HomeMy WebLinkAbout20210247 Ver 1_JD Porters Neck Tract 1-5-21_20210202U.S. ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
Action Id. SAW-2019-02238 County: New Hanover U.S.G.S. Quad: NC- Scotts Hill
NOTIFICATION OF JURISDICTIONAL DETERMINATION
Requestor: Logan Developers Inc. Agent: Land Management Group
Andrew Smith Wes Frvar
60 Gregory Road 3805 Wrightsville Ave
Suite 1 Suite 15
Belville, NC 28451 Wilmington, NC 28403
Size (acres) 51.6 Nearest Town Wilmington
Nearest Waterway Pages Creek River Basin Onslow Bay
USGS HUC 03020302 Coordinates Latitude: 34.299443
Longitude:-77.783172
Location description: Property is located east of the end of Futch Creek Road and runs west to east to Shiraz Way in Porters
Neck, New Hanover County, North Carolina.
Indicate Which of the Following Apply:
A. Preliminary Determination
❑ There appear to be waters on the above described project area/property, that may be subject to Section 404 of the Clean Water
Act (CWA)(33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). The waters have been
delineated, and the delineation has been verified by the Corps to be sufficiently accurate and reliable. The approximate boundaries
of these waters are shown on the enclosed delineation map dated DATE. Therefore this preliminary jurisdiction determination
may be used in the permit evaluation process, including determining compensatory mitigation. For purposes of computation of
impacts, compensatory mitigation requirements, and other resource protection measures, a permit decision made on the basis of a
preliminary JD will treat all waters and wetlands that would be affected in any way by the permitted activity on the site as if they
are jurisdictional waters of the U.S. This preliminary determination is not an appealable action under the Regulatory Program
Administrative Appeal Process (Reference 33 CFR Part 331). However, you may request an approved JD, which is an appealable
action, by contacting the Corps district for further instruction.
❑ There appear to be waters on the above described project area/property, that may be subject to Section 404 of the Clean Water
Act (CWA)(33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). However, since the waters
have not been properly delineated, this preliminary jurisdiction determination may not be used in the permit evaluation process.
Without a verified wetland delineation, this preliminary determination is merely an effective presumption of CWA/RHA
jurisdiction over all of the waters at the project area, which is not sufficiently accurate and reliable to support an enforceable
permit decision. We recommend that you have the waters on your project area/property delineated. As the Corps may not be able
to accomplish this wetland delineation in a timely manner, you may wish to obtain a consultant to conduct a delineation that can
be verified by the Corps.
B. Approved Determination
❑ There are Navigable Waters of the United States within the above described project area/property subject to the permit
requirements of Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403) and Section 404 of the Clean Water Act
(CWA)(33 USC § 1344). Unless there is a change in law or our published regulations, this determination may be relied upon for
a period not to exceed five years from the date of this notification.
® There are waterson the above described project area/property subject to the permit requirements of Section 404 of the Clean
Water Act (CWA) (33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be
relied upon for a period not to exceed five years from the date of this notification.
❑ We recommend you have the waters on your project area/property delineated. As the Corps may not be able to accomplish
this wetland delineation in a timely manner, you may wish to obtain a consultant to conduct a delineation that can be verified by
the Corps.
❑ The waters on your project area/property have been delineated and the delineation has been verified by the Corps. The
approximate boundaries of these waters are shown on the enclosed delineation map dated DATE. We strongly suggest you have
this delineation surveyed. Upon completion, this survey should be reviewed and verified by the Corps. Once verified, this survey
SAW-2019-02238
will provide an accurate depiction of all areas subject to CWA jurisdiction on your property which, provided there is no change in
the law or our published regulations, may be relied upon for a period not to exceed five years.
❑ The waters have been delineated and surveyed and are accurately depicted on the plat signed by the Corps Regulatory Official
identified below onDATE. Unless there is a change in the law or our published regulations, this determination may be relied
upon for a period not to exceed five years from the date of this notification.
❑ There are no waters of the U.S., to include wetlands, present on the above described project area/property which are subject to the
permit requirements of Section 404 of the Clean Water Act (33 USC 1344). Unless there is a change in the law or our published
regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification.
❑ The property is located in one of the 20 Coastal Counties subject to regulation under the Coastal Area Management Act (CAMA).
You should contact the Division of Coastal Management in in Wilmington, NC, at (910) 796-7215 to determine their
requirements.
