HomeMy WebLinkAbout20200402 Ver 1_Line 99 ESC Details_20210201GENERAL NOTES 1. THE CONTRACTOR SHALL VISIT THE SITE TO INFORM AND SATISFY HIMSELF OF ALL EXISTING CONDITIONS PRIOR TO SUBMITTING HIS BID. ANY DISCREPANCY BETWEEN THE SITE AND THOSE CONDITIONS REPRESENTED ON THE DRAWINGS SHALL BE BROUGHT TO THE ATTENTION OF THE OWNER AND THE ENGINEER IMMEDIATELY. 2. ALL EXISTING UTILITIES AND/OR STRUCTURES INDICATED ON THE DRAWINGS ARE BASED ON A FIELD SURVEY. THE EXISTING IMPROVEMENTS SHOWN ON THESE DRAWINGS MAY NOT BE ALL-INCLUSIVE. THE CONTRACTOR SHALL TAKE PRECAUTIONARY MEASURES TO PROTECT THE UTILITY LINES AND OTHER IMPROVEMENTS SHOWN HEREON AND ANY OTHER EXISTING LINES NOT OF RECORD OR NOT SHOWN ON THESE PLANS, UNLESS THEY ARE SHOWN TO BE REMOVED OR RELOCATED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAKING ARRANGEMENTS FOR THE PROTECTION, RELOCATION OR REMOVAL OF CONFLICTING EXISTING UTILITIES AND SHALL BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES RESULTING FROM HIS FAILURE TO LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. BEFORE BEGINNING WORK THE CONTRACTOR SHALL CONTACT THE N.C. ONE -CALL CENTER AT 811 TO HAVE ALL EXISTING UTILITIES LOCATED. 3. THE LOCATION AND ELEVATIONS OF IMPROVEMENTS, TO BE MET OR CROSSED BY WORK, SHALL BE CONFIRMED BY FIELD MEASUREMENT, SUFFICIENTLY AHEAD OF CONSTRUCTION TO PERMIT REVISIONS TO THE PLANS, IF REVISIONS ARE NECESSARY DUE TO ACTUAL LOCATION OF EXISTING UTILITIES. 4. THE CONTRACTOR SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY. THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS. THE CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD THE OWNER AND THE ENGINEER HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED IN CONNECTION WITH PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING FOR LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE OWNER OR THE ENGINEER. 5. THE CONTRACTOR SHALL VERIFY THAT ALL REQUIRED PERMITS AND APPROVALS HAVE BEEN OBTAINED FROM THE APPROPRIATE AUTHORITIES BEFORE BEGINNING WORK ON THE PROJECT. APPROVED PLANS, APPROVAL LETTERS OR OTHER CERTIFICATES OF APPROVAL SHALL BE MAINTAINED ON THE SITE AT ALL TIMES DURING CONSTRUCTION. 6. CLEARING AND GRUBBING DEBRIS SHALL BE DISPOSED OF OFFSITE IN A PERMITTED LANDFILL FACILITY. DISPOSAL ON THE PIPELINE EASEMENT OR IN OTHER LOCATIONS IS NOT ALLOWED. 7. GAS MAIN INSTALLATION SHALL BE BY OPEN CUT UNLESS SHOWN OTHERWISE ON THE DRAWINGS. THE ENTIRE WIDTH OF THE RIGHTS -OF -WAY, EASEMENTS AND WORK SPACES SHALL BE CLEARED AND GRUBBED UNLESS SHOWN OTHERWISE ON THE DRAWINGS. ALL CLEARING DEBRIS - STUMPS, TREES, TOPS, BRUSH, ETC. SHALL BE REMOVED FROM THE SITE AND DISPOSED OF IN A LEGAL MANNER. 8. AREAS SHOWN AS ' TREE CUTTING ONLY - NO GRUBBING' SHALL BE CUT AT NO MORE THAN 12 INCHES ABOVE THE GROUND. STUMPS SHALL BE LEFT IN PLACE. LOGGING MATS OR OTHER SIMILAR MEASURES SHALL BE USED AS NEEDED TO MINIMIZE GROUND DISTURBANCE. ALL CLEARING DEBRIS - TREE TOPS, BRUSH, ETC. SHALL BE REMOVED FROM THE SITE AND DISPOSED OF IN A LEGAL MANNER. 9. SEE PLANS BY NORTHSTAR ENERGY SERVICES FOR PIPING LAYOUT AND INSTALLATION REQUIREMENTS ALSO FENCING AND GATE DETAILS. 10.SURFACE MATERIAL FOR STATION AREA SHALL BE 6" THICK #57 WASHED STONE. STONE SHALL BE PLACED ON NON -WOVEN GEOTEXTILE FABRIC. 11.IF FENCING REMOVAL AND REPLACEMENT IS REQUIRED FOR INSTALLATION OF THE GAS MAIN, THE CONTRACTOR SHALL PROTECT REMOVED FENCING MATERIAL DURING CONSTRUCTION. ANY FENCING MATERIAL THAT IS DAMAGED SHALL BE REPLACED AT THE CONTRACTORS EXPENSE WITH NEW MATERIAL OF LIKE SIZE, GAUGE, FINISH, ETC. AS THE EXISTING MATERIAL. EXISTING FENCE POSTS THAT ARE SET IN CONCRETE SHALL BE REPLACED WITH NEW POSTS AS DETAILED. DISPOSAL OF DAMAGED MATERIALS IS THE RESPONSIBILITY OF THE CONTRACTOR. NCBEES CERT. NO.: C-1347 \A CAR PINY � AYALI NO TOR. GIN •... • �Q'N FA L Tv ♦♦ I� PROFESSIONAL ENG/ARCHSTAMP EROSION CONTROL NOTES 1. THE CONTRACTOR SHALL CONFIRM THAT ALL REQUIRED PERMITS AND APPROVALS HAVE BEEN OBTAINED FROM THE APPROPRIATE AUTHORITIES PRIOR TO BEGINNING ANY WORK ON THE PROJECT. THE APPROVED PLANS AND THE CERTIFICATE OF PLAN APPROVAL SHALL BE MAINTAINED ON THE SITE AT ALL TIMES. 2. PIEDMONT NATURAL GAS WILL HAVE A FULL-TIME EROSION CONTROL INSPECTOR ONSITE. THE RESPONSIBILITY OF THE PNG INSPECTOR IS TO ENSURE COMPLIANCE WITH THE APPROVED PLANS. THE PNG INSPECTOR DOES NOT HAVE THE AUTHORITY TO CHANGE THE REQUIREMENTS OR SCOPE OF THE EROSION CONTROL WORK ON THE PROJECT. IF PERMIT IS REQUIRED APPROVAL AUTHORITY FOR EROSION CONTROL PLAN CHANGES LIES SOLELY WITH NCDEQ, IF NO PERMIT IS REQUIRED APPROVAL AUTHORITY FOR EROSION CONTROL PLAN CHANGES LIES SOLELY WITH THE ENGINEER. 3. AN ONSITE PRE -CONSTRUCTION MEETING WITH THE CONTRACTOR, THE PNG EROSION CONTROL INSPECTOR, NCDEQ EROSION CONTROL INSPECTOR IF PERMIT IS REQUIRED AND THE OWNER'S REPRESENTATIVE WILL BE REQUIRED PRIOR TO BEGINNING WORK. 4. THE NORTH CAROLINA SEDIMENTATION POLLUTION CONTROL PROGRAM IS PERFORMANCE ORIENTED, REQUIRING PROTECTION OF NATURAL RESOURCES AND ADJOINING PROPERTIES. THE EROSION AND SEDIMENT CONTROL MEASURES AND DEVICES SHOWN ON THE PLANS ARE INTENDED AS A GUIDE. IF THESE MEASURES DO NOT CONTROL EROSION AND SEDIMENT AS INTENDED, ADDITIONAL MEASURES SHALL BE ADDED AS NEEDED, OR AS INSTRUCTED BY THE EROSION CONTROL INSPECTOR. 5. THE CONTRACTOR IS RESPONSIBLE FOR FOLLOWING THE SEQUENCE OF CONSTRUCTION. 6. INSTALL AND MAINTAIN ALL EROSION AND SEDIMENT CONTROL MEASURES AND DEVICES AS SHOWN ON THE PLANS. 7. THE LIMITS OF DISTURBANCE AND CLEARING LIMITS, IF APPLICABLE, SHALL FOLLOW THE EASEMENT LINES UNLESS NOTED OTHERWISE ON THE PLANS. SILT FENCE SHALL BE PLACED ON THE LIMITS OF DISTURBANCE LINE, BUT MAY BE SHOWN OFFLINE ON THE PLANS FOR CLARITY. 8. SILT FENCE OUTLET DEVICES ARE SHOWN AT THE LOW SPOTS BASED ON THE ELEVATION CONTOURS. SHIFT THESE OUTLET DEVICES AS NEEDED IN THE FIELD TO LOCATE THEM IN THE ACTUAL LOW SPOTS. 9. ALL DISTURBED AREAS SHALL BE SEEDED AND MULCHED IN ACCORDANCE WITH THE SEEDING SCHEDULE WITH LIMITATIONS AS FOLLOWS. GIVEN THE NATURE OF THE PROJECT, TEMPORARY AND PERMANENT SEEDING MIXTURES HAVE BEEN COMBINED AND SHALL BE APPLIED IN A SINGLE OPERATION. 10. ALL EROSION AND SEDIMENT CONTROL DEVICES SHALL REMAIN IN PLACE UNTIL ALL DISTURBED AREAS ARE REVEGETATED AND THE EROSION CONTROL INSPECTOR APPROVES THE REMOVAL OF THE DEVICES. ALL TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES SHALL BE REMOVED UPON APPROVAL BY THE EROSION CONTROL INSPECTOR. 11. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLING ALL MEASURES AND DEVICES SHOWN ON THE PLANS, AND FOR COMPLYING WITH THE PROVISIONS AND CONDITIONS OF THE PROJECT SPECIFIC EROSION CONTROL PERMIT. GRADING NOTES 1. ALL GRADING ACTIVITIES SHALL BE CONTAINED WITHIN THE LIMITS OF DISTURBANCE SHOWN ON THE PLANS. 2. ALL AREAS TO BE GRADED SHALL BE STRIPPED TO REMOVE ALL TOPSOIL, STUMPS, ROOTS, ORGANICS AND OTHER UNSUITABLE MATERIAL. AFTER STRIPPING, EXPOSED SUBGRADE IN BUILDING AND PAVEMENT AREAS TO BE FILLED SHALL BE PROOF ROLLED IN THE PRESENCE OF THE GEOTECHNICAL ENGINEER. IF UNSTABLE AREAS ARE ENCOUNTERED THAT ARE THE RESULT OF WET SOIL CONDITIONS, REASONABLE EFFORT SHALL BE MADE TO MECHANICALLY DRY THOSE SOILS. IF UNSUITABLE SOILS ARE ENCOUNTERED THEY SHALL BE UNDERCUT TO FIRM MATERIALS AS DIRECTED BY THE GEOTECHNICAL ENGINEER, AND BACKFILLED WITH CONTROLLED FILL. REASONABLE DRYING EFFORT AND UNSUITABLE SOILS ARE DEFINED IN THE EARTHWORK SPECIFICATIONS. 3. CONTROLLED FILL SHALL BE BENCHED INTO THE SIDES OF SLOPES STEEPER THAN 4:1 (H:V) TO IMPROVE THE BOND BETWEEN THE FILL AND THE UNDISTURBED SOIL. EACH BENCH CUT INTO A SLOPE SHOULD BE AT LEAST 12 INCHES BUT NOT MORE THAN 60 INCHES HIGH. THE BENCHES SHALL BE WIDE ENOUGH TO ALLOW OPERATION OF THE COMPACTION EQUIPMENT WITHIN THE BENCHED AREA SO THAT FILL CAN BE PLACED ON THE BENCH AND OVER THE REST OF THE FILL IN CONTINUOUS LAYERS. 4. FILL SLOPES SHALL BE CONSTRUCTED BY PLACING CONTROLLED FILL IN HORIZONTAL LIFTS WHICH EXTEND SLIGHTLY BEYOND THE SLOPE FACE. EACH LIFT OF FILL SHALL BE COMPACTED TO THE SPECIFIED MINIMUM DENSITY BEFORE PLACING THE NEXT LIFT. THE COMPACTION EQUIPMENT SHOULD TRAVEL PARALLEL TO THE SLOPE FACE TO ENSURE PROPER COMPACTION. ONCE THE SLOPE IS COMPLETED IT SHALL BE TRACKED WITH A DOZER TO MINIMIZE THE POTENTIAL FOR EROSION. 5. CONTROLLED FILL FOR STRUCTURAL AREAS SHALL BE COMPACTED TO 95% OF THE STANDARD PROCTOR MAXIMUM DRY DENSITY (ASTM - D698), UNLESS OTHERWISE NOTED ON THE PLANS, IN THE SPECIFICATIONS, OR GEOTECHNICAL REPORT. FILL UNDER BUILDINGS AND PAVED AREA SHALL BE COMPACTED TO 98% STANDARD PROCTOR IN THE TOP 12" OF SUBGRADE. COMPACTION TESTS SHALL BE TAKEN TO SUBGRADE AND MINIMUM 15 FEET BEYOND LIMITS OF PAVED AREAS OR BUILDING FOOTPRINTS AREAS. FREQUENCY OF COMPACTION TESTING SHALL BE DONE IN ACCORDANCE WITH THE WRITTEN SPECIFICATIONS. 6. PERMANENT CUT AND FILL SLOPES SHOWN TO RECEIVE EROSION CONTROL MATTING SHALL BE TRACKED WITH A DOZER PRIOR TO INSTALLING THE MATTING. STORM DRAINAGE NOTES NOTES 1. ALL STORM DRAINAGE CONSTRUCTION SHALL CONFORM TO NCDOT STANDARDS AND SPECIFICATIONS. 2. ALL STORM SEWER PIPE SHALL BE REINFORCED CONCRETE PIPE (RCP) (15" MIN. DIAMETER) UNLESS OTHERWISE NOTED. RCP SHALL BE MINIMUM CLASS III WITH BUTYL RUBBER MASTIC JOINTS UNLESS NOTED OTHERWISE ON THE PLANS. 