredged or fill material within waters of the US, including wetlands, without a Department of the Army permit may
constitute a violation of Section 301 of the Clean Water Act (33 USC § 1311). Placement of dredged or fill material, construction or
placement of structures, or work within navigable waters of the United States without a Department of the Army permit may
constitute a violation of Sections 9 and/or 10 of the Rivers and Harbors Act (33 USC § 401 and/or 403). If you have any questions
regarding this determination and/or the Corps regulatory program, please contact James Lastinger at 919-554-4884 ext 32 or
James.C.Lastint!er(&usace.armv.mil.
C. Basis For Determination: Basis For Determination: See the preliminary jurisdictional determination
form dated 09/17/2020.
D. Remarks: None.
E. Attention USDA Program Participants
This delineation/determination has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the particular site
identified in this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security
Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request
a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work.
F. Appeals Information (This information applies only to approved jurisdictional determinations as indicated in B.
above)
This correspondence constitutes an approved jurisdictional determination for the above described site. If you object to this
determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed you will find a
Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form. If you request to appeal this determination you
must submit a completed RFA form to the following address:
US Army Corps of Engineers
South Atlantic Division
Attn: Phillip Shannin, Review Officer
60 Forsyth Street SW, Room 10M15
Atlanta, Georgia 30303-8801
In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal
under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP. Should you
decide to submit an RFA form, it must be received at the above address by Not applicable.
**It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this correspondence.**
Corps Regulatory Official: %'—
Date of JD: 09/17/2020 Expiration Date of JD: Not applicable
SAW-2020-01460
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we
continue to do so, please complete the Customer Satisfaction Survey located at
http://corpsmapu.usace.anny.mil/cm_apex/f?p=136:4:0
Copy furnished:
NOTIFICATION OF ADMINISTRATIVE APPEAL OPTIONS AND PROCESS AND
W; REQUEST FOR APPEAL
Applicant: Timmons Grou , Lauren Norris -Heflin File Number: SAW-2020-01460
Date: 09/17/2020
Attached is:
See Section below
INITIAL PROFFERED PERMIT (Standard Permit or Letter of permission)
A
PROFFERED PERMIT (Standard Permit or Letter of permission)
B
PERMIT DENIAL
C
APPROVED JURISDICTIONAL DETERMINATION
D
❑X
PRELIMINARY JURISDICTIONAL DETERMINATION
E
SECTION I - The following identifies your rights and options regarding an administrative appeal of the above decision.
Additional information may be found at or http://www.usace.army.miUMissions/CivilWorks/ReaulatoryProgramandPenuits.asi)
OZI& Corps regulations at 33 CFR Part 331.
A: INITIAL PROFFERED PERMIT: You may accept or object to the permit.
• ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final
authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your
signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all
rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the
permit.
• OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request
that the permit be modified accordingly. You must complete Section II of this form and return the form to the district
engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will
forfeit your right to appeal the permit in the future. Upon receipt of your letter, the district engineer will evaluate your
objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your
objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After
evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in
Section B below.
B: PROFFERED PERMIT: You may accept or appeal the permit
• ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final
authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your
signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all
rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the
permit.
• APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein,
you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of
this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days
of the date of this notice.
C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by
completing Section II of this form and sending the form to the division engineer. This form must be received by the division
engineer within 60 days of the date of this notice.
D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new
information.
• ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the
date of this notice, means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD.
• APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers
Administrative Appeal Process by completing Section II of this form and sending the form to the district engineer. This form
must be received by the division engineer within 60 days of the date of this notice.
E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the
preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed),
by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the
Corps to reevaluate the JD.
SECTION II - REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT
REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial
proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or
objections are addressed in the administrative record.)
ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the
record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to
clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record.
However, you may provide additional information to clarify the location of information that is already in the administrative
record.
