Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW8050513_Current Permit_20200220
STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Pulte Home Company, LLC Beacon Townes at Carolina Shores US 17, Carolina Shores, Brunswick County FOR THE construction, operation and maintenance of two wet detention ponds in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Energy, Mineral and Land Resources and considered an enforceable part of this permit. This permit shall be effective from the date of issuance until June 1, 2027, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.6 on page 3 of this permit. The stormwater control has been designed to handle the runoff from 412,000 square feet of impervious area which includes 7,675 square feet for future BUA. 3. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans. This permit does not include built -upon area for future development. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. Page 1 of 5 State Stormwater Management Systems Permit No. SW8 050513 6. The following design criteria have been provided in the wet detention ponds and must be maintained at design conditions: Design Criteria Pond #1 Pond #2 a. Drainage Area, acres: Onsite, ft2 Offsite, ft2 17.8 294,000 None 9.3 118,000 None b. Total Impervious Surfaces, ft2 294,000 118,000 c. Design Storm, inches 1.0 1.0 d. Pond Depth, feet 5.0 4.0 e. TSS removal efficiency 90 90 f. Permanent Pool Elevation, FMSL 36.0 37.0 g. Permanent Pool Surface Area, ft2 66,700 13,700 h. Permitted Storage Volume, ft3 25,400 10,800 i. Temporary Storage Elevation, FMSL 36.4 37.72 j. Controlling Orifice 3.0 1.5 k. Permitted Forebay Volume, ft3 43,550 6,310 I. Receiving Stream/River Basin Persimmon Swam / Lumber m. Stream Index Number 15-23-2-1 n. Classification of Water Body C o. Max. horsepower for a fountain 3/4 1/8 II. SCHEDULE OF COMPLIANCE 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at the design condition. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. c. Mowing and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping. g. Access to the outlet structure must be available at all times. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DEMLR. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. The facilities shall be constructed, operated and maintained in accordance with the provisions of this permit, the approved plans and specifications, and the supporting documents attached to this permit and on file with the Division Page 2 of 5 State Stormwater Management Systems Permit No. SW8 050513 6. Decorative spray fountains will be allowed in the stormwater treatment system, subject to the following criteria: a. The fountain must draw its water from less than 2' below the permanent pool surface. b. Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond. c. The falling water from the fountain must be centered in the pond, away from the shoreline. d. The maximum horsepower for a fountain in these ponds is 3/4 and 1/8 horsepower for Ponds #1 and #2, respectively. 7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 8. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 9. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 10. The permit No person or entity, including the permittee, shall alter any component shown in the approved plans and specifications. Prior to the construction of any modification to the approved plans, the permittee shall submit to the Director, and shall have received approval for modified plans, specifications, and calculations including, but not limited to, those listed below. For changes to the project or SCM that impact the certifications, a new or updated certification(s), as applicable, will be required and a copy must be submitted to the appropriate DEQ regional office upon completion of the modification. a. Any modification to the approved plans and specifications, regardless of size including the SCM(s), BUA, details, etc. b. Redesign or addition to the approved amount of BUA or to the drainage area. c. Further development, subdivision, acquisition, lease or sale of any, all or part of the project and/or property area as reported in the approved plans and specifications. d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any component of the approved SCM(s), the stormwater collection system and/or vegetative conveyance shown on the approved plan. e. The construction of any allocated future BUA. f. The construction of any permeable pavement, #57 stone area, public trails, or landscaping material to be considered a permeable surface that were not included in the approved plans and specifications. g. Other modifications as determined by the Director. 11. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 12. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. Page 3of5 State Stormwater Management Systems Permit No. SW8 050513 III. GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a formal permit transfer request to the Division of Energy, Mineral and Land Resources, accompanied by a completed name/ownership change form; documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. This permit is not transferable to any person or entity except after notice to and approval by the Director. The permittee shall submit a completed and signed "Permit Transfer Application Form" (available on the Division website) accompanied by the required fee and supporting documentation as listed on the form, to the,Division at least 60 days prior to any one or more of the following events: a. The sale or conveyance of the project area in whole or in part, except in the case of an individual lot sale that is made subject to the recorded deed restrictions and protective covenants; b. The assignment or conveyance of declarant rights to another individual or entity; c. The sale or conveyance of the common areas to a Homeowner's or Property Owner's Association, subject to the requirements of NCGS 143- 214.7(c2); d. Dissolution of the partnership, corporate, or LLC entity, subject to NCGS 55-14-05 or NCGS 57D-6-07 and 08; e. Bankruptcy; f. Foreclosure, subject to the requirements of Session Law 2013-121; 2. Any individual or entity found to be in noncompliance with the provisions of this stormwater management permit or the requirements of the Stormwater rules is subject to enforcement procedures as set forth in the NCGS 143 Article 21. 3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 4. The permittee is responsible for compliance with all permit conditions until such times as the Division approves the transfer request. Neither the sale of the project, in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the stormwater permit. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permittee grants DEQ Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 7. The permit issued shall continue in force and effect until the permittee files a request with the Division for a permit modification, transfer, renewal, or rescission; however, these actions do not stay any permit conditions. 8. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. Page 4 of 5 State Stormwater Management Systems Permit No. SW8 050513 9. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 10. The permittee shall submit a completed "Permit Information Update Application Form" (available on the Division website) to the Division within 30 days to making any one or more of the following changes: a. A name change of the current permittee; b. A name change of the project; c. A mailing address change of the permittee, 11. A permit renewal request must be submitted at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate application, documentation and the processing fee as outlined in Title 15A NCAC 02H.1045(3). Permit renewed, updated and reissued this the 20th day of February 2020. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION . ; Brian Wrenn-,'Arb71-g Di Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Page 5of5 Beacon Townes at Carolina Shores Stormwater Permit No. SW8 050513 Brunswick County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date Certification Requirements: SEAL Page 1 of 2 State Stormwater Management Systems Permit No. SW8 050513 The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. .10. The inlets are located per the approved plans and do not cause short- circuiting of the system. .11. The permitted amounts of surface area and/or volume have been provided. .12. Required drawdown devices are correctly sized per the approved plans. .13. All required design depths are provided. .14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. .15. The required system dimensions are provided per the approved plans. CC' NCDEQ-DEMLR Regional Office Brunswick County Building Inspections Page 2 of 2 14C DREG Division of Energy, Mara$ and Land Resources STATE STORMWATER: ECEIV E PERMIT RENEWAL APPLICATION FORS 222020 n accordence we, t 5R NCAC 2H.1045f3), the cuurrent permit hokleer shelf renew their high den pryer to fts axpim ion. Renewed permits are va/rd for a period of 8-yeas per Session Lane 20 l 1-399 (SB 781)' Section &d?:.(cf: This application form to for permit renewals only. A. PROJECT INFORMAsTIOtr 1. State Stormwate'r Permit Number. SWS 050513 2. Project name: Bucon. Townes at Carolina mares 3. Project street address: _Huy 17/ Pilot; ,H,,,,ose Ln City: Caraft Shores. County: SwImM 4. What, if ary, changes have been made to the project as permitted? No changes to per rit since m+�d'ification, tie project has changed from the original approved plans, please complete swU-101 for a Mayor bkd Hattori ar Minor �icat!on r icafion form available at httus:ltd g nc aoWJ�nsr'er ut/divesioray- i t artgM-tWneral-tand-aliel/§Lom—PAWer-PM=Mtpwt-construction. B. P'ERMffTEE INFORMATION if changes to the permwee or project ;name have been made, please complete efther the Permit Update form or the Permit transfer fom avail" at htUwJAtfea.nc.aov/abouVdiviaiors/enerav-rninaral-iam- transfer twoh the sale of the property, State Stormwater Permits do not 1. Current Pe idee Campa Name/Organization; ofico Lzc- 2. Signing: Official's Name. Jamison Fair J (�V 3. Signing Official's Title: Land Manager / D&isio�t_comahance Executiv9 (DCE1 4. Mailing Address: 4136 Passerine Ave City: Wiimimon State: NC ZIP : n4l.2 5. Street Add: Sarre as above City: State; Z .P 6 Phone: - 232&K2 Email` iarnison fair pultearoura ,�.orn ttrrryY t2 !'t' tilt ?i?T ?vYr�l :Yt':f; .-a ge. 1 if 3 fi, u !cy s C. SUBMITTAL REQUIREMENTS Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal HQW/ORW). Only applications packages that include all required items listed below will be accepted and reviewed. Initial each item below to indicate that the required iniormarion is provided in the application package: x 1. A permit application processing fee of $505.00 payable to NCDEQ. X 2. One original signed hard copy and one electronic copy of this completed form. The signing official named on this application to represent the current permittee must meet one of the following: a. Corporation — a principle executive officer of at least the level of vice-president; b. Limited Liability Company (LLC) — a manager or company official as those terms are defined in G.S. 57D "North Carolina Limited Liability Company Act;" c. Public Entity — a principal executive officer, ranking official, or other duly authorized employee; d. Partnership or limited partnership — the general partner; e. Sole proprietor; or f. Letter of authorization signed by one of the signatories noted in a — e above authorizing the signature of another entity. NA 3. One hard copy and one electronic copy of recorded documents required by the original permit that have not yet been received by DEMLR, including: deed restrictions, protective covenants, condominium/planned community declaration and easements. If the project has been built, include documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. If the project has not been built, include a signed agreement that the final recorded deed restrictions and protective covenants will be submitted at a later date. X 4. O&M Agreements, Please select one: X❑ I have a copy of the current recorded O&M Agreement for all SCMs, and I will continue to keep this on file with the permit; or ❑ I do not have a copy of the current recorded O&M Agreement for all SCMs and am requesting a copy be sent to me. I agree to keep this on file with the permit. X 5. Designer Certifications, Please select one: X❑ A copy of the certification(s) confirming that the project was built in accordance with the approved plans have been previously provided to the Division; or ❑ A copy of the certification(s) confirming that the project was built in accordance with the approved plans are enclosed; or ❑ The project has not yet been built. X 6. [IF APPLICABLE] If the project has been built, one original hard copy and one electronic copy of a signed, sealed, and dated letter from a licensed professional stating that the SCMs have been inspected, and that they have been built and maintained in accordance with the permit. X 7. [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC): Provide one hard copy and one electronic copy of documentation from the NC Secretary of State, or other official documentation, which supports the titles and positions held by the persons listed in Section C.2 per 15A NCAC 2H. 1043(3)(b). https://www.sosnc.gov/online services/search/by title/ Business Registration E� w 2 0 2919 BY: Stormwatcr Permit Renewal Application Form Page 2 of 3 May 1 i, 2018 D. PERMITTEE'S CERTIFICATION I, Jamison Fair , the person legally responsible for the permit, certify that I have a copy of the Permit and O&M Agreement on site (or I will obtain a copy and it will be kept on site), that I am responsible for the performance of the maintenance procedures, and the site has been and will be maintained according to the O&M Agreement and approved plans. I agree to notify DEMLR of any problems with the SCMs or built -upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the project, SCMs, or ownership. All information provided on this permit renewai application is, to the best of my knowledge, d co let 77 Signature: Date: NOTARIZATION: I, County of this the a r-d day of execution of the forgoing instrument. Witness my hand and official seal, (Notary Seal) Notary Signature: My commission e.N a Notary Public for the State of do hereby certify personally appeared before me 20L1, and acknowledge the due V. 'T. NOV 2 6 z019 Stormwater Permit Renev al Application Form Page 3 of 3 May 11, 2018 A, .r���" MCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Charles Wakild, P. E. Dee Freeman Governor Director Secretary June 11, 2012 Craig Hobart Land Development Project Manager Pulte Home tororation 4876 Barefoot Resort Bridge Road North .Myrtle Beach, SC 29582 Subject: Stormwater Permit No. SW8 050513 Beacon Townes at Carolina Shores High Densityy Project Brunswick Coun�y Dear Mr. Hobart: The Wilmington Regional Office received a complete State Stormwater Management Permit Application and Name/Ownership Change request for Beacon Townes at Carolina Shores on June 11, 2012. Staff review of the plans and specifications for this modification and permit ownership transfer have determined that the project, as pproposed will comply with the Stormwater Regulations set forth in Session Law 2008- 211and title 15A NCAC 2H.1000. The project site was inspected on June 1, 2012 and found that the documentation for the transfer is in order, and the project is in compliance with the Stormwater ppermit requirements. Therefore we are forwarding Permit'No. SW8 050513 dated June 11, 2012, for the construction operation and maintenance of the BMP's and built -upon area associated with the subject project. On August 5, 2009, the Governor signed Session Law 2009-406. This law impacts any development approval issued by the Division of Water Quality under Article 21 of Chapter 143 of the General Statutes, which is current and valid at any point between January 1, 2008, and December 31, 2010. The law extends the effective period of any stormwater permit that was set to expire duringthis time frame up to three (3) years from its current expiration date. On August 2,010, the Governor signed Session Law 2010-177, which granted an extra year Tor an extension of up to four (4) years. This permit shall be effective from the date of issuance until June.1 2019, which includes the extensions, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the conditions listed in this permit regarding the Operation and Maintenance of the BMP(s), recordation of deed restrictions, certification of the BMP's, procedures for changes of ownership, transferring the permit, and renewing the permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system, to record deed restrictions, to certify the BMP's, to transfer the permit, or to renew the permit, will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the rigght to request an adjudicate hearing.by filin a written petition with the Office of Administrative Hearings (OAH). The written pe5ition must conform to Chapter 150B of the North Carolina General Statutes, and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions re ardingg the filing fee (if a filing fee is required) and/or the details of the filing process at 714 IVlail Service Center, Raleiggh NC 27699-67.14, or via telephone at 919-431- 30001 or visit their website at www.%tOAH.com. Unless such demands are made this permit shall be final and binding. Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 T�TOne 1 Phone: 910-796-72151 FAX: 910-350-20041 DENR Assistance: 1-877-623-6748 .1vOlilCiil Ol.11la Internet: www.ncwaterqualiiy.org �Qtlll'�C�l� An Equal Opportunity 4 Affirmative Action Employer L tZL For your records, please find enclosed a copy of the final inspection report for this permitted site. If you have any questions concerning this matter, need additional copies of the permit or the approved plans, please contact Chris Baker at (910) 796-7215. Sincerely, £For Charles Wakild, P. E., Director Division of Water Quality GDS/csb: S:1WQS1Stormwater\Permits & Projects120051050513 HD12012 06 permit 050513 cc: Richard Collier, P. E., McKim & Creed PA Brunswick County Building Inspections Wilmington Regional Office Page 2 of 2 State Stormwater Management Systems Permit No. SW8 050513 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Pulte Home Corporation Beacon Townes at Carolina Shores US 17, Carolina Shores, Brunswick County FOR THE construction, operation and maintenance of two wet detention ponds in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules) and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until June 1, 2019, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormlivater runoff as described in Section 1.6 on page 3 of this permit. The stormwater control has been designed to handle the runoff from 412,000 square feet of impervious area which includes 7,675 square feet for future BUA. 3. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans. This permit does not include built -upon area for future development. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. Page 2of7 State Stormwater Management Systems Permit No. SW8 050513 6. The following design criteria have been provided in the wet detention ponds and must be maintained at design conditions: Design Criteria Pond #1 Pond #2 a. Drainage Area, acres: Onsite, ftZ Offsite, ft2 17.8 294,000 None 9.3 118,000 None b. Total Impervious Surfaces, W 294,000 118,000 c. Design Storm, inches 1.0 1.0 d. Pond Depth, feet 5.0 4.0 e. TSS removal efficiency 90 90 f. Permanent Pool Elevation, FMSL 36.0 37.0 g. Permanent Pool Surface Area, fe 66,700 13,700 h. Permitted Storage Volume, ft 25,400 10 800 i. Temporary Storage Elevation, FMSL 36.4 37.72 '. Controlling Orifice 3.0 1.5 k. Permitted Forebay Volume 43,550 6,310 I. Receiving Stream/River Basin Persimmon Swam / Lumber m. Stream Index Number 15-23-2-1 n. Classification of Water Body C o. Max. horsepower for a fountain 3/4 1/8 II. SCHEDULE OF COMPLIANCE The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannua! scheduled i,nspections (every 6 months). b. Sediment removal. c. Mowing and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping. g. Access to the outlet structure must be available at all times. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. Page 3 of 7 State Stormwater Management Systems Permit No. SW8 050513 6. Decorative spray fountains will be allowed in the stormwater treatment system, subject to the following criteria: a. The fountain must draw its water from less than 2' below the permanent pool surface. b. Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond. c. The falling water from the fountain must be centered in the pond, away from the shoreline. d. The maximum horsepower for a fountain in these ponds is 3/4 and 1/8 horsepower for Ponds #1 and #2, respectively. 7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 8. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 9. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 10. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. c. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all prope owned by the permittee, for which Sedimentation and Erosion Control van approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 11. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 12. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. 13. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. Page 4 of 7 State Stormwater Management Systems Permit No. SW8 050513 III. GENERAL CONDITIONS 1. This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a formal permit transfer request to the Division of Water Quality, accompanied by a completed name/ownership change form, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 5. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 7. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 8. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 9. The permittee shall notify the Division any name, ownership or mailing address changes within 30 days. Permit issued this the 11th day of June, 2012. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Division of Water Quality By Authority of the Environmental Management Commission Page 5of7 State Stormwater Management Systems Permit No. SW8 050513 Beacon Townes at Carolina Shores Stormwater Permit No. SW8 050513 Brunswick County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL Page 6 of 7 State Stormwater Management Systems Permit No. SW8 050513 Certification Requirements: .1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 15. The required system dimensions are provided per the approved plans. cc: NCDENR-DWQ Regional Office Brunswick County Building Inspections Page 7 of 7 DWQ USE ONLY Date Received Fee P idOC ermit Number Applicable Rules: ❑ Coastal SW - 1955 ❑ Coastal SW - 2008 ❑ P II - Post Construction (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ Mgmt Plan: State of North Carolina DePaartmen1 cf Environment and NaturaY Resoui7ces Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Beacon Townes at Carolina Shores 2. Location of Project (street address): Us Hwy 17 City:Carolina Shores County:Brunswick Zip:28467 3. Directions to project (from nearest major intersection): The project site is located +/- 650' northeast from the intersection of Ocean Hwy (US 17) and Thomasboro Road (SR 1168) in Carolina Shores. 4. Latitude:330 55' 15" N Longitude:780 34' 15" W of the main entrance to the project. II. PERMIT INFORMATION: 1. a. Specify whether project is (check one): ❑New ®Modification b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit numberSW8 050513 , its issue date (if known)Tune 1st 2005 , and the status of construction: ❑Not Started ®Partially Completed* ❑ Completed* *provide a designer's certification 2. Specify the type of project (check one): ❑Low Density ®High Density ❑Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DWQ requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CAMA Major ®Sedimentation/Erosion Control: ac of Disturbed Area ❑NPDES Industrial Stormwater Z404/401 Permit: Proposed Impacts 0.2 acres b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit:Sediment / Erosion Control - Beacon Townes at Carolina Shores Permit Number Bruns-2005-335, Issued 5/17/2005 modified 5/6/2006.404 Wetlands - No Written Concurence Needed, Tuly 30th 2008 (DWO Project # 05-1717v2). ! CEIVED JUN 0 5 "Z01'Z Form SWU-101 Version 07Jun2010 Page I of 6 t IIL CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): Applicant/Organization:Pulte Homes Signing Official & Title:Craig Hobart, Land Development Pr ject Manager b. Contact information for person listed in item la above: Street Address:4876 Barefoot Resort Bridge Rd. City:North Myrtle Beach State:SC Zip:29582 Mailing Address (if applicable):4876 Barefoot Resort Bridge Rd. City:North Myrtle Beach Phone: (843 ) 390-6631 Email:craig.hobart@pultegroup.com State:SC Zip:28582 Fax: (843 L 390-6630 c. Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization: Signing Official & b. Contact information for person listed in item 2a above: Street Address: City; State: Zip:_ _ Mailing Address (if applicable): City: State: Zip: Phone: ( ) Fax: Email: 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other ire " rson *rvhe can answer questions about the project: Other Contact Person/Organization: Signing Official & Title: b. Contact information for person listed in item 3a above: Mailing Address: City: State: Zip; Phone:( ) Fax: Email: 4. Local jurisdiction for building permits: Town of Carolina Shores Point of Contact:Building Inspector Phone # Form SWU-101 Version 07Jun2010 Page 2 of 7 (910 575-4877 EIVED JUN Q 5 ZGIZ BY: IV, PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. The stormwater runoff will be treated through the use of storm drainage pipes and two wet detention 12onds. Part of this modification will involve the installation of four (4) perforated drainage pipes that will tie direct into the roofleaders off the back of buildings T6-T9 to redirect stormwater runoff from 1/2 of the rooftop runoff to the existing canal, located directly behind these units 2. a. If claiming vested rights, identify the supporting documents provided and the date thev were annroved ❑ Approval of a Site Specific Development Plan or PUD ❑ Valid Building Permit ❑ Other: Approval Date: Issued Date: Date: b. If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW -1995 ❑ Ph II - Post Construction 3. Stormwater runoff from this project drains to the Lumber River basin. 4. Total Property Area: 32.71 acres 5. Total Coastal Wetlands Area: 4.73 acres 6. Total Surface Water Area: 0 acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area+:27.98 acres + Total project area shall be calculated to exclude the following: the normal pool of impounded structures, the area between the banks of streams and rivers, the area below the Normal High Water (NHM line or Mean High Water (MHW) line, and coastal wetlands landward from the NHW (or MhW line. The resultant project area is used to calculate overall percent built upon area (B A). Non -coastal wetlands landward of the NHW (or MHW) line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 =-3�3 .� �j'�i� % 9. How many drainage areas does the project have?2 (For high density, count 1 for each proposed engineered stormwater BMP. For low density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Form SW-101 Version 07Jun2010 Page 3 of 7 Basin Information Drainage Area 1 Drama e Area 2 Drama e Area Drainage Area Receiving Stream Name Persimmon Swamp Persimmon Swam _ _ Stream Class * C;Sw C;Sw Stream Index Number * 15-23-2-1 15-23-2-1 Total Drainage Area (sf) 17.8 9.3 On -site Drainage Area (sf) 17.8 9.3 Off -site Drainage Area (sf) n n Proposed Impervious Area** s 6.75 r2-55- ;) % Impervious Area** total 38% Impervious** Surface Area Drainage Area 1 Drainage Area 2 Drainage Area _ Drainage Area On -site Buildings/Lots (sf) 184,100 -%425 , 4a _ On -site Streets (sf) 60,000 37,400 On -site Parking (sf) 49,900 46,- N9- ( l0 p U On -site Sidewalks (sf) 0 0 Other on -site (sf) 0 0 Future (sf) 0 * `761 S Off -site (sf) 0 0 Existing BUA*** (sf) 0 0 Total (sf): 294,000 —U&;32 1l 000 T stream Class and index Number can be determined at: http_[portal.ncdenr.or fw�q[ps/csu/classifications Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. 'Report only that amount of existing B UA that will remain after development. Do not report any existing B UA that is to be removed and which will be replaced by new BUA. 11. How was the off -site impervious area listed above determined? Provide documentation. N/A Projects in Union County: Contact DWQ Central Office staff to check if the project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stormwater requirements as per NCAC 02B . 0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from http://PortaI.ncdenr.or—a/web/wcl/ws/su/bmv-manual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accented and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from bM://portal.ncdenr.Mlweb/wq/ws/su/statesw/forms does. The complete application package should be submitted to the appropriate DWQ Office. (The appropriate office may be found by locating project on the interactive online map at http://portal.ncdenr.2M/web/wq/ws/su/maps.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from ba://vortaLncdenr.org/web/wg/ws/su/statesw/forms does. tiR 1. Original and one copy of the stormwater Management Permit Application Form. (/ 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants Form. (if required as per Part VII below) 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M --� agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to �i :/ /www.envhelp.org/12a&es%onestopexpress.html for information on the Express progr and the associated fees. Contact the appropriate regional office Express Permit Coordinator;RECEIVED additional information and to schedule the required application meeting.) Form SWU-101 Version 073un2010 Page 4 of 7 JUN Q 'LU1Z 5.. A detailed narrative (one to two pages) describing the stormwater treatment/managementfor_ the project. This is required in addition to the brief summary provided in the Project Information, item 1. 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within 1/2 mile of the site boundary, include the 1/2 mile radius on the map. 7. Sealed, signed and dated calculations. 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: a. Development/Projeci name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. 1. Details of roads, drainage features, collection systems, and stormwater control measures. m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). p. Vegetated buffers (where required). 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"xll" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DWQ to verify the SHWT prior to submittal, (910) 796-7378.) 10. A copy of the most current property deed. Deed book: Page No: 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item 1a, 2a, and/or 3a per NCAC 2H.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. hM://www.secretaiy.state.nc.us/Corporations/CSearch.gVx VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from hft://portal.ncdenr.org/web/wA/ws/su/statesw/forms does. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concur—rence from the NC DWQ, and that they will be recorded prior to the sale of CEIVED JUN 0 5 [U�[ Form SWU-101 Version 07Jun2010 Page 5 of 7 VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer:Richard Collier Consulting Firm: McKim & Creed, PA Mailing Address:243 N Front St City:Wilmington Phone: (910 ) 343-1048 Email:rcollier@mckimcreed.com State:NC Zip:28401 Fax: (910 ) 251-8282 IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this section) I, (print or type name of person listed in Contact Information, item 2a) certify that I own the property identified in this permit application, and thus give permission to (print or type name of person listed in Contact Information, item 1a) with (print or type name of organization listed in Contact Information, item 1a) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DWQ immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. Signature: Date: a Notary Public for the State of . County of do hereby certify that before me this _ day of personally appeared . and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission expires REC:1VD JUN Z By: Fonn SWU-101 Version 07Jun2010 Page 6 of 7 X. APPLICANT'S CERTIFICATION I, (print or type name of person listed in Contact Information, item la) certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable stormwater rules under 15A NCAC 2H .1000, SL 2006-246 (Ph. II -Post Construction) r SL 2008-211. Signature: e<11 Date: a Notary Public for the State of 1y OM PW OCounty of ScsC3�C-tl do hereby certify that��j personally appeared before me this day of ��t3r—_ and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission expires Rmi-La ]\U 13 ' 60 �s Form SW-101 Version 07Jun2010 Page 7 of 7 RECEIVED JUN 0. 5 [U12 BY: Permit No. � Mrp5t-2) (to be provided by DWo State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form may be photocopied for use as an original DWO Stormwater Management Plan Review: A complete stormwater management plan submittal includes an application form, a wet detention basin supplement for each basin, design calculations, and plans and specifications showing all basin and outlet structure details. I. PROJECT INFORMATION Project Name: Beacon Townes at Carolina Shores Contact Person: Tim Clinkscales, PE Phone Number: (910) 343-1048 For projects with multiple basins, specify which basin this worksheet applies to: Basin 1 elevations Basin Bottom Elevation Permanent Pool Elevation Temporary Pool Elevation areas Permanent Pool Surface Area Drainage Area Impervious Area volumes Permanent Pool Volume Temporary Pool Volume Forebay Volume Other parameters SA/DA' Diameter of Orifice Design Rainfall Design TSS Removal2 31 ft. (1loor of the basin) 36 ft. (elevation of the orifice) 36.4 ft. (elevation of the discharge structure overflow) 66,700 sq. ft. (water surface area at the orifice elevation) 17.8 ac. (on -site and off -site drainage to the basin) 6.75 ac. (on -site and off -site drainage to the basin) 232,108 cu. ft. (combined volume of main basin and forebay) 25,400 cu. ft._ (volume detained above the permanent pool) 43,550 cu. ft. (approximately 20% of total volume) 0.021 3.0 in. 1.0 in: 90, % (surface area to drainage area ratio from DWQ table) (2 to 5 day temporary pool draw -down required) (minimum 85% required) Form SWU-102 Rev 3.99 Page 1 of 4 Footnotes: 1 when using the Division SA/DA tables, the correct SA/DA ratio for permanent pool sizing should be computed based upon the actual impervious % and permanent pool depth. Linear interpolation should be employed to determine the correct value for non- standard table entries. 2 In the 20 coastal counties, the requirement for a vegetative filter may be waived if the wet detention basin is designed to provide 90% TSS removal. The NCDENR BUT manual provides design tables for both 85% TSS removal and 90% TSS removal. II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. If a requirement has not been met, attach justification. Applic Initials a. oe b. C. d. e. f. 9. h. i. j. k. 1. m The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). The forebay volume is approximately equal to 20% of the basin volume. The temporary pool controls runoff from the design storm event. The temporary pool draws down in 2 to 5 days. If required, a 30-foot vegetative filter is provided at the outlet (include non -erosive flow calculations) The basin length to width ratio is greater than 3:1. The basin side slopes above the permanent pool are no steeper than 3:1. A submerged and vegetated perimeter shelf with a slope of 6:1 or less (show detail). Vegetative cover above the permanent pool elevation is specified. A trash rack or similar device is provided for both the overflow and orifice. A recorded drainage easement is provided for each basin including access to nearest right- of-way. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified prior to use as a wet detention basin. A mecl:anisrn is specified which will drain the basin for maintenance or an emergency. III. WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one) 0 does v0 does not incorporate a vegetated filter at the outlet. This system (check one) 0 does v0 does not incorporate pretreatment other than a forebay. Form SWU-102 Rev 3.99 Page 2 of 4 Maintenance activities shall be performed as follows: 1. After every significant runoff producing rainfall event and at least monthly: a. Inspect the wet detantlor, basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately, re -seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wet detention basin or stream, etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads feet in the main pond, the sediment shall be removed. When the permanent pool depth reads feet in the forebay, the sediment shall be removed. BASIN DIAGRAM ill in the blanks) FOREBAY MAIN POND 5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and forebay berm. 6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. Form SWU-1o2 Rev 3.99 Pages of 4 t. tiii components of ine wet uetention oasm system snail oe maimameu in goou worxing oruer. I acknowledge and agree by my signature below that I am responsible for the performance of the seven maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print name: Mike Wvatt Title: Division Manager, Centex Homes Myrtle Beach Di,�,,ision Address: 2050 Corporate Centre Drive, Sijite 200 Phone: 843-839-2200 Signature: Date : Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, \3 . S6 , a Notary Public for the State of North Carolina County of VIS j jL . ,`O,c < , do hereby certify that t-.& personally appeared before me this 1� day of Ap Q; L , and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, IOTA S9 , a4io s A�BIIG rhreuneou++� SEAL My commission expires Q Form SWU-102 Rev 3.99 Page 4 of 4 Permit No. Svc t? C6064 (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM WET DETENTION .BASIN SUPPLEMENT This form may be photocopied for use as an original DWO Stormwater Management Plan Review: Acomplete stormwater management plan submittal includes an application form, a wet detention basin supplement for each basin, design calculations, and plans and specifications showing all basin and outlet structure details. L PROJECTINFORMATION Project Name: Beacon Townes at Carolina Shores Contact Person: Tim Clinkscales, PE Phone Number: (910) 343-1048 For projects with multiple basins, specify which basin this worksheet applies to: Basin 2 elevations Basin Bottom Elevation Permanent Pool Elevation Temporary Pool Elevation areas Permanent Pool Surface Area Drainage Area Impervious Area volumes Permanent Pool. Volume Temporary Pool Volume Forebay Volume Other parameters SA/DA' Diameter of Orifice Design Rainfall Design TSS Remova12 33.0 ft. 37.0 ft. 37.72 ft, 13,700 sq. ft. 9.3 ac. 2.7 ac.. 31,683 cu. ft. 10,800 cu. ft. 6310 cu. ft. 0.016 1.5 in. 1 in. 90 % (floor of the basin) (elevation of the orifice) (elevation of the discharge structure overflow) (water surface area at the orifice elevation) (on -site and off -site drainage to the basin) (on -site and off site drainage to the basin) (combined volume of °main basin and forebay) (volume detained above the permanent pool) (approximately 20% of total volume) (surface area to drainage area ratio from DWQ table) (2 to S day temporary pool draw -down required) (minimum 85% required) Form SWU-102 Rev 3.99 Page 1 of 4 ;r Footnotes: When using the Division SA/DA tables, the correct SA/DA ratio for permanent pool sizing should be computed based upon the actual impervious % and permanent pool depth. Linear interpolation should be employed to determine the correct value for non- standard table entries. Z In the 20 coastal counties, the requirement for a vegetative filter may be waived if the wet detention basin is designed to provide 90% TSS removal. The NCDENR BW manual provides design tables for both 85% TSS removal and 90% TSS removal. II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. If a requirement has not been met, attach justification. Applicants Initials a. The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). b. The forebay volume is approximately equal to 20% of the basin volume. c. The temporary pool controls runoff from the design storm event. d. The temporary pool draws down in 2 to 5 days. e. If required, a 30-foot vegetative filter is provided at the outlet (include non -erosive flow calculations) f. The basin length to width ratio is greater than 3:1. g. The basin side slopes above the permanent pool are -no steeper than 3:1. h. A submerged and vegetated perimeter shelf with a slope of 6:1 or less (show detail). i. Vegetative cover above the permanent pool elevation is specified. j. A trash rack or similar device is provided for both the overflow and orifice. k. A recorded drainage easement is provided for each basin including access to nearest right- of-way. 1. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified prior to use as a wet detention basin. n±. A mechanism is specified which will d~ain the basin for maintenance or an emergency. III. WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one) 0 does v0 does not incorporate a vegetated filter at the outlet. This system (check one) 0 does v0 does not incorporate pretreatment other than a forebay. Form SWU-102 Rev 3.99 Page 2 of 4 Maintenance activities shall be performed as follows: 1. After every significant runoff producing rainfall event and at least monthly: a. Inspect the wet detention basin systera for sediment accumulation, erosion, trash accumuiation, vegetated cover, and general condition. b. Check .and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately, re -seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wet detention basin or stream, etc.). 5. :.1 The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads feet in the main pond, the sediment shall be removed. When the permanent pool depth reads feet in the forebay, the sediment shall be removed. BASIN DIAGRAM ill in the blanks) FOREBAY MAIN POND Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and forebay berm. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. Form SWU-102 Rev 3.99 Page 3 of 4 4. , Ali components oI Lne wet ueLenLion Dash system snail oe mamLaMea In goon woriung oruer. I acknowledge and agree by my signature below that I am responsible for the performance of the seven maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print name: Mike Wyatt Title: Division Manage , Centex Homes Myrde Beach Division Address: 2050 Corporate Centre Drie, Suite 200 Phone: 843-839-220 1 • ' Signature: fig" E Date Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. a Notary Public for the State of North Carolina , County of oA&Wsw cl-�. , do hereby certify that A--� ;1� personally appeared before me this \3 day of �uZ, _ , aDqS , and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, a. IOTAI?k .a• SEAL My commission expires Form SWU-102 Rev 3.99 Page 4 of NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary S T A TE STORMWATER PERMIT NAME/OWNERSHIP CHANGE FORM I. CURRENT PERMIT INFORMATION 1. Stormwater Management Permit Number: SW8 050513 2. Project Name: Beacon Townes at Carolina Shores 3. Current Permit Holder's Company Name/Organization: Centex Real Estate Corporation 4. Signing Official's Name: Mike Wyatt Title: Division President 5. Mailing Address: 2050 Corporation Center Drive, Suite 200 City: Myrtle Beach State: SC Zip: 29577 6. Phone: 8( 43 ) 839-2200 Fax: ( ) II. PROPOSED PERMITTEE I OWNER I PROJECT / ADDRESS INFORMATION This request is for: (please check all that apply) ❑ Name change of the owner (Please complete Items 1, 2 and 3 below) ❑ Name change of project (Please complete Item 5 below) © Change in ownership of the property/company (Please complete Items 1, 2, 3, and 4 below) ❑ Mailing address / phone number change. (Please complete Item 4 below) ❑ Other (please explain): 1. Proposed permittee's company name/organization: Pulte Group 2. Proposed permittee's signing official's name: Craig Hobart 3. Proposed permittee's title: Land Development Project Manager 4. Mailing Address: 4876 Barefoot Resort Bridge Rd. City: North Myrtle Beach State: SC Zip: 29582 Phone: ( 843 ) 390-6631 Fax: (843 )390-6630 5. New Project Name to be placed on permit: N/A Please check the appropriate box. The proposed permittee listed above is: ❑ HOA or POA (Attach documentation showing that the HOA or POA owns, controls, or has a recorded easement for all areas that contain stormwater system features. Print name of HOA or POA in #1 above and provide name of HOA/POA's authorized representative in #2 above) ® The property owner ❑ Lessee (Attach a copy of the lease agreement and complete Property Owner Information on page 4) ❑ Purchaser (Attach a copy of the pending sales agreement. Final granted upon receipt of a copy of the recorded deed) ❑ Developer (Complete Property Owner Information on page 4) SSW N/O Change Rev15Feb2011 Page 1 of 4 Ill., ' REQUIRED ITEMS A request to transfer a permit will not be approved by the Division of Water Quality (DWQ) unless all of the applicable required items listed below are included with the submittal. Failure to provide the listed items may result in processing delays or denial of the transfer. 1. This completed and signed form. This certification must be completed and signed by both the current permit holder and the new applicant if this is a change of ownership. 2. Legal documentation of the property transfer to a new owner. 3. A copy of any recorded deed restrictions, covenants, or easements, if required by the permit. 4. The designer's certification (DWQ Engineer and Designer Certification Forms are available from each DWQ Regional office), if required by the permit and if not already submitted to DWQ. 5. If the proposed permittee is a firm, partnership, association, institution, corporation, limited liability company, or other corporate entity, provide documentation showing the authority of the named representative to act on behalf of the proposed permittee. 6. The $40.00 processing fee. If this is an initial transfer from the original permittee the processing fee is not required. Subsequent ownership transfers will require the $40.00 processing fee. IV. CURRENT PERMITTEE'S CERTIFICATION Please check one of the following statements and fill out the certification below that statement: [Check here if the current permittee ' only changing his/her/its name, the project name, or mailing address, but will retain the permit. I, \ , the current permittee, hereby notify the DWQ that am changing my name and/or I am changing my mailing address and/or I am changing the name of the permitted project. I further attest that this application for a name/ownership change is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed or if all required supporting information and attachments listed above are not included, this application package will be returned as incomplete. ❑ Check here if current permittee is transferring the property to a new owner and will not retain ownership of the permit. 1, , the current permittee, am submitting this application for a transfer of ownership for permit # . I hereby notify DWQ of the sale or other legal transfer of the stormwater system associated with this permit. I have provided a copy of the most recent permit, the designer's certification for each BMP, any recorded deed restrictions, covenants, or easements, the DWQ approved plans and/or approved as -built plans, the approved operation and maintenance agreement, past maintenance records, and the most recent DWQ stormwater inspection report to the proposed permittee named in Sections II and V of this form. I further attest that this application for a name/ownership change is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed or if all required supporting information and attachments listed above are not included, this application package will be returned as incomplete. I assign all rights and obligations as permittee to the proposed permittee named in Sections II and V of this form. I understand that this transfer of ownership cannot be a proved by the DVVQ unless and until the facility is in compliance with the permit. r f 1 Signature: Date: q` /:f/ v I, 1 , a Notary Public for the State of bGP( C_fmLo L-1;'arV , County of _emsW , do hereby certify that personally appeared before me this the day of 7aut3, 20 , and acknowledge thQ�el'@xE%QFdkof the fSwDiaq instrument. Wit e s my hand and official seal, No ry Signature ary Seal) NOTARY PUBLIC SSW N/O Change Rev15Feb2011 Page 2 of 4 V. . ' PROPOSED PERMITTEE CERTIFICATION: (This section must be completed by the Proposed Permittee for all transfers of ownership) 1, , hereby notify the DWQ that I have acquired through sale, lease or legal transfer, the responsibility for operating and maintaining the permitted stormwater management system, and, if applicable, constructing the permitted system. I acknowledge and attest that I have received a copy of: (check all that apply to this permit) ❑ the most recent permit ❑ the designer's certification for each BMP ❑ any recorded deed restrictions, covenants, or easements ❑ the DWQ approved plans and/or approved as -built plans ❑ the approved operation and maintenance agreement Epast maintenance records from the previous permittee (where required) DWQ stormwater inspection report showing compliance within 90 days prior to this transfer I have reviewed the permit, approved plans and other documents listed above, and I will comply with the terms and conditions of the permit and approved plans. I acknowledge and agree that I will operate and maintain the system pursuant to the requirements listed in the permit and in the operation and maintenance agreement. I further attest that this application for a name/ownership change is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed or if all required supporting information and attachments listed above are not included, this appl'c tion package will be returned as incomplet . r Signature: Date: I, a Notary Public for the State of I�i t C E&O LI NN , County of Rx��su� �_ , do hereby certify that C A3�Q A a—Y personally appeared before me this the day of j l-. "e-1 , 20 t �— , and acknowledg&ajL_due execution of the forgoing instrument. Witness my hand and official seal, '% ` C6�- (No Notary Signaturb Ij tic a._ M_.. Additional copies of the original permit and the approved Operation and Maintenance agreement can be obtained from the appropriate Regional Office of the Division of Water Quality. This completed form, including all supporting documents and processing fee (if required), should be sent to the appropriate Regional Office of the North Carolina Department of Environment and Natural Resources, Division of Water Quality, as shown on the attached map. Please note that if the Proposed Permittee listed above is not the property owner, the property owner must complete and sign page 4 of this document. Both the lessee / developer and the property owner will appear on the permit as permittees. SSW N/O Change Rev15Feb2011 JUN 0' 5 [UIZ Page 3 of 4 VI. PROPERTY OWNER CONTACT INFORMATION AND CERTIFICATION If the Proposed Permittee listed in Sections II and V of this form is not the Property Owner, the Property Owner must provide his/her Contact Information below and sign this form: Printed Name: Orr«rization: . Title within the Organization: Street Address: City: Mailing Address: City: Phone: Email: State: Zip: (if different from street address) State: Zip: Fax: I certify that I own the property identified in this permit transfer document and have given permission to the Proposed Permittee listed in Sections II and V to develop and/or, lease the property. A copy of the lease agreement or other contract, which indicates the party responsible for the construction and/or operation and maintenance of the stormwater system, has been provided with the submittal. As the legal property owner I acknowledge, understand, and agree by my signature below, that I will appear as a permittee along with the lessee/developer and I will therefore share responsibility for compliance with the DWQ Stormwater permit. As the property owner, it is my responsibility to notify DWQ by submitting a completed Name/Ownership Change Form within 30 days of procuring a developer, lessee or purchaser for the property. I understand that failure to operate and maintain the stormwater treatment facility in accordance with the permit is a violation of NC General Statute (NCGS) 143-215.1, and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. Signature of the property owner M , County of Date: a Notary Public for the State of do hereby certify that personaiiy appeared before me this the day of , 20 , and acknowledge the due execution of the forgoing instrument. Witness my hand and official seal, Notary Signature (Notary Seal) JUN 0 5 Z01Z SSW N/O Change Rev15Feb2011 Page 4 of 4 Compliance inspection Report Permit: SW8050513 Effective: 06/01/05 Expiration: 06/01/19 Owner: Centex Real Estate Corporation, Myrtle Beach Project: Beacon Townes at Carolina Shores County: Brunswick US Hwy 17 Region: Wilmington Contact Person: Title: Carolina Shores NC 28467 Phone: Directions to Project: The project site is located +/- 650' northeast from the intersection of Ocean Hwy (US 17) and Thomasboro Road (SR 1168) in Carolina Shores Type of Project: State Stormwater - HD - Detention Pond Drain Areas: 1 - (Persimmon Swamp) (03-07-57 ) ( C;Sw) 2 - (Persimmon Swamp) (03-07-57 ) ( C;Sw) On -Site Representative(s): Related Permits: Inspection Date: 05/2512012 Entry Time: 10:30 AM Primary Inspector: David W Cox Secondary Inspector(s): Reason for Inspection: Follow-up Permit Inspection Type: State Stormwater Facility Status: ■ Compliant ❑ Not Compliant Question Areas: State Stormwater (See attachment summary) Exit Time: 10:40 AM Phone: 910-796-7215 Inspection Type: Transfer Renewal Page: 1 Permit: SW8050513 Owner - Project: Centex Real Estate Corporation, Myrtle Beach Inspection Date: 05/25/2012 Inspection Type: Transfer Renewal Reason for Visit: Fallow -up Inspection Summary: Chris Baker and David Cox met with Craiq Hobart to re -inspect and discuss possible solutions to address this issue. SW Measures Are the SW measures constructed as per the approved plans? Are the inlets located per the approved plans? Are the outlet structures located per the approved plans? Comment: All roof drains were terminated, per the plan. But now the ditch is eroding away at the back of some buildings. Yes No NA NE 0000 0000 ■❑00 Page: 2 MEMORY TRANSMISSION REPORT TIME :06-11-i12 14:27 FAX NO.1 :910-350-2018 NAME ;DENR Wilmington FILE NO. 776 DATE 06.11 14:25 TO S 92518282 DOCUMENT PAGES 9 START TIME Jl 1 .`5 END TIME 06.11 14:2 PAGES SENT 9 STATUS OK *** SUCCESSFUL TX NOTICE *** state err "N Caa�p�jp�t Department orl6avir� —a t and Natarsd R+got�F ces VV11mlogto- luw& nal Oi'�ee �svie:Y Savor Ferdirs, Gaveraor sA7C COVER S8EE7' bva maw. Secretary No. Pages Cmral_ To:% G�� r d ��> E FYouac .Fo Casmer Phosie: f910) 796�7336 sax: a 127 Cs.ainal n ivm Hxt—d—. wilmn gffin, NC 28405 . (910) 75M%-.7213 —An l q—d oypo,i.,,,iq, pM,.m cn,e ^OU . EL,, A,00 � State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office Beverly Eaves Perdue, Governor FAX COVER SHEET Dee Freeman, Secretary Date: To: Co: 0cei`,79 Fax: No. Pages (excl. cover): From: Jo Casmer Phone: (910) 796-7336 Fax: (910) 350-2004 Re: �E�e"o -a �r.J - , ; , E S , 0 L r' e:: �4' t /o Z. "1 �9 -f � z �d l'! F S 127 Cardinal Drive Extension, Wilmington, NC 28405 • (910) 796-7215 • An Equal Opportunity Affirmative Action Employer 'MEMORY TRANSMISSION REPORT FILE NO. DATE TO DOCUMENT PAGES START TIME END TIME a PAGES SENT STATUS 777 06.11 14:25 9 918433906630 06.11'1 :27 f� 06.11 14: 9 ' OK *** SUCCESSFUL TX NOTICE TIME FAX NO.1 NAME *** state or PTorth Cmroliam Dopwrtmaat orEsvironmeat �.l Nmtmral 3a"O .rtbr 17VLmimgton At-mlonml cxma 8sw� Eews Pbr�dirq Gm.ermor - FA}C C6�'ER �il1F. .S.T :06-11-12 14:29 :910-350-2018 :DENR Wilmington bar oirameva. -secrelmry �� // No. Pages (weal. opver): To: Co; ��/ G >�- � iJ7E S Phone: l910] 796-7336 Vex; � '� — ��� � `�•'��' �7 Fax; C9Z0] 356-"f,00 Ito: 127 0—H—+ 17rs-e S—mMom Wilraiagcon_ Nc 2S405 . (97O)'f%-7ZIS -.A- 89•+a1 aPpo+'tvi+lb' Affiemaetw Aotien Employer State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office Beverly Eaves Perdue, Governor FAX COVER SHEET Dee Freemen, Secretary Date: - 45�-- //— 0 i '2�— No. Pages (excl. cover): To: C.e•4� �i 4.6,0,P— T From: Jo Casmer Co: �� L ��7�/ �E S Phone: (910) 796-7336 Fax: Fax: (910) 350-2004 Re: ���cp.J / DLJN ES �T C� �.�O�i .✓,4 c 61 1—i�- 127 Cardinal Drive Extension, Wilmington, NC 28405 . (910) 796-7215 • An Equal Opportunity Affirmative Action Employer ROY COOPER covernar MICHAEL S. REGAN Secretary BRIAN WRENN NORTH CAROLINA Actrng DLector Env&mmenftl QuaNy February 20, 2020 Pulte Home Company, LLC Attn: Jamison Fair, Division Compliance Executive 3350 Peachtree Road Northeast Suite 550 Atlanta, GA 30326 Subject: Permit Renewal State Stormwater Management Permit No. SW8 050513 Beacon Townes at Carolina Shores Brunswick County Dear Mr. Fair: Effective August 1, 2013 the State Stormwater program has been transferred from the Division of Water Quality (DWQ) to the Division of Energy, Mineral and Land Resources (DEMLR). All previous references to DWQ will remain in older stormwater permits issued prior to August 1, 2013 until they are modified. Please note that this permit will now reference DEMLR as the Division responsible for issuance of the permit. The Wilmington Regional Office received a complete 8 year Stormwater Management Permit Renewal Application for Beacon Townes at Carolina Shores on January 22, 2020. The Division is hereby notifying you that permit SW8 050513 has been renewed on February 20, 2020, and shall be effective until June 1, 2027. For your records, please find enclosed a renewed, updated, and re -issued permit and a copy of the renewal application. Please keep this permit on file at all times. Please note that the renewed, updated, and re -issued permit does not impose new or different terms; it merely restates some of the previous terms to provide you with a better understanding of your obligations under the permit. The renewal and reissuance of this stormwater permit does not imply that the site is currently in compliance with the terms and conditions of this state stormwater permit. The plans originally approved on June 1, 2005 and subsequently modified on June 11, 2019, will remain in full force and effect in accordance with the regulations set forth in Title 15A NCAC 2H.1000 effective September 1, 1995. This permit is subject to the conditions and limitations as specified therein. Please pay special attention to the conditions listed in this permit regarding the Operation and Maintenance of the BMP(s), recordation of deed restrictions, procedures for changes of ownership, transferring the permit, and renewing the permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system, to record deed restrictions, to transfer the permit, or to renew the permit, will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes, and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. If you have any questions, need additional copies of the permit or approved plans, please contact Garrett Zorda in the Wilmington Regional Office, at (910) 796-7215 or garrett.zorda@ncdenr.gov. Sincerely, Brian Wrenn, Acting Director Division of Energy, Mineral and Land Resources Enclosures: Attachment A — Designer's Certification Form Renewal Application Documents North Carolina Department of Environmental Quality I Division of Energy. h9heral and Land Resources Je tz�[) 1M1rilrningLon Regional Office 1127 Car tfirral Drive Extension I Wilmington, North Carolina 28405 NORftt [7WOLWA o�.i..sdS.Y..�Wo.u4� /'s 910.796.7215 State Stormwater Permit No. SW8 050513 Page 2 of 2 DES/gdz: \\\Stormwater\Permits & Projects\2005\050513 HD\2020 02 permit 050513 cc: Richard Collier, PE, McKim & Creed Wilmington Regional Office Stormwater File