3. HIGH DENSITY POLYETHYLENE (HDPE): PIPE AND FITTINGS SHALL COMPLY WITH THE LATEST EDITIONS OF AASHTO M252 (FOR TUBING), AND M294 (FOR PIPE). PIPE AND FITTINGS SHALL BE DOUBLE WALL WITH OUTER CORRUGATIONS AND SMOOTH INTERIOR. PIPE AND FITTINGS SHALL HAVE WATER TIGHT RUBBER GASKET JOINTS. PIPE UNDER PAVEMENTS SHALL BE BEDDED AND ENCASED WITH #57 OR #67 WASHED STONE. TRENCH BACKFILL SHALL COMPLY WITH THE REQUIREMENTS FOR CONTROLLED FILL. HAUNCHING AND BACKFILL MATERIAL FOR PIPE OUTSIDE TRAFFIC AREAS MAY BE SOIL THAT IS EXCAVATED FROM THE PIPE TRENCH. 4. ALL RIP RAP FOR CHANNEL LINERS AND INLET AND OUTLET PROTECTION SHALL BE INSTALLED WITH A WASHED STONE BEDDING LAYER AND GEOTEXTILE FABRIC UNDERLINER AS DETAILED. RIP RAP SHALL BE INSTALLED SUCH THAT THE FINISHED SURFACE OF THE LINER IS AT FINISHED GRADE. 5. THE CONTRACTOR SHALL REPAIR AND/OR REPLACE ANY EXISTING STORM DRAINAGE LINES AND/OR STRUCTURES THAT ARE DAMAGED DURING THE CONSTRUCTION OF THIS PROJECT. ALL REPAIR MEASURES ARE TO BE AT THE CONTRACTORS EXPENSE AND SHALL MEET THE STANDARDS AND SPECIFICATIONS AS NOTED WITHIN THE STORM DRAINAGE NOTES ON THIS SHEET. PIPE AND STRUCTURES THAT ARE REPLACED SHALL BE REPLACED WITH SAME TYPE AS EXISTING. MODIFICATIONS AND PERFORMANCE RESERVATIONS FROM NCDEQ - DEMLR - WASHINGTON REGIONAL OFFICE 1. THE DEVELOPER IS RESPONSIBLE FOR THE CONTROL OF SEDIMENT ON -SITE. IF THE APPROVED EROSION AND SEDIMENTATION CONTROL MEASURES PROVE INSUFFICIENT, THE DEVELOPER MUST TAKE THOSE ADDITIONAL STEPS NECESSARY TO STOP SEDIMENT FROM LEAVING THIS SITE (NCGS 113A-57(3)). EACH SEDIMENT STORAGE DEVICE MUST BE INSPECTED AFTER EACH STORM EVENT (NCGS 113A-54.1(E)). MAINTENANCE AND/OR CLEAN OUT IS NECESSARY ANYTIME THE DEVICE IS AT 50% CAPACITY. ALL SEDIMENT STORAGE MEASURES WILL REMAIN ON SITE AND FUNCTIONAL UNTIL ALL GRADING AND FINAL LANDSCAPING OF THE PROJECT IS COMPLETE (15A NCAC 04B .0113). 2. ALL EXISTING DITCHES ON THIS PROJECT SITE ARE ASSUMED TO BE LEFT UNDISTURBED BY THE PROPOSED DEVELOPMENT UNLESS OTHERWISE NOTED. THE REMOVAL OF VEGETATION WITHIN ANY EXISTING DITCH OR CHANNEL IS PROHIBITED UNLESS THE DITCH OR CHANNEL IS TO BE REGRADED WITH SIDE SLOPES OF 2 HORIZONTAL TO 1 VERTICAL OR LESS STEEP (15A NCAC 04B .0124(D)). BANK SLOPES MAY BE MOWED, BUT STRIPPING OF VEGETATION IS CONSIDERED NEW EARTH WORK AND IS SUBJECT TO THE SAME EROSION CONTROL REQUIREMENTS AS NEW DITCHES (NCGS 113A-52(6)). 3. THE DEVELOPER IS RESPONSIBLE FOR OBTAINING ALL PERMITS AND APPROVALS NECESSARY FOR THE DEVELOPMENT OF THIS PROJECT PRIOR TO THE COMMENCEMENT OF THIS LAND DISTURBING ACTIVITY. THIS COULD INCLUDE OUR AGENCY'S STORMWATER REGULATIONS AND THE DIVISION OF WATER RESOURCES' ENFORCEMENT REQUIREMENTS WITHIN SECTION 401 OF THE CLEAN WATER ACT, THE U.S. ARMY CORPS OF ENGINEERS' JURISDICTION OF SECTION 404 OF THE CLEAN WATER ACT, THE DIVISION OF COASTAL MANAGEMENT'S CAMA REQUIREMENTS, THE DIVISION OF SOLID WASTE MANAGEMENT'S LANDFILL REGULATIONS, THE ENVIRONMENTAL PROTECTION AGENCY AND/OR THE U.S. ARMY CORPS OF ENGINEERS' JURISDICTION OF THE CLEAN WATER ACT, LOCAL COUNTY OR MUNICIPALITIES' ORDINANCES, OR OTHERS THAT MAY BE REQUIRED. THIS APPROVAL CANNOT SUPERSEDE ANY OTHER PERMIT OR APPROVAL. 4. ADEQUATE AND APPROPRIATE MEASURES MUST BE PROPERLY INSTALLED DOWNSTREAM, WITHIN THE LIMITS OF DISTURBANCE, OF ANY LAND DISTURBING ACTIVITY TO PREVENT SEDIMENT FROM LEAVING THE LIMITS OF DISTURBANCE, ENTERING EXISTING DRAINAGE SYSTEMS, IMPACTING AN ON -SITE NATURAL WATERCOURSE OR ADJOINING PROPERTY. (NCGS 113A-57) WETLANDS / STREAMS / CAMA / BUFFER NOTES LAUNCHER PROPERTIES INVOLVED IN THIS PROJECT CONTAIN WETLANDS / STREAMS AND/OR STREAM BUFFERS THAT ARE UNDER THE JURISDICTION OF THE US ARMY CORPS OF ENGINEERS AND THE NC DEPARTMENT OF ENVIRONMENTAL QUALITY. THIS PROJECT WILL NOT INVOLVE IMPACTS TO THESE JURISDICTIONAL AREAS. THE CONTRACTOR SHALL FAMILIARIZE HIMSELF WITH THE LOCATIONS OF THESE JURISDICTIONAL AREAS AS WELL AS THE IMPACT AREAS. PERMITS ARE NOT REQUIRED AS THERE ARE NO IMPACTS TO THE JURISDICTIONAL AREAS. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL HAVE THESE JURISDICTIONAL AREAS STAKED BY A PROFESSIONAL LAND SURVEYOR TO INSURE THAT NO CONSTRUCTION OR IMPACTS EXCEEDS THESE LIMITS WHERE WORK MAY COMMENCE. =fl M\ /= PROPERTIES INVOLVED IN THIS PROJECT DO NOT CONTAIN WETLANDS / STREAMS AND STREAM BUFFERS THAT ARE UNDER THE JURISDICTION OF THE US ARMY CORPS OF ENGINEERS AND THE NC DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES. THIS PROJECT WILL NOT INVOLVE IMPACTS TO ANY JURISDICTIONAL AREAS. STIMMEL ASSOCIATES P.A. 601 N. TRADE STREET, SUITE 200 WINSTON-SALEM. NC, 27101 338.723.1067 STIMMEL PROJECT # 20-127 PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 REF. DWG(S) DATE REVISION(S) DESCRIPTION BY CHK JAPPD DESCRIPTION APPROVALS DUKEr6111 Piedmont ENERGY:: � Natural Gas COPYRIGHT 2018 LINE 99 RECLAMATION GRADING AND EC NOTES L E LAND, NC Lumberton Resource Center, Lumberton North Carolina SHEET(S) 4 OF TBD DWG SCALE N/A AREA CODE 2730 DATE INITIALS REGIONAL ENGINEER DWG DATE 04/1012019 SUPERSEDED ACCOUNT NUMBER 10700 PROJECT NUMBER 0227663 DATE INITIALS MGR TECH REC &STD DRAWING NUMBER PNG-C-026-0001194 REVISION A DRAWING BY DKJ STATION ID DATE 05/01/2020 INITIALS JNT PRINCIPAL ENGINEER CHECKER INITIALS JNT DISCIPLINE / RESOURCE CENTER / LINE NUMBER NCBEES CERT. NO.: C-1347 \A CAR PINY � AWI .NOT9OR. GQN I !V141 Q'N PROFESSIONAL ENG/ARCHSTAMP SEEDING / WOODY SPECIES SCHEDULE -WETLAND & RIPARIAN BUFFER AREAS WETLAND AND BUFFER AREAS SHALL BE REVEGETATED USING SPECIAL SEED MIXTURES AND WOODY VEGETATION AS SPECIFIED BELOW WETLANDS - THE NATIVE SEED MIX SHOWN IN TABLE 1 SHALL BE USED FOR RESTORATION OF WETLAND AREAS. THIS SEED MIX SHALL BE USED TO A POINT 5 FEET LANDWARD OF WETLAND AREAS. ZONE 1 RIPARIAN BUFFERS - THE NATIVE SEED MIX SHOWN IN TABLE 2 SHALL BE USED FOR RESTORATION OF ZONE 1 RIPARIAN BUFFER AREAS. THIS SEED MIX SHALL BE USED TO A POINT 5 FEET LANDWARD OF RIPARIAN BUFFER AREAS. ZONE 1 BUFFERS SHOWN AS 'REPLANT AREA' ON THE PLANS SHALL ALSO BE REPLANTED USING AN APPROPRIATE MIX OF CONTAINERIZED SPECIES FROM TABLE 5. STREAM BANKS - THE NATIVE SEED MIX SHOWN IN TABLE 2 SHALL BE USED FOR RESTORATION OF STREAM BANKS. ADDITIONALLY, STREAM BANKS SHALL BE STABILIZED WITH COIR MATTING AND REVEGETATED USING NATIVE WOODY SPECIES. WOODY SPECIES PLANTING DURING THE DORMANT SEASON SHALL CONSIST OF A COMBINATION OF LIVE STAKE AND BARE ROOT SPECIES FROM TABLE 4. WOODY SPECIES PLANTING DURING THE GROWING SEASON SHALL CONSIST OF PLANTINGS FROM TABLE 4 AND SHALL ALSO INCLUDE AND APPROPRIATE MIX OF CONTAINERIZED SPECIES FROM TABLE 5. SEE RESTORATION PLAN PREPARED BY S&ME FOR ADDITIONAL REQUIREMENTS FOR WETLAND AND RIPARIAN STREAM BANK & BUFFER AREAS. SUBSTITUTIONS TO THE SPECIES IDENTIFIED IN TABLES 3 AND 4 MAY BE MADE BASED ON AVAILABILITY AND APPROVAL OF S&ME. TABLE 1: WETLAND AREA SEEDING MIXTURES SEED MIXTURES SEEDING RATES RIVERBANK WILD RYE 5 LBS./ACRE CREEPING BENTGRASS 3.75 LBS./ACRE FOX SEDGE 3 LBS./ACRE SWITCHGRASS 3.75 LBS./ACRE FOWL BLUEGRASS 3.75 LBS./ACRE DEER TONGUE 2 LBS./ACRE BIDENS 1 LBS./ACRE SOFT RUSH 1 LBS./ACRE CALICO ASTER .75 LBS./ACRE DUCK POTATO .5 LBS./ACRE LIZARDS TAIL .5 LBS./ACRE PERENNIAL RYE GRASS 15 LBS./ACRE GERMAN MILLET 15 LBS./ACRE WETLAND SEED MIX TO BE APPLIED TO ALL WETLAND AREAS EXTENDING 5 FEET LANDWARD. DO NOT APPLY TO AREAS OF STANDING WATER. APPLICATION RATE OF MIXTURE ABOVE SHALL BE 55 LBS./ACRE. SEE RESTORATION PLAN PREPARED BY S&ME FOR ADDITIONAL REQUIREMENTS FOR WETLAND AREAS. TABLE 2: RIPARIAN BUFFER AND STREAM BANK SEEDING MIXTURE SEED MIXTURES SEEDING RATES VIRGINIA WILD RYE 3.75 LBS./ACRE SWITCHGRASS 3.75 LBS./ACRE CREEPING BENTGRASS 2.5 LBS./ACRE BLACK-EYED SUSAN 2.5 LBS./ACRE LANCE LEAF TICKSEED 2.5 LBS./ACRE DEER TONGUE 2.5 LBS./ACRE BIG BLUESTEM 1.25 LBS./ACRE SOFT RUSH 1.25 LBS./ACRE AWNED BARNYARD GRASS 1.25 LBS./ACRE LITTLE BLUESTEM 1.25 LBS./ACRE INDIAN GRASS 1.25 LBS./ACRE GAMMA GRASS 1.25 LBS./ACRE PERENNIAL RYE GRASS 15 LBS./ACRE GERMAN MILLET 15 LBS./ACRE RIPARIAN SEED MIX TO BE APPLIED TO ALL DISTURBED STREAM BANKS, EXTENDING FIVE FEET LANDWARD. APPLICATION RATE OF MIXTURE ABOVE SHALL BE 55 LBS./ACRE. SEE RESTORATION PLAN PREPARED BY S&ME FOR ADDITIONAL REQUIREMENTS FOR RIPARIAN STREAM BUFFER AREAS. TABLE 4: LIVE STAKE AND BARE ROOT SPECIES* COMMON NAME PLANT SPACING SILKY DOGWOOD 2 FEET ON CENTER NINEBARK 3 FEET ON CENTER CAROLINA WILLOW 1 FOOT ON CENTER BLACK WILLOW 1 FOOT ON CENTER SILKY WILLOW 2 FEET ON CENTER ELDERBERRY 3 FEET ON CENTER CORAL BERRY 2 FEET ON CENTER *FOR USE WHEN PLANTING DURING THE DORMANT SEASON. SELECT AT LEAST THREE OF THE LISTED SPECIES. TABLE 5: CONTAINERIZED SPECIES* COMMON NAME PLANT SPACING TAG ALDER 5 FEET ON CENTER RED CHOKEBERRY 5 FEET ON CENTER BEAUTYBERRY 5 FEET ON CENTER IRONWOOD 5 FEET ON CENTER REDBUD 5 FEET ON CENTER SILKY DOGWOOD 5 FEET ON CENTER CAROLINA ASH 5 FEET ON CENTER SPICEBUSH 5 FEET ON CENTER WINTERBERRY 5 FEET ON CENTER REDBAY 5 FEET ON CENTER ELDERBERRY 5 FEET ON CENTER *FOR USE WHEN PLANTING DURING THE GROWING SEASON. SELECT AT LEAST TWO OF THE LISTED SPECIES. EXCEPTION TO FERTILIZER RECOMMENDATION: STREAM BANKS, STREAM BUFFERS AND WETLANDS SHALL NOT BE FERTILIZED. AFTER SEEDING, THE AREA SHALL BE ROLLED OR CULTIPACKED TO INSURE THAT THE SEED IS PRESSED INTO CONTACT WITH THE SOIL SURFACE. ALL SEEDED AREAS SHALL BE MULCHED WITH STRAW MULCH AT A RATE OF 4,000 LBS./ACRE. STRAW MULCH SHALL BE ANCHORED BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. NORTH CAROLINA SUPPLIERS OF NATIVE SEED AND PLANT MATERIAL: MELLOW MARSH FARM 1312 WOODY STORE ROAD SILER CITY, NC 27344 (919) 742-1200 (919) 742-1280 (FAX) NATIVES 550 EAST