HomeMy WebLinkAbout20210247 Ver 1_JD Porters Neck Tract 1-5-21_20210202U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW-2019-02238 County: New Hanover U.S.G.S. Quad: NC- Scotts Hill NOTIFICATION OF JURISDICTIONAL DETERMINATION Requestor: Logan Developers Inc. Agent: Land Management Group Andrew Smith Wes Frvar 60 Gregory Road 3805 Wrightsville Ave Suite 1 Suite 15 Belville, NC 28451 Wilmington, NC 28403 Size (acres) 51.6 Nearest Town Wilmington Nearest Waterway Pages Creek River Basin Onslow Bay USGS HUC 03020302 Coordinates Latitude: 34.299443 Longitude:-77.783172 Location description: Property is located east of the end of Futch Creek Road and runs west to east to Shiraz Way in Porters Neck, New Hanover County, North Carolina. Indicate Which of the Following Apply: A. Preliminary Determination ❑ There appear to be waters on the above described project area/property, that may be subject to Section 404 of the Clean Water Act (CWA)(33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). The waters have been delineated, and the delineation has been verified by the Corps to be sufficiently accurate and reliable. The approximate boundaries of these waters are shown on the enclosed delineation map dated DATE. Therefore this preliminary jurisdiction determination may be used in the permit evaluation process, including determining compensatory mitigation. For purposes of computation of impacts, compensatory mitigation requirements, and other resource protection measures, a permit decision made on the basis of a preliminary JD will treat all waters and wetlands that would be affected in any way by the permitted activity on the site as if they are jurisdictional waters of the U.S. This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process (Reference 33 CFR Part 331). However, you may request an approved JD, which is an appealable action, by contacting the Corps district for further instruction. ❑ There appear to be waters on the above described project area/property, that may be subject to Section 404 of the Clean Water Act (CWA)(33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). However, since the waters have not been properly delineated, this preliminary jurisdiction determination may not be used in the permit evaluation process. Without a verified wetland delineation, this preliminary determination is merely an effective presumption of CWA/RHA jurisdiction over all of the waters at the project area, which is not sufficiently accurate and reliable to support an enforceable permit decision. We recommend that you have the waters on your project area/property delineated. As the Corps may not be able to accomplish this wetland delineation in a timely manner, you may wish to obtain a consultant to conduct a delineation that can be verified by the Corps. B. Approved Determination ❑ There are Navigable Waters of the United States within the above described project area/property subject to the permit requirements of Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403) and Section 404 of the Clean Water Act (CWA)(33 USC § 1344). Unless there is a change in law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. ® There are waterson the above described project area/property subject to the permit requirements of Section 404 of the Clean Water Act (CWA) (33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. ❑ We recommend you have the waters on your project area/property delineated. As the Corps may not be able to accomplish this wetland delineation in a timely manner, you may wish to obtain a consultant to conduct a delineation that can be verified by the Corps. ❑ The waters on your project area/property have been delineated and the delineation has been verified by the Corps. The approximate boundaries of these waters are shown on the enclosed delineation map dated DATE. We strongly suggest you have this delineation surveyed. Upon completion, this survey should be reviewed and verified by the Corps. Once verified, this survey SAW-2019-02238 will provide an accurate depiction of all areas subject to CWA jurisdiction on your property which, provided there is no change in the law or our published regulations, may be relied upon for a period not to exceed five years. ❑ The waters have been delineated and surveyed and are accurately depicted on the plat signed by the Corps Regulatory Official identified below onDATE. Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. ❑ There are no waters of the U.S., to include wetlands, present on the above described project area/property which are subject to the permit requirements of Section 404 of the Clean Water Act (33 USC 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. ❑ The property is located in one of the 20 Coastal Counties subject to regulation under the Coastal Area Management Act (CAMA). You should contact the Division of Coastal Management in in Wilmington, NC, at (910) 796-7215 to determine their requirements. Placement of dredged or fill material within waters of the US, including wetlands, without a Department of the Army permit may constitute a violation of Section 301 of the Clean Water Act (33 USC § 1311). Placement of dredged or fill material, construction or placement of structures, or work within navigable waters of the United States without a Department of the Army permit may constitute a violation of Sections 9 and/or 10 of the Rivers and Harbors Act (33 USC § 401 and/or 403). If you have any questions regarding this determination and/or the Corps regulatory program, please contact Rachel Capito at (910)-251-4487 or Rachel.A.0 apito(a)usace.armv.mil. C. Basis For Determination: Basis For Determination: See the approved jurisdictional determination form dated 01/05/2021. D. Remarks: None. E. Attention USDA Program Participants This delineation/determination has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the particular site identified in this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work. F. Appeals Information (This information applies only to approved jurisdictional determinations as indicated in B. above) This correspondence constitutes an approved jurisdictional determination for the above described site. If you object to this determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form. If you request to appeal this determination you must submit a completed RFA form to the following address: US Army Corps of Engineers South Atlantic Division Attn: Phillip Shannin, Review Officer 60 Forsyth Street SW, Room 10M15 Atlanta, Georgia 30303-8801 In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP. Should you decide to submit an RFA form, it must be received at the above address by 03/06/2021. **It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this correspondence.** Corps Regulatory Official: CAPITO.RACHEL.ANN.153 Digitally signed by CAPITO.RACHEL.ANN.1536276790 6276790 Date: 2021.01.05 16:14:29-05'00' Date of JD: 01/05/2021 Expiration Date of JD: 01/04/2026 NOTIFICATION OF ADMINISTRATIVE APPEAL OPTIONS AND PROCESS AND REQUEST FOR APPEAL Applicant: Logan Developers Inc., Andrew Smith File Number: SAW-2019-02238 Date. 01/05/2021 Attached is: See Section below INITIAL PROFFERED PERMIT (Standard Permit or Letter of permission) A PROFFERED PERMIT (Standard Permit or Letter of permission) B PERMIT DENIAL C ❑X APPROVED JURISDICTIONAL DETERMINATION D ❑ PRELIMINARY JURISDICTIONAL DETERMINATION E SECTION I - The following identifies your rights and options regarding an administrative appeal of the above decision. Additional information may be found at or http://www.usace.army.miUMissions/CivilWorks/Re ug latoiyProgramandPermits.aspx or ft Corps regulations at 33 CFR Part 331. A: INITIAL PROFFERED PERMIT: You may accept or object to the permit. • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that the permit be modified accordingly. You must complete Section II of this form and return the form to the district engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit your right to appeal the permit in the future. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in Section B below. B: PROFFERED PERMIT: You may accept or appeal the permit • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new information. • ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice, means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD. • APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the district engineer. This form must be received by the division engineer within 60 days of the date of this notice. E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the Corps to reevaluate the JD. SECTION II - REQUEST FOR APPEAMoCTIONS TO AN INITIAL PROFFERED PERMIT Er REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or objections are addressed in the administrative record.) ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record. However, you may provide additional information to clarify the location of information that is already in the administrative record. POINT OF CONTACT FOR QUESTIONS OR INFORMATION: If you have questions regarding this decision and/or the If you only have questions regarding the appeal process you may appeal process you may contact: also contact: District Engineer, Wilmington Regulatory Division Mr. Phillip Shannin, Administrative Appeal Review Officer Attn: Rachel Capito CESAD-PDO Wilmington Regulatory Office U.S. Army Corps of Engineers, South Atlantic Division U.S Army Corps of Engineers 60 Forsyth Street, Room 1 OM15 69 Darlington Avenue Atlanta, Georgia 30303-8801 Wilmington, North Carolina 28403 Phone: (404) 562-5137 RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15-day notice of any site investigation, and will have the opportum to participate in all site investi ations. Date: Telephone number: Signature of appellant or agent. For appeals on Initial Proffered Permits send this form to: District Engineer, Wilmington Regulatory Division, Attn: Rachel Capito, 69 Darlington Avenue, Wilmington, North Carolina 28403 For Permit denials, Proffered Permits and Approved Jurisdictional Determinations send this form to: Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Phillip Shannin, Administrative Appeal Officer, CESAD-PDO, 60 Forsyth Street, Room 1OM15, Atlanta, Georgia 30303-8801 Phone: (404) 562-5137 U.S. ARMY CORPS OF ENGINEERS REGULATORY PROGRAM APPROVED JURISDICTIONAL DETERMINATION FORM (INTERIM) o NAVIGABLE WATERS PROTECTION RULE I. ADMINISTRATIVE INFORMATION Completion Date of Approved Jurisdictional Determination (AJD): 01/05/2021 ORM Number: SAW-2019-02238 Associated JDs: \l/A or ORM numbers and identifiers (e.g. HQS-2020-00001-MSW-MITSITE). Review Area Location': State/Territory: NC City: Wilmington County/Parish/Borough: Jew Hanover Center Coordinates of Review Area: Latitude 34.299443 Longitude-77.783172 II. FINDINGS A. Summary: Check all that apply. At least one box from the following list MUST be selected. Complete the corresponding sections/tables and summarize data sources. ❑ The review area is comprised entirely of dry land (i.e., there are no waters or water features, including wetlands, of any kind in the entire review area). Rationale: N/A or describe rationale. ❑ There are "navigable waters of the United States" within Rivers and Harbors Act jurisdiction within the review area (complete table in Section 11.13). There are "waters of the United States" within Clean Water Act jurisdiction within the review area (complete appropriate tables in Section II.C). There are waters or water features excluded from Clean Water Act jurisdiction within the review area (complete table in Section II.D). B. Rivers and Harbors Act of 1899 Section 10 (§ 10)2 § 10 Name § 10 Size § 10 Criteria Rationale for § 10 Determination C. Clean Water Act Section 404 Territorial Seas and Traditional Navi able Waters a 1 waters :3 a 1 Name a 1 Size a 1 Criteria Rationale fora 1 Determination Tributaries a 2 waters): (a)(2) Name (a)(2) Size (a)(2) Criteria Rationale fora 2 Determination S-1 -591 linear (a)(2) Perennial Stream S-1 flows southwest offsite to UT to Page's feet tributary Creek. Field observations of geomorphology contributes indicate this feature exhibits perennial flow. surface water flow directly or indirectly to an (a)(1) water in a typical year. NS-1 -125 Linear (a)(2) Perennial Non -Stream NS-1 flows northeast offsite to UT to feet tributary Futch Creek. Field observations of geomorphology contributes indicate this feature exhibits intermittent flow. ' Map(s)/figure(s) are attached to the AJD provided to the requestor. ' If the navigable water is not subject to the ebb and flow of the tide or included on the District's list of Rivers and Harbors Act Section 10 navigable waters list, do NOT use this document to make the determination. The District must continue to follow the procedure outlined in 33 CFR part 329.14 to make a Rivers and Harbors Act Section 10 navigability determination. s A stand-alone TNW determination is completed independently of a request for an AJD. A stand-alone TNW determination is conducted for a specific segment ofriver or stream or other type of waterbody, such as a lake, where upstream or downstream limits or lake borders are established. A stand-alone TNW determination should be completed following applicable guidance and should NOT be documented on the AJD Form. Page 2 of 2 Form Version 10 June 2020 updated U.S. ARMY CORPS OF ENGINEERS REGULATORY PROGRAM APPROVED JURISDICTIONAL DETERMINATION FORM (INTERIM) NAVIGABLE WATERS PROTECTION RULE Tributaries a 2 waters): (a)(2) Name (a)(2) Size (a)(2) Criteria Rationale fora 2 Determination surface water flow directly or indirectly to an (a)(1) water in a typical year. Lakes and ponds, and impoundments of jurisdictional waters ((a)(3 waters): a 3 Name a 3 Size a 