Loading...
HomeMy WebLinkAbout20140129 Ver 2_USACE Permit_20210128Strickland, Bev From: Browning, Kimberly D CIV USARMY CESAW (USA) <Kimberly.D.Browning@usace.army.mil> Sent: Thursday, January 28, 2021 4:03 PM To: Samanns, Edward Cc: Xu, Lin; Wiesner, Paul; Becker, Jonathan W.; Holthaus, Matthew; Tugwell, Todd J CIV USARMY CESAW (US); Bowers, Todd; Davis, Erin B; Haywood, Casey M CIV (USA); Wilson, Travis W.; Munzer, Olivia; Hamstead, Byron A; Baumgartner, Tim; McLendon, C S CIV USARMY CESAW (USA); Smith, Ronnie D CIV USARMY CESAW (USA); Jones, M Scott (Scott) CIV USARMY CESAW (USA) Subject: [External] Authorization of NWP 3/ NCDMS Little Buffalo Creek Mitigation Site Repair/ Cabarrus County/ SAW-2014-00386 Attachments: NWP3_NCDMS Little Buffalo Creek _SAW-2014-00386.pdf, Nationwide Permit 03 - Maintenance.pdf, LBC PCN Attach ments_1_20_21.pdf Follow Up Flag: Follow up Flag Status: Flagged CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Mr. Samanns, Attached to this message is the requested Section 404 permit authorization for the following project: Project Name: Little Buffalo Creek Mitigation Site Repair USACE Action ID: SAW-2014-00386 Location: 35.491041 ON,-80.366698°W County: Cabarrus Also attached are the corresponding regional and general conditions, and the permit compliance certification. Please note that design plans submitted with the PCN as well as all special, general and regional conditions must be strictly adhered to in order for this verification letter/authorization to remain valid. *Please note, a 401 permit may also be required. Please contact NCDWR, Erin Davis prior to starting work. This electronic copy is your official Department of the Army authorization; no paper copy will be mailed. Very Respectfully, Kim Browning Mitigation Project Manager, Regulatory Division I U.S. Army Corps of Engineers SAW-2014-00386 U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action ID: 2014-00386 County: Cararrus USGS Quad: NC -Richfield GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Applicant: Edward Samanns WSP Address: 434 Fayetteville Street, #1500 Raleigh, North Carolina 27601 Size and location of property (water body, road name/number, town, etc.): The project site is located on unnamed tributaries to and Little Buffalo Creek proper, approximately 12 miles east of Kannapolis and 2 miles southwest of Gold Hill, Cabarrus County, NC. Yadkin River Basin, HUC 03040105. PIN 5693372834. Coordinates: 35.491041°N,-80.366698 °W Waterway: Dutch Buffalo Creek River Basin: Yadkin Description of project area and activity: This permit authorizes mechanized land clearing, excavation, and the placement of fill material associated with stream repair, restoration and enhancement activities for the Little Buffalo Creek Mitigation Site. The impacts associated with this permit include 475 linear feet of stream channel. See page 2 for details. Applicable Law: ❑ Section 404 (Clean Water Act, 33 USC 1344) ❑ Section 10 (Rivers and Harbors Act, 33 USC 403) Authorization: Nationwide or Regional General Permit Number(s): NWP 3 - Maintenance SEE ATTACHED NATIONWIDE CONDITIONS AND SPECIAL CONDITIONS ON PAGE 2 OF THIS FORM Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the attached conditions and your submitted application and attached information dated January 20, 2021. Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order and/or appropriate legal action. • This verification will remain valid until the expiration date identified below unless the nationwide authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide permit. If the nationwide permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon the nationwide permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide permit's expiration, modification or revocation, unless discretionary authority has been exercised on a case -by -case basis to modify, suspend or revoke the authorization. • Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Resources (telephone 919-807-6300) to determine Section 401 requirements. SAW-2014-00386 For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (CAMA), prior to beginning work you must contact the N.C. Division of Coastal Management in Wilmington, NC, at (910) 395-3900. This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals/permits. If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program, please contact Kim Browning at (919) 554-4884 x60 or Kimberly.d.browning@usace.army.mil. BROWN INGXIMBERLY. ROWINIsigned by NG.KIMBERLY.DANIELLE.152768 DANIELLE1527683510 3510 . Corps Regulatory Official: Date: 2021.01.28 15:46:28 -0500' Date: January 28, 2021 Expiration Date of Nationwide Permit Verification: March 18, 2022 Summary of Authorized Impacts: NCDMS Little Buffalo Mitigation Site (SAW-2014-00386) Stream JD Permanent Type of Perinnial Average Impact Impact Stream (P) or Impact (PER) or stream length (linear Number Name Temporary (Linear Feet) Intermitten width feet) T t INT feet Repair UT-2 T Stabilization INT 2 75 Area 1 / excavation Repair UT-3 T Stabilization INT 1 400 Area 2 / exavation Total Loss 0* TOTAL 475 of Waters IMPACTS of the US LF *Impacts are associated with stream restoration activities and are expected to result in a net gain in Waters of the US. Additional Remarks and/or Special Permit Conditions: 1. The activities will be conducted in accordance with the information submitted and meet the conditions applicable to the NWP, as described at Part C of the NWP Program and the Wilmington District NWP Regional Conditions. 2. This Nationwide Permit verification does not imply approval of the suitability of this property for compensatory mitigation for any particular project. The use of any portion of this site as compensatory mitigation for a particular project will be determined during our public interest review and 404 (b) (1) Guidelines analysis during the permit review process for that project. Copy Furnished: NCIRT (Electronic Copy) , NCDMS 2 SAW-2014-00386 WILMINGTON DISTRICT POST -CONSTRUCTION COMPLIANCE FORM Action ID Number: SAW-2014-00386 Permittee: Edward Sammans, WSP Date Permit Issued: January 28, 2021 Project Manager: Kim Browning County: Cabarrus Project: Little Buffalo Creek Repair Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the address of the Regulatory Field Office indicated below: ® Wilmington District Mitigation Office US Army Corps of Engineers ATTN: Kim Browning 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. If you fail to comply with this permit you are subject to permit suspension, modification, or revocation. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. Signature of Permittee Date Nationwide Permit 3 - Maintenance Effective Date: March 19, 2017; Expiration Date: March 18, 2022 (NWP Final Notice, 82 FIR 1860) Nationwide Permit 3 - Maintenance. (a) The repair, rehabilitation, or replacement of any previously authorized, currently serviceable structure or fill, or of any currently serviceable structure or fill authorized by 33 CFR 330.3, provided that the structure or fill is not to be put to uses differing from those uses specified or contemplated for it in the original permit or the most recently authorized modification. Minor deviations in the structure's configuration or filled area, including those due to changes in materials, construction techniques, requirements of other regulatory agencies, or current construction codes or safety standards that are necessary to make the repair, rehabilitation, or replacement are authorized. This NWP also authorizes the removal of previously authorized structures or fills. Any stream channel modification is limited to the minimum necessary for the repair, rehabilitation, or replacement of the structure or fill; such modifications, including the removal of material from the stream channel, must be immediately adjacent to the project. This NWP also authorizes the removal of accumulated sediment and debris within, and in the immediate vicinity of, the structure or fill. This NWP also authorizes the repair, rehabilitation, or replacement of those structures or fills destroyed or damaged by storms, floods, fire or other discrete events, provided the repair, rehabilitation, or replacement is commenced, or is under contract to commence, within two years of the date of their destruction or damage. In cases of catastrophic events, such as hurricanes or tornadoes, this two-year limit may be waived by the district engineer, provided the permittee can demonstrate funding, contract, or other similar delays. (b) This NWP also authorizes the removal of accumulated sediments and debris outside the immediate vicinity of existing structures (e.g., bridges, culverted road crossings, water intake structures, etc.). The removal of sediment is limited to the minimum necessary to restore the waterway in the vicinity of the structure to the approximate dimensions that existed when the structure was built, but cannot extend farther than 200 feet in any direction from the structure. This 200 foot limit does not apply to maintenance dredging to remove accumulated sediments blocking or restricting outfall and intake structures or to maintenance dredging to remove accumulated sediments from canals associated with outfall and intake structures. All dredged or excavated materials must be deposited and retained in an area that has no waters of the United States unless otherwise specifically approved by the district engineer under separate authorization. (c) This NWP also authorizes temporary structures, fills, and work, including the use of temporary mats, necessary to conduct the maintenance activity. Appropriate measures must be taken to maintain normal downstream flows and minimize flooding to the maximum extent practicable, when temporary structures, work, and discharges, including cofferdams, are necessary for construction activities, access fills, or dewatering of construction sites. Temporary fills must consist of materials, and be placed in a manner, that will not be eroded by expected high flows. After conducting the maintenance activity, temporary fills must be removed in their entirety and the affected areas returned to pre -construction elevations. The areas affected by temporary fills must be revegetated, as appropriate. (d) This NWP does not authorize maintenance dredging for the primary purpose of navigation. This NWP does not authorize beach restoration. This NWP does not authorize new stream channelization or stream relocation projects. Notification: For activities authorized by paragraph (b) of this NWP, the permittee must submit a pre -construction notification to the district engineer prior to commencing the activity (see general condition 32). The pre - construction notification must include information regarding the original design capacities and configurations of the outfalls, intakes, small impoundments, and canals. (Authorities: Section 10 of the Rivers and Harbors Act of 1899 and section 404 of the Clean Water Act (Sections 10 and 404)) Note: This NWP authorizes the repair, rehabilitation, or replacement of any previously authorized structure or fill that does not qualify for the Clean Water Act section 404(f) exemption for maintenance. Authority: Section 10 of the Rivers and Harbors Act of 1899 and Section 404 of the Clean Water Act A. Nationwide Permit General Conditions Note: To qualify for NWP authorization, the prospective permittee must comply with the following general conditions, as applicable, in addition to any regional or case -specific conditions imposed by the division engineer or district engineer. Prospective permittees should contact the appropriate Corps district office to determine if regional conditions have been imposed on an NWP. Prospective permittees should also contact the appropriate Corps district office to determine the status of Clean Water Act Section 401 water quality certification and/ or Coastal Zone Management Act consistency for an NWP. Every person who may wish to obtain permit authorization under one or more NWPs, or who is currently relying on an existing or prior permit authorization under one or more NWPs, has been and is on notice that all of the provisions of 33 CFR 330.1 through 330.6 apply to every NWP authorization. Note especially 33 CFR 330.5 relating to the modification, suspension, or revocation of any NWP authorization. 1. Navigation. (a) No activity may cause more than a minimal adverse effect on navigation. (b) Any safety lights and signals prescribed by the U.S. Coast Guard, through regulations or otherwise, must be installed and maintained at the permittee's expense on authorized facilities in navigable waters of the United States. (c) The permittee understands and agrees that, if future operations by the United States require the removal, relocation, or other alteration, of the structure or work herein authorized, or if, in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to the free navigation of the navigable waters, the permittee will be required, upon due notice from the Corps of Engineers, to remove, relocate, or alter the structural work or obstructions caused thereby, without expense to the United States. No claim shall be made against the United States on account of any such removal or alteration. 2. Aquatic Life Movements. No activity may substantially disrupt the necessary life cycle movements of those species of aquatic life indigenous to the waterbody, including those species that normally migrate through the area, unless the activity's primary purpose is to impound water. All permanent and temporary crossings of waterbodies shall be suitably culverted, bridged, or otherwise designed and constructed to maintain low flows to sustain the movement of those aquatic species. If a bottomless culvert cannot be used, then the crossing should be designed and constructed to minimize adverse effects to aquatic life movements. 3. Spawning Areas. Activities in spawning areas during spawning seasons must be avoided to the maximum extent practicable. Activities that result in the physical destruction (e.g., through excavation, fill, or downstream smothering by substantial turbidity) of an important spawning area are not authorized. 4. Migratory Bird Breeding Areas. Activities in waters of the United States that serve as breeding areas for migratory birds must be avoided to the maximum extent practicable. 5. Shellfish Beds. No activity may occur in areas of concentrated shellfish populations, unless the activity is directly related to a shellfish harvesting activity authorized by NWPs 4 and 48, or is a shellfish seeding or habitat restoration activity authorized by NWP 27. 6. Suitable Material. No activity may use unsuitable material (e.g., trash, debris, car bodies, asphalt, etc.). Material used for construction or discharged must be free from toxic pollutants in toxic amounts (see section 307 of the Clean Water Act). 7. Water Supply Intakes. No activity may occur in the proximity of a public water supply intake, except where the activity is for the repair or improvement of public water supply intake structures or adjacent bank stabilization 8. Adverse Effects from Impoundments. If the activity creates an impoundment of water, adverse effects 2 to the aquatic system due to accelerating the passage of water, and/or restricting its flow must be minimized to the maximum extent practicable. 