WESTINGHOUSE BLVD CHARLOTTE, NC 28273 (688) 527-1177 PLANTS@PLANTNATIVE.NET SEEDING SCHEDULE - NON-WETLAND/NON-RIPARIAN BUFFER AREAS GIVEN THE NATURE OF THE PROJECT, TEMPORARY AND PERMANENT SEEDING MIXTURES HAVE BEEN COMBINED AND SHALL BE APPLIED IN A SINGLE APPLICATION. SPECIAL SEEDING MIXTURES ARE REQUIRED FOR DISTURBANCES WITHIN NCDOT RIGHT-OF-WAY, RIPARIAN STREAM BANKS, AND FOR WETLAND AREAS. USE THE GENERAL SEEDING MIXTURE FOR ALL OTHER AREAS. AREAS SHOWN ON THE PLANS AS "PERMANENT CONVERSION AREA" SHALL BE SEEDED WITH THE GENERAL SEEDING MIXTURE. SOIL AMENDMENTS: AGRICULTURAL LIMESTONE: 4,000 LBS./ACRE FERTILIZER: 10-10-10 - 1,000 LBS./ACRE LIME AND FERTILIZER SHALL BE DISKED INTO THE SOIL SURFACE TO A MINIMUM DEPTH OF 4 INCHES. GENERAL SEEDING MIXTURES: SEEDING DATES SEED MIXTURES SEEDING RATES DEC. 1 - APR. 15 RYE (GRAIN) 120 LBS./ACRE TALL FESCUE 100 LBS./ACRE APR. 15 -AUG. 15 GERMAN MILLET 50 LBS./ACRE TALL FESCUE 100 LBS./ACRE AUG. 15 - DEC. 30 RYE (GRAIN) 120 LBS./ACRE TALL FESCUE 100 LBS./ACRE NCDOT SEEDING MIXTURES: SEEDING DATES SEED MIXTURES SEEDING RATES NOV. 1 - APR. 30 TALL FESCUE 75 LBS./ACRE WINTER PENSACOLA BAHIA GRASS 50 LBS./ACRE CENTIPEDE GRASS 5 LBS./ACRE MAY 1 - OCT. 31 TALL FESCUE 50 LBS./ACRE SUMMER PENSACOLA BAHIA GRASS 75 LBS./ACRE CENTIPEDE GRASS 5 LBS./ACRE THE SOIL AMENDMENT AND SEEDING SCHEDULES SHOWN ABOVE SHOULD BE REGARDED AS GENERAL AND MINIMUM, AND IS INTENDED FOR SOIL STABILIZATION IN LOW MAINTENANCE, NON -LAWN AREAS. SPECIFIC LOCAL SOIL CONDITIONS MAY REQUIRE DIFFERENT SOIL AMENDMENT APPLICATION RATES AND SEED MIXTURES TO OBTAIN ACCEPTABLE VEGETATIVE COVER. MODIFICATION OF THE ABOVE RECOMMENDED SOIL AMENDMENTS AND SEED MIXTURES MAY BE MADE WITH THE ADVICE OF A LOCAL SEEDING PROFESSIONAL WITHOUT AUTHORIZATION FROM THE ENGINEER. EXCEPTION TO FERTILIZER RECOMMENDATION: STREAM BANKS, STREAM BUFFERS AND WETLANDS SHALL NOT BE FERTILIZED. AFTER SEEDING, THE AREA SHALL BE ROLLED OR CULTIPACKED TO INSURE THAT THE SEED IS PRESSED INTO CONTACT WITH THE SOIL SURFACE. ALL SEEDED AREAS SHALL BE MULCHED WITH STRAW MULCH AT A RATE OF 4,000 LBS./ACRE. STRAW MULCH SHALL BE ANCHORED BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. LAWN AREAS: IF THE PROJECT INVOLVES DISTURBANCE TO MAINTAINED LAWN AREAS, THE LAWN SHALL BE RESTORED TO THE ORIGINAL CONDITION BY WHATEVER MEANS NECESSARY INCLUDING SODDING. GRASS TYPES USED SHALL BE THE SAME AS THE EXISTING LAWN. STEEP SLOPE - SEEDING SPECIFICATION: IMMEDIATELY AFTER SLOPE IS CUT TO GRADE, CONTRACTOR SHALL HYDROSEED ALL SLOPES 2:1 OR STEEPER WITH THE FOLLOWING SEEDING BLEND, PLUS FERTILIZER AND SOIL AMENDMENTS, AND MULCH MIXTURE. HYDROSEED & MULCH SHALL BE DONE IN MULTIPLE APPLICATIONS AS SPECIFIED BELOW. SEEDING DATES FOR THE RECOMMENDED BLEND LISTED BELOW ARE NOVEMBER - APRIL. SEED BLEND TO CONSIST OF THE FOLLOWING: KENTUCKY 31 FESCUE 100 LBS./ACRE FINE FESCUE - EQUAL MIX OF CREEPING RED, HARD AND SHEEP'S FESCUE 50 LBS./ACRE CROWN VETCH 10 LBS./ACRE MEDIUM RED CLOVER 10 LBS./ACRE KOREAN LESPEDEZA 12 LBS./ACRE SERICEA LESPEDEZA 12 LBS./ACRE AUSTRIAN WINTER PEAS 15 LBS./ACRE BAHIA GRASS 10 LBS./ACRE BERMUDA GRASS 6 LBS./ACRE (HOT WEATHER JUNE-AUGUST 15TH) ADD GERMAN MILLET 10 LBS./ACRE (COLD WEATHER AUGUST 15TH - FEBRUARY) ADD ANNUAL RYE GRAIN 20 LBS./ACRE FERTILIZER / SOIL AMENDMENTS: 18-18-18 FERTILIZER 700 LBS./ACRE HIGH CALCIUM POWDER LIME 200 LBS./ACRE MULCH MIXTURE: FLEXTERRA HYDRO MULCH (OR EQUAL) 1300 LBS./ACRE STRAW HYDRO MULCH 1300 LBS./ACRE THE FLEXTERRA HYDRO MULCH AND STRAW HYDRO MULCH SHALL BE MIXED TOGETHER AND APPLIED IN ALL THREE APPLICATIONS SPECIFIED BELOW. THE 1300 LBS./ACRE OF EACH HYDRO MULCH TYPE SHALL BE APPLIED BETWEEN THE THREE APPLICATIONS. NOTES: 1. INOCULATE ALL LEGUMES 2. HYDROSEED APPLICATIONS SHALL BE AS FOLLOWS. FIRST APPLICATION SHALL BE SEED, FERTILIZER, LIME MIXED WITH HYDRO MULCH. SECOND AND THIRD APPLICATIONS SHALL BE HYDRO MULCH MIX ONLY. 3. NO SOIL SHALL BE SHOWING AND MULCH SHALL BE APPROXIMATELY 1/4 INCH THICK. 4. WATERING MAY BE REQUIRED TO ESTABLISH A FULL STAND OF GRASS AT NO ADDITIONAL COST TO THE OWNER. 5. THE SLOPE SHALL BE INSPECTED 11 MONTHS AFTER THE COMPLETION OF THE PROJECT AND PRIOR TO THE EXPIRATION OF THE 1-YEAR WARRANTY TO CONFIRM A FULL STAND OF GRASS. RESEED ANY BARE OR DEAD AREAS. MAINTENANCE PLAN TEMPORARY GRAVEL CONSTRUCTION ENTRANCE MAINTAIN THE GRAVEL PAD IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION SITE. THIS MAY REQUIRE PERIODIC TOPDRESSING WITH 2-INCH STONE. AFTER EACH RAINFALL, INSPECT ANY STRUCTURE USED TO TRAP SEDIMENT AND CLEAN IT OUT AS NECESSARY. IMMEDIATELY REMOVE All OBJECTIONABLE MATERIALS SPILLED, WASHED, OR TRACKED ONTO PUBLIC ROADWAYS. TEMPORARY / PERMANENT SEEDING RESEED AND MULCH AREAS WHERE SEEDING EMERGENCE IS POOR, OR WHERE EROSION OCCURS, AS SOON AS POSSIBLE. DO NOT MOW. PROTECT FROM TRAFFIC AS MUCH AS POSSIBLE. SILT FENCE INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL EVENT, MAKE ANY REQUIRED REPAIRS IMMEDIATELY. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAINFALL EVENT, AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. FIBER FILTRATION TUBE CHECK DAMS / INLET PROTECTION INSPECT THE WATTLES AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1/2 INCH OR GREATER) RAINFALL EVENT. CHECK TO BE SURE THERE ARE NO GAPS BETWEEN THE BOTTOM OF THE WATTLE AND THE GROUND SURFACE REPAIR ANY UNDERCUTTING BELOW THE WATTLE. REMOVE ALL SEDIMENT DEPOSITS AND DEBRIS WHEN SUCH DEPOSITS ADVERSELY AFFECT THE FUNCTION OF THE WATTLE. TAKE CARE TO AVOID UNDERMINING THE WATTLE DURING CLEANOUT. SEDIMENT BUILDUP SHALL NOT BE ALLOWED TO EXCEED ONE-THIRD THE WATTLE HEIGHT. REPLACE THE WATTLE WHEN IT BECOMES CLOGGED WITH SEDIMENT. EROSION CONTROL MATTING INSPECT EROSION CONTROL MATTING AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1/2 INCH OR GREATER) RAINFALL EVENT. IF DAMAGED, REPAIR IMMEDIATELY. GOOD CONTACT WITH GROUND MUST BE MAINTAINED, AND EROSION MUST NOT OCCUR BENEATH THE MATTING MATERIAL. ANY AREAS OF THE MATTING THAT ARE DAMAGED OF NOT IN CLOSE CONTACT WITH THE GROUND SHALL BE REPAIRED AND STAPLED. IF EROSION OCCURS DUE TO POORLY CONTROLLED DRAINAGE, THE PROBLEM SHALL BE CORRECTED AND THE ERODED AREA PROTECTED. MONITOR AND REPAIR THE EROSION CONTROL MATTING AS NECESSARY UNTIL GROUND COVER IS ESTABLISHED. DIVERSION BERM INSPECT TEMPORARY DIVERSIONS ONCE A WEEK AND AFTER EVERY RAINFALL. IMMEDIATELY REMOVE SEDIMENT FROM THE FLOW AREA AND REPAIR THE DIVERSION RIDGE. CAREFULLY CHECK OUTLETS AND MAKE TIMELY REPAIRS AS NEEDED. WHEN THE AREA PROTECTED IS PERMANENTLY STABILIZED, REMOVE THE RIDGE AND THE CHANNEL TO BLEND WITH THE NATURAL GROUND LEVEL AND APPROPRIATELY STABILIZE IT. PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 DATE REVISION(S) DESCRIPTION BY CHK JAPPD DESCRIPTION APPROVALS Er6111 PiedmontNEREC � ENERGY:: Natural Gas COPYRIGHT 2018 LINE 99 RECLAMATION SEEDING AND MAINTENANCE NOTES L E LAN D, NC Lumberton Resource Center, Lumberton North Carolina AREA CODE 2730 DATE INITIALS REGIONAL ENGINEER ACCOUNT NUMBER 10700 PROJECT NUMBER 0227663 DATE INITIALS MGR TECH REC &STD DRAWING BY DKJ STATION ID DATE 03/20/2020 INITIALS JNT PRINCIPAL ENGINEER CHECKER INITIALS JNT STIMMEL ASSOCIATES P.A. 601 N. TRADE STREET, SUITE 200 WINSTON—SALEM. NC, 27101 338.723.1067 STIMMEL PROJECT # 20-127 REF. DWG(S) SHEET(S) 4 OF TBD I DWG SCALE N/A DWG DATE 04/10/2019 SUPERSEDED DRAWING NUMBER REVISION PNG-C-026-0001195 A DISCIPLINE / RESOURCE CENTER / LINE NUMBER GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH THE NCG01 CONSTRUCTION GENERAL PERMIT Implementing the details and specifications on this plan sheet will result in the construction activity being considered compliant with the Ground Stabilization and Materials Handling sections of the NCG01 Construction General Permit (Sections E and F, respectively). The permittee shall comply with the Erosion and Sediment Control plan approved by the delegated authority having jurisdiction. All details and specifications shown on this sheet may not apply depending on site conditions and the delegated authority having jurisdiction. SECTION E: GROUND STABILIZATION Required Ground Stabilization Timeframes Stabilize within this Site Area Description many calendar Timeframe variations days after ceasing land disturbance (a) Perimeter dikes, swales, ditches, and 7 None perimeter slopes (b) High Quality Water 7 None (HQW) Zones (c) Slopes steeper than If slopes are 10' or less in length and are 3:1 7 not steeper than 2:1, 14 days are allowed -7 days for slopes greater than 50' in length and with slopes steeper than 4:1 -7 days for perimeter dikes, swales, (d) Slopes 3:1 to 4:1 14 ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed -7 days for perimeter dikes, swales, (e) Areas with slopes ditches, perimeter slopes and HQW Zones flatter than 4:1 14 -10 days for Falls Lake Watershed unless there is zero slope Note: After the permanent cessation of construction activities, any areas with temporary ground stabilization shall be converted to permanent ground stabilization as soon as practicable but in no case longer than 90 calendar days after the last land disturbing activity. Temporary ground stabilization shall be maintained in a manner to render the surface stable against accelerated erosion until permanent ground stabilization is achieved. GROUND STABILIZATION SPECIFICATION Stabilize the ground sufficiently so that rain will not dislodge the soil. Use one of the techniques in the table below: Temporary Stabilization Permanent Stabilization • Temporary grass seed covered with straw or • Permanent grass seed covered with straw or other mulches and tackifiers other mulches and tackifiers • Hydroseeding • Geotextile fabrics such as permanent soil • Rolled erosion control products with or reinforcement matting without temporary grass seed • Hydroseeding • Appropriately applied straw or other mulch • Shrubs or other permanent plantings covered • Plastic sheeting with mulch • Uniform and evenly distributed ground cover sufficient to restrain erosion • Structural methods such as concrete, asphalt or retaining walls • Rolled erosion control products with grass seed POLYACRYLAMIDES (PAMS) AND FLOCCULANTS 1. Select flocculants that are appropriate for the soils being exposed during construction, selecting from the NC DWR List of Approved PAMS/Flocculants. 