3 Criteria Rationale fora 3 Determination Adjacent wetlands ((a)(4) waters): (a)(4) Name (a)(4) Size (a)(4) Criteria Rationale fora 4 Determination N/A. N/A. I N/A. N/H. N/A. D. Excluded Waters or Features Excluded waters ((b)(1) - (b)(12)):4 Exclusion Name Exclusion Size Exclusions Rationale for Exclusion Determination NJb -0.17 acre(s) (b)(1) Non- Non -Jurisdictional Basin Wetland NJW-1 is adjacent wetland. surrounded by uplands with no direct hydrologic connection to downstream (a)(1)-(a)(4) waters. NJD-1 -217 Linear (b)(5) Ditch that is Ditch NJD-1 is non -jurisdictional according to feet not an (a)(1) or field observations, county soils surveys, and (a)(2) water, and USGS topographic maps. It is constructed in those portions of non-hydric soils and is not a relocated tributary a ditch or stream. constructed in an (a)(4) water that do not satisfy the conditions of (c)(1). NJD-2 -53 linear (b)(5) Ditch that is Ditch NJD-2 is non -jurisdictional according to feet not an (a)(1) or field observations, county soils surveys, and (a)(2) water, and USGS topographic maps. It is constructed in those portions of non-hydric soils and is not a relocated tributary a ditch or stream. constructed in an (a)(4) water that do not satisfy the conditions of c 1. NJD-3 -610 Linear (b)(5) Ditch that is Ditch NJD-3 is non -jurisdictional according to feet not an (a)(1) or field observations, county soils surveys, and 4 Some excluded waters, such as (b)(2) and (b)(4), may not be specifically identified on the AJD form unless a requestor specifically asks a Corps district to do so. Corps districts may, in case -by -case instances, choose to identify some or all of these waters within the review area. 5 Because of the broad nature of the (b)(1) exclusion and in an effort to collect data on specific types of waters that would be covered by the (b)(1) exclusion, four sub- categories of (b)(1) exclusions were administratively created for the purposes of the AJD Form. These four sub -categories are not new exclusions, but are simply administrative distinctions and remain (b)(1) exclusions as defined by the NWPR Page 2 of 2 Form Version 10 June 2020 updated U.S. ARMY CORPS OF ENGINEERS REGULATORY PROGRAM APPROVED JURISDICTIONAL DETERMINATION FORM (INTERIM) NAVIGABLE WATERS PROTECTION RULE Excluded waters b 1 — b 12 :4 Exclusion Name Exclusion Size Exclusions Rationale for Exclusion Determination (a)(2) water, and USGS topographic maps. It is constructed in those portions of non-hydric soils and is not a relocated tributary a ditch or stream. constructed in an (a)(4) water that do not satisfy the conditions of c 1. III. SUPPORTING INFORMATION A. Select/enter all resources that were used to aid in this determination and attach data/maps to this document and/or references/citations in the administrative record, as appropriate. ❑x Information submitted by, or on behalf of, the applicant/consultant: Title(s) and date(s) This information Select. sufficient for purposes of this AJD. Rationale: N/A or describe rationale for insufficiency (including partial insufficiency). ❑ Data sheets prepared by the Corps: Title(s) and/or date(s). ❑ Photographs: Title(s) and/or date(s). ❑x Corps site visit(s) conducted on: 1/22/2019 ❑ Previous Jurisdictional Determinations (AJDs or PJDs): ORM Number(s) and date(s). ❑x Antecedent Precipitation Tool: provide detailed discussion in Section 111.B. ❑x USDA NRCS Soil Survey: Title(s) and/or date(s). ❑ USFWS NWI maps: Title(s) and/or date(s). ❑x USGS topographic maps: Title(s) and/or date(s). Other data sources used to aid in this determination: Data Source select Name and/or date and other relevant information USGS Sources New Hanover County Topographic Map USDA Sources NRCS New Hanover County WebSoil GIS Data NOAA Sources N/A. USACE Sources N/A. State/Local/Tribal Sources N/A. Other Sources NC Emergency Management 2014 QL2 LiDAR Other Sources 2016 NC One Map Aerial Photography B. Typical year assessment(s): According to the Antecedent Precipitation vs Normal Range based on NOAA's Daily Global Historical Climatology Network, the project area conditions were normal at the time of the field work. C. Additional comments to support AJD: N/A or provide additional discussion as appropriate. Page 2 of 2 Form Version 10 June 2020 updated L:\WETLANDS\2019 WETLANDS FILES\LMG19.244 --- Porters Neck Lots, D Logan\delineation task\maps Boundaries are approximate and not meant to be absolute. Map Source: 2016 NC One Map CAPITO•RACHEL• C PIMMCHELANNA 53627679 AN N.1536276790 Dace. 2021.01.0516.1526-W 200 400 800 Feet Scale applies to 11X17" print.