Placement of dredged or fill material within waters of the US, including wetlands, without a Department of the Army permit may
constitute a violation of Section 301 of the Clean Water Act (33 USC § 1311). Placement of dredged or fill material, construction or
placement of structures, or work within navigable waters of the United States without a Department of the Army permit may
constitute a violation of Sections 9 and/or 10 of the Rivers and Harbors Act (33 USC § 401 and/or 403). If you have any questions
regarding this determination and/or the Corps regulatory program, please contact Rachel Capito at (910)-251-4487 or
Rachel.A.0 apito(a)usace.armv.mil.
C. Basis For Determination: Basis For Determination: See the approved jurisdictional determination
form dated 01/05/2021.
D. Remarks: None.
E. Attention USDA Program Participants
This delineation/determination has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the particular site
identified in this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security
Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request
a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work.
F. Appeals Information (This information applies only to approved jurisdictional determinations as indicated in B.
above)
This correspondence constitutes an approved jurisdictional determination for the above described site. If you object to this
determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed you will find a
Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form. If you request to appeal this determination you
must submit a completed RFA form to the following address:
US Army Corps of Engineers
South Atlantic Division
Attn: Phillip Shannin, Review Officer
60 Forsyth Street SW, Room 10M15
Atlanta, Georgia 30303-8801
In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal
under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP. Should you
decide to submit an RFA form, it must be received at the above address by 03/06/2021.
**It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this correspondence.**
Corps Regulatory Official:
CAPITO.RACHEL.ANN.153 Digitally signed by
CAPITO.RACHEL.ANN.1536276790
6276790 Date: 2021.01.05 16:14:29-05'00'
Date of JD: 01/05/2021 Expiration Date of JD: 01/04/2026
NOTIFICATION OF ADMINISTRATIVE APPEAL OPTIONS AND PROCESS AND
REQUEST FOR APPEAL
Applicant: Logan Developers Inc., Andrew Smith File Number: SAW-2019-02238
Date. 01/05/2021
Attached is:
See Section below
INITIAL PROFFERED PERMIT (Standard Permit or Letter of permission)
A
PROFFERED PERMIT (Standard Permit or Letter of permission)
B
PERMIT DENIAL
C
❑X
APPROVED JURISDICTIONAL DETERMINATION
D
❑
PRELIMINARY JURISDICTIONAL DETERMINATION
E
SECTION I - The following identifies your rights and options regarding an administrative appeal of the above decision.
Additional information may be found at or http://www.usace.army.miUMissions/CivilWorks/Re ug latoiyProgramandPermits.aspx
or ft Corps regulations at 33 CFR Part 331.
A: INITIAL PROFFERED PERMIT: You may accept or object to the permit.
• ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final
authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your
signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all
rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the
permit.
• OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request
that the permit be modified accordingly. You must complete Section II of this form and return the form to the district
engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will
forfeit your right to appeal the permit in the future. Upon receipt of your letter, the district engineer will evaluate your
objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your
objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After
evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in
Section B below.
B: PROFFERED PERMIT: You may accept or appeal the permit
• ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final
authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your
signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all
rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the
permit.
• APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein,
you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of
this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days
of the date of this notice.
C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by
completing Section II of this form and sending the form to the division engineer. This form must be received by the division
engineer within 60 days of the date of this notice.
D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new
information.
• ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the
date of this notice, means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD.
• APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers
Administrative Appeal Process by completing Section II of this form and sending the form to the district engineer. This form
must be received by the division engineer within 60 days of the date of this notice.
E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the
preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed),
by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the
Corps to reevaluate the JD.
SECTION II - REQUEST FOR APPEAMoCTIONS TO AN INITIAL PROFFERED PERMIT Er
REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial
proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or
objections are addressed in the administrative record.)
ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the
record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to
clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record.
However, you may provide additional information to clarify the location of information that is already in the administrative
record.
POINT OF CONTACT FOR QUESTIONS OR INFORMATION:
If you have questions regarding this decision and/or the
If you only have questions regarding the appeal process you may
appeal process you may contact:
also contact:
District Engineer, Wilmington Regulatory Division
Mr. Phillip Shannin, Administrative Appeal Review Officer
Attn: Rachel Capito
CESAD-PDO
Wilmington Regulatory Office
U.S. Army Corps of Engineers, South Atlantic Division
U.S Army Corps of Engineers
60 Forsyth Street, Room 1 OM15
69 Darlington Avenue
Atlanta, Georgia 30303-8801
Wilmington, North Carolina 28403
Phone: (404) 562-5137
RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government
consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15-day
notice of any site investigation, and will have the opportum to participate in all site investi ations.
Date:
Telephone number:
Signature of appellant or agent.