2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures. 3. Apply flocculants at the concentrations specified in the NC DWR List of Approved PAMS/Flocculants and in accordance with the manufacturer's instructions. 4. Provide ponding area for containment of treated Stormwater before discharging offsite. 5. Store flocculants in leak -proof containers that are kept under storm -resistant cover or surrounded by secondary containment structures. NCBEES CERT. NO.: C-1347 \A CAR P I ay AYAV NOTTOR. GINgPPIN AL Tv '118111►►►►► PROFESSIONAL ENG/ARCHSTAMP EQUIPMENT AND VEHICLE MAINTENANCE 1. Maintain vehicles and equipment to prevent discharge of fluids. 2. Provide drip pans under any stored equipment. 3. Identify leaks and repair as soon as feasible, or remove leaking equipment from the project. 4. Collect all spent fluids, store in separate containers and properly dispose as hazardous waste (recycle when possible). 5. Remove leaking vehicles and construction equipment from service until the problem has been corrected. 6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products to a recycling or disposal center that handles these materials. LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE 1. Never bury or burn waste. Place litter and debris in approved waste containers. 2. Provide a sufficient number and size of waste containers (e.g dumpster, trash receptacle) on site to contain construction and domestic wastes. 3. Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 4. Locate waste containers on areas that do not receive substantial amounts of runoff from upland areas and does not drain directly to a storm drain, stream or wetland. 5. Cover waste containers at the end of each workday and before storm events or provide secondary containment. Repair or replace damaged waste containers. 6. Anchor all lightweight items in waste containers during times of high winds. 7. Empty waste containers as needed to prevent overflow. Clean up immediately if containers overflow. 8. Dispose waste off -site at an approved disposal facility. 9. On business days, clean up and dispose of waste in designated waste containers. PAINT AND OTHER LIQUID WASTE 1. Do not dump paint and other liquid waste into storm drains, streams or wetlands. 2. Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 3. Contain liquid wastes in a controlled area. 4. Containment must be labeled, sized and placed appropriately for the needs of site. 5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from construction sites. PORTABLE TOILETS 1. Install portable toilets on level ground, at least 50 feet away from storm drains, streams or wetlands unless there is no alternative reasonably available. If 50 foot offset is not attainable, provide relocation of portable toilet behind silt fence or place on a gravel pad and surround with sand bags. 2. Provide staking or anchoring of portable toilets during periods of high winds or in high foot traffic areas. 3. Monitor portable toilets for leaking and properly dispose of any leaked material. Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit. EARTHEN STOCKPILE MANAGEMENT 1. Show stockpile locations on plans. Locate earthen -material stockpile areas at least 50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless it can be shown no other alternatives are reasonably available. 2. Protect stockpile with silt fence installed along toe of slope with a minimum offset of five feet from the toe of stockpile. 3. Provide stable stone access point when feasible. 4. Stabilize stockpile within the timeframes provided on this sheet and in accordance with the approved plan and any additional requirements. Soil stabilization is defined as vegetative, physical or chemical coverage techniques that will restrain accelerated erosion on disturbed soils for temporary or permanent control needs. 0 0 0 ONSITE CONCRETE WASHOUT STRUCTURE WITH LINER O 0 SANDBAGS (TYP.) OR 0 STAPLES 10 MIL SILT FENCE SIDE SLOP LINING C SANDBAGS (TYP.) (TYP-) OR STAPLES eI 0 HIGH COHESIVE & LOW FILTRATION SOIL BERM CLEARLY MARKED SIGNAGE SECTION A -A or NOTING DEVICE (18-X24- MIN.) NOTES: 1. ACTUAL LOCATION DETERMINED IN FIELD 2. THE CONCRETE WASHOUT STRUCTURES SHALL BE MAINTAINED WHEN THE LIQUID AND/OR SOLD REACHES 75% OF THE STRUCTURES CAPACITY. PLAN 3.CONCRETE WASHOUT STRUCTURE NEEDS TO BE CLEARY MARKED WITH SIGNAGE NOTING DEVICE. BELOW GRADE WASHOUT STRUCTURE NOT TO SCALE Min SANDBAGS (TYP.) B ffTAPLES 10 MIL COHESIVE & 0 O O 0 PLASTIC LINING LOW FILTRATION 0 0 1:1 SIDE SLOP SOIL BERM -7�(TYP-) Z U0 0- I 0 O O I CF!`TWW R-R -SANDBAGS (TYP.) NOTES: OR STAPLES 1. ACTUAL LOCATION DETERMINED IN FIELD CLEARLY MARKED SIGNAGE CONCRETE NOTING DEVICE (18•X24- MIN.) 2. THE CONCRETE WASHOUT WASHOUT STRUCTURES SHALL BE MAINTAINED WHEN THE LIQUID AND/OR SOLID REACHES 75% OF THE STRUCTURES CAPACITY TO PROVIDE ADEQUATE HOLDING CAPACITY WITH A MINIMUM 12 PLAN INCHES OF FREEBOARD. 3.CONCRETE WASHOUT STRUCTURE NEEDS TO BE CLEARY MARKED WITH SIGNAGE NOTING DEVICE. ABOVE GRADE WASHOUT STRUCTURE NOT TO SCALE CONCRETE WASHOUTS 1. Do not discharge concrete or cement slurry from the site. 2. Dispose of, or recycle settled, hardened concrete residue in accordance with local and state solid waste regulations and at an approved facility. 3. Manage washout from mortar mixers in accordance with the above item and in addition place the mixer and associated materials on impervious barrier and within lot perimeter silt fence. 4. Install temporary concrete washouts per local requirements, where applicable. If an alternate method or product is to be used, contact your approval authority for review and approval. If local standard details are not available, use one of the two types of temporary concrete washouts provided on this detail. 5. Do not use concrete washouts for dewatering or storing defective curb or sidewalk sections. Stormwater accumulated within the washout may not be pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must be pumped out and removed from project. 6. Locate washouts at least 50 feet from storm drain inlets and surface waters unless it can be shown that no other alternatives are reasonably available. At a minimum, install protection of storm drain inlet(s) closest to the washout which could receive spills or overflow. 7. Locate washouts in an easily accessible area, on level ground and install a stone entrance pad in front of the washout. Additional controls may be required by the approving authority. 8. Install at least one sign directing concrete trucks to the washout within the project limits. Post signage on the washout itself to identify this location. 9. Remove leavings from the washout when at approximately 75% capacity to limit overflow events. Replace the tarp, sand bags or other temporary structural components when no longer functional. When utilizing alternative or proprietary products, follow manufacturer's instructions. 10. At the completion of the concrete work, remove remaining leavings and dispose of in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance caused by removal of washout. HERBICIDES, PESTICIDES AND RODENTICIDES 1. Store and apply herbicides, pesticides and rodenticides in accordance with label restrictions. 2. Store herbicides, pesticides and rodenticides in their original containers with the label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning. 3. Do not store herbicides, pesticides and rodenticides in areas where flooding is possible or where they may spill or leak into wells, stormwater drains, ground water or surface water. If a spill occurs, clean area immediately. 4. Do not stockpile these materials onsite. HAZARDOUS AND TOXIC WASTE 1. Create designated hazardous waste collection areas on -site. 2. Place hazardous waste containers under cover or in secondary containment. 3. Do not store hazardous chemicals, drums or bagged materials directly on the ground. PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 DATE REVISION(S) DESCRIPTION BY CHK JAPPD DESCRIPTION APPROVALS DUKEr6111 Piedmont ENERGY:: � Natural Gas COPYRIGHT 2018 LINE 99 RECLAMATION SOIL STABILIZATION & MATERIAL HAN DELI N L E LAN D, N C Lumberton Resource Center, Lumberton North Carolina AREA CODE 2730 DATE INITIALS REGIONAL ENGINEER ACCOUNT NUMBER 10700 PROJECT NUMBER 0227663 DATE INITIALS MGR TECH REC &STD DRAWING BY DKJ STATION ID DATE 03/20/2020 INITIALS JNT PRINCIPAL ENGINEER CHECKER INITIALS JNT STIMMEL ASSOCIATES P.A. 601 N. TRADE STREET, SUITE 200 WINSTON-SALEM. NC, 27101 338.723.1067 STIMMEL PROJECT # 20-127 REF. DWG(S) SHEET(S) 4 OF TBD I DWG SCALE N/A DWG DATE 04/10/2019 SUPERSEDED DRAWING NUMBER REVISION 1PNG -C-026-0001196 A DISCIPLINE / RESOURCE CENTER / LINE NUMBER PART III I I PART III I I PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION A: SELF -INSPECTION Self -inspections are required during normal business hours in accordance with the table below. When adverse weather or site conditions would cause the safety of the inspection personnel to be in jeopardy, the inspection may be delayed until the next business day on which it is safe to perform the inspection. In addition, when a storm event of equal to or greater than 1.0 inch occurs outside of normal business hours, the self -inspection shall be performed upon the commencement of the next business day. Any time when inspections were delayed shall be noted in the Inspection Record. Frequency Inspect (during normal Inspection records must include: business hours) (1) Rain gauge Daily Daily rainfall amounts. maintained in If no daily rain gauge observations are made during weekend or good working holiday periods, and no individual -day rainfall information is order available, record the cumulative rain measurement for those un- attended days (and this will determine if a site inspection is needed). Days on which no rainfall occurred shall be recorded as "zero." The permittee may use another rain -monitoring device approved by the Division. (2) E&SC At least once per 1. Identification of the measures inspected, Measures 7 calendar days 2. Date and time of the inspection, and within 24 3. Name of the person performing the inspection, hours of a rain 4. Indication of whether the measures were operating event > 1.0 inch in properly, 24 hours 5. Description of maintenance needs for the measure, 6. Description, evidence, and date of corrective actions taken. (3) Stormwater At least once per 1. Identification of the discharge outfalls inspected, discharge 7 calendar days 2. Date and time of the inspection, outfalls (SDOs) and within 24 3. Name of the person performing the inspection, hours of a rain 4. Evidence of indicators of stormwater pollution such as oil event > 1.0 inch in sheen, floating or suspended solids or discoloration, 24 hours 5. Indication of visible sediment leaving the site, 6. Description, evidence, and date of corrective actions taken. (4) Perimeter of At least once per If visible sedimentation is found outside site limits, then a record site 7 calendar days of the following shall be made: and within 24 1. Actions taken to clean up or stabilize the sediment that has left hours of a rain the site limits, event > 1.0 inch in 2. Description, evidence, and date of corrective actions taken, and 24 hours 3. An explanation as to the actions taken to control future releases. (5) Streams or At least once per If the stream or wetland has increased visible sedimentation or a wetlands onsite 7 calendar days stream has visible increased turbidity from the construction or offsite and within 24 activity, then a record of the following shall be made: (where hours of a rain 1. Description, evidence and date of corrective actions taken, and accessible) event > 1.0 inch in 2. Records of the required reports to the appropriate Division 24 hours Regional Office per Part III, Section C, Item (2)(a) of this permit of this permit. (6) Ground After each phase 1. The phase of grading (installation of perimeter E&SC stabilization of grading measures, clearing and grubbing, installation of storm measures drainage facilities, completion of all land -disturbing activity, construction or redevelopment, permanent ground cover). 2. Documentation that the required ground stabilization measures have been provided within the required timeframe or an assurance that they will be provided as soon as possible. NOTE: The rain inspection resets the required 7 calendar day inspection requirement. NCBEES CERT. NO.: C-1347 \A CAR P I ay AYAV NOTTOR. GIN PINFv PROFESSIONAL ENG/ARCHSTAMP SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION B: RECORDKEEPING 1. E&SC Plan Documentation The approved E&SC plan as well as any approved deviation shall be kept on the site. The approved E&SC plan must be kept up-to-date throughout the coverage under this permit. The following items pertaining to the E&SC plan shall be documented in the manner described: Item to Document Documentation Requirements (a) Each E&SC Measure has been installed Initial and date each E&SC Measure on a copy and does not significantly deviate from the of the approved E&SC Plan or complete, date locations, dimensions and relative elevations and sign an inspection report that lists each shown on the approved E&SC Plan. E&SC Measure shown on the approved E&SC Plan. This documentation is required upon the initial installation of the E&SC Measures or if the E&SC Measures are modified after initial installation. (b) A phase of grading has been completed. Initial and date a copy of the approved E&SC Plan or complete, date and sign an inspection report to indicate completion of the construction phase. (c) Ground cover is located and installed Initial and date a copy of the approved E&SC in accordance with the approved E&SC Plan or complete, date and sign an inspection Plan. report to indicate compliance with approved ground cover specifications. (d) The maintenance and repair Complete, date and sign an inspection report. requirements for all E&SC Measures have been performed. (e) Corrective actions have been taken Initial and date a copy of the approved E&SC to E&SC Measures. Plan or complete, date and sign an inspection report to indicate the completion of the corrective action. 2. Additional Documentation In addition to the E&SC Plan documents above, the following items shall be kept on the site and available for agency inspectors at all times during normal business hours, unless the Division provides a site -specific exemption based on unique site conditions that make this requirement not practical: (a) This general permit as well as the certificate of coverage, after it is received. (b) Records of inspections made during the previous 30 days. The permittee shall record the required observations on the Inspection Record Form provided by the Division or a similar inspection form that includes all the required elements. Use of electronically -available records in lieu of the required paper copies will be allowed if shown to provide equal access and utility as the hard -copy records. (c) All data used to complete the Notice of Intent and older inspection records shall be maintained for a period of three years after project completion and made available upon request. [40 CFR 122.41] SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION C: REPORTING 1. Occurrences that must be reported Permittees shall report the following occurrences: (a) Visible sediment deposition in a stream or wetland. (b) Oil spills if: • They are 25 gallons or more, • They are less than 25 gallons but cannot be cleaned up within 24 hours, • They cause sheen on surface waters (regardless of volume), or • They are within 100 feet of surface waters (regardless of volume). (a) Releases of hazardous substances in excess of reportable quantities under Section 311 of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA (Ref: 40 CFR 302.4) or G.S. 143-215.85. (b) Anticipated bypasses and unanticipated bypasses. (c) Noncompliance with the conditions of this permit that may endanger health or the environment. 2. Reporting Timeframes and Other Requirements After a permittee becomes aware of an occurrence that must be reported, he shall contact the appropriate Division regional office within the timeframes and in accordance with the other requirements listed below. Occurrences outside normal business hours may also be reported to the Division's Emergency Response personnel at (800) 662-7956, (800) 858-0368 or (919) 733-3300. Occurrence Reporting Timeframes (After Discovery) and Other Requirements (a) Visible sediment • Within 24 hours, an oral or electronic notification. deposition in a • Within 7 calendar days, a report that contains a description of the stream or wetland sediment and actions taken to address the cause of the deposition. Division staff may waive the requirement for a written report on a case -by -case basis. • If the stream is named on the NC 303(d) list as impaired for sediment - related causes, the permittee may be required to perform additional monitoring, inspections or apply more stringent practices if staff determine that additional requirements are needed to assure compliance with the federal or state impaired -waters conditions. (b) Oil spills and • Within 24 hours, an oral or electronic notification. The notification release of shall include information about the date, time, nature, volume and hazardous location of the spill or release. substances per Item 1(b)-(c) above (c) Anticipated • A report at least ten days before the date of the bypass, if possible. bypasses [40 CFR The report shall include an evaluation of the anticipated quality and 122.41(m)(3)] effect of the bypass. (d) Unanticipated • Within 24 hours, an oral or electronic notification. bypasses [40 CFR • Within 7 calendar days, a report that includes an evaluation of the 122.41(m)(3)] quality and effect of the bypass. (e) Noncompliance • Within 24 hours, an oral or electronic notification. with the conditions • Within 7 calendar days, a report that contains a description of the of this permit that noncompliance, and its causes; the period of noncompliance, may