9. Management of Water Flows. To the maximum extent practicable, the preconstruction course, condition, capacity, and location of open waters must be maintained for each activity, including stream channelization, storm water management activities, and temporary and permanent road crossings, except as provided below. The activity must be constructed to withstand expected high flows. The activity must not restrict or impede the passage of normal or high flows, unless the primary purpose of the activity is to impound water or manage high flows. The activity may alter the preconstruction course, condition, capacity, and location of open waters if it benefits the aquatic environment (e.g., stream restoration or relocation activities). 10. Fills Within 100-Year Floodplains. The activity must comply with applicable FEMA-approved state or local floodplain management requirements. 11. Equipment. Heavy equipment working in wetlands or mudflats must be placed on mats, or other measures must be taken to minimize soil disturbance. 12. Soil Erosion and Sediment Controls. Appropriate soil erosion and sediment controls must be used and maintained in effective operating condition during construction, and all exposed soil and other fills, as well as any work below the ordinary high water mark or high tide line, must be permanently stabilized at the earliest practicable date. Permittees are encouraged to perform work within waters of the United States during periods of low -flow or no -flow, or during low tides. 13. Removal of Temporary Fills. Temporary fills must be removed in their entirety and the affected areas returned to pre -construction elevations. The affected areas must be revegetated, as appropriate. 14. Proper Maintenance. Any authorized structure or fill shall be properly maintained, including maintenance to ensure public safety and compliance with applicable NWP general conditions, as well as any activity -specific conditions added by the district engineer to an NWP authorization. 15. Single and Complete Project. The activity must be a single and complete project. The same NWP cannot be used more than once for the same single and complete project. 16. Wild and Scenic Rivers. (a) No NWP activity may occur in a component of the National Wild and Scenic River System, or in a river officially designated by Congress as a "study river" for possible inclusion in the system while the river is in an official study status, unless the appropriate Federal agency with direct management responsibility for such river, has determined in writing that the proposed activity will not adversely affect the Wild and Scenic River designation or study status. (b) If a proposed NWP activity will occur in a component of the National Wild and Scenic River System, or in a river officially designated by Congress as a "study river" for possible inclusion in the system while the river is in an official study status, the permittee must submit a pre- construction notification (see general condition 32). The district engineer will coordinate the PCN with the Federal agency with direct management responsibility for that river. The permittee shall not begin the NWP activity until notified by the district engineer that the Federal agency with direct management responsibility for that river has determined in writing that the proposed NWP activity will not adversely affect the Wild and Scenic River designation or study status. (c) Information on Wild and Scenic Rivers may be obtained from the appropriate Federal land management agency responsible for the designated Wild and Scenic River or study river (e.g., National Park Service, U.S. Forest Service, Bureau of Land Management, U.S. Fish and Wildlife Service). Information on these rivers is also available at: http://www.rivers.gov/. 3 17. Tribal Rights. No NWP activity may cause more than minimal adverse effects on tribal rights (including treaty rights), protected tribal resources, or tribal lands. 18. Endangered Species. (a) No activity is authorized under any NWP which is likely to directly or indirectly jeopardize the continued existence of a threatened or endangered species or a species proposed for such designation, as identified under the Federal Endangered Species Act (ESA), or which will directly or indirectly destroy or adversely modify the critical habitat of such species. No activity is authorized under any NWP which "may affect" a listed species or critical habitat, unless ESA section 7 consultation addressing the effects of the proposed activity has been completed. Direct effects are the immediate effects on listed species and critical habitat caused by the NWP activity. Indirect effects are those effects on listed species and critical habitat that are caused by the NWP activity and are later in time, but still are reasonably certain to occur. (b) Federal agencies should follow their own procedures for complying with the requirements of the ESA. If preconstruction notification is required for the proposed activity, the Federal permittee must provide the district engineer with the appropriate documentation to demonstrate compliance with those requirements. The district engineer will verify that the appropriate documentation has been submitted. If the appropriate documentation has not been submitted, additional ESA section 7 consultation may be necessary for the activity and the respective federal agency would be responsible for fulfilling its obligation under section 7 of the ESA. (c) Non-federal permittees must submit a pre -construction notification to the district engineer if any listed species or designated critical habitat might be affected or is in the vicinity of the activity, or if the activity is located in designated critical habitat, and shall not begin work on the activity until notified by the district engineer that the requirements of the ESA have been satisfied and that the activity is authorized. For activities that might affect Federally -listed endangered or threatened species or designated critical habitat, the pre -construction notification must include the name(s) of the endangered or threatened species that might be affected by the proposed activity or that utilize the designated critical habitat that might be affected by the proposed activity. The district engineer will determine whether the proposed activity "may affect" or will have "no effect" to listed species and designated critical habitat and will notify the non- Federal applicant of the Corps' determination within 45 days of receipt of a complete pre- construction notification. In cases where the non -Federal applicant has identified listed species or critical habitat that might be affected or is in the vicinity of the activity, and has so notified the Corps, the applicant shall not begin work until the Corps has provided notification that the proposed activity will have "no effect" on listed species or critical habitat, or until ESA section 7 consultation has been completed. If the non -Federal applicant has not heard back from the Corps within 45 days, the applicant must still wait for notification from the Corps. (d) As a result of formal or informal consultation with the FWS or NMFS the district engineer may add species - specific permit conditions to the NWPs. (e) Authorization of an activity by an NWP does not authorize the "take" of a threatened or endangered species as defined under the ESA. In the absence of separate authorization (e.g., an ESA Section 10 Permit, a Biological Opinion with "incidental take" provisions, etc.) from the FWS or the NMFS, the Endangered Species Act prohibits any person subject to the jurisdiction of the United States to take a listed species, where "take" means to harass, harm, pursue, hunt, shoot, wound, kill, trap, capture, or collect, or to attempt to engage in any such conduct. The word "harm" in the definition of "take" means an act which actually kills or injures wildlife. Such an act may include significant habitat modification or degradation where it actually kills or injures wildlife by significantly impairing essential behavioral patterns, including breeding, feeding or sheltering. (f) If the non-federal permittee has a valid ESA section 10(a)(1)(B) incidental take permit with an approved Habitat Conservation Plan for a project or a group of projects that includes the proposed NWP activity, the non- federal applicant should provide a copy of that ESA section 10(a)(1)(B) permit with the PCN required by 4 paragraph (c) of this general condition. The district engineer will coordinate with the agency that issued the ESA section 10(a)(1)(B) permit to determine whether the proposed NWP activity and the associated incidental take were considered in the internal ESA section 7 consultation conducted for the ESA section 10(a)(1)(B) permit. If that coordination results in concurrence from the agency that the proposed NWP activity and the associated incidental take were considered in the internal ESA section 7 consultation for the ESA section 10(a)(1)(B) permit, the district engineer does not need to conduct a separate ESA section 7 consultation for the proposed NWP activity. The district engineer will notify the non-federal applicant within 45 days of receipt of a complete pre - construction notification whether the ESA section 10(a)(1)(B) permit covers the proposed NWP activity or whether additional ESA section 7 consultation is required. (g) Information on the location of threatened and endangered species and their critical habitat can be obtained directly from the offices of the FWS and NMFS or their world wide Web pages at http://www.fws.gov/ or http:// www.fws.gov/ipac and http://www.nmfs.noaa.gov/pr/species/esa/ respectively. 19. Migratory Birds and Bald and Golden Eagles. The permittee is responsible for ensuring their action complies with the Migratory Bird Treaty Act and the Bald and Golden Eagle Protection Act. The permittee is responsible for contacting appropriate local office of the U.S. Fish and Wildlife Service to determine applicable measures to reduce impacts to migratory birds or eagles, including whether "incidental take" permits are necessary and available under the Migratory Bird Treaty Act or Bald and Golden Eagle Protection Act for a particular activity. 20. Historic Properties. (a) In cases where the district engineer determines that the activity may have the potential to cause effects to properties listed, or eligible for listing, in the National Register of Historic Places, the activity is not authorized, until the requirements of Section 106 of the National Historic Preservation Act (NHPA) have been satisfied. (b) Federal permittees should follow their own procedures for complying with the requirements of section 106 of the National Historic Preservation Act. If pre -construction notification is required for the proposed NWP activity, the Federal permittee must provide the district engineer with the appropriate documentation to demonstrate compliance with those requirements. The district engineer will verify that the appropriate documentation has been submitted. If the appropriate documentation is not submitted, then additional consultation under section 106 may be necessary. The respective federal agency is responsible for fulfilling its obligation to comply with section 106. (c) Non-federal permittees must submit a pre -construction notification to the district engineer if the NWP activity might have the potential to cause effects to any historic properties listed on, determined to be eligible for listing on, or potentially eligible for listing on the National Register of Historic Places, including previously unidentified properties. For such activities, the preconstruction notification must state which historic properties might have the potential to be affected by the proposed NWP activity or include a vicinity map indicating the location of the historic properties or the potential for the presence of historic properties. Assistance regarding information on the location of, or potential for, the presence of historic properties can be sought from the State Historic Preservation Officer, Tribal Historic Preservation Officer, or designated tribal representative, as appropriate, and the National Register of Historic Places (see 33 CFR 330.4(g)). When reviewing pre -construction notifications, district engineers will comply with the current procedures for addressing the requirements of section 106 of the National Historic Preservation Act. The district engineer shall make a reasonable and good faith effort to carry out appropriate identification efforts, which may include background research, consultation, oral history interviews, sample field investigation, and field survey. Based on the information submitted in the PCN and these identification efforts, the district engineer shall determine whether the proposed NWP activity has the potential to cause effects on the historic properties. Section 106 consultation is not required when the district engineer determines that the activity does not have the potential to cause effects on historic properties (see 36 CFR 800.3(a)). Section 106 consultation is required when the district engineer determines that the activity has the potential to cause effects on historic properties. The district engineer will conduct consultation with consulting 5 parties identified under 36 CFR 800.2(c) when he or she makes any of the following effect determinations for the purposes of section 106 of the NHPA: no historic properties affected, no adverse effect, or adverse effect. Where the non -Federal applicant has identified historic properties on which the activity might have the potential to cause effects and so notified the Corps, the non -Federal applicant shall not begin the activity until notified by the district engineer either that the activity has no potential to cause effects to historic properties or that NHPA section 106 consultation has been completed. (d) For non-federal permittees, the district engineer will notify the prospective permittee within 45 days of receipt of a complete pre -construction notification whether NHPA section 106 consultation is required. If NHPA section 106 consultation is required, the district engineer will notify the non -Federal applicant that he or she cannot begin the activity until section 106 consultation is completed. If the non -Federal applicant has not heard back from the Corps within 45 days, the applicant must still wait for notification from the Corps. (e) Prospective permittees should be aware that section 110k of the NHPA (54 U.S.C. 306113) prevents the Corps from granting a permit or other assistance to an applicant who, with intent to avoid the requirements of section 106 of the NHPA, has intentionally significantly adversely affected a historic property to which the permit would relate, or having legal power to prevent it, allowed such significant adverse effect to occur, unless the Corps, after consultation with the Advisory Council on Historic Preservation (ACHP), determines that circumstances justify granting such assistance despite the adverse effect created or permitted by the applicant. If circumstances justify granting the assistance, the Corps is required to notify the ACHP and provide documentation specifying the circumstances, the degree of damage to the integrity of any historic properties affected, and proposed mitigation. This documentation must include any views obtained from the applicant, SHPO/THPO, appropriate Indian tribes if the undertaking occurs on or affects historic properties on tribal lands or affects properties of interest to those tribes, and other parties known to have a legitimate interest in the impacts to the permitted activity on historic properties. 