POINT OF CONTACT FOR QUESTIONS OR INFORMATION:
If you have questions regarding this decision and/or the
If you only have questions regarding the appeal process you may
appeal process you may contact:
also contact:
District Engineer, Wilmington Regulatory Division
Mr. Phillip Shannin, Administrative Appeal Review Officer
Attn: James Lastinger
CESAD-PDO
Raleigh Regulatory Office
U.S. Army Corps of Engineers, South Atlantic Division
U.S Army Corps of Engineers
60 Forsyth Street, Room 1 OM15
3331 Heritage Trade Drive, Suite 105
Atlanta, Georgia 30303-8801
Wake Forest, North Carolina 27587
Phone: (404) 562-5137
RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government
consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15-day
notice of any site investigation, and will have the opportum to participate in all site investi ations.
Date:
Telephone number:
Signature of appellant or agent.
For appeals on Initial Proffered Permits send this form to:
District Engineer, Wilmington Regulatory Division, Attn: James Lastinger, , 69 Darlington Avenue, Wilmington, North
Carolina 28403
For Permit denials, Proffered Permits and Approved Jurisdictional Determinations send this form to:
Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Phillip Shannin, Administrative
Appeal Officer, CESAD-PDO, 60 Forsyth Street, Room 1OM15, Atlanta, Georgia 30303-8801
Phone: (404) 562-5137
PRELIMINARY JURISDICTIONAL DETERMINATION (PJD) FORM
BACKGROUND INFORMATION
A. REPORT COMPLETION DATE FOR PJD: 09/17/2020
B. NAME AND ADDRESS OF PERSON REQUESTING PJD: Timmons Group, Lauren Norris -Heflin, 5410
Trinity Road, suite 102, Raleigh, NC 27607
C. DISTRICT OFFICE, FILE NAME, AND NUMBER: Wilmington District, Tramway Road site, SAW-
2020-01460
D. PROJECT LOCATION(S) AND BACKGROUND INFORMATION: The project site is approximately
132 acres bisected by Tramway Road, near the town of Sanford, Lee County, North Carolina.
(USE THE TABLE BELOW TO DOCUMENT MULTIPLE AQUATIC RESOURCES
AND/OR AQUATIC RESOURCES AT DIFFERENT SITES)
State: NC County: Lee City: Sanford
Center coordinates of site (lat/long in degree decimal format): Latitude: 35.4486 Longitude:-79.1662
Universal Transverse Mercator:
Name of nearest waterbody: Gasters Creek
E. REVIEW PERFORMED FOR SITE EVALUATION (CHECKALL THAT APPLY):
® Office (Desk) Determination. Date: September 17, 2020
❑ Field Determination. Date(s):
TABLE OF AQUATIC RESOURCES INREVIEW AREA WHICH "MAYBE" SUBJECT TO
REGULATORY JURISDICTION
Site Number
Latitude
(decimal
degrees)
Longitude
(decimal
degrees)
Estimated
amount of
aquatic
resources in
review area
(acreage and
linear feet, if
applicable
Type of aquatic
resources (i.e.,
wetland vs.
non -wetland
waters)
Geographic authority to
which the aquatic
resource "may be"
subject (i.e., Section 404
or Section 10/404)
A
35.45602800
-79.16586800
6.43 acres
Wetland
Section 404
B
35.45013900
-79.166371
5.84 acres
Wetland
Section 404
C
35.44800200
-79.16472600
0.008 acre
Wetland
Section 404
D
35.44679000
-79.16690900
0.15 acre
Wetland
Section 404
E
35.44896400
-79.16252200
0.34 acre
Wetland
Section 404
F
35.44614100
-79.16606500
0.51 acre
Wetland
Section 404
G
35.44616600
-79.16586700
2069 LF
Non -wetland
Section 404
H
35.44671400
-79.16780900
1076 LF
Non -wetland
Section 404
1
35.44445100
-79.16609200
904 LF
Non -wetland
Section 404
J
35.45586600
-79.16588500
190 LF
Non -wetland
j Section 404
K
35.44775100
-79.16277800
144 LF
Non -wetland
Section 404
L
35.44683500
-79.16398900
225 LF
Non -wetland
Section 404
1. The Corps of Engineers believes that there may be jurisdictional aquatic resources in the
review area, and the requestor of this PJD is hereby advised of his or her option to request
and obtain an approved JD (AJD) for that review area based on an informed decision after
having discussed the various types of JDs and their characteristics and circumstances when
they may be appropriate.