For appeals on Initial Proffered Permits send this form to:
District Engineer, Wilmington Regulatory Division, Attn: Rachel Capito, 69 Darlington Avenue, Wilmington, North Carolina
28403
For Permit denials, Proffered Permits and Approved Jurisdictional Determinations send this form to:
Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Phillip Shannin, Administrative
Appeal Officer, CESAD-PDO, 60 Forsyth Street, Room 1OM15, Atlanta, Georgia 30303-8801
Phone: (404) 562-5137
U.S. ARMY CORPS OF ENGINEERS
REGULATORY PROGRAM
APPROVED JURISDICTIONAL DETERMINATION FORM (INTERIM)
o NAVIGABLE WATERS PROTECTION RULE
I. ADMINISTRATIVE INFORMATION
Completion Date of Approved Jurisdictional Determination (AJD): 01/05/2021
ORM Number: SAW-2019-02238
Associated JDs: \l/A or ORM numbers and identifiers (e.g. HQS-2020-00001-MSW-MITSITE).
Review Area Location': State/Territory: NC City: Wilmington County/Parish/Borough: Jew Hanover
Center Coordinates of Review Area: Latitude 34.299443 Longitude-77.783172
II. FINDINGS
A. Summary: Check all that apply. At least one box from the following list MUST be selected. Complete the
corresponding sections/tables and summarize data sources.
❑ The review area is comprised entirely of dry land (i.e., there are no waters or water features, including
wetlands, of any kind in the entire review area). Rationale: N/A or describe rationale.
❑ There are "navigable waters of the United States" within Rivers and Harbors Act jurisdiction within the
review area (complete table in Section 11.13).
There are "waters of the United States" within Clean Water Act jurisdiction within the review area
(complete appropriate tables in Section II.C).
There are waters or water features excluded from Clean Water Act jurisdiction within the review area
(complete table in Section II.D).
B. Rivers and Harbors Act of 1899 Section 10 (§ 10)2
§ 10 Name § 10 Size § 10 Criteria Rationale for § 10 Determination
C. Clean Water Act Section 404
Territorial Seas and Traditional Navi able Waters a 1 waters :3
a 1 Name
a 1 Size
a 1 Criteria
Rationale fora 1 Determination
Tributaries a 2 waters):
(a)(2) Name
(a)(2) Size
(a)(2) Criteria
Rationale fora 2 Determination
S-1
-591
linear
(a)(2) Perennial
Stream S-1 flows southwest offsite to UT to Page's
feet
tributary
Creek. Field observations of geomorphology
contributes
indicate this feature exhibits perennial flow.
surface water
flow directly or
indirectly to an
(a)(1) water in a
typical year.
NS-1
-125
Linear
(a)(2) Perennial
Non -Stream NS-1 flows northeast offsite to UT to
feet
tributary
Futch Creek. Field observations of geomorphology
contributes
indicate this feature exhibits intermittent flow.
' Map(s)/figure(s) are attached to the AJD provided to the requestor.
' If the navigable water is not subject to the ebb and flow of the tide or included on the District's list of Rivers and Harbors Act Section 10 navigable waters list, do
NOT use this document to make the determination. The District must continue to follow the procedure outlined in 33 CFR part 329.14 to make a Rivers and Harbors
Act Section 10 navigability determination.
s A stand-alone TNW determination is completed independently of a request for an AJD. A stand-alone TNW determination is conducted for a specific segment ofriver
or stream or other type of waterbody, such as a lake, where upstream or downstream limits or lake borders are established. A stand-alone TNW determination should be
completed following applicable guidance and should NOT be documented on the AJD Form.
Page 2 of 2 Form Version 10 June 2020 updated
U.S. ARMY CORPS OF ENGINEERS
REGULATORY PROGRAM
APPROVED JURISDICTIONAL DETERMINATION FORM (INTERIM)
NAVIGABLE WATERS PROTECTION RULE
Tributaries a 2 waters):
(a)(2) Name
(a)(2) Size
(a)(2) Criteria
Rationale fora 2 Determination
surface water
flow directly or
indirectly to an
(a)(1) water in a
typical year.
Lakes and ponds, and impoundments of jurisdictional waters ((a)(3 waters):
a 3 Name
a 3 Size
a 3 Criteria
Rationale fora 3 Determination
Adjacent wetlands ((a)(4) waters):
(a)(4) Name
(a)(4) Size
(a)(4) Criteria
Rationale fora 4 Determination
N/A.
N/A. I N/A.
N/H.
N/A.
D. Excluded Waters or Features
Excluded waters ((b)(1) - (b)(12)):4
Exclusion Name
Exclusion Size
Exclusions
Rationale for Exclusion Determination
NJb
-0.17
acre(s)
(b)(1) Non-
Non -Jurisdictional Basin Wetland NJW-1 is
adjacent wetland.
surrounded by uplands with no direct hydrologic
connection to downstream (a)(1)-(a)(4) waters.