21. Discovery of Previously Unknown Remains and Artifacts. If you discover any previously unknown historic, cultural or archeological remains and artifacts while accomplishing the activity authorized by this permit, you must immediately notify the district engineer of what you have found, and to the maximum extent practicable, avoid construction activities that may affect the remains and artifacts until the required coordination has been completed. The district engineer will initiate the Federal, Tribal, and state coordination required to determine if the items or remains warrant a recovery effort or if the site is eligible for listing in the National Register of Historic Places. 22. Designated Critical Resource Waters. Critical resource waters include, NOAA-managed marine sanctuaries and marine monuments, and National Estuarine Research Reserves. The district engineer may designate, after notice and opportunity for public comment, additional waters officially designated by a state as having particular environmental or ecological significance, such as outstanding national resource waters or state natural heritage sites. The district engineer may also designate additional critical resource waters after notice and opportunity for public comment. (a) Discharges of dredged or fill material into waters of the United States are not authorized by NWPs 7, 12, 14, 16, 17, 21, 29, 31, 35, 39, 40, 42, 43, 44, 49, 50, 51, and 52 for any activity within, or directly affecting, critical resource waters, including wetlands adjacent to such waters. (b) For NWPs 3, 8, 10, 13, 15, 18, 19, 22, 23, 25, 27, 28, 30, 33, 34, 36, 37, 38, and 54, notification is required in accordance with general condition 32, for any activity proposed in the designated critical resource waters including wetlands adjacent to those waters. The district engineer may authorize activities under these NWPs only after it is determined that the impacts to the critical resource waters will be no more than minimal. 23. Mitigation. The district engineer will consider the following factors when determining appropriate and practicable mitigation necessary to ensure that the individual and cumulative adverse environmental effects 6 are no more than minimal: (a) The activity must be designed and constructed to avoid and minimize adverse effects, both temporary and permanent, to waters of the United States to the maximum extent practicable at the project site (i.e., on site). (b) Mitigation in all its forms (avoiding, minimizing, rectifying, reducing, or compensating for resource losses) will be required to the extent necessary to ensure that the individual and cumulative adverse environmental effects are no more than minimal. (c) Compensatory mitigation at a minimum one -for -one ratio will be required for all wetland losses that exceed IIAO-acre and require preconstruction notification, unless the district engineer determines in writing that either some other form of mitigation would be more environmentally appropriate or the adverse environmental effects of the proposed activity are no more than minimal, and provides an activity -specific waiver of this requirement. For wetland losses of 1/10-acre or less that require preconstruction notification, the district engineer may determine on a case -by -case basis that compensatory mitigation is required to ensure that the activity results in only minimal adverse environmental effects. (d) For losses of streams or other open waters that require pre -construction notification, the district engineer may require compensatory mitigation to ensure that the activity results in no more than minimal adverse environmental effects. Compensatory mitigation for losses of streams should be provided, if practicable, through stream rehabilitation, enhancement, or preservation, since streams are difficult to -replace resources (see 33 CFR 332.3(e)(3)). (e) Compensatory mitigation plans for NWP activities in or near streams or other open waters will normally include a requirement for the restoration or enhancement, maintenance, and legal protection (e.g., conservation easements) of riparian areas next to open waters. In some cases, the restoration or maintenance/protection of riparian areas may be the only compensatory mitigation required. Restored riparian areas should consist of native species. The width of the required riparian area will address documented water quality or aquatic habitat loss concerns. Normally, the riparian area will be 25 to 50 feet wide on each side of the stream, but the district engineer may require slightly wider riparian areas to address documented water quality or habitat loss concerns. If it is not possible to restore or maintain/protect a riparian area on both sides of a stream, or if the waterbody is a lake or coastal waters, then restoring or maintaining/protecting a riparian area along a single bank or shoreline may be sufficient. Where both wetlands and open waters exist on the project site, the district engineer will determine the appropriate compensatory mitigation (e.g., riparian areas and/or wetlands compensation) based on what is best for the aquatic environment on a watershed basis. In cases where riparian areas are determined to be the most appropriate form of minimization or compensatory mitigation, the district engineer may waive or reduce the requirement to provide wetland compensatory mitigation for wetland losses. (f) Compensatory mitigation projects provided to offset losses of aquatic resources must comply with the applicable provisions of 33 CFR part 332. (1) The prospective permittee is responsible for proposing an appropriate compensatory mitigation option if compensatory mitigation is necessary to ensure that the activity results in no more than minimal adverse environmental effects. For the NWPs, the preferred mechanism for providing compensatory mitigation is mitigation bank credits or in -lieu fee program credits (see 33 CFR 332.3(b)(2) and (3)). However, if an appropriate number and type of mitigation bank or in -lieu credits are not available at the time the PCN is submitted to the district engineer, the district engineer may approve the use of permittee-responsible mitigation. (2) The amount of compensatory mitigation required by the district engineer must be sufficient to ensure that the authorized activity results in no more than minimal individual and cumulative adverse environmental effects (see 33 CFR 330.1(e)(3)). (See also 33 CFR 332.3(f)). 7 (3) Since the likelihood of success is greater and the impacts to potentially valuable uplands are reduced, aquatic resource restoration should be the first compensatory mitigation option considered for permittee- responsible mitigation. (4) If permittee-responsible mitigation is the proposed option, the prospective permittee is responsible for submitting a mitigation plan. A conceptual or detailed mitigation plan may be used by the district engineer to make the decision on the NWP verification request, but a final mitigation plan that addresses the applicable requirements of 33 CFR 332.4(c)(2) through (14) must be approved by the district engineer before the permittee begins work in waters of the United States, unless the district engineer determines that prior approval of the final mitigation plan is not practicable or not necessary to ensure timely completion of the required compensatory mitigation (see 33 CFR 332.3(k)(3)). (5) If mitigation bank or in -lieu fee program credits are the proposed option, the mitigation plan only needs to address the baseline conditions at the impact site and the number of credits to be provided. (6) Compensatory mitigation requirements (e.g., resource type and amount to be provided as compensatory mitigation, site protection, ecological performance standards, monitoring requirements) may be addressed through conditions added to the NWP authorization, instead of components of a compensatory mitigation plan (see 33 CFR 332.4(c)(1)(ii)). (g) Compensatory mitigation will not be used to increase the acreage losses allowed by the acreage limits of the NWPs. For example, if an NWP has an acreage limit of 1/2-acre, it cannot be used to authorize any NWP activity resulting in the loss of greater than 12- acre of waters of the United States, even if compensatory mitigation is provided that replaces or restores some of the lost waters. However, compensatory mitigation can and should be used, as necessary, to ensure that an NWP activity already meeting the established acreage limits also satisfies the no more than minimal impact requirement for the NWPs. (h) Permittees may propose the use of mitigation banks, in -lieu fee programs, or permittee- responsible mitigation. When developing a compensatory mitigation proposal, the permittee must consider appropriate and practicable options consistent with the framework at 33 CFR 332.3(b). For activities resulting in the loss of marine or estuarine resources, permittee responsible mitigation may be environmentally preferable if there are no mitigation banks or in- lieu fee programs in the area that have marine or estuarine credits available for sale or transfer to the permittee. For permittee responsible mitigation, the special conditions of the NWP verification must clearly indicate the party or parties responsible for the implementation and performance of the compensatory mitigation project, and, if required, its long-term management. (i) Where certain functions and services of waters of the United States are permanently adversely affected by a regulated activity, such as discharges of dredged or fill material into waters of the United States that will convert a forested or scrub -shrub wetland to a herbaceous wetland in a permanently maintained utility line right-of-way, mitigation may be required to reduce the adverse environmental effects of the activity to the no more than minimal level. 24. Safety of Impoundment Structures. To ensure that all impoundment structures are safely designed, the district engineer may require non -Federal applicants to demonstrate that the structures comply with established state dam safety criteria or have been designed by qualified persons. The district engineer may also require documentation that the design has been independently reviewed by similarly qualified persons, and appropriate modifications made to ensure safety. 25. Water Quality. Where States and authorized Tribes, or EPA where applicable, have not previously certified compliance of an NWP with CWA section 401, individual 401 Water Quality Certification must be obtained or waived (see 33 CFR 330.4(c)). The district engineer or State or Tribe may require additional water quality management measures to ensure that the authorized activity does not result in more than minimal degradation of 8 water quality 26. Coastal Zone Management. In coastal states where an NWP has not previously received a state coastal zone management consistency concurrence, an individual state coastal zone management consistency concurrence must be obtained, or a presumption of concurrence must occur (see 33 CFR 330.4(d)). The district engineer or a State may require additional measures to ensure that the authorized activity is consistent with state coastal zone management requirements. 27. Regional and Case -By -Case Conditions. The activity must comply with any regional conditions that may have been added by the Division Engineer (see 33 CFR 330.4(e)) and with any case specific conditions added by the Corps or by the state, Indian Tribe, or U.S. EPA in its section 401 Water Quality Certification, or by the state in its Coastal Zone Management Act consistency determination. 28. Use of Multiple Nationwide Permits. Use of Multiple Nationwide Permits. The use of more than one NWP for a single and complete project is prohibited, except when the acreage loss of waters of the United States authorized by the NWPs does not exceed the acreage limit of the NWP with the highest specified acreage limit. For example, if a road crossing over tidal waters is constructed under NWP 14, with associated bank stabilization authorized by NWP 13, the maximum acreage loss of waters of the United States for the total project cannot exceed V3- acre. 29. Transfer of Nationwide Permit Verifications. If the permittee sells the property associated with a nationwide permit verification, the permittee may transfer the nationwide permit verification to the new owner by submitting a letter to the appropriate Corps district office to validate the transfer. A copy of the nationwide permit verification must be attached to the letter, and the letter must contain the following statement and signature: "When the structures or work authorized by this nationwide permit are still in existence at the time the property is transferred, the terms and conditions of this nationwide permit, including any special conditions, will continue to be binding on the new owner(s) of the property. To validate the transfer of this nationwide permit and the associated liabilities associated with compliance with its terms and conditions, have the transferee sign and date below." (Transferee) (Date) 30. Compliance Certification. Each permittee who receives an NWP verification letter from the Corps must provide a signed certification documenting completion of the authorized activity and implementation of any required compensatory mitigation. The success of any required permittee-responsible mitigation, including the achievement of ecological performance standards, will be addressed separately by the district engineer. The Corps will provide the permittee the certification document with the NWP verification letter. The certification document will include: (a) A statement that the authorized activity was done in accordance with the NWP authorization, including any general, regional, or activity -specific conditions; 9 (b) A statement that the implementation of any required compensatory mitigation was completed in accordance with the permit conditions. If credits from a mitigation bank or in -lieu fee program are used to satisfy the compensatory mitigation requirements, the certification must include the documentation required by 33 CFR 332.3(I)(3) to confirm that the permittee secured the appropriate number and resource type of credits; and (c) The signature of the permittee certifying the completion of the activity and mitigation. The completed certification document must be submitted to the district engineer within 30 days of completion of the authorized activity or the implementation of any required compensatory mitigation, whichever occurs later. 