2. In any circumstance where a permit applicant obtains an individual permit, or a Nationwide
General Permit (NWP) or other general permit verification requiring "pre- construction
notification" (PCN), or requests verification for a non -reporting NWP or other general
permit, and the permit applicant has not requested an AID for the activity, the permit
applicant is hereby made aware that: (1) the permit applicant has elected to seek a permit
authorization based on a PJD, which does not make an official determination of
jurisdictional aquatic resources; (2) the applicant has the option to request an AJD before
accepting the terms and conditions of the permit authorization, and that basing a permit
authorization on an AJD could possibly result in less compensatory mitigation being
required or different special conditions; (3) the applicant has the right to request an
individual permit rather than accepting the terms and conditions of the NWP or other
general permit authorization; (4) the applicant can accept a permit authorization and
thereby agree to comply with all the terms and conditions of that permit, including
whatever mitigation requirements the Corps has determined to be necessary; (5)
undertaking any activity in reliance upon the subject permit authorization without
requesting an AJD constitutes the applicant's acceptance of the use of the PJD; (6)
accepting a permit authorization (e.g., signing a proffered individual permit) or undertaking
any activity in reliance on any form of Corps permit authorization based on a PJD
constitutes agreement that all aquatic resources in the review area affected in any way by
that activity will be treated as jurisdictional, and waives any challenge to such jurisdiction
in any administrative or judicial compliance or enforcement action, or in any administrative
appeal or in any Federal court; and (7) whether the applicant elects to use either an AID or
a PJD, the JD will be processed as soon as practicable. Further, an AJD, a proffered
individual permit (and all terms and conditions contained therein), or individual permit
denial can be administratively appealed pursuant to 33 C.F.R. Part 331. If, during an
administrative appeal, it becomes appropriate to make an official determination whether
geographic jurisdiction exists over aquatic resources in the review area, or to provide an
official delineation of jurisdictional aquatic resources in the review area, the Corps will
provide an AJD to accomplish that result, as soon as is practicable. This PJD finds that
there "may be" waters of the U.S. and/or that there "may be" navigable waters of the U.S.
on the subject review area, and identifies all aquatic features in the review area that could
be affected by the proposed activity, based on the following information:
SUPPORTING DATA. Data reviewed for PJD (check all that apply) Checked items are included in the administrative
record and are appropriately cited:
® Maps, plans, plots or plat submitted by or on behalf of the PJD requestor:
Map: attached dated 7/20/2020
® Data sheets prepared/submitted by or on behalf of the PJD requestor. Datasheets:
® Office concurs with data sheets/delineation report.
❑ Office does not concur with data sheets/delineation report. Rationale:
❑ Data sheets prepared by the Corps:
❑Corps navigable waters' study:
®U.S. Geological Survey Hydrologic Atlas:
® USGS NHD data:
® USGS 8 and 12 digit HUC maps: 030300040201
® U.S. Geological Survey map(s). Cite scale & quad name: Sanford Quad, 2016
®Natural Resources Conservation Service Soil Survey. Citation: Lee County, 1989
® National wetlands inventory map(s). Cite name: USFWS NWI, 2018
❑ State/local wetland inventory map(s):
® FEMA/FIRM maps:
❑ 100-year Floodplain Elevation is: (National Geodetic Vertical Datum of 1929)
® Photographs: ® Aerial (Name & Date): NC OneMap, 2017
or ® Other (Name & Date): site photos
❑ Previous determination(s). File no. and date of response letter:
❑ Other information (please specify):
IMPORTANT NOTE: The information recorded on this form has not necessarily been verified by the Corps
and should not be relied upon for later Jurisdictional determinations.
Signature and date of Regulatory
staff member completing PJD
09/17/2020
Signature and date of person requesting PJD
(REQUIRED, unless obtaining the signature is
impracticable)1
1 Districts may establish timeframes for requester to return signed PJD forms. If the requester does not respond within the established
time frame, the district may presume concurrence and no additional follow up is necessary prior to fmalizing an action.