endanger including exact dates and times, and if the noncompliance has not health or the been corrected, the anticipated time noncompliance is expected to environment[40 continue; and steps taken or planned to reduce, eliminate, and CFR 122.41(I)(7)] prevent reoccurrence of the noncompliance. [40 CFR 122.41(l)(6). • Division staff may waive the requirement for a written report on a case -by -case basis. PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 DATE REVISION(S) DESCRIPTION BY CHK IAPPD DESCRIPTION APPROVALS ENERGY:: Pie DUKEr6111 Natt mo ntural Gas � N COPYRIGHT 2018 LINE 99 RECLAMATION SELF INSPECTION PLAN L E LAN D, N C Lumberton Resource Center, Lumberton North Carolina AREA CODE 2730 DATE INITIALS REGIONAL ENGINEER ACCOUNT NUMBER 10700 PROJECT NUMBER 0227663 DATE INITIALS MGR TECH REC &STD DRAWING BY DKJ STATION ID DATE 03/20/2020 INITIALS JNT PRINCIPAL ENGINEER CHECKER INITIALS JNT STIMMEL ASSOCIATES P.A. 601 N. TRADE STREET, SUITE 200 WINSTON-SALEM. NC, 27101 338.723.1067 STIMMEL PROJECT # 20-127 REF. DWG(S) SHEET(S) 4 OF TBD I DWG SCALE N/A DWG DATE 04/10/2019 SUPERSEDED DRAWING NUMBER REVISION PNG-C-026-0001197 A DISCIPLINE / RESOURCE CENTER / LINE NUMBER 5/N. 8" MIN. CLASS 'A' STONE GEOTEXTILE FABRIC UNDERLINING NOTE: PLACE FILTRATION GEOTEXTILE BENEATH STONE. NOTES SILT FENCE OPTIONS: 1. SILT FENCE MAY BE PROVIDED WITH OR WITHOUT WIRE FENCE REINFORCING. IF USED, WIRE FENCING SHALL BE 6" X 6" MESH WITH 14 GAUGE WIRE. UNSUPPORTED FABRIC SHALL BE HEAVY DUTY RATED FOR UNSUPPORTED USE. 2. POST SPACING SHALL BE A MAXIMUM OF 8 FEET WITH WIRE FENCE AND 6 FEET WITHOUT WIRE FENCE. 3. POST SHALL BE STEEL, SHALL HAVE PROJECTIONS TO FACILITATE FASTENING THE FABRIC, SHALL HAVE A MINIMUM WEIGHT OF 1.33 LB/LINEAR FOOT, AND A MINIMUM OF 5 FEET IN LENGTH. WOODEN POST MAY BE SUBSTITUTED FOR STEEL. WOODEN POST SHALL BE 3 INCHES IN DIAMETER, MINIMUM. 4' STEEL POST 8' O.C. WITH 12 GAUGE WIRE MESH (6" MAX. SPACING) AND FILTER FABRIC TRENCH 4" X 8" DEEP, EXTEND FILTER FABRIC AND WIRE MESH, BACKFILL TRENCH WITH SOIL FLOw SILT FENCE OPTIONS: 1. SILT FENCE MAY BE PROVIDED WITH OR WITHOUT WIRE FENCE REINFORCING. IF USED, WIRE FENCING SHALL BE 6" X 6" MESH WITH 14 GAUGE WIRE. UNSUPPORTED FABRIC SHALL BE HEAVY DUTY RATED FOR UNSUPPORTED USE. 2. POST SPACING SHALL BE A MAXIMUM OF 8 FEET WITH WIRE FENCE AND 6 FEET WITHOUT WIRE FENCE. 3. POST SHALL BE STEEL, SHALL HAVE PROJECTIONS TO FACILITATE FASTENING THE FABRIC, SHALL HAVE A MINIMUM WEIGHT OF 1.33 LB/LINEAR FOOT, AND A MINIMUM OF 5 FEET IN LENGTH. WOODEN POST MAY BE SUBSTITUTED FOR STEEL. WOODEN POST SHALL BE 3 INCHES IN DIAMETER, MINIMUM. 4' STEEL POST 8' O.C. WITH 12 GAUGE WIRE MESH (6" MAX. SPACING) AND FILTER FABRIC TRENCH 4" X 8" DEEP, EXTEND FILTER FABRIC AND WIRE MESH, BACKFILL TRENCH WITH NCDOT #57 STONE FLOw FIBER FILTRATION TUBES (FFT) NOTES: 1. FIBER FILTRATION TUBES (FFT) SHALL BE ENGINEERED COMPOSITES OF WOOD FIBER, MAN-MADE FIBERS AND POLYMERS. NO STRAW WATTLES ARE ALLOWED. 2. FIBER FILTRATION TUBES SHALL BE STAGGERED TO AVOID BYPASS. EXCAVATED SEDIMENT PIT 81 X 4'W X 2' DEEP 1" X 2" X 48" (MIN) WOOD STAKES - 9" X U-6" FIBER FILTRATION TUBES SEE SECTION A -A BELOW 1. PROVIDE TURNING RADIUS SUFFICIENT TO ACCOMMODATE LARGE TRUCKS = Irriii -III 2. LOCATE ENTRANCES TO PROVIDE FOR UTILIZATION OF ALL CONSTRUCTION VEHICLES. II - 3. MUST BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OF DIRECT FLOW OF MUD ONTO STREETS. PERIODIC TOP DRESSING WITH STONE WILL BE NECESSARY. COMPACTED COMPACTEDI, 4. ANY MATERIAL TRACKED ONTO ROADWAY MUST BE CLEANED UP IMMEDIATELY. BACKFILL BACKFILL T'hr 5. LOCATE GRAVEL CONSTRUCTION ENTRANCE AT ALL POINTS OF INGRESS AND EGRESS UNTIL = SITE IS STABILIZED. PROVIDE FREQUENT CHECKS OF THE DEVICE AND TIMELY MAINTENANCE. -I II - 4 FT EXTENSION OF FILTER 6. NUMBER AND LOCATION OF CONSTRUCTION ENTRANCES TO BE DETERMINED BY THE ENGINEER. EXTENSION OF FILTER -1 I li I II I II I II I I I I II I I� I i I I III III i' 7. USE CLASS 'A' STONE OR OTHER COARSE AGGREGATE APPROVED BY THE ENGINEER. FABRIC AND WIRE MESH FABRIC AND WIRE MESH 8. INSTALL CONSTRUCTION ENTRANCES IN A WAY TO PREVENT VEHICLES FROM BYPASSING INTO TRENCH INTO TRENCH CONSTRUCTION ENTRANCES LEAVING PROJECT SITE. TYPE 1 TYPE 2 SECTION A -A LT FEN ELT FENCE TYPE 2 4 SILT FENCE OUTLET STONE CONSTRUCTION ENTRANCE(2)==sS C Q=a j)=SCALE: N.T.S. ICA N.T.S. SCALE: N.T.S. SCALE: N.T.S. FIBER FILTRATION TUBES (FFT) NOTES: 1. FIBER FILTRATION TUBES (FFT) SHALL BE ENGINEERED COMPOSITES OF WOOD FIBER, MAN-MADE FIBERS AND POLYMERS. NO STRAW WATTLES ARE ALLOWED. 2. FIBER FILTRATION TUBES SHALL BE STAGGERED TO AVOID BYPASS. k 1" X 2" X 48" (MIN) WOOD STAKES 3" 9" X 6'-6" FIBER A FILTRATION TUBES FLOW SEE SECTION A -A BELOW BACKFILL AND TEMPORARY COMPACT / SILT FENCE LOOSE MATERIAL \ UPSTREAM OF TUBE 6 OR 8 INCH U-SHAPE WIRE STAPLES PLACED q AT ONE FOOT i INTERVALS DRIVEN THROUGH OUTER 1 INCH OF TUBE F� PLAN TREAT WITH SILTSTOP POLYMER PER MANUFACTURER'S RECOMMENDATION, RE -APPLY AFTER EACH RAIN EVENT EXCAVATED SEDIMENT PIT 101 X 4'W X 3' DEEP 9" X 6'-6" FIBER 12" SPACING FILTRATION TUBES (2) - 1" X 2" X 48" (MIN) WOOD STAKES CROSSED SECTION A -A SILT FENCE OUTLET W / J HOOK 5 SCALE: N.T.S. NCBEES CERT. NO.: C-1347 \A CAR PINY � AYALI .NOT R. GQN I !V141Q'N PROFESSIONAL ENG/ARCHSTAMP FIBER FILTRATION TUBES (FFT) NOTES: 1. FIBER FILTRATION TUBES (FFT) SHALL BE ENGINEERED COMPOSITES OF WOOD FIBER, MAN-MADE FIBERS AND POLYMERS. NO STRAW WATTLES ARE ALLOWED. 9" FIBER FILTRATION TUBES (6" MIN.) USE 36-1N H STAKES WITH 6-INCH MINIMUM EMBEDMENT SPACED AT ONE FOOT INTERVALS DRIVEN THROUGH OUTER 1 INCH OF TUBE, LEAVING ABOUT 3 INCHES OF THE STAKE PROTRUDING ABOVE THE TUBE \� EXCAVATE A PLACEMENT TRENCH 3 INCHES DEEP OVERLAP ADJACENT ROLL ENDS BY A MINIMUM OF ONE FOOT AND REDUCE STAKING INTERVALS TO ONE FOOT WITHIN OVERLAP SECTION FOR CHANNEL APPLICATIONS, BOTH UPSTREAM AND DOWNSTREAM ANCHORING SHOULD BE AT 1 FOOT INTERVALS. PLACE CHECK DAMS OR WATTLES AT THE LOWER LIMITS OF EACH DAYS WORK. (2) 1" X 2" X 36" (MIN.) WOOD FIBER STAKES (TYP.) FILTRATION TUBE \\// FIBER FILTRATION TUBE CHECK DAM NTS Maintenance of Fiber Filtration Tubes To assure long term performance, Fiber Filtration Tubes (FFTs) installations must be properly maintained. By definition, these devices are designed to provide filtration and it is intuitive that a properly functioning filter will eventually need to be replaced. This is the case with the water, oil and air filters that we all use on a daily basis. The first maintenance activity for FFTs is to inspect the installation every two weeks and/or after each significant precipitation event (typically > %" of rainfall) as mandated by the US EPA NPDES regulations. When sediment accumulations reach'/2 of the FFT height the sediment should be removed to insure storage capacity for the next event. This may be accomplished using hand labor or a small bucket loader. Care must be taken to prevent damage to the FFTs. Replace all FFTs that display torn netting and/or excessive deformation. Unlike many sediment retention devices that simply act as barriers to slow water flow velocities, FFTs are also designed to capture sediment within their 3-D matrix. As filtered material accumulates the matrix will eventually begin to blind or clog resulting in reduced flow rates and increased turbidity of water exiting the FFT. The functional longevity of an FFT is dependent upon a variety of site specific environmental conditions including duration of installation, sediment composition, the presence/type of a flocculant and amount of water that has passed through the device. The functional longevity of an FFT must be determined by regularly scheduled field inspections and on site experience will lead to predictive results in a given environment. Fiber Filtration Tubes are designed to photo -biodegrade within two years. Depending upon application and long term land use the devices may be left in place or removed. FFTs will support long term plant growth in areas conducive to establishment of dense vegetation. If an FFT is removed there are at least three options for disposal and re -use. 1. The FFT may be re -used for additional sediment retention or storm water treatment applications if there is not excessive sediment loading. 2. The FFT may be cut open and the matrix may be rolled out to be used as a blanket if there is not excessive sediment loading. 3. The FFT may be hauled to a landfill if there are potentially undesirable constituents trapped within the matrix. To replace, carefully pull out the anchoring staples and stakes. Take care not to damage erosion control devices that have been installed in conjunction with FFTs. The staples and stakes may be reused if they demonstrate no significant damage and can be driven back into the ground. Remove the "spent" FFT and reshape the existing trench, if applicable. Smooth the soil surface and install the new FFTs following the published installation guidelines. Be sure to compact any residual soil against the base of the FFTs to minimize the chance of undermining by water. T 2 MAX. 18" MIN. HEIGHT 1 F __� __�Xl 9" X 6-6" FIBER FILTRATION TUBES - (2) - 1" X 2" X 48" (MIN) WOOD STAKES CROSSED 3 MIN. RUNOFF 1 � L OBTAIN BORROW FROM EXISTING GRADE SEDIMENT SHAPE BORROW INTO BERM EXISTING GRADE TEMPORARY DIVERSION BERM SCALE: NTS NOTE: CONTINUE FENCE COMPLETELY AROUND AREA TO BE PROTECTED. NO BLDG. MATERIALS, DIRT OR CAI IIOAICAIT TA DC' CT/IOC % IAICI r1C BLAZE ORANGE SYNTHETIC BARRICADE TEMPORARY ENCROACHMENT FENCE SCALE: N.T.S. PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 DATE REVISION(S) DESCRIPTION BY CHK JAPPID DESCRIPTION APPROVALS ,(DUKEr6111 Piedmont ENERGY:: � Natural Gas COPYRIGHT 2018 LINE 99 RECLAMATION EROSION CONTROL DETAILS L E LAN D, NC Lumberton Resource Center, Lumberton North Carolina AREA CODE 2730 DATE INITIALS REGIONAL ENGINEER ACCOUNT NUMBER 10700 PROJECT NUMBER 0227663 DATE INITIALS MGR TECH REC &STD DRAWING BY DKJ STATION ID DATE 03/20/2020 INITIALS JNT / PRINCIPAL ENGINEER CHECKER INITIALS JNT STIMMEL ASSOCIATES P.A. 601 N. TRADE STREET, SUITE 200 WINSTON—SALEM. NC, 27101 338.723.1067 STIMMEL PROJECT # 20-127 REF. DWG(S) SHEET(S) 4 OF TBD I DWG SCALE N/A DWG DATE 04/10/2019 SUPERSEDED DRAWING NUMBER REVISION PNG-C-026-0001198 A DISCIPLINE / RESOURCE CENTER / LINE NUMBER FIBER FILTRATION TUBES (FFT) NOTES: 1. FIBER FILTRATION TUBES (FFT) SHALL BE ENGINEERED COMPOSITES OF WOOD FIBER, MAN-MADE FIBERS AND POLYMERS. NO STRAW WATTLES ARE ALLOWED. 2. FIBER FILTRATION TUBES SHALL BE STAGGERED TO AVOID BYPASS. FIBER FILTRATION TUBE NTS 9" DIA F.F.T. FLOW (2) 1" x 2" x 36" (MIN.) (2) 1" x 2" x 36" (MIN.) WOOD STAKES (TYP.) X Sp Pr 9" DIA F.F.T. �2 PIPE III (2) 1" x 2" x 36" (MIN.) WOOD STAKES (2)-1" x 2" x 36" (MIN.) WOOD STAKES CROSSED 9" DIA F.F.T. �. _.'�_�L_o W (2)-1" x 2" x 36" (MIN.) WOOD STAKES CROSSED 9" DIA STORM INLET F.F.T. FLOW ------ SECTION VIEW BASIN GENERAL NOTES: 1. SPACE WOODED STAKES AT 3-FT O.C. 2. SEE MAINTENANCE REQUIREMENTS ABOVE FOR TERRA TUBES PLAN VIEW .M . ..............................� IF -AREEMEMEN ICI I7 7- SECTION VIEW .._ FIBER FILTRATION TUBES (FFT) NOTES: 1. FIBER FILTRATION TUBES (FFT) SHALL BE ENGINEERED COMPOSITES OF WOOD FIBER, MAN-MADE FIBERS AND POLYMERS. NO STRAW OR COMPOST WATTLES ARE ALLOWED. 2. FIBER FILTRATION TUBES SHALL BE STAGGERED TO AVOID BYPASS. ANCHOR STAKES PROPOSED GROUND ELEVATION 18" MIN. SEE PLAN FOR ADDITIONAL INFORMATION TEMP. EARTH BERM ELBOW ANCHOR STAKE EXTEND DRAIN AS REQUIRED TO COINCIDE WITH HEIGHT OF FINISHED EMBANKMENT TEMP. EARTH BERM 18" MIN. SEE PLAN FOR ADDITIONAL INFORMATION MIN. _ 10' MAX. _ NATURAL GROUND LINE ELBOW TEMP RARY SLOPE DRAIN RIPRAP PAD MAYBE OMITTED 5' MIN. WHEN SLOPE DRAIN DISCHARGES STAGE BUILDUP OF FILL ANCHOR STAKE DIRECTLY INTO A SEDIMENT BASIN -,- ELBOW NOTE: aao� o oo�ooa�oo ANCHOR STAKES 30" LONG TOE OF FILL AND SET MINIMUM 12" DEEP. TEMPORARY SLOPE DRAIN CLASS "B" STONE NCDOT TYPE 2 SEE PLAN FOR GEOTEXTILE FABRIC DIMENSIONS UNDERLINER NOTES: 1. WHEN A LONG DELAY IS EXPECTED BETWEEN FINAL GRADE AND PLACEMENT OF A PERMANENT DRAINAGE SYSTEM PROTECT THE INLET BY PLACING A TEE SECTION ON THE INLET AND/OR BY LINING THE INLET AREA WITH CLASS B STONE OR ASPHALT CONCRETE PLANT MIX AS DIRECTED BY THE ENGINEER. 2. USE CLASS B STONE FOR EROSION CONTROL AT OUTLET LOCATIONS SUBJECT TO SCOURING. TRMPORARY SLOPE DRAIN NTS FIBER FILTRATION TUBE INLET PROTECTION SCALE: NTS NCBEES CERT. NO.: C-1347 \A CAR PINY � AWI NO TOR. GIN •... • �Q'N PROFESSIONAL ENG/ARCHSTAMP NOTES: 1. La IS THE LENGTH OF THE RIPRAP APRON. 2. d= 1.5 TIMES THE MAXIMUM STONE DIAMETER BUT NOT LESS THAN 6 INCHES. 3. IN A WELL-DEFINED CHANNEL EXTEND THE APRON UP THE CHANNEL BANKS TO AN ELEVATION OF 6" ABOVE THE MAXIMUM TAILWATER DEPTH OR TO THE TOP OF THE BANK, WHICHEVER IS LESS. 4. A FILTER BLANKET OR FILTER FABRIC SHOULD BE INSTALLED BETWEEN THE RIPRAP AND SOIL FOUNDATION. z PIPE OUTLET TO FLAT AREA PIPE OUTLET TO WELL DEFINED CHANNEL NO WELL DEFINED CHANNEL I d La A PLAN i d SECTION A -A FILTER BLANKET WASHED F FILTER BLANKET STONE BEDDING LAYER SECTION A A 6" THICK WASHED STONE BEDDING LAYER CONSTRUCTION SPECIFICATIONS: 1. ENSURE THAT THE SUBGRADE FOR THE FILTER AND RIPRAP FOLLOWS THE REQUIRED LINES AND GRADES SHOWN IN THE PLAN. COMPACT ANY FILL REQUIRED IN THE SUBGRADE TO THE DENSITY OF THE SURROUNDING UNDISTURBED MATERIAL. LOW AREAS IN THE SUBGRADE ON UNDISTURBED SOIL MAY ALSO BE FILLED BY INCREASING THE RIPRAP THICKNESS. 2. THE RIPRAP AND GRAVEL FILTER MUST CONFORM TO THE SPECIFIED GRADING LIMITS SHOWN ON THE PLANS. 3. FILTER CLOTH, WHEN USED, MUST MEET DESIGN REQUIREMENTS AND BE PROPERLY PROTECTED FROM PUNCHING OR TEARING DURING INSTALLATION. REPAIR ANY DAMAGE BY REMOVING THE RIPRAP AND PLACING ANOTHER PIECE OF FILTER CLOTH OVER THE DAMAGED AREA. ALL CONNECTING JOINTS SHOULD OVERLAP SO THE TOP LAYER IS ABOVE THE DOWNSTREAM LAYER A MINIMUM OF 1 FOOT. IF THE DAMAGE IS EXTENSIVE, REPLACE THE ENTIRE FILTER CLOTH. 4. RIPRAP MAY BE PLACED BY EQUIPMENT, BUT TAKE CARE TO AVOID DAMAGING THE FILTER. 5. THE MINIMUM THICKNESS OF THE RIPRAP SHOULD BE 1.5 TIMES THE MAXIMUM STONE DIAMETER. 6. RIPRAP MAY BE FIELD STONE OR ROUGH QUARRY STONE. IT SHOULD BE HARD, ANGULAR, HIGHLY WEATHER -RESISTANT AND WELL GRADED. 7. CONSTRUCT THE APRON ON ZERO GRADE WITH NO OVERFILL AT THE END. MAKE THE TOP OF THE RIPRAP AT THE DOWNSTREAM END LEVEL WITH THE RECEIVING AREA OR SLIGHTLY BELOW IT. 8. ENSURE THAT THE APRON IS PROPERLY ALIGNED WITH THE RECEIVING STREAM AND PREFERABLY STRAIGHT THROUGHOUT ITS LENGTH. IF A CURVE IS NEEDED TO FIT SITE CONDITIONS, PLACE IT IN THE UPPER SECTION OF THE APRON. 9. IMMEDIATELY AFTER CONSTRUCTION, STABILIZE ALL DISTURBED AREAS WITH VEGETATION (NCDENR'S PRACTICES 6.10, TEMPORARY SEEDING AND 6.11, PERMANENT SEEDING). MEASUREMENT AND PAYMENT: RIPRAP OUTLET STABILIZATION STRUCTURES SHALL BE MEASURED AND PAID FOR IN TONS OF STONE ACCEPTABLY PLACED. THE TYPE OF STONE TO BE USED AND PAID FOR SHALL BE INDICATED ON THE PLAN. PRICE BID SHALL INCLUDE INSTALLATION AND MAINTENANCE OF STONE AND FILTER FABRIC. RIP RAP OUTLET SCALE: NTS PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY 2 MAX. 18" MIN. HEIGHT 1 F,// MATTING AS SPECIFIED ON EROSION CONTROL PLANS. 3 MIN. \ 1 � L OBTAIN BORROW FROM EXISTING GRADE SEDIMENT SHAPE BORROW INTO BERM EXISTING GRADE CLEANWATER DIVERSION BERM SCALE: NTS SILT FENCE OR FII FILTRATION TU SEE PLANS FOR LOCAL INSTALLATION NOTES: 1. COMPOSITE MAT MATERIAL IS HIGH DENSITY POLYETHYLENE OR EQUIVALENT. 2. MAT DIMENSIONS ARE 8' X 14' 4-1/4". 3. MATS INTERLOCK WITH INSTALLATION. NOTE: PER APPROVAL OF OWNER/ENGINEER, COMMERCIAL AVAILABLE TIMBER MATS MAY BE SUBSTITUTED FOR COMPOSITE MATS. Z FIBER 1BES R LOCATION MAINTENANCE NOTES: 1. REMOVE AND DISPOSE OF SILT ACCUMULATIONS WHEN THE DEPTH REACHES ONE HALF OF THE HEIGHT OF THE PERIMETER SILT FENCE OR FIBER FILTRATION TUBES. 2. REPLACE OR CLEAN THE FIBER FILTRATION TUBES AS NEEDED TO ALLOW RUNOFF TO SLOWLY DEWATER THROUGH THE DEVICE BETWEEN RAIN EVENTS 3. MONITOR THE WOODEN STAKES AND STAPLES TO ENSURE THAT THE FIBER FILTRATION TUBES REMAIN SECURELY ANCHORED AFTER A RAIN EVENT. 4. MONITOR DAILY TO SUPPLEMENT / REFURBISH/REPLACE MATS TO ENSURE PROPER FUNCTIONALITY. 5. CLEAN AND ERODIBLE MATERIAL OR POLLUTANTS TRACKED ONTO THE MATS IMMEDIATELY. COMMERCIALLY MADE COMPOSITE MATS SCALE: N.T.S. PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 DATE REVISION(S) DESCRIPTION BY CHK JAPPD DESCRIPTION APPROVALS Er6111 PiedmontNEREROSION � ENERGY:: Natural Gas COPYRIGHT 2018 LINE 99 RECLAMATION CONTROL & SITE DETAILS L E LAN D, N C Lumberton Resource Center, Lumberton North Carolina AREA CODE 2730 DATE INITIALS REGIONAL ENGINEER ACCOUNT NUMBER 10700 PROJECT NUMBER 0227663 DATE INITIALS MGR TECH REC &STD DRAWING BY DKJ STATION ID DATE 03/20/2020 INITIALS JNT / PRINCIPAL ENGINEER CHECKER INITIALS JNT STIMMEL ASSOCIATES P.A. 601 N. TRADE STREET, SUITE 200 WINSTON-SALEM. NC, 27101 338.723.1067 STIMMEL PROJECT # 20-127 REF. DWG(S) SHEET(S) 4 OF TBD I DWG SCALE N/A DWG DATE 04/10/2019 SUPERSEDED DRAWING NUMBER REVISION PNG-C-026-0001199 A DISCIPLINE / RESOURCE CENTER / LINE NUMBER 6" (15cm) 6 (15cm CRITICAL POINTS A. OVERLAPS AND SEAMS B. PROJECTED WATER LINE C. CHANNEL BOTTOM/SIDE SLOPE VERTICES A A B B C C NOTES: *HORIZONTAL STAPLE SPACING SHOULD BE ALTERED IF NECESSARY TO ALLOW STAPLES TO SECURE THE CRITICAL POINTS ALONG THE CHANNEL SURFACE. **IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE OR STAKE LENGTHS GREATER THAN 6"(15CM) MAY BE NECESSARY TO PROPERLY SECURE THE RECP'S. CHANNEL MATTING INSTALLATION SCALE: NTS 2"-5" PATTERN 'A' (5-12.5cm) 3' (0.9m) 6' (1.8m) 3.3' (1 M) 0 0.7 STAPLES PER SQ.YD. 2"-5" (5-12.5cm) PATTERN 'B' 3' (0.9m) 6' (1.8m Ll.'6' (1 M) If (0.5m) 3.3' (1 M) 0 0 1.15 STAPLES PER SQ.YD. 2"-5" (5-12.5cm) 4:1 SLOPES (PATTERN 'A') 3:1 SLOPES (PATTERN 'B') 2:1 SLOPES (PATTERN 'C') 0 1:1 & STEEPER SLOPES 'D') (PATTERN O MEDIUM/HIGH FLOW CHANNEL 'D') (PATTERN 0 HIGH FLOW CHANNEL AND SHORELINE (PATTERN 'E') NOTES: USE ECMDS® FOR MORE ACCURATE STAPLE PATTERN SELECTION. 2"-5" PATTERN ' C' 2„-5„ PATTERN _'D' 2„-5„ PATTERN ' E' 2"-5" (5-12.5cm) (5-12.5cm) (5-12.5cm) (5-12.5cm) 4, 4' 4' (0.6m) (25cm) L. 1.6' (0.5m)"(0.5m) (0.5m) 0 0 0 3.3' 1 3.3' 10"(25cm) 0 (I M) () 0 0 0 0O Y. 0 3.3' 0 0 0 0 0 0 0(1rr')0 1.7 STAPLES PER SQ.YD. 3.4 STAPLES PER SQ.YD. 3.75 STAPLES PER SQ.YD. 1 STAPLE PATTERN GUIDE SCALE: NTS NCBEES CERT. NO.: C-1347 \A CAR PINY � AYALI NO TOR. GIN •... • �Q'N PROFESSIONAL ENG/ARCHSTAMP 1. PREPARE SOIL BEFORE INSTALLING ROLLED EROSION CONTROL PRODUCTS (RECPS), INCLUDING ANY NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED. 2. BEGIN AT THE TOP OF THE CHANNEL BY ANCHORING THE RECPS IN A 6"(15CM) DEEP X 6"(15CM) WIDE TRENCH WITH APPROXIMATELY 12"(30CM) OF RECPS EXTENDED BEYOND THE UP -SLOPE PORTION OF THE TRENCH. USE MATTING AT THE CHANNEL/CULVERT OUTLET AS SUPPLEMENTAL SCOUR PROTECTION AS NEEDED. ANCHOR THE RECPS WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12"(30CM) APART IN THE BOTTOM OF THE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO THE COMPACTED SOIL AND FOLD THE REMAINING 12"(30CM) PORTION OF RECPS BACK OVER THE SEED AND COMPACTED SOIL. SECURE RECPS OVER COMPACTED SOIL WITH A ROW OF STAPLES/STAKES SPACED APPROXIMATELY 12" APART ACROSS THE WIDTH OF THE RECPS. 3. ROLL CENTER RECPS IN DIRECTION OF WATER FLOW IN BOTTOM OF CHANNEL. RECPS WILL UNROLL WITH APPROPRIATE SIDE AGAINST THE SOIL SURFACE. ALL RECPS MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES/STAKES IN APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE. 4. PLACE CONSECUTIVE RECPS END -OVER -END (SHINGLE STYLE) WITH A 4"-6" OVERLAP. USE A DOUBLE ROW OF STAPLES STAGGERED 4" APART AND 4" ON CENTER TO SECURE RECPS. 5. FULL LENGTH EDGE OF RECPS AT TOP OF SIDE SLOPES MUST BE ANCHORED WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12"(30CM) APART IN A 6"(15CM) DEEP X 6"(15CM) WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. 6. ADJACENT RECPS MUST BE OVERLAPPED APPROXIMATELY 2"-5" (5-12.5CM) (DEPENDING ON RECPS TYPE) AND STAPLED. 7. IN HIGH FLOW CHANNEL APPLICATIONS A STAPLE CHECK SLOT IS RECOMMENDED AT 30 TO 40 FOOT (9 -12M) INTERVALS. USE A DOUBLE ROW OF STAPLES STAGGERED 4"(10CM) APART AND 4"(10CM) ON CENTER OVER ENTIRE WIDTH OF THE CHANNEL. 8. THE TERMINAL END OF THE RECPS MUST BE ANCHORED WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (30CM) APART IN A 6"(15CM) DEEP X 6"(15CM) WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. NORTH AMERICAN GREEN MATERIAL SPECIFICATIONS S75BN THE SHORT-TERM SINGLE NET EROSION CONTROL BLANKET SHALL BE A MACHINE PRODUCED MAT OF 100% AGRICULTURAL STRAW WITH A FUNCTIONAL LONGEVITY OF UP TO 12 MONTHS. (NOTE: FUNCTIONAL LONGEVITY MAY VARY DEPENDING UPON CLIMATIC CONDITIONS, SOIL, GEOGRAPHICAL LOCATION, AND ELEVATION). THE BLANKET SHALL BE OF CONSISTENT THICKNESS WITH THE STRAW EVENLY DISTRIBUTED OVER THE ENTIRE AREA OF THE MAT. THE BLANKET SHALL BE COVERED ON THE TOP SIDE WITH A 100% BIODEGRADABLE WOVEN NATURAL ORGANIC FIBER NET. THE NETTING SHALL CONSIST OF MACHINE DIRECTIONAL STRANDS FORMED FROM TWO INTERTWINED YARNS WITH ACROSS DIRECTIONAL STRANDS INTERWOVEN THROUGH THE TWISTED MACHINE STRANDS (COMMONLY REFERRED TO AS A LENO WEAVE) TO FORM APPROXIMATE 0.50 X 1.0 IN. (1.27 X 2.54 CM) MESH. THE BLANKET SHALL BE SEWN TOGETHER ON 1.50 INCH (3.81 CENTERS WITH DEGRADABLE THREAD. THE BLANKET SHALL BE MANUFACTURED WITH A COLORED THREAD STITCHED ALONG BOTH OUTER EDGES (APPROXIMATELY 2-5 INCHES [5-12.5 CM] FROM THE EDGE) AS AN OVERLAP GUIDE FOR ADJACENT MATS. THE S75BN SHALL MEET TYPE 2.0 SPECIFICATION REQUIREMENTS ESTABLISHED BY THE EROSION CONTROL TECHNOLOGY COUNCIL (ECTC) AND FEDERAL HIGHWAY ADMINISTRATION'S (FHWA) FP-03 SECTION 713.17 STRAW FIBER CHANNEL LINING SHALL BE S75BN AS MANUFACTURED BY NORTH AMERICAN GREEN, OR EQUIVALENT. THE S75BN SHORT TERM EROSION CONTROL BLANKET SHALL HAVE THE FOLLOWING PROPERTIES: MATERIAL CONTENT STRAW FIBER 100% (0.5 LBS/YD"2) (0.27 KG/M"2) NETTING TOP SIDE ONLY: LENO WOVEN 100% BIODEGRADABLE NATURAL ORGANIC FIBER 9.3 LB/1,000 FT"2 (4.5 KG/100 M"2) THREAD BIODEGRADABLE PHYSICAL SPECIFICATIONS (ROLL) WIDTH 6.67 FEET (2.03 M) LENGTH 108 FEET (32.92 M) WEIGHT 46.4 LBS (21.05 KG) AREA 80.0 YD"2 (66.9 M"2) NAG S75BN 3A 1 SLOPE MATTING INSTALLATION SCALE: NTS NORTH AMERICAN GREEN MATERIAL SPECIFICATIONS SC-15013N THE EXTENDED -TERM DOUBLE NET EROSION CONTROL BLANKET SHALL BE A MACHINE -PRODUCED MAT OF 70% AGRICULTURAL STRAW AND 30% COCONUT FIBER WITH A FUNCTIONAL LONGEVITY OF UP TO 18 MONTHS. (NOTE: FUNCTIONAL LONGEVITY MAY VARY DEPENDING UPON CLIMATIC CONDITIONS, SOIL, GEOGRAPHICAL LOCATION, AND ELEVATION). THE BLANKET SHALL BE OF CONSISTENT THICKNESS WITH THE STRAW AND COCONUT EVENLY DISTRIBUTED OVER THE ENTIRE AREA OF THE MAT. THE BLANKET SHALL BE COVERED ON THE TOP AND BOTTOM SIDES WITH A 100% BIODEGRADABLE WOVEN NATURAL ORGANIC FIBER NETTING. THE NETTING SHALL CONSIST OF MACHINE DIRECTIONAL STRANDS FORMED FROM TWO INTERTWINED YARNS WITH CROSS DIRECTIONAL STRANDS INTERWOVEN THROUGH THE TWISTED MACHINE STRANDS (COMMONLY REFERRED TO AS LENO WEAVE) TO FORM AN APPROXIMATE 0.50 X 1.0 IN. (1.27 X 2.54 MESH. THE BLANKET SHALL BE SEWN TOGETHER ON 1.50 INCH (3.81 CM) CENTERS WITH DEGRADABLE THREAD. THE BLANKET SHALL BE MANUFACTURED WITH A COLORED THREAD STITCHED ALONG BOTH OUTER EDGES (APPROXIMATELY 2-5 INCHES [5-12.5 CM] FROM THE EDGE) AS AN OVERLAP GUIDE FOR ADJACENT MATS. THE SC150BN SHALL MEET TYPE 3.B SPECIFICATION REQUIREMENTS ESTABLISHED BY THE EROSION CONTROL TECHNOLOGY COUNCIL (ECTC) AND FEDERAL HIGHWAY ADMINISTRATION'S (FHWA) FP-03 SECTION 713.17. COCONUT FIBER CHANNEL LINING SHALL BE SC150BN AS MANUFACTURED BY NORTH AMERICAN GREEN, OR EQUIVALENT. THE SC150BN LONG-TERM EROSION CONTROL BLANKET SHALL HAVE THE FOLLOWING PROPERTIES: MATERIAL CONTENT STRAW FIBER 70% (0.35 LBS/YD"2) (0.19 KG/M"2) COCONUT FIBER 30% (0.15 LBS/YD"2) (0.08 KG/M"2) NETTING TOP: LENO WOVEN 100% BIODEGRADABLE ORGANIC JUTE 9.35 LB/1,000 FT"2 (4.5 KG/100 M"2) BOTTOM: 100% BIODEGRADABLE ORGANIC JUTE 7.7 LB/1000 FT"2 (3.76 KG/100 M"2) THREAD BIODEGRADABLE PHYSICAL SPECIFICATIONS (ROLL) WIDTH 6.67 FEET (2.03 M) LENGTH 108 FEET (32.92 M) WEIGHT 52.22 LBS (23.69 KG) AREA 80.0 YD"2 (66.9 M"2) NAG SC-150BN 12" 3"(7.5cm 0 1. PREPARE SOIL BEFORE INSTALLING ROLLED EROSION CONTROL PRODUCTS (RECPS), INCLUDING ANY NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED. 2. BEGIN AT THE TOP OF THE SLOPE BY ANCHORING THE RECPS IN A 6"(15CM) DEEP X 6"(15CM) WIDE TRENCH WITH APPROXIMATELY 12" (30CM) OF RECPS EXTENDED BEYOND THE UP -SLOPE PORTION OF THE TRENCH. ANCHOR THE RECPS WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (30CM) APART IN THE BOTTOM OF THE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO THE COMPACTED SOIL AND FOLD THE REMAINING 12"(30CM) PORTION OF RECPS BACK OVER THE SEED AND COMPACTED SOIL. SECURE RECPS OVER COMPACTED SOIL WITH A ROW OF STAPLES/STAKES SPACED APPROXIMATELY 12"(30CM) APART ACROSS THE WIDTH OF THE RECPS. 3. ROLL THE RECPS (A) DOWN OR (B) HORIZONTALLY ACROSS THE SLOPE. RECPS WILL UNROLL WITH APPROPRIATE SIDE AGAINST THE SOIL SURFACE. ALL RECPS MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES/STAKES IN APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE. 4. THE EDGES OF PARALLEL RECPS MUST BE STAPLED WITH APPROXIMATELY 2" - 5" (5-12.5CM) OVERLAP DEPENDING ON THE RECPS TYPE. 5. CONSECUTIVE RECPS SPLICED DOWN THE SLOPE MUST BE END OVER END (SHINGLE STYLE) WITH AN APPROXIMATE 3"(7.5CM) OVERLAP. STAPLE THROUGH OVERLAPPED AREA, APPROXIMATELY 12"(30CM) APART ACROSS ENTIRE RECPS WIDTH. *NOTE: IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE OR STAKE LENGTHS GREATER THAN 6"(15CM) MAY BE NECESSARY TO PROPERLY SECURE THE RECPS. NORTH AMERICAN GREEN MATERIAL SPECIFICATIONS C-125BN THE LONG-TERM DOUBLE NET EROSION CONTROL BLANKET SHALL BE A MACHINE PRODUCED MAT OF 100% COCONUT FIBER WITH A FUNCTIONAL LONGEVITY OF UP TO 24 MONTHS. (NOTE: FUNCTIONAL LONGEVITY MAY VARY DEPENDING UPON CLIMATIC CONDITIONS, SOIL, GEOGRAPHICAL LOCATION, AND ELEVATION). THE BLANKET SHALL BE OF CONSISTENT THICKNESS WITH THE COCONUT EVENLY DISTRIBUTED OVER THE ENTIRE AREA OF THE MAT. THE BLANKET SHALL BE COVERED ON THE TOP AND BOTTOM SIDES WITH 100% BIODEGRADABLE WOVEN NATURAL ORGANIC FIBER NETTING. THE NETTING SHALL CONSIST OF MACHINE DIRECTIONAL STRANDS FORMED FROM TWO INTERTWINED YARNS WITH CROSS DIRECTIONAL STRANDS INTERWOVEN THROUGH THE THE TWISTED MACHINE STRANDS (COMMONLY REFERRED TO AS LENO TO FORM AN APPROXIMATE 0.50 X 1.0 IN (1.27 X 2.54 CM) MESH. THE BLANKET SHALL BE SEWN TOGETHER ON 1.50 INCH (3.81 CM) CENTERS WITH DEGRADABLE THREAD. THE BLANKET SHALL BE MANUFACTURED WITH A COLORED THREAD STITCHED ALONG BOTH OUTER EDGES (APPROXIMATELY 2-5 INCHES [5-12.5 FROM THE EDGE) AS AN OVERLAP GUIDE FOR ADJACENT MATS. THE C125BN SHALL MEET TYPE 4 SPECIFICATION REQUIREMENTS ESTABLISHED BY THE EROSION CONTROL TECHNOLOGY COUNCIL (ECTC) AND FEDERAL HIGHWAY ADMINISTRATION'S (FHWA) FP-03 SECTION 713.17 COCONUT FIBER CHANNEL LINING SHALL BE C125BN AS MANUFACTURED BY NORTH AMERICAN GREEN, OR EQUIVALENT. THE C125BN LONG-TERM EROSION CONTROL BLANKET SHALL HAVE THE FOLLOWING PROPERTIES: MATERIAL CONTENT COCONUT FIBER 100% (0.5 LBS/YD"2) (0.27 KG/M"2) NETTING TOP: LENO WOVEN 100% BIODEGRADABLE ORGANIC JUTE 9.35 LB/1,000 FTA2 (4.5 KG/100 MA 2) BOTTOM: 100% BIODEGRADABLE ORGANIC JUTE 7.7 LB/1000 FT"2 (3.76 KG/100 M"2) THREAD BIODEGRADABLE PHYSICAL SPECIFICATIONS (ROLL) WIDTH 6.67 FEET (2.03 M) LENGTH 108 FEET (32.92 M) WEIGHT 52.22 LBS (23.69 KG) AREA 80.0 YD"2 (66.9 MA 2) NAG C-125BN SCALE: NTS \� SCALE: NTS \ v / SCALE: NTS PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 DATE REVISION(S) DESCRIPTION BY CHK JAPPD DESCRIPTION APPROVALS Er6111 PiedmontNEREROSION � ENERGY:: Natural Gas COPYRIGHT 2018 LINE 99 RECLAMATION CONTROL MATTING DETAILS L E LAN D, N C Lumberton Resource Center, Lumberton North Carolina AREA CODE 2730 DATE INITIALS REGIONAL ENGINEER ACCOUNT NUMBER 10700 PROJECT NUMBER 0227663 DATE INITIALS MGR TECH REC &STD DRAWING BY DKJ STATION ID DATE 03/20/2020 INITIALS JNT PRINCIPAL ENGINEER CHECKER INITIALS JNT STIMMEL ASSOCIATES P.A. 601 N. TRADE STREET, SUITE 200 WINSTON-SALEM. NC, 27101 338.723.1067 STIMMEL PROJECT # 20-127 REF. DWG(S) SHEET(S) 4 OF TBD I DWG SCALE N/A DWG DATE 04/10/2019 SUPERSEDED DRAWING NUMBER REVISION PNG-C-026-0001200 A DISCIPLINE / RESOURCE CENTER / LINE NUMBER