31. Activities Affecting Structures or Works Built by the United States. If an NWP activity also requires permission from the Corps pursuant to 33 U.S.C. 408 because it will alter or temporarily or permanently occupy or use a U.S. Army Corps of Engineers (USACE) federally authorized Civil Works project (a "USACE project"), the prospective permittee must submit a preconstruction notification. See paragraph (b)(10) of general condition 32. An activity that requires section 408 permission is not authorized by NWP until the appropriate Corps office issues the section 408 permission to alter, occupy, or use the USACE project, and the district engineer issues a written NWP verification. 32. Pre -Construction Notification. (a) Timing. Where required by the terms of the NWP, the prospective permittee must notify the district engineer by submitting a pre -construction notification (PCN) as early as possible. The district engineer must determine if the PCN is complete within 30 calendar days of the date of receipt and, if the PCN is determined to be incomplete, notify the prospective permittee within that 30 day period to request the additional information necessary to make the PCN complete. The request must specify the information needed to make the PCN complete. As a general rule, district engineers will request additional information necessary to make the PCN complete only once. However, if the prospective permittee does not provide all of the requested information, then the district engineer will notify the prospective permittee that the PCN is still incomplete and the PCN review process will not commence until all of the requested information has been received by the district engineer. The prospective permittee shall not begin the activity until either: (1) He or she is notified in writing by the district engineer that the activity may proceed under the NWP with any special conditions imposed by the district or division engineer; or (2) 45 calendar days have passed from the district engineer's receipt of the complete PCN and the prospective permittee has not received written notice from the district or division engineer. However, if the permittee was required to notify the Corps pursuant to general condition 18 that listed species or critical habitat might be affected or are in the vicinity of the activity, or to notify the Corps pursuant to general condition 20 that the activity might have the potential to cause effects to historic properties, the permittee cannot begin the activity until receiving written notification from the Corps that there is "no effect" on listed species or "no potential to cause effects" on historic properties, or that any consultation required under Section 7 of the Endangered Species Act (see 33 CFR 330.4(f)) and/or section 106 of the National Historic Preservation Act (see 33 CFR 330.4(g)) has been completed. Also, work cannot begin under NWPs 21, 49, or 50 until the permittee has received written approval from the Corps. If the proposed activity requires a written waiver to exceed specified limits of an NWP, the permittee may not begin the activity until the district engineer issues the waiver. If the district or division engineer notifies the permittee in writing that an individual permit is required within 45 calendar days of receipt of a complete PCN, the permittee cannot begin the activity until an individual permit has been obtained. Subsequently, the permittee's right to proceed under the NWP may be modified, suspended, or revoked only in accordance with the procedure set forth in 33 CFR 330.5(d)(2). (b) Contents of Pre -Construction Notification: The PCN must be in writing and include the following information: (1) Name, address and telephone numbers of the prospective permittee; 10 (2) Location of the proposed activity; (3) Identify the specific NWP or NWP(s) the prospective permittee wants to use to authorize the proposed activity; (4) A description of the proposed activity; the activity's purpose; direct and indirect adverse environmental effects the activity would cause, including the anticipated amount of loss of wetlands, other special aquatic sites, and other waters expected to result from the NWP activity, in acres, linear feet, or other appropriate unit of measure; a description of any proposed mitigation measures intended to reduce the adverse environmental effects caused by the proposed activity; and any other NWP(s), regional general permit(s), or individual permit(s) used or intended to be used to authorize any part of the proposed project or any related activity, including other separate and distant crossings for linear projects that require Department of the Army authorization but do not require pre - construction notification. The description of the proposed activity and any proposed mitigation measures should be sufficiently detailed to allow the district engineer to determine that the adverse environmental effects of the activity will be no more than minimal and to determine the need for compensatory mitigation or other mitigation measures. For single and complete linear projects, the PCN must include the quantity of anticipated losses of wetlands, other special aquatic sites, and other waters for each single and complete crossing of those wetlands, other special aquatic sites, and other waters. Sketches should be provided when necessary to show that the activity complies with the terms of the NWP. (Sketches usually clarify the activity and when provided results in a quicker decision. (Sketches usually clarify the activity and when provided results in a quicker decision. Sketches should contain sufficient detail to provide an illustrative description of the proposed activity (e.g., a conceptual plan), but do not need to be detailed engineering plans); (5) The PCN must include a delineation of wetlands, other special aquatic sites, and other waters, such as lakes and ponds, and perennial, intermittent, and ephemeral streams, on the project site. Wetland delineations must be prepared in accordance with the current method required by the Corps. The permittee may ask the Corps to delineate the special aquatic sites and other waters on the project site, but there may be a delay if the Corps does the delineation, especially if the project site is large or contains many wetlands, other special aquatic sites, and other waters. Furthermore, the 45 day period will not start until the delineation has been submitted to or completed by the Corps, as appropriate; (6) If the proposed activity will result in the loss of greater than 1A O-acre of wetlands and a PCN is required, the prospective permittee must submit a statement describing how the mitigation requirement will be satisfied, or explaining why the adverse environmental effects are no more than minimal and why compensatory mitigation should not be required. As an alternative, the prospective permittee may submit a conceptual or detailed mitigation plan. (7) For non -Federal permittees, if any listed species or designated critical habitat might be affected or is in the vicinity of the activity, or if the activity is located in designated critical habitat, the PCN must include the name(s) of those endangered or threatened species that might be affected by the proposed activity or utilize the designated critical habitat that might be affected by the proposed activity. For NWP activities that require pre - construction notification, Federal permittees must provide documentation demonstrating compliance with the Endangered Species Act; (8) For non -Federal permittees, if the NWP activity might have the potential to cause effects to a historic property listed on, determined to be eligible for listing on, or potentially eligible for listing on, the National Register of Historic Places, the PCN must state which historic property might have the potential to be affected by the proposed activity or include a vicinity map indicating the location of the historic property. For NWP activities that require pre -construction notification, Federal permittees must provide documentation demonstrating compliance with section 106 of the National Historic Preservation Act; 11 (9) For an activity that will occur in a component of the National Wild and Scenic River System, or in a river officially designated by Congress as a "study river" for possible inclusion in the system while the river is in an official study status, the PCN must identify the Wild and Scenic River or the "study river" (see general condition 16); and (10) For an activity that requires permission from the Corps pursuant to 33 U.S.C. 408 because it will alter or temporarily or permanently occupy or use a U.S. Army Corps of Engineers federally authorized civil works project, the pre -construction notification must include a statement confirming that the project proponent has submitted a written request for section 408 permission from the Corps office having jurisdiction over that USACE project. (c) Form of Pre -Construction Notification: The standard individual permit application form (Form ENG 4345) may be used, but the completed application form must clearly indicate that it is an NWP PCN and must include all of the applicable information required in paragraphs (b)(1) through (10) of this general condition. A letter containing the required information may also be used. Applicants may provide electronic files of PCNs and supporting materials if the district engineer has established tools and procedures for electronic submittals. (d) Agency Coordination: (1) The district engineer will consider any comments from Federal and state agencies concerning the proposed activity's compliance with the terms and conditions of the NWPs and the need for mitigation to reduce the activity's adverse environmental effects so that they are no more than minimal. (2) Agency coordination is required for: (i) All NWP activities that require pre -construction notification and result in the loss of greater than 1/2-acre of waters of the United States; (ii) NWP 21, 29, 39, 40, 42, 43, 44, 50, 51, and 52 activities that require pre -construction notification and will result in the loss of greater than 300 linear feet of stream bed; (iii) NWP 13 activities in excess of 500 linear feet, fills greater than one cubic yard per running foot, or involve discharges of dredged or fill material into special aquatic sites; and (iv) NWP 54 activities in excess of 500 linear feet, or that extend into the waterbody more than 30 feet from the mean low water line in tidal waters or the ordinary high water mark in the Great Lakes. (3) When agency coordination is required, the district engineer will immediately provide (e.g., via email, facsimile transmission, overnight mail, or other expeditious manner) a copy of the complete PCN to the appropriate Federal or state offices (FWS, state natural resource or water quality agency, EPA, and, if appropriate, the NMFS). With the exception of NWP 37, these agencies will have 10 calendar days from the date the material is transmitted to notify the district engineer via telephone, facsimile transmission, or email that they intend to provide substantive, site -specific comments. The comments must explain why the agency believes the adverse environmental effects will be more than minimal. If so contacted by an agency, the district engineer will wait an additional 15 calendar days before making a decision on the preconstruction notification. The district engineer will fully consider agency comments received within the specified time frame concerning the proposed activity's compliance with the terms and conditions of the NWPs, including the need for mitigation to ensure the net adverse environmental effects of the proposed activity are no more than minimal. The district engineer will provide no response to the resource agency, except as provided below. The district engineer will indicate in the administrative record associated with each pre -construction notification that the resource agencies' concerns were considered. For NWP 37, the emergency watershed protection and rehabilitation activity may proceed immediately in cases where there is an unacceptable hazard to life or a significant loss of property or economic hardship will occur. The district engineer will consider any comments received to decide whether the NWP 37 authorization should be modified, suspended, or revoked in accordance with the procedures at 33 CFR 330.5. (4) In cases of where the prospective permittee is not a Federal agency, the district engineer will provide a response to NMFS within 30 calendar days of receipt of any Essential Fish Habitat conservation recommendations, as required by section 305(b)(4)(B) of the Magnuson -Stevens Fishery Conservation and Management Act. (5) Applicants are encouraged to provide the Corps with either electronic files or multiple copies of 12 preconstruction notifications to expedite agency coordination B. District Engineer's Decision. 1. In reviewing the PCN for the proposed activity, the district engineer will determine whether the activity authorized by the NWP will result in more than minimal individual or cumulative adverse environmental effects or may be contrary to the public interest. If a project proponent requests authorization by a specific NWP, the district engineer should issue the NWP verification for that activity if it meets the terms and conditions of that NWP, unless he or she determines, after considering mitigation, that the proposed activity will result in more than minimal individual and cumulative adverse effects on the aquatic environment and other aspects of the public interest and exercises discretionary authority to require an individual permit for the proposed activity. For a linear project, this determination will include an evaluation of the individual crossings of waters of the United States to determine whether they individually satisfy the terms and conditions of the NWP(s), as well as the cumulative effects caused by all of the crossings authorized by NWP. If an applicant requests a waiver of the 300 linear foot limit on impacts to streams or of an otherwise applicable limit, as provided for in NWPs 13, 21, 29, 36, 39, 40, 42, 43, 44, 50, 51, 52, or 54, the district engineer will only grant the waiver upon a written determination that the NWP activity will result in only minimal individual and cumulative adverse environmental effects. For those NWPs that have a waivable 300 linear foot limit for losses of intermittent and ephemeral stream bed and a 1/2-acre limit (i.e., NWPs 21, 29, 39, 40, 42, 43, 44, 50, 51, and 52), the loss of intermittent and ephemeral stream bed, plus any other losses of jurisdictional waters and wetlands, cannot exceed 12- acre. 2. When making minimal adverse environmental effects determinations the district engineer will consider the direct and indirect effects caused by the NWP activity. He or she will also consider the cumulative adverse environmental effects caused by activities authorized by NWP and whether those cumulative adverse environmental effects are no more than minimal. The district engineer will also consider site specific factors, such as the environmental setting in the vicinity of the NWP activity, the type of resource that will be affected by the NWP activity, the functions provided by the aquatic resources that will be affected by the NWP activity, the degree or magnitude to which the aquatic resources perform those functions, the extent that aquatic resource functions will be lost as a result of the NWP activity (e.g., partial or complete loss), the duration of the adverse effects (temporary or permanent), the importance of the aquatic resource functions to the region (e.g., watershed or ecoregion), and mitigation required by the district engineer. If an appropriate functional or condition assessment method is available and practicable to use, that assessment method may be used by the district engineer to assist in the minimal adverse environmental effects determination. The district engineer may add case -specific special conditions to the NWP authorization to address site -specific environmental concerns. 