NJD-1
-217
Linear
(b)(5) Ditch that is
Ditch NJD-1 is non -jurisdictional according to
feet
not an (a)(1) or
field observations, county soils surveys, and
(a)(2) water, and
USGS topographic maps. It is constructed in
those portions of
non-hydric soils and is not a relocated tributary
a ditch
or stream.
constructed in an
(a)(4) water that
do not satisfy the
conditions of
(c)(1).
NJD-2
-53
linear
(b)(5) Ditch that is
Ditch NJD-2 is non -jurisdictional according to
feet
not an (a)(1) or
field observations, county soils surveys, and
(a)(2) water, and
USGS topographic maps. It is constructed in
those portions of
non-hydric soils and is not a relocated tributary
a ditch
or stream.
constructed in an
(a)(4) water that
do not satisfy the
conditions of
c 1.
NJD-3
-610
Linear
(b)(5) Ditch that is
Ditch NJD-3 is non -jurisdictional according to
feet
not an (a)(1) or
field observations, county soils surveys, and
4 Some excluded waters, such as (b)(2) and (b)(4), may not be specifically identified on the AJD form unless a requestor specifically asks a Corps district to do so.
Corps districts may, in case -by -case instances, choose to identify some or all of these waters within the review area.
5 Because of the broad nature of the (b)(1) exclusion and in an effort to collect data on specific types of waters that would be covered by the (b)(1) exclusion, four sub-
categories of (b)(1) exclusions were administratively created for the purposes of the AJD Form. These four sub -categories are not new exclusions, but are simply
administrative distinctions and remain (b)(1) exclusions as defined by the NWPR
Page 2 of 2 Form Version 10 June 2020 updated
U.S. ARMY CORPS OF ENGINEERS
REGULATORY PROGRAM
APPROVED JURISDICTIONAL DETERMINATION FORM (INTERIM)
NAVIGABLE WATERS PROTECTION RULE
Excluded waters b 1 — b 12 :4
Exclusion Name
Exclusion Size
Exclusions
Rationale for Exclusion Determination
(a)(2) water, and
USGS topographic maps. It is constructed in
those portions of
non-hydric soils and is not a relocated tributary
a ditch
or stream.
constructed in an
(a)(4) water that
do not satisfy the
conditions of
c 1.
III. SUPPORTING INFORMATION
A. Select/enter all resources that were used to aid in this determination and attach data/maps to this
document and/or references/citations in the administrative record, as appropriate.
❑x Information submitted by, or on behalf of, the applicant/consultant: Title(s) and date(s)
This information Select. sufficient for purposes of this AJD.
Rationale: N/A or describe rationale for insufficiency (including partial insufficiency).
❑ Data sheets prepared by the Corps: Title(s) and/or date(s).
❑ Photographs: Title(s) and/or date(s).
❑x Corps site visit(s) conducted on: 1/22/2019
❑ Previous Jurisdictional Determinations (AJDs or PJDs): ORM Number(s) and date(s).
❑x Antecedent Precipitation Tool: provide detailed discussion in Section 111.B.
❑x USDA NRCS Soil Survey: Title(s) and/or date(s).
❑ USFWS NWI maps: Title(s) and/or date(s).
❑x USGS topographic maps: Title(s) and/or date(s).
Other data sources used to aid in this determination:
Data Source select
Name and/or date and other relevant information
USGS Sources
New Hanover County Topographic Map
USDA Sources
NRCS New Hanover County WebSoil GIS Data
NOAA Sources
N/A.
USACE Sources
N/A.
State/Local/Tribal Sources
N/A.
Other Sources
NC Emergency Management 2014 QL2 LiDAR
Other Sources
2016 NC One Map Aerial Photography
B. Typical year assessment(s): According to the Antecedent Precipitation vs Normal Range based on
NOAA's Daily Global Historical Climatology Network, the project area conditions were normal at the time of
the field work.
C. Additional comments to support AJD: N/A or provide additional discussion as appropriate.
Page 2 of 2 Form Version 10 June 2020 updated
L:\WETLANDS\2019 WETLANDS FILES\LMG19.244 ---
Porters Neck Lots, D Logan\delineation task\maps
Boundaries are approximate and not meant to be absolute.
Map Source: 2016 NC One Map
CAPITO•RACHEL• C PIMMCHELANNA 53627679
AN N.1536276790 Dace. 2021.01.0516.1526-W
200 400 800
Feet
Scale applies to 11X17" print.