Loading...
HomeMy WebLinkAbout20120206 Ver 1_More Info Received_20120309vMCIGM&caESn TO NC DWQ 1650 Mail Service Center Raleigh NC 27699 1650 ATTENTION Karen Higgins WE ARE SENDING ❑ Originals ® Prints ❑ Specifications ❑ Calculations 1a- 02-0 1. LETTER OF TRANSMITTAL DATE March 7 2012 PROJECT NO 4555 0006 1 TASK NO RE Belmont Apartment Stream Crossing, 401 Permit -T TRANSMITTAL NO PAGE 1 OF 1 ❑ Shop Drawings ❑ Samples ❑ Other Quantity Drawing No FRey] Description Status 5 Pre Construction Notification Form 1 CD with Belmont Apartment Plans MAR 9 2012 DENR WAVE QUALI Wetlands &, St r it