3. If the proposed activity requires a PCN and will result in a loss of greater than 1/10-acre of wetlands, the prospective permittee should submit a mitigation proposal with the PCN. Applicants may also propose compensatory mitigation for NWP activities with smaller impacts, or for impacts to other types of waters (e.g., streams). The district engineer will consider any proposed compensatory mitigation or other mitigation measures the applicant has included in the proposal in determining whether the net adverse environmental effects of the proposed activity are no more than minimal. The compensatory mitigation proposal may be either conceptual or detailed. If the district engineer determines that the activity complies with the terms and conditions of the NWP and that the adverse environmental effects are no more than minimal, after considering mitigation, the district engineer will notify the permittee and include any activity specific conditions in the NWP verification the district engineer deems necessary. Conditions for compensatory mitigation requirements must comply with the appropriate provisions at 33 CFR 332.3(k). The district engineer must approve the final mitigation plan before the permittee commences work in waters of the United States, unless the district engineer determines that prior approval of the final mitigation plan is not practicable or not necessary to ensure timely completion of the required compensatory mitigation. If the prospective permittee elects to submit a compensatory mitigation plan with the PCN, the district engineer will expeditiously review the proposed compensatory mitigation plan. The district engineer must review the proposed compensatory mitigation plan within 45 calendar days of receiving a complete PCN and determine whether the proposed mitigation would ensure the NWP activity results in no more than 13 minimal adverse environmental effects. If the net adverse environmental effects of the NWP activity (after consideration of the mitigation proposal) are determined by the district engineer to be no more than minimal, the district engineer will provide a timely written response to the applicant. The response will state that the NWP activity can proceed under the terms and conditions of the NWP, including any activity -specific conditions added to the NWP authorization by the district engineer. 4. If the district engineer determines that the adverse environmental effects of the proposed activity are more than minimal, then the district engineer will notify the applicant either: (a) That the activity does not qualify for authorization under the NWP and instruct the applicant on the procedures to seek authorization under an individual permit; (b) that the activity is authorized under the NWP subject to the applicant's submission of a mitigation plan that would reduce the adverse environmental effects so that they are no more than minimal; or (c) that the activity is authorized under the NWP with specific modifications or conditions. Where the district engineer determines that mitigation is required to ensure no more than minimal adverse environmental effects, the activity will be authorized within the 45-day PCN period (unless additional time is required to comply with general conditions 18, 20, and/or 31, or to evaluate PCNs for activities authorized by NWPs 21, 49, and 50), with activity specific conditions that state the mitigation requirements. The authorization will include the necessary conceptual or detailed mitigation plan or a requirement that the applicant submit a mitigation plan that would reduce the adverse environmental effects so that they are no more than minimal. When compensatory mitigation is required, no work in waters of the United States may occur until the district engineer has approved a specific mitigation plan or has determined that prior approval of a final mitigation plan is not practicable or not necessary to ensure timely completion of the required compensatory mitigation. C. Further Information 1. District Engineers have authority to determine if an activity complies with the terms and conditions of an NWP. 2. NWPs do not obviate the need to obtain other federal, state, or local permits, approvals, or authorizations required by law. 3. NWPs do not grant any property rights or exclusive privileges. 4. NWPs do not authorize any injury to the property or rights of others. 5. NWPs do not authorize interference with any existing or proposed Federal project (see general condition 31). D. Definitions Best management practices (BMPs): Policies, practices, procedures, or structures implemented to mitigate the adverse environmental effects on surface water quality resulting from development. BMPs are categorized as structural or non-structural. Compensatory mitigation: The restoration (re-establishment or rehabilitation), establishment (creation), enhancement, and/or in certain circumstances preservation of aquatic resources for the purposes of offsetting unavoidable adverse impacts which remain after all appropriate and practicable avoidance and minimization has been achieved. Currently serviceable: Useable as is or with some maintenance, but not so degraded as to essentially require reconstruction. Direct effects: Effects that are caused by the activity and occur at the same time and place. 14 Discharge: The term "discharge" means any discharge of dredged or fill material into waters of the United States. Ecological reference: A model used to plan and design an aquatic habitat and riparian area restoration, enhancement, or establishment activity under NWP 27. An ecological reference may be based on the structure, functions, and dynamics of an aquatic habitat type or a riparian area type that currently exists in the region where the proposed NWP 27 activity is located. Alternatively, an ecological reference may be based on a conceptual model for the aquatic habitat type or riparian area type to be restored, enhanced, or established as a result of the proposed NWP 27 activity. An ecological reference takes into account the range of variation of the aquatic habitat type or riparian area type in the region. Enhancement: The manipulation of the physical, chemical, or biological characteristics of an aquatic resource to heighten, intensify, or improve a specific aquatic resource function(s). Enhancement results in the gain of selected aquatic resource function(s), but may also lead to a decline in other aquatic resource function(s). Enhancement does not result in a gain in aquatic resource area. Ephemeral stream: An ephemeral stream has flowing water only during, and for a short duration after, precipitation events in a typical year. Ephemeral stream beds are located above the water table year-round. Groundwater is not a source of water for the stream. Runoff from rainfall is the primary source of water for stream flow. Establishment (creation): The manipulation of the physical, chemical, or biological characteristics present to develop an aquatic resource that did not previously exist at an upland site. Establishment results in a gain in aquatic resource area. High Tide Line: The line of intersection of the land with the water's surface at the maximum height reached by a rising tide. The high tide line may be determined, in the absence of actual data, by a line of oil or scum along shore objects, a more or less continuous deposit of fine shell or debris on the foreshore or berm, other physical markings or characteristics, vegetation lines, tidal gages, or other suitable means that delineate the general height reached by a rising tide. The line encompasses spring high tides and other high tides that occur with periodic frequency but does not include storm surges in which there is a departure from the normal or predicted reach of the tide due to the piling up of water against a coast by strong winds such as those accompanying a hurricane or other intense storm. Historic Property: Any prehistoric or historic district, site (including archaeological site), building, structure, or other object included in, or eligible for inclusion in, the National Register of Historic Places maintained by the Secretary of the Interior. This term includes artifacts, records, and remains that are related to and located within such properties. The term includes properties of traditional religious and cultural importance to an Indian tribe or Native Hawaiian organization and that meet the National Register criteria (36 CFR part 60). Independent utility: A test to determine what constitutes a single and complete non -linear project in the Corps Regulatory Program. A project is considered to have independent utility if it would be constructed absent the construction of other projects in the project area. Portions of a multi -phase project that depend upon other phases of the project do not have independent utility. Phases of a project that would be constructed even if the other phases were not built can be considered as separate single and complete projects with independent utility. Indirect effects: Effects that are caused by the activity and are later in time or farther removed in distance, but are still reasonably foreseeable. Intermittent stream: An intermittent stream has flowing water during certain times of the year, when groundwater provides water for stream flow. During dry periods, intermittent streams may not have flowing water. Runoff from 15 rainfall is a supplemental source of water for stream flow. Loss of waters of the United States: Waters of the United States that are permanently adversely affected by filling, flooding, excavation, or drainage because of the regulated activity. Permanent adverse effects include permanent discharges of dredged or fill material that change an aquatic area to dry land, increase the bottom elevation of a waterbody, or change the use of a waterbody. The acreage of loss of waters of the United States is a threshold measurement of the impact to jurisdictional waters for determining whether a project may qualify for an NWP; it is not a net threshold that is calculated after considering compensatory mitigation that may be used to offset losses of aquatic functions and services. The loss of stream bed includes the acres or linear feet of stream bed that are filled or excavated as a result of the regulated activity. Waters of the United States temporarily filled, flooded, excavated, or drained, but restored to pre -construction contours and elevations after construction, are not included in the measurement of loss of waters of the United States. Impacts resulting from activities that do not require Department of the Army authorization, such as activities eligible for exemptions under section 404(f) of the Clean Water Act, are not considered when calculating the loss of waters of the United States. Navigable waters: Waters subject to section 10 of the Rivers and Harbors Act of 1899. These waters are defined at 33 CFR part 329. Non -tidal wetland: A non -tidal wetland is a wetland that is not subject to the ebb and flow of tidal waters. Non - tidal wetlands contiguous to tidal waters are located landward of the high tide line (i.e., spring high tide line). Open water: For purposes of the NWPs, an open water is any area that in a year with normal patterns of precipitation has water flowing or standing above ground to the extent that an ordinary high water mark can be determined. Aquatic vegetation within the area of flowing or standing water is either non -emergent, sparse, or absent. Vegetated shallows are considered to be open waters. Examples of "open waters" include rivers, streams, lakes, and ponds. Ordinary High Water Mark: An ordinary high water mark is a line on the shore established by the fluctuations of water and indicated by physical characteristics, or by other appropriate means that consider the characteristics of the surrounding areas. Perennial stream: A perennial stream has flowing water year-round during a typical year. The water table is located above the stream bed for most of the year. Groundwater is the primary source of water for stream flow. Runoff from rainfall is a supplemental source of water for stream flow. Practicable: Available and capable of being done after taking into consideration cost, existing technology, and logistics in light of overall project purposes. Pre -construction notification: A request submitted by the project proponent to the Corps for confirmation that a particular activity is authorized by nationwide permit. The request may be a permit application, letter, or similar document that includes information about the proposed work and its anticipated environmental effects. Preconstruction notification may be required by the terms and conditions of a nationwide permit, or by regional conditions. A pre -construction notification may be voluntarily submitted in cases where preconstruction notification is not required and the project proponent wants confirmation that the activity is authorized by nationwide permit. Preservation: The removal of a threat to, or preventing the decline of, aquatic resources by an action in or near those aquatic resources. This term includes activities commonly associated with the protection and maintenance of aquatic resources through the implementation of appropriate legal and physical mechanisms. Preservation does not result in a gain of aquatic resource area or functions. Protected tribal resources: Those natural resources and properties of traditional or customary religious or 16 cultural importance, either on or off Indian lands, retained by, or reserved by or for, Indian tribes through treaties, statutes, judicial decisions, or executive orders, including tribal trust resources. Re-establishment: The manipulation of the physical, chemical, or biological characteristics of a site with the goal of returning natural/historic functions to a former aquatic resource. Reestablishment results in rebuilding a former aquatic resource and results in a gain in aquatic resource area and functions. Rehabilitation: The manipulation of the physical, chemical, or biological characteristics of a site with the goal of repairing natural/historic functions to a degraded aquatic resource. Rehabilitation results in a gain in aquatic resource function, but does not result in a gain in aquatic resource area. Restoration: The manipulation of the physical, chemical, or biological characteristics of a site with the goal of returning natural/historic functions to a former or degraded aquatic resource. For the purpose of tracking net gains in aquatic resource area, restoration is divided into two categories: Reestablishment and rehabilitation. Riffle and pool complex: Riffle and pool complexes are special aquatic sites under the 404(b)(1) Guidelines. Riffle and pool complexes sometimes characterize steep gradient sections of streams. Such stream sections are recognizable by their hydraulic characteristics. The rapid movement of water over a course substrate in riffles results in a rough flow, a turbulent surface, and high dissolved oxygen levels in the water. Pools are deeper areas associated with riffles. A slower stream velocity, a streaming flow, a smooth surface, and a finer substrate characterize pools. Riparian areas: Riparian areas are lands next to streams, lakes, and estuarine -marine shorelines. Riparian areas are transitional between terrestrial and aquatic ecosystems, through which surface and subsurface hydrology connects riverine, lacustrine, estuarine, and marine waters with their adjacent wetlands, non -wetland waters, or uplands. Riparian areas provide a variety of ecological functions and services and help improve or maintain local water quality. (See general condition 23.) Shellfish seeding: The placement of shellfish seed and/or suitable substrate to increase shellfish production. Shellfish seed consists of immature individual shellfish or individual shellfish attached to shells or shell fragments (i.e., spat on shell). Suitable substrate may consist of shellfish shells, shell fragments, or other appropriate materials placed into waters for shellfish habitat. Single and complete linear project: A linear project is a project constructed for the purpose of getting people, goods, or services from a point of origin to a terminal point, which often involves multiple crossings of one or more waterbodies at separate and distant locations. The term "single and complete project' is defined as that portion of the total linear project proposed or accomplished by one owner/developer or partnership or other association of owners/developers that includes all crossings of a single water of the United States (i.e., a single waterbody) at a specific location. For linear projects crossing a single or multiple waterbodies several times at separate and distant locations, each crossing is considered a single and complete project for purposes of NWP authorization. However, individual channels in a braided stream or river, or individual arms of a large, irregularly shaped wetland or lake, etc., are not separate waterbodies, and crossings of such features cannot be considered separately. Single and complete non -linear project: For non -linear projects, the term "single and complete project' is defined at 33 CFR 330.2(i) as the total project proposed or accomplished by one owner/developer or partnership or other association of owners/developers. A single and complete non -linear project must have independent utility (see definition of "independent utility"). Single and complete non -linear projects may not be "piecemealed" to avoid the limits in an NWP authorization. Stormwater management: Stormwater management is the mechanism for controlling stormwater runoff for the purposes of reducing downstream erosion, water quality degradation, and flooding and mitigating the adverse effects of changes in land use on the aquatic environment. 17 Stormwater management facilities: Stormwater management facilities are those facilities, including but not limited to, stormwater retention and detention ponds and best management practices, which retain water for a period of time to control runoff and/or improve the quality (i.e., by reducing the concentration of nutrients, sediments, hazardous substances and other pollutants) of stormwater runoff. Stream bed: The substrate of the stream channel between the ordinary high water marks. The substrate may be bedrock or inorganic particles that range in size from clay to boulders. Wetlands contiguous to the stream bed, but outside of the ordinary high water marks, are not considered part of the stream bed. Stream channelization: The manipulation of a stream's course, condition, capacity, or location that causes more than minimal interruption of normal stream processes. A channelized stream remains a water of the United States. Structure: An object that is arranged in a definite pattern of organization. Examples of structures include, without limitation, any pier, boat dock, boat ramp, wharf, dolphin, weir, boom, breakwater, bulkhead, revetment, riprap, jetty, artificial island, artificial reef, permanent mooring structure, power transmission line, permanently moored floating vessel, piling, aid to navigation, or any other manmade obstacle or obstruction. Tidal wetland: A tidal wetland is a jurisdictional wetland that is inundated by tidal waters. Tidal waters rise and fall in a predictable and measurable rhythm or cycle due to the gravitational pulls of the moon and sun. Tidal waters end where the rise and fall of the water surface can no longer be practically measured in a predictable rhythm due to masking by other waters, wind, or other effects. Tidal wetlands are located channelward of the high tide line. Tribal lands: Any lands title to which is either: (1) Held in trust by the United States for the benefit of any Indian tribe or individual; or (2) held by any Indian tribe or individual subject to restrictions by the United States against alienation. Tribal rights: Those rights legally accruing to a tribe or tribes by virtue of inherent sovereign authority, unextinguished aboriginal title, treaty, statute, judicial decisions, executive order or agreement, and that give rise to legally enforceable remedies. Vegetated shallows: Vegetated shallows are special aquatic sites under the 404(b)(1) Guidelines. They are areas that are permanently inundated and under normal circumstances have rooted aquatic vegetation, such as seagrasses in marine and estuarine systems and a variety of vascular rooted plants in freshwater systems. Waterbody: For purposes of the NWPs, a waterbody is a jurisdictional water of the United States. If a wetland is adjacent to a waterbody determined to be a water of the United States, that waterbody and any adjacent wetlands are considered together as a single aquatic unit (see 33 CFR 328.4(c)(2)). Examples of "waterbodies" include streams, rivers, lakes, ponds, and wetlands. ADDITIONAL INFORMATION Information about the U.S. Army Corps of Engineers regulatory program, including nationwide permits, may also be accessed at http://www.swt.usace.army.miI/Missions/Regulatory.aspx or http://www. usace.army.miI/Missions/CivilWorks/ReguIatoryProgramandPermits.aspx 18 November 16, 2020 Paul Wiesner NCDEQ — DMS 5 Ravenscroft Drive Asheville, NC 28801 RE: Little Buffalo Creek Stream Restoration Project Adaptive Management Plan NCDEQ — Division of Mitigation Services Contract #002029 DMS Project # 94147 Cabarrus County, North Carolina Yadkin River Basin - 03040105 Dear Paul, Below please find the Adaptive Management Plan (AMP) for the Little Buffalo Creek Stream Restoration Project. The AMP has been developed in accordance with comments and recommendations from the Interagency Review Team (IRT) received at the July 27, 2020 closeout site visit and follow up information received by the IRT on August 17, 2020 via email. Based on the input of the IRT and DMS an Adaptive Management Plan was developed to address the project issues outlined below. Attachments include design sheets that highlight the proposed work areas along Unnamed Tributary (UT) 2 and 3 as part of the Adaptive Management Plan. Below is an explanation of the issues and the planned work that is targeted for completion in December 2020. UT-2: Issue: An approximately 75-foot segment of the channel has an undefined bed and bank as a result of past sediment accumulation. Plan: A follow up field visit conducted on October 16, 2020 determined that the length of channel that needs to be modified is approximately 75 feet in length. A single thread channel will be excavated in this reach using the existing channel dimensions as a guide for the appropriate width and depth. The location of the channel construction is shown in Attachment A, Plan Sheet 1. Given the short segment and potential to damage trees and shrubs with large equipment the work will be completed using hand tools. Excavated material will be side cast upslope and into the riparian areas, spread out by raking and seeded with a native seed mix. The channel edge will be planted with a double row of approximately 100 live stakes at 3-foot spacing. Live stakes will consist of native species of willow (Salix), buttonbush (Cephalanthus occidentalis) and dogwoods (Cornus). The dense shrub growth will secure the channel banks, reduce the likelihood of herbaceous plant growth within the channel, and promote stability of the channel banks and floodplain zone. The major sources of sediment that may have affected this reach have been stabilized with the revegetation of the easement (former cropland) and the removal of the beavers from the upslope pond. Based on field observations the pond outfall is stable. Field observations over the past year have shown that ongoing channel adjustment to form a single channel has persisted and is likely to be maintained with the removal of potential sources of sediment. Assisted by establishment of lives stakes, and without a significant source of new sediment loads, the channel is likely to maintain its restored form over time and effectively transport sediment. UT-3: Issue: The upper portion of the UT-3 channel is poorly defined and damaged by recent cattle encroachment and sediment accumulation from the erosion of an off -site, unused cattle crossing. The area of prior bank erosion at the culvert is appears to be stable and is no longer a significant source of sediment. Plan: WSP conducted a field inspection October 9, 2020 to determine the length of channel to be restored and the extent of replanting that will be required. Channel: Based on field inspection, approximately 400 liner feet of stream channel beginning at the start of the reach at Station 10+00 extending downstream to Station 14+00 (see UT3 Plan View sheet) requires reconstruction to re-establish or reform a defined channel. WSP proposes to use a small, tracked excavator to reform and excavate the channel beginning at the downstream end of the work area and proceeding upstream to the start of the channel within the spring seep. The channel width will be restored to the original design width and depth as depicted in the typical section sheet (attached). The maintenance work will restore the channel back to its functional conditional before the bank erosion at the cattle crossing and the recent damage from the cattle encroachment occurred. Without a significant source of sediment loads, the removal of cattle encroachment and the additional tree and shrub live stake planting along the channel is likely to maintain the restored form over time. Riparian Vegetation: WSP has completed an initial fall herbicide treatment of the densest areas of tall fescue within the easement. Additional herbicide treatment will occur in the spring of 2021. Supplemental planting with native trees and shrubs within the conservation easement is planned in December 2020 concurrent with the channel work. The reconstructed channel will be replanted with approximately 800 live stakes at 3-foot spacing. A portion of the live stakes will also be planted within the spring seep at the upstream end of the UT3. Live stakes will consist of native species of willow (Salix), buttonbush (Cephalanthus occidentalis), and dogwoods (Cornus). The supplemental planting in portions of the riparian zone, outside of the live stake planting area, will focus on areas with low tree density based on the recent 2020 monitoring results. The combined areas for supplemental planting are approximately 1.0 acre in size and will be planted with a mixture of native tree species, including oaks (Quercus), sycamore (Platanus occidentalis), sugarberry (Celtis laevigata), slippery elm (Ulmus rubra) and black gum (Nyssa sylvatica). Approximately 200 plants installed at 12 to 15 foot centers are necessary to meet the required planting density. The plant material will be container grown plants in No. 1 size containers (I-gallon)with an approximate height of 3 feet. The main planting areas coincide with the two fescue treatment areas shown on the UT3 Plan View sheet, though additional small patches requiring just a few trees will also be planted. Cattle Encroachment: Issue: Recent cattle encroachments have impacted the condition of the stream channel and riparian zone on UT-3 and to a lesser degree the riparian area along portions of UT-4 and the mainstem of Little Buffalo Creek below (downstream) of Old Mine Road. The cessation of recurring cattle encroachments is a requirement of the IRT for future project closeout and credit release. Plan: WSP has been in correspondence/discussion with Mr. Marcus Harward, cattle owner and lessee of pasture from Mr. Philip Cline, as well as Mr. Cline and Mr. Allen Hamill, the primary landowner's whose land is affected by cattle encroachments. Mr. Harward indicated his willingness to do what is needed to avoid future cattle encroachments at the site, including: Keeping the gates closed at the stream crossing. Improving the fence at the crossing to prevent calves from moving through the chains when the crossing is in use. Providing a water source in the lower, western pasture. Cattle use this field primarily in the fall and winter. Conducting weekly inspections of the fence and addressing any issues to prevent cattle from accessing easement. Communicating with WSP frequently on status and findings of the weekly inspections. WSP will continue regular coordination with Mr. Harward, Mr. Cline and Mr. Allen throughout the year to track progress and compliance with these elements of the plan. In addition to these items, WSP has initiated monthly site visits to inspect the conservation easement, fence condition, and signs of cattle encroachment, and will report site findings to DMS following each visit. DMS has likewise initiated monthly site visits. The exclusion of livestock together with the planting of additional trees and shrubs along the modified channel segments of UT-2 and UT-3, and portions of the riparian zone of UT-3, will improve the rate of forest establishment within the riparian zone, improve water quality and water infiltration through soil, and provide for a stable and persistent channel and floodplain. WSP staff completed the installation of additional fencing at Old Mine Road to close off gaps between the easement fence and the bridge to prevent cattle from entering the easement from the roadway. Invasive Plants: Issue: Invasive plants have been greatly reduced to less than 5 percent cover within the easement. Some recurrence of treated species such as Chinese privet and tree -of -heaven has been noted within the easement by both WSP and DMS staff. DMS staff have also observed patches of Japanese honeysuckle. Plan: Invasive plant removal will be performed within the easement in the winter and spring using a combination of hand -pulling and cut -stump herbicide treatment. The stream restoration and enhancement corridor will be inspected and invasive plants removed or treated as encountered. Monitoring Plan: Following the completion of the stream channel corrections and additional plantings, WSP will conduct periodic visual monitoring of site conditions along the entire channel and riparian zones of UT-2 and UT-3. Site conditions will be recorded through photographs and plan notes indicating locations of active bank erosion, excessive sediment aggradation and degradation, head cuts, undercut banks, and other features indicative of active channel adjustments. If needed, any additional channel work to address localized areas of instability on UT-2 or UT-3 will be completed by hand work. Locations will be marked on a site map with approximate beginning and end points, type of feature, and photograph locations to aid in future inspections of these same areas. The dam outfall above UT-2 will also be inspected periodically for signs of erosion or new beaver activity. For UT-3 the riparian zone will be monitored for tree and shrub density in the spring using the established plot and a series of a minimum of six additional 1 Om by 1 Om plots. Both planted material and recruits will be counted. Each plot will be photographed. The general condition of the observed trees and shrubs will be recorded. A letter report will be sent to DMS with the results of the monitoring by May 30t" with recommendations to address any issues observed. A final letter report summarizing the monitoring and maintenance findings will be submitted in early fall to DMS and the IRT. Permitting Plan: Prior to implementation of any work that will directly impact aquatic resources the appropriate federal and state permits will be acquired. For this project a Nationwide Permit No. 3 for maintenance will be required from the USACE, and a Section 401 Water Quality Certificate will be required from the NC Division of Water Quality. Permit applications and supporting materials will be prepared and submitted to each agency for review and approval. The area of disturbance on UT2 and UT3 is estimated to be less than 700 SY or 0.016 acre; therefore, a Land Disturbance permit will not be required. Project Closeout: WSP is proposing a project closeout site visit to be scheduled for late October or early November of 2021. Based on the implementation of the measures noted above and the exclusion of cattle from the easement WSP anticipates requesting a full credit release for UT-2 and UT-3 for a combined total of 1,259 SMUs. Reach ID Stationing Existing Feet (linear feet) Restoration Footage* (Stationing) Mitigation Ratio Stream Mitigation Units 335 P (10+00 - 13+35) 94 EII (13+35 - 10+00 to 13+79) R 1:1 UT 2 19+51 951 49 R (13+79 - E II 2.5:1 343 14+28) P 5:1 523 EII (14+28 - 19+51) 218 R (10+00 - 12+18) 249 EII (12+18 - 14+67) 194 EI (14+67 - 16+61) 24 R (16+61 - 16+85) 342 EI (16+85 - 10+00 to 20+27) R 1:1 UT 3 1�975 E I 5:1 916 24+75 109 EII (20+27 - E II 2.5:1 2 21+36) 23 R (21+36 - 21+59) 255 EII (21+59 - 24+14) 40 R (24+14 - 24+54) 21 EII (24+54- 24+75) Please let me know if you have any questions regarding the proposed Adaptive Management Plan. Sincerely, WS 'US o tions, Inc. Edward Samanns Senior Program Manager Cc: I Becker, WSP M. Holthaus, WSP Attachments 4 w O Cn 2 \II I 1 1 6 AMMILL FARM INC s \ �m z PIN 72834 \ �, WG, <� O o WE 656.3' --•-•—••—. ..� \\� CD ui REMOVE EXISTING P E \ 11\\ 0 Ncv LLJ .. .. .. .. . .. . .. .. .. .. . .. Q W �. W (n ♦ W C 0 U a r cr ' s LU 0 I a Y O cr Z LILP WO L�Crra a 7o cr a�F 3 c)zzz _ O�OM Z JF— ULJ O x ILL. CrNZ U x ILL. O O Q O 'A O x = LJ x x�x CO cr z N x _LuaW O x �<g d ~aU~ d x x 7 ' Jcr N — —x 0 V.)O x D 0LLJ DATE JUNE 2014 SEAL = 94147 0 50, 100, 16003 ; FILENAME !%%V. 0`�� SHEET NO. ]rj OF 54 fH{tt� �`� DRAWING NO. PC4 SCALE P -100' DRAWN BY A filename: peralions — Little u co ree a rverc es rcwings incDesign esign ons uc ion Pion a —redesign _ u a o_ _—4.dgn Date: ime: w O Y 2 U �-64n0 6 Vl Z O VI W K H MILL FA INC 5 DEE 455-23 i9 569 4 to H o o W Z m ,^ 00-MONUMENT \� 6 8.61 / RO 5 G I E T C '•�• W U \\ E D /• RE T I P I 4 4 (� O T 47.50' ••� O d O .. - _ aCD OUT - 6 \, •�. ..�•' ..�„�..�. �.. .�..�. REMOVE EXISTING FENCI •• ••�•• ^ N \ X• W THIN EASEMENT AREA Y . 1 Lk � z (a E 6 �" I ( x Ofc \\ \ h 5- n X— x X—X w U \ \ UT-3 W * �o w 5 5 •'� LiJ m z WE 664. \ \ ` / 4 N cn o Z S X M EXI ING PE 52' CMP INVER - 52. \ _ 52' CMP INV OU * \ 6 5 00 \ 4 \\ 6 x 6 5 W W C2 x x x_ U cr X_ W � w o _ x I + x x x s O W cr d Z r' W } /* �a�F- uzzz �' o�o� ~ + O o ILL. Cr tnz o) + ILL. ooa W mWaw o lJ N + W J�m2 o + Q CL V LL 0 + J cr � } a o LL.1 ` yQttSloy%' DATE JUNE 2014 SCE/77��AL = 94147 0 50' 100' k. 16003 ; FILENAME .(��.•'i�`�SHEET N0. 17 OF 54 4ML1HAt`c; v��` DRAWING N0. PC6 SCALE I' -100' DRAWN I A filename: peralions — Little u co ree a rvera es rcwings inaDesign esign ons uc ion Pion a —redesign _ u a o_ _—b.dgn Date: ime: . CONSTRUCTION LIMITS 8' 8• 1 VARIES OUTER EDGE OF OUTER EDGE OF VARIES 4' -BANKFULL BENCH EXISTING BANKFULL BENCH GROUND EXISTING GROUND \/\\/ \\\\�/ �/\\\ //\ %i\ LOW FLOW CHANNEL 6" GRAVEL LINED BOTTOMS MAINSTEM CONCRETE REMOVAL RIFFLE ALIGNMENT STATIONS 64+06 TO 64+21.15 64+56.15 TO 64+66.15 65+06.15 TO 65+27.87 N.T.S. CONSTRUCTION LIMITS 10.5' 1 10.5' OUTER EDGE OF BANKFULL BENCH VARIES EXISTING GROUND VARIES 5, EXISTING GROUND \ OUTER EDGE OF ANKFULL BENCH 6" GRAVEL LINED BOTTOMS I SLOW FLOW CHANNEL MAINSTEM CONCRETE REMOVAL POOL ALIGNMENT STATIONS 64+36.15 TO 64+46.15 64+76.15 TO 64+96.15 N.T.S. OUTER EDGE OF BANKFULL BENCF MEET EXISTING GROUND - EXISTING GROUND MEET EXISTING GROUN CONSTRUCTION LIMITS VARIES • 0.5' • 0.5'• VARIES OUTER EDGE OF BANKFULL BENCF NOTE: CHANNEL DEPTH SHALL BE 6 INCHES MINIMUM. LOW FLOW CHANNEL UT2 AND UT3 CHANNEL CREATION ALIGNMENT STATIONS UT2 13+72.14 TO 14+23.88 UT3 10+00 TO 11+97.12 N.T.S. CONSTRUCTION LIMITS VARIES EXISTING Ex GROUND G1 /.\//.���\��\\��\j/\\//� \//i\/�\i\\i� 'x / OUTER EDGE OF OUTER EDGE OF BANKFULL BE`\/��\/ \\�/\\�//��/� BANKFULL BENCH EXISTING TOE OF SLOP OW FLOW CHANNEL UT3 AND UT4 BANK ENHANCEMENT ALIGNMENT STATIONS UT3 14+60.22 TO 19+74.90 UT4 14+31 TO 18+28 N.T.S. SEAL 16003 ?MD U C a Lo Z o ti � N c � > 2 W Q m -U co W5-o m�Z U) o L O — .L O J � IE W H la ~ Q V1 U CY Z W O Y OO =LLI _ W er>- a U J (X �- F.- W W UZ ZZ V,)> OLOM J_j Q U U Q U 1i CrtoZ —Z �ODa aW m V cr z H W U wxa� Wx U W O Z ~a NaW J a O to d tN O U W )ATE JUNE 2014 �ROJECT NO. 94147 TY5 STREAM BANK DETAIL - ZONE 1 N.T.S. LIVE STAKE INSTALLATION: 1. TAMP THE LIVE STAKE INTO THE GROUND AT RIGHT ANGLES TO THE SLOPE FACE. 2. LIVE STAKES SHALL BE INSTALLED 2-3 FEET APART USING TRIANGULAR SPACING. STAKES SHOULD BE PLACED WITH 2 TO 4 STAKES PER SOUARE YARD. 3. BUDS SHALL BE ORIENTED UP. 4. FOUR FIFTHS OF THE LENGTH OF THE LIVE STAKE SHALL BE INSTALLED INTO THE GROUND AND SOIL FIRMLY PACKED AROUND IT AFTER INSTALLATION. 5. STAKES THAT SPLIT DURING INSTALLATION SHALL BE REPLACED AT THE CONTRACTORS EXPENSE. 6. AN IRON BAR CAN BE USED TO MAKE A PILOT HOLE IN FIRM SOIL. DRIVE THE LIVE STAKE INTO THE GROUND WITH A DEAD HAMMER (HAMMER HEAD FILLED WITH SHOT OR SAND). ACCEPTABLE LIVE STAKE SPECIES SCIENTIFIC NAME BLACK WILLOW SALIX NIGRA SILKY DOGWOOD CORNUS AMOMUM NOTE: REFER TO PLANTING NOTES n • 1 STREAM BED LIVE STAKE INSTALLED AT RIGHT 6 IN BY 6 IN BACKFILLED I it HMINAL ANUHUH I Ht NUH LIVE STAKE INSTALLATION N.T.S. 6 IN BY 6 IN BACKFILLED INII IAL ANUHUH I Ht NUH t U a LO DO CV 1Y Q 2 W m (D_U m w W�:a mrz U)o_c� o J � W S LIVE STAKE DETAIL � a Wcr LIVE STAKE GUIDELINES: N.T.S. 0 W c a _J r cr a 1. LIVE STAKE CUTTINGS SHALL BE INSTALLED WITHIN THE PLANTING ZONE I AS INDICATED ON THE PLANTING NOTES. u z z z W 2. LIVE STAKE CUTTINGS SHALL BE 0.5 TO 1.5 INCHES IN DIAMETER AND A MINIMUM OF THREE FEET LONG. o�ou Jt..)W o 3. CUTTINGS SHOULD BE UNDAMAGED, DISEASE AND INSECT FREE STOCK, AND FROM THE LIST OF ACCEPTABLE SPECIES PROVIDED ON THE PLANS. t' cr V) z Z 4. MATERIALS MUST HAVE SIDE BRANCHES CLEANLY REMOVED AND BARK INTACT. Z cr = m 5. THE BASAL ENDS SHOULD BE CUT AT AN ANGLE FOR EASY INSERTION INTO THE SOIL. THE TOP SHOULD BE SOUARE. STAKES SHOULD BE CO N cr z W cr CO W a PLANTED WITH BUTT -END INTO THE GROUND. BUDS SHOULD BE ORIENTED UP. �w � 6. MATERIALS SHALL BE SOAKED IN WATER A MINIMUM OF 10 DAYS IMMEDIATELY AFTER PREPARATION. MATERIALS SHOULD BE INSTALLED THE JL } V) SAME DAY THAT THEY ARRIVE ON SITE. THE MATERIAL MUST NOT BE ALLOWED TO DRY OUT; KEEP MATERIALS IN WATER OR IN A COOL, V' o SHADED. WET ENVIROMENT PRIOR TO INSTALLATION. W 7. PLANTS SHALL BE BOTH CUT AND INSTALLED WHEN THEY ARE DORMANT: THAT IS, PRIOR TO BUD SWELL AND LEAF EMERGENCE IN THE o `TtCA"'''., SPRING AND AFTER LEAVES HAVE TURNED COLOR AND FALLEN OFF IN THE FALL. THE INSTALLATION PERIOD IN THE SPRING IS BETWEEN �`sy���°, °ATE DUNE 2014 MARCH 1 AND APRIL 15, AND IN THE FALL BETWEEN OCTOBER 30 AND NOVEMBER 30. = ': -_ 1600003 t — � 94147 FILENAME I,1pp(��•'i�`�� SHEET NO. 51 OF 54 DRAWING N0. pTg gM11iiA�:VV DRAWN BY A -name: peralions — Little u clo reek eliverc es ra ,canal esign esign ons uc ion Ian el —redesign —bu olo— IL .dgn a e: ime: U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action ID: 2014-00386 County: Cabarrus USGS Quad: NC -Richfield GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Property Owner / Authorized Agent: Edward Samanns; Louis Berger Group, Inc. Address: 1001 Wade Avenue, Suite 400 Raleigh, NC 27605 Telephone No.: 973-407-1468 Size and location of property (water body, road name/number, town, etc.): The Little Buffalo Creek project site is located on UTs to and Little Buffalo Creek proper, approximately 12 miles east of Kannapolis and 2 miles southwest of Gold Hill, Cabarrus County, NC. Coordinates are: 35.491041 N,-80.366698 W Description of projects area and activity: The NCEEP Little Buffalo Creek Mitigation project consists of restoration and enhancement of 3,0641f of stream channel associated with the generation of credits for use in the State ILF mitigation program. Applicable Law: ® Section 404 (Clean Water Act, 33 USC 1344) ❑ Section 10 (Rivers and Harbors Act, 33 USC 403) Authorization: Regional General Permit Number: Nationwide Permit Number: 27 Summar of Authorized Im acts and Required Miti ation Impact ID # NWP / GP # Open Water (ac) Wetland (ac) Stream (10 Temporary Permanent Temporary Permanent Temporary Permanent LBC-Restore 27 705 LBC-Enhance 27 120 UT3-Restore 27 197 UT3-Enhance 27 515 UT4-Enhance 27 397 UT7-Enhance 27 1,374 Impact Totals Total Loss of Waters of the U.S. (ac) Total Loss of Waters of the U.S. (If) Required Wetland Mitigation ac Required Stream Mitigation (If) Additional Remarks and/or Special Permit Conditions: Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the attached conditions and your Final Mitigation Plan (Little Buffalo Creek Stream Mitigation Plan, Final: April 2013) submitted on 7 February, 2014. Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order and/or appropriate legal action. This verification will remain valid until the expiration date identified below unless the nationwide authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide permit. If the nationwide permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon the nationwide permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide permit's expiration, modification or revocation, unless discretionary authority has been exercised on a case -by -case basis to modify, suspend or revoke the authorization. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Quality (telephone (919) 733-1786) to determine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (LAMA), prior to beginning work you must contact the N.C. Division of Coastal Management. This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals/permits. If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program, please contact Tyler Crumbley at 919-846-2564. Digitally signed by CRUMBLEY.TYLER.AUT RY.1007509975 Corps Regulatory Official _Tyler Crumbley Date 014.03.13 Date: 13 March, 2014 Expiration Date of Verification: 18 March, 2017 Determination of Jurisdiction: A. ® Based on preliminary information, there appear to be waters of the US including wetlands within the above described project area. This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process ( Reference 33 CFR Part 331). B. ❑ There are Navigable Waters of the United States within the above described project area subject to the permit requirements of Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act. Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. C. ❑ There are waters of the US and/or wetlands within the above described project area subject to the permit requirements of Section 404 of the Clean Water Act (CWA)(33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. D. ❑ The jurisdictional areas within the above described project area have been identified under a previous action. Please reference jurisdictional determination issued — Action ID Basis of Jurisdictional Determination: The site contains wetlands that meet the criteria of the 1987 Corps Delineation Manual and regional supplement. The stream channels exhibit indicators of ordinary high water marks. The stream channels on the property are UTs to Little Buffalo Creek. UTs flow to Little Buffalo Creek, which flows to the Rocky Watershed, Upper Pee Dee River Basin. The Pee Dee River is a Section 10 Navigable water (TNW) at the Blewett Falls dam on the Anson/Richmond County line in NC. Attention USDA Program Participants This delineation/determination has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the particular site identified in this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work. Appeals Information: (This information does not apply to preliminary determinations as indicated by paragraph A. above). Attached to this verification is an approved jurisdictional determination. If you are not in agreement with that approved jurisdictional determination, you can make an administrative appeal under 33 CFR 331. Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form. If you request to appeal this determination you must submit a completed RFA form to the following address: District Engineer, Wilmington Regulatory Program Attn: Tyler Crumbley, Project Manager 11405 Falls ofNeuse Road Wake Forest, North Carolina 27587 In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP. Should you decide to submit an RFA form, it must be received at the above address within 60 days from the Issue Date below. **It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this correspondence. * * Digitally signed by ` CRUMBLEY.TYLER.AUTRY �� ✓f. .1007509975 Date: 2014.03.13 Corps Regulatory Official: _Tyler Crumbley _ 14:05:34-04'00' Issue Date: 14 March, 2014 Expiration Date: Five years from Issue Date SURVEY PLATS, FIELD SKETCH, WETLAND DELINEATION FORMS, PROJECT PLANS, ETC., MUST BE ATTACHED TO THE FILE COPY OF THIS FORM, IF REQUIRED OR AVAILABLE. Electronic Copy Furnished: CESAW-RG-A/Elliot, W. Paul Wiesner/NCEEP Permit Number: 2014-00386 Permit Type: NW 27 Name of County: Cabarrus Name of Permittee: Edward Samanns; Louis Berger Group, Inc. Date of Issuance: 13 March, 2014 Project Manager: Tyler Crumbley Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: U.S. Army Corps of Engineers Attention: CESAW-RG 11405 Falls of Neuse Road Wake Forest, North Carolina 27587 Please note that your permitted activity is subject to a compliance inspection by an U.S. Army Corps of Engineers representative. If you fail to comply with this permit you are subject to permit suspension, modification, or revocation. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and conditions of the said permit, and required mitigation was completed in accordance with the permit conditions. Signature of Permittee Date NOTIFICATION OF ADMINISTRATIVE APPEAL OPTIONS AND PROCESS AND REQUEST FOR APPEAL Applicant: Edward Samanns; Louis Berger Group, Inc. File Number: 2014-00386 Date: 13 March, 2014 Attached is: See Section below INITIAL PROFFERED PERMIT (Standard Permit or Letter of permission) A PROFFERED PERMIT (Standard Permit or Letter of permission) B PERMIT DENIAL C APPROVED JURISDICTIONAL DETERMINATION D X PRELIMINARY JURISDICTIONAL DETERMINATION E SECTION I - The following identifies your rights and options regarding an administrative appeal of the above decision. Additional information may be found at http://www.usace.army.mil/CECW/Pages/reg_materials.aspx or Corps regulations at 33 CFR Part 331. dL A: INITIAL PROFFERED PERMIT: You may accept or object to the permit. ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that the permit be modified accordingly. You must complete Section II of this form and return the form to the district engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit your right to appeal the permit in the future. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in Section B below. B: PROFFERED PERMIT: You may accept or appeal the permit ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new information. ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice, means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD. APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the Corps to reevaluate the JD. SECTION II - REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or objections are addressed in the administrative record.) ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record. However, you may provide additional information to clarify the location of information that is already in the administrative record. POINT OF CONTACT FOR QUESTIONS OR INFORMATION: If you have questions regarding this decision and/or the appeal process If you only have questions regarding the appeal process you may you may contact: also contact: Tyler Crumbley, Mitigation Specialist Mr. Jason Steele, Administrative Appeal Review Officer USACE, Regulatory Division CESAD-PDO 11405 Falls of Neuse Road U.S. Army Corps of Engineers, South Atlantic Division Wake Forest, NC 27587 60 Forsyth Street, Room 10M15 919-846-2564 Atlanta, Georgia 30303-8801 Phone: (404) 562-5137 RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 day notice of any site investigation, and will have the opportunity to participate in all site investigations. Date: Telephone number: Signature of appellant or agent. For appeals on Initial Proffered Permits send this form to: District Engineer, Wilmington Regulatory Division, Attn: Tyler Crumbley, 69 Darlington Avenue, Wilmington, North Carolina 28403 For Permit denials, Proffered Permits and approved Jurisdictional Determinations send this form to: Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Jason Steele, Administrative Appeal Officer, CESAD-PDO, 60 Forsyth Street, Room 10M15, Atlanta, Georgia 30303- 8801 Phone: (404) 562-5137 ATTACHMENT PRELIMINARY JURISDICTIONAL DETERMINATION FORM BACKGROUND INFORMATION A. REPORT COMPLETION DATE FOR PRELIMINARY JURISDICTIONAL DETERMINATION (JD): 13 March, 2014 B. NAME AND ADDRESS OF PERSON REQUESTING PRELIMINARY JD: Edward, Samanns; Louis Berger Group, Inc. 1001 Wade Avenue, Suite 400 Raleigh, NC 27605 C. DISTRICT OFFICE, FILE NAME, AND NUMBER:CESAW-RG-2014- 00386; D. PROJECT LOCATION(S) AND BACKGROUND INFORMATION: The Little Buffalo Creek Mitigatio Project (NCEEP) is located on UTs to and Little Buffalo Creek proper, approximately 12 miles east of Kannapolis and 2 miles southwest of Gold Hill, Cabarrus County, NC. (USE THE ATTACHED TABLE TO DOCUMENT MULTIPLE WATERBODIES AT DIFFERENT SITES) State:North Carolina County/parish/borough: Cabarrus City: Gold Hill Center coordinates of site (lat/long in degree decimal format): Lat. 35.4910410 N, Long.-80.3666980 W. Universal Transverse Mercator: Name of nearest waterbody: Little Buffalo Creek Identify (estimate) amount of waters in the review area: Non -wetland waters: 13,641 linear feet: 3 width (ft) and/or acres. Cowardin Class: Riverine Stream Flow: Perennial Wetlands: 0.1 acres. Cowardin Class: Forested Name of any water bodies on the site that have been identified as Section 10 waters: Tidal: Non -Tidal: E. REVIEW PERFORMED FOR SITE EVALUATION (CHECK ALL THAT APPLY): 7 Office (Desk) Determination. Date: 13 March, 2014 1 ❑ Field Determination. Date(s): 1. The Corps of Engineers believes that there may be jurisdictional waters of the United States on the subject site, and the permit applicant or other affected party who requested this preliminary JD is hereby advised of his or her option to request and obtain an approved jurisdictional determination (JD) for that site. Nevertheless, the permit applicant or other person who requested this preliminary JD has declined to exercise the option to obtain an approved JD in this instance and at this time. 2. In any circumstance where a permit applicant obtains an individual permit, or a Nationwide General Permit (NWP) or other general permit verification requiring "pre -construction notification" (PCN), or requests verification for a non -reporting NWP or other general permit, and the permit applicant has not requested an approved JD for the activity, the permit applicant is hereby made aware of the following: (1) the permit applicant has elected to seek a permit authorization based on a preliminary JD, which does not make an official determination of jurisdictional waters; (2) that the applicant has the option to request an approved JD before accepting the terms and conditions of the permit authorization, and that basing a permit authorization on an approved JD could possibly result in less compensatory mitigation being required or different special conditions; (3) that the applicant has the right to request an individual permit rather than accepting the terms and conditions of the NWP or other general permit authorization; (4) that the applicant can accept a permit authorization and thereby agree to comply with all the terms and conditions of that permit, including whatever mitigation requirements the Corps has determined to be necessary; (5) that undertaking any activity in reliance upon the subject permit authorization without requesting an approved JD constitutes the applicant's acceptance of the use of the preliminary JD, but that either form of JD will be processed as soon as is practicable; (6) accepting a permit authorization (e.g., signing a proffered individual permit) or undertaking any activity in reliance on any form of Corps permit authorization based on a preliminary JD constitutes agreement that all wetlands and other water bodies on the site affected in any way by that activity are jurisdictional waters of the United States, and precludes any challenge to such jurisdiction in any administrative or judicial compliance or enforcement action, or in any administrative appeal or in any Federal court; and (7) whether the applicant elects to use either an approved JD or a preliminary JD, that JD will be processed as soon as is practicable. Further, an approved JD, a proffered individual permit (and all terms and conditions contained therein), or individual permit denial can be administratively appealed pursuant to 33 C.F.R. Part 331, and that in any administrative appeal, jurisdictional issues can be raised (see 33 C.F.R. 331.5(a)(2)). If, during that administrative appeal, it becomes necessary to make an official determination whether CWA jurisdiction exists over a site, or to provide an official delineation of jurisdictional waters on the site, the Corps will provide an approved JD to accomplish that result, as soon as is practicable. 2 This preliminary JD finds that there "maybe" waters of the United States on the subject project site, and identifies all aquatic features on the site that could be affected by the proposed activity, based on the following information: SUPPORTING DATA. Data reviewed for preliminary JD (check all that apply - checked items should be included in case file and, where checked and requested, appropriately reference sources below): ❑ Maps, plans, plots or plat submitted by or on behalf of the applicant/consultant: ❑ Data sheets prepared/submitted by or on behalf of the applicant/consultant. ❑ Office concurs with data sheets/delineation report. ❑ Office does not concur with data sheets/delineation report. ❑ Data sheets prepared by the Corps: ❑ Corps navigable waters' study: ❑ U.S. Geological Survey Hydrologic Atlas: ❑ USGS NHD data. ❑ USGS 8 and 12 digit HUC maps. U.S. Geological Survey map(s). Cite scale & quad name: 1:20,000 Richfield. M USDA Natural Resources Conservation Service Soil Survey. Citation:Cabarrus County. ❑ National wetlands inventory map(s). Cite name: ❑ State/Local wetland inventory map(s): ❑ FEMA/FIRM maps: ❑ 100-year Floodplain Elevation is: (National Geodectic Vertical Datum of 1929) ❑ Photographs: ❑ Aerial (Name & Date): or ® Other (Name & Date): Mitigation plan photos. ❑ Previous determination(s). File no. and date of response letter: ❑ Other information (please specify): IMPORTANT NOTE: The information recorded on this form has not necessarily been verified by the Corps and should not be relied upon for later jurisdictional determinations. Digitally signed by C RU M BLEY.TYLER.AUTRY.1 007509975 Date: 2014.03.13 11:10:44 -04'00' Signature and date of Regulatory Project Manager Digitally signed by esamanns @ l o esamanns@louisberger.com DN: uisberger.com cn=esamanns@louisberger.com Date: 2014.03.13 12:02:21-04'00' Signature and date of person requesting preliminary JD 3 }. • abRc��R j a 4 �. 7 7AF W. C CL Au h PN'auk1N•GIO ... �%enepey I PA 'Pa ` v o �D m .. F+elley.itdt 4n� N m N4� � rs�e t .�_._._- 'Stswphrns-hur- .Rdcm Samanns, Edward From: Browning, Kimberly D CIV USARMY CESAW (USA) <Kimberly.D.Browning@usace.army.mil> Sent: Thursday, November 19, 2020 10:29 AM To: Wiesner, Paul; Haywood, Casey M CIV (USA); Davis, Erin B; Tugwell, Todd J CIV USARMY CESAW (USA) Cc: Phillips, Kelly D; Samanns, Edward; Becker, Jonathan W.; Holthaus, Matthew; Allen, Melonie; Horton, Jeffrey; Hajnos, Edward A Subject: RE: IRT Review Request: Adaptive Management Plan - Little Buffalo Creek (DMS#94147) - (SAW-2014-00386) (DWR#20140129) - Yadkin River Basin (03040105) Thanks Paul, we'll send this out for a streamlined 15-day review to the IRT. Just a note, if the impacts for the repairs will be for more than 75 linear feet, the ePCN should be for a NWP-3, not a NWP-27 as stated in their ADP. Thanks Kim Kim Browning Mitigation Project Manager, Regulatory Division I U.S. Army Corps of Engineers -----Original Message ----- From: Wiesner, Paul <paul.wiesner@ncdenr.gov> Sent: Thursday, November 19, 2020 9:25 AM To: Haywood, Casey M CIV (USA) <Casey.M.Haywood@usace.army.mil>; Davis, Erin B <erin.davis@ncdenr.gov>; Browning, Kimberly D CIV USARMY CESAW (USA) < Kimberly. D.Browning@usace.army.mil>; Tugwell, Todd J CIV USARMY CESAW (USA) <Todd.J.Tugwell@usace.army.mil> Cc: Phillips, Kelly D <Kelly.Phillips@ncdenr.gov>; Samanns, Edward <ed.samanns@wsp.com>; Becker, Jonathan W. <JON.BECKER@wsp.com>; Holthaus, Matthew <matthew.holthaus@wsp.com>; Allen, Melonie <melonie.allen@ncdenr.gov>; Horton, Jeffrey <jeffrey.horton@ncdenr.gov>; Hajnos, Edward A <edward.hajnos@ncdenr.gov> Subject: [Non-DoD Source] IRT Review Request: Adaptive Management Plan - Little Buffalo Creek (DMS#94147) - (SAW- 2014-00386) (DWR#20140129) - Yadkin River Basin (03040105) Casey, Erin, Kim and Todd; The Adaptive Management Plan for the Little Buffalo Creek site (DMS# 94147) was posted to the IRT Sharepoint site and DWR Laserfiche on November 19, 2020 for your review. Please review the document (also attached) and let us know if you have any questions, comments or concerns. Project Information: Little Buffalo Creek Mit. Site DMS Project # 94147 USACE # SAW-2014-00386 DWR # 20140129 RFP: 16-001122 - Issued 05/02/2008 Institution Date: 09/18/2009 - Full Delivery Yadkin River Basin Cataloging Unit 03040105 Cabarrus County, North Carolina Proposed Assets at Closeout (2021): 6,337.533 SMUs (warm) FD Provider: WSP - Contact: Ed Sammans, CE, PWS, CERP, ed.samanns@wsp.com <mailto:ed.samanns@wsp.com> 973-407-1468 (office), 973-951-3286 (cell) NCDEQ- DMS PM: Paul Wiesner paul.wiesner@ncdenr.gov<mailto:paul.wiesner@ncdenr.gov>, (828) 273-1673 The Adaptive Management Plan can be accessed directly on the DMS SharePoint site here: IRT-DMS SharePoint Page: https:Hncconnect.sharepoint.com/sites/IRT-DMS/SitePages/Home.aspx <Blockedhttps:Hncconnect.sharepoint.com/sites/IRT-DMS/SitePages/Home.aspx> Little Buffalo Cr._94147_Adaptive Management Plan_11_16_2020 https:Hncconnect.sharepoint.com/sites/IRT- DMS/Misc%20Documents/Forms/Allltems.aspx?id=%2Fsites%2FIRT%2DDMS%2FMisc%20Documents%2FLittle%20Buffal o%20Cr%2E%5F94147%5FAdaptive%2OManagement%20PIan%5F11%5F16%5F2020%2Epdf&parent=%2Fsites%2FIRT%2 DDMS%2FMisc%20Documents <Blockedhttps://ncconnect.sharepoint.com/sites/IRT- DMS/Misc%20Documents/Forms/Allitems.aspx?id=%2Fsites%2FIRT%2DDMS%2FMisc%2ODocuments%2FLittle%2OBuffaI o%20Cr%2E%5F94147%5FAdaptive%2OManagement%20PIan%5F11%5F16%5F2020%2Epdf&parent=%2Fsites%2FIRT%2 DDMS%2FMisc%20Documents> Please let me know if you have questions or call to discuss. Thanks Paul Wiesner Western Regional Supervisor North Carolina Department of Environmental Quality Division of Mitigation Services 828-273-1673 Mobile paul.wiesner@ncdenr.gov <mailto:paul.wiesner@ncdenr.gov> Western DMS Field Office 5 Ravenscroft Drive Suite 102 Asheville, N.C. 28801 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties.