HomeMy WebLinkAbout20120206 Ver 1_More Info Received_20120309vMCIGM&caESn
TO NC DWQ
1650 Mail Service Center
Raleigh NC 27699 1650
ATTENTION Karen Higgins
WE ARE SENDING ❑ Originals ® Prints
❑ Specifications ❑ Calculations
1a- 02-0 1.
LETTER OF TRANSMITTAL
DATE March 7 2012
PROJECT NO 4555 0006
1 TASK NO
RE Belmont Apartment Stream
Crossing, 401 Permit
-T TRANSMITTAL NO
PAGE 1 OF 1
❑ Shop Drawings ❑ Samples
❑ Other
Quantity
Drawing No
FRey]
Description
Status
5
Pre Construction Notification Form
1
CD with Belmont Apartment Plans
MAR 9 2012
DENR WAVE QUALI
Wetlands &, St r it Ap
ry
Issue Status Code A Preliminary B Fabrication Only C For Information D Bid
E Construction F For Review & Comments G For Approval H See Remarks
Action Status Code 1 No Exceptions Taken 2 Make Corrections Noted 3 Other
4 Amend & Resubmit 5 Rejected See Remarks
Alan Attached is our Nationwide 29 Permit submittal with a revised Pre Construction
REMARKS Notification Form Call me should you have any questions about the site
Email wboles@mckuncreed com
Phone 704 8412588
cc
McKIM & CREED, Inc
Signed
Documentl
Weston Boles PE
W A TE9
O�pF QG
o -c
►2, -DZoLo
\
Office Use Only
Corps action ID no
DWQ project no
Form Version 1 3 Dec 10 2008
Page 1 of 10
PCN Form - Version 1 3 December 10 2008 Version
Pre - Construction Notification PC Fornr
A Applicant Information
1
Processing
la
Type(s) of approval sought from the
Corps
®Section 404 Permit ❑Section 10 Kermit
1 b Specify Nationwide Permit (NWP) number 29 or General Permit (GP) number
1c
Has the NWP or GP number been verified by the Corps?
IF] Yes
® No
1 d
Type(s) of approval sought from the DWQ (check all that apply)
® 401 Water Quality Certification - Regular ❑ Non404 Jurisdictional General Permit
❑ 401 Water Quality Certification - Express ❑ Riparian Buffer Authorization
le
Is this notification solely for the record
because written approval is not required?
For the record only for DWQ 401
Certification
® Yes ❑ No
For the record only for Corps Permit
® Yes ❑ No
1f
Is payment into a mitigation bank or in lieu fee program proposed for mitigation
of impacts? If so attach the acceptance letter from mitigation bank or in'
n lieu
fee program
El Yes
®No
1g
Is the project located in any of NC s twenty coastal counties If yes answer 1 h
below
❑ Yes
® No
1h
Is the project located within a NC DCM Area of Environmental Concern (AEC)?
❑ Yes
® No
2
Project Information
2a
Name of project
Belmont Apartments
2b
County
Mecklenburg
2c
Nearest municipality / town
Charlotte
2d
Subdivision name
Belmont Apartments
2e
NCDOT only T I P or state
project no
J IdAQ
a )n
3
Owner Information
3a
Name(s) on Recorded Deed
1152 LLC (SOSID #0923643) DENR
Wafla
WAT R Q A-L-14
3b
Deed Book and Page No
DB 22345 PG 210
3c
Responsible Party (for LLC if
applicable)
Alex Pete Kotandes
3d
Street address
5601 Virginia Beach Blvd
3e
City state zip
Virginia Beach VA 23462
3f
Telephone no
757 -461 1000
3g
Fax no
757 -461 4433
3h
Email address
Danny @kotandes corn
Page 1 of 10
PCN Form - Version 1 3 December 10 2008 Version
4
Applicant Information (if different from owner)
4a
Applicant is
❑ Agent ❑ Other specify
4b
Name
4c
Business name
(if applicable)
4d
Street address
4e
City state zip
4f
Telephone no
4g
Fax no
4h
Email address
5
Agent/Consultant Information (if applicable)
5a
Name
Weston Boles PE
5b
Business name
(if applicable)
McKim & Creed
5c
Street address
8020 Tower Point Drive
5d
City state zip
Charlotte NC 28227
5e
Telephone no
704 841 2588
5f
Fax no
704 841 2567
5g
Email address
wboles @mckimcreed com
Page 2 of 10
PCN Form — Version 1 3 December 10 2008 Version
B Project Information and Prior Project History
1 Property Identification
1a Property identification no (tax PIN or parcel ID)
02906494
1b Site coordinates (in decimal degrees)
Latitude 35 203544 Longitude 8042217
(DD DDDDDD) ( DD DDDDDD)
1c Property size
20 78 acres
2 Surface Waters
2a Name of nearest body of water (stream river etc ) to
proposed project
Mallard Creek
2b Water Quality Classification of nearest receiving water
C
2c River basin
Yadkin
3 Project Description
3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application
The existing site is wooded
3b List the total estimated acreage of all existing wetlands on the property
0 AC
3c List the total estimated linear feet of all existing streams (intermittent and perennial) on the property
3512 LF
3d Explain the purpose of the proposed project
To allow an internal roadway connection within the apartment complex
3e Describe the overall project in detail including the type of equipment to be used
An 84 and 66 CMP pipe will be installed to convey stormwater to allow a road connection The pipe will be installed
using a large track hoe or crane
4 Jurisdictional Determinations
4a Have Jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property /
project (including all prior phases) in the past?
Comments
❑ Yes ® No ❑ Unknown
4b If the Corps made the jurisdictional determination what type
of determination was made?
❑ Preliminary ❑ Final
4c If yes who delineated the jurisdictional areas?
Name (if known)
Agency /Consultant Company
Other
4d If yes list the dates of the Corps Jurisdictional determinations or State determinations and attach documentation
5 Project History
5a Have permits or certifications been requested or obtained for
this project (including all prior phases) in the pasty
❑Yes ® No ❑ Unknown
5b if yes explain in detail according to help file instructions
6 Future Project Plans
6a Is this a phased project? ❑ Yes ® No
6b If yes explain
Page 3 of 10
PCN Form — Version 1 3 December 10 2008 Version
C Proposed Impacts Inventory
1 Impacts Summary
la Which sections were completed below for your project (check all that apply)
❑ Wetlands ® Streams tributaries ❑ Buffers
❑ Open Waters ❑ Pond Construction
2 Wetland Impacts
If there are wetland impacts proposed on the site then complete this question for each wetland area impacted
2a
2b
2c
2d
2e
2f
Wetland impact
Type of Jurisdiction
number —
Type of impact
Type of wetland
Forested
(Corps 404 10
Area of impact
Permanent (P) or
(if known)
DWQ — non -404 other)
(acres)
Tem ora T
W1 ❑ P [:IT
❑ Yes
❑ Corps
❑ No
❑ DWQ
W2 ❑ P ❑ T
❑ Yes
❑ Corps
❑ No
❑ DWQ
W3 ❑ P ❑ T
❑ Yes
❑ Corps
❑ No
❑ DWQ
W4 ❑ P ❑ T
❑ Yes
❑ Corps
❑ No
❑ DWQ
W5 ❑ P ❑ T
❑ Yes
❑ Corps
❑ No
❑ DWQ
Wg ❑ p ❑ T
❑ Yes
❑ Corps
❑ No
❑ DWQ
2g Total wetland impacts
2h Comments
3 Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site then complete this
question for all stream sites impacted
3a
3b
3c
3d
3e
3f
3g
Stream impact
Type of impact
Stream name
Perennial
Type of Jurisdiction
Average
Impact
number
Permanent (P) or
(PER) or
intermittent
(Corps 404 10
DWQ — non 404
stream
width
length
(linear
Temporary (T)
(INT)?
other)
(feet)
feet)
S1 ®P ❑ T
Roadway
UT1 to Mallard
❑ PER
® Corps
Crossing
Creek
® INT
❑ DWQ
g
90 If
S2 ❑ P ❑ T
❑ PER
❑ Corps
❑ INT
❑ DWQ
S3 ❑ P ❑ T
❑ PER
❑ Corps
❑ INT
❑ DWQ
S4 ❑ P ❑ T
❑ PER
❑ Corps
❑ INT
❑ DWQ
S5 ❑ P ❑ T
❑ PER
❑ Corps
❑ INT
❑ DWQ
S6 El [:3 T
7—
E:1 PER
El
❑ INT
[:1 DWQ
3h Total stream and tributary impacts
90 If
31 Comments
Page 4 of 10
PCN Form — Version 1 3 December 10 2008 Version
4 Open Water Impacts
If there are proposed impacts to lakes ponds estuaries tributaries sounds the Atlantic Ocean or any other open water of
the U S then individually list all open water impacts below
4a
4b
4c
4d
4e
Open water
Name of waterbody
impact number —
(if applicable)
Type of impact
Waterbody type
Area of impact (acres)
Permanent (P) or
Temporary T
01 ❑P ❑T
02 ❑P ❑T
03 [3P [IT
04 ❑P ❑T
4f Total open water impacts
4g Comments
5 Pond or Lake Construction
If pond or lake construction proposed then complete the chart below
5a
5b
5c
5d
5e
Wetland Impacts (acres)
Stream Impacts (feet)
Upland
Pond ID
Proposed use or purpose
(acres)
number
of pond
Flooded
Filled
Excavated
Flooded
Filled
Excavated
Flooded
P1
P2
5f Total
5g Comments
5h Is a dam high hazard permit required
❑ Yes ❑ No If yes permit ID no
51 Expected pond surface area (acres)
51 Size of pond watershed (acres)
5k Method of construction
6 Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer then complete the chart below If yes then individually list all buffer impacts
below If any impacts require mitigation then you MUST fill out Section D of this form
6a
❑ Neuse ❑ Tar Pamlico ❑ Other
Project is in which protected basin?
❑ Catawba ❑ Randleman
6b
6c
6d
6e
6f
6g
Buffer impact
number—
Reason
Buffer
Zone 1 impact
Zone 2 impact
Permanent (P) or
for
Stream name
mitigation
(square feet)
(square feet)
Temporary
impact
required?
61 ❑ PEI T
El Yes
❑ No
B2 ❑ P ❑ T
❑ Yes
❑ No
B3 ❑P ❑T
L1 Yes
❑ No
6h Total buffer impacts
61 Comments
Page 5 of 10
PCN Form — Version 1 3 December 10 2008 Version
D Impact Justification and Mitigation
1 Avoidance and Minimization
1a Specifically describe measures taken to avoid or minimize the proposed impacts in designing project
1 b Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques
2 Compensatory Mitigation for Impacts to Waters of the U S or Waters of the State
2a Does the project require Compensatory Mitigation for
impacts to Waters of the U S or Waters of the State?
❑ Yes ® No
2b If yes mitigation is required by (check all that apply)
❑ DWQ ❑ Corps
2c If yes which mitigation option will be used for this
project?
❑ Mitigation bank
❑ Payment to in lieu fee program
❑ Permittee Responsible Mitigation
3 Complete if Using a Mitigation Bank
3a Name of Mitigation Bank
3b Credits Purchased (attach receipt and letter)
Type
Quantity
3c Comments
4 Complete if Making a Payment to In lieu Fee Program
4a Approval letter from in lieu fee program is attached
❑ Yes
4b Stream mitigation requested
linear feet
4c If using stream mitigation stream temperature
❑ warm ❑ cool []cold
4d Buffer mitigation requested (DWQ only)
square feet
4e Riparian wetland mitigation requested
acres
4f Non riparian wetland mitigation requested
acres
4g Coastal (tidal) wetland mitigation requested
acres
4h Comments
5 Complete if Using a Permittee Responsible Mitigation Plan
5a If using a permittee responsible mitigation plan provide a description of the proposed mitigation plan
Page 6 of 10
PCN Form — Version 1 3 December 10 2008 Version
6 Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ
6a Will the project result in an impact within a protected riparian buffer that requires
❑ Yes ® No
buffer mitigation?
6b If yes then identify the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the
amount of mitigation required
6c
6d
6e
Zone
Reason for impact
Total impact
Multiplier
Required mitigation
(square feet)
(square feet)
Zone 1
3 (2 for Catawba)
Zone 2
1 5
6f Total buffer mitigation required
6g If buffer mitigation is required discuss what type of mitigation is proposed (e g payment to private mitigation bank
permittee responsible riparian buffer restoration payment into an approved in lieu fee fund)
6h Comments 8 886 sf of Mecklenburg County Post Construction Storm Water Ordinance vegetated buffer impacted by
creek crossing is being mitigated on site to meet Mecklenburg County requirements
Page 7 of 10
PCN Form — Version 1 3 December 10 2008 Version
E
Stormwater Management and Diffuse Flow Plan (required by DWQ)
1
Diffuse Flow Plan
1a
Does the project include or is it adjacent to protected riparian buffers identified
❑ Yes ® No
within one of the NC Riparian Buffer Protection Rules?
1 b
If yes then is a diffuse flow plan included? If no explain why
❑ Yes El No
Comments
2
Stormwater Management Plan
2a
What is the overall percent imperviousness of this project?
44%
2b
Does this project require a Stormwater Management Plan?
® Yes ❑ No
2c
If this project DOES NOT require a Stormwater Management Plan explain why
2d
If this project DOES require a Stormwater Management Plan then provide a brief narrative description of the plan
Stormwater Management is review by the City of Charlotte
® Certified Local Government
2e
Who will be responsible for the review of the Stormwater Management Plan?
❑ DWQ Stormwater Program
❑ DWQ 401 Unit
3
Certified Local Government Stormwater Review
3a
In which local government s jurisdiction is this project?
City of Charlotte
® Phase II
3b
Which of the following locally implemented stormwater management programs
❑ NSW
❑ USMP
apply (check all that apply)
❑ Water Supply Watershed
❑ Other
3c
Has the approved Stormwater Management Plan with proof of approval been
® Yes ❑ No
attached?
4
DWQ Stormwater Program Review
❑ Coastal counties
4a
Which of the following state implemented stormwater management programs apply
❑ HQW
❑ ORW
(check all that apply)
❑ Session Law 2006 246
❑ Other
4b
Has the approved Stormwater Management Plan with proof of approval been
attached?
❑ Yes ❑ No
5
DWQ 401 Unit Stormwater Review
5a
Does the Stormwater Management Plan meet the appropriate requirements?
❑ Yes ❑ No
5b
Have all of the 401 Unit submittal requirements been met?
❑ Yes ❑ No
Page 8 of 10
PCN Form — Version 1 3 December 10 2008 Version
F
Supplementary Information
1
Environmental Documentation (DWQ Requirement)
la
Does the project involve an expenditure of public (federal /state /local) funds or the
❑ Yes
® No
use of public (federal /state) land?
lb
If you answered yes to the above does the project require preparation of an
environmental document pursuant to the requirements of the National or State
❑ Yes
❑ No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1c
If you answered yes to the above has the document review been finalized by the
State Clearing House? (If so attach a copy of the NEPA or SEPA final approval
letter )
❑ Yes
❑ No
Comments
2
Violations (DWQ Requirement)
2a
Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500) Isolated
Wetland Rules (15A NCAC 2H 1300) DWQ Surface Water or Wetland Standards
❑ Yes
® No
or Riparian Buffer Rules (15A NCAC 2B 0200)?
2b
is this an after the fact permit application?
❑ Yes
® No
2c
If you answered yes to one or both of the above questions provide an explanation of the violation(s)
3
Cumulative Impacts (DWQ Requirement)
3a
Will this project (based on past and reasonably anticipated future impacts) result in
E] Yes
No
additional development which could impact nearby downstream water quality?
3b
If you answered yes to the above submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy If you answered no provide a short narrative description
4
Sewage Disposal (DWQ Requirement)
4a
Clearly detail the ultimate treatment methods and disposition (non discharge or discharge) of wastewater generated from
the proposed project or available capacity of the subject facility
Charlotte Mecklenburg Utilities will serve the site
Page 9 of 10
PCN Form — Version 1 3 December 10 2008 Version
5 Endangered Species and Designated Critical Habitat (Corps Requirement)
5a Will this project occur in or near an area with federally protected species or
El Yes ®No
habitat
5b Have you checked with the USFWS concerning Endangered Species Act
El Yes No
impacts?
5c If yes indicate the USFWS Field Office you have contacted
El Raleigh
❑ Asheville
5d What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
6 Essential Fish Habitat (Corps Requirement)
6a Will this project occur in or near an area designated as essential fish habitat?
❑Yes No
6b What data sources did you use to determine whether your site would impact Essential Fish Habitat?
7 Historic or Prehistoric Cultural Resources (Corps Requirement)
7a Will this project occur in or near an area that the state federal or tribal
governments have designated as having historic or cultural preservation
❑ Yes ® No
status (e g National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
7b What data sources did you use to determine whether your site would impact historic or archeological resources?
8 Flood Zone Designation (Corps Requirement)
8a Will this project occur in a FEMA designated 100 year floodplain?
❑ Yes ® No
8b If yes explain how project meets FEMA requirements
8c What source(s) did you use to make the floodplain determination? FEMA Flood Map
Alex Pete Kotarides
�/ 1
�j
229 12
Applicant/Agents Printed Name
Applicant/Agents Signature
Date
(Agents signature is valid only if an authorization letter from the applicant
is provided
Page 10 of 10
PCN Form — Version 1 3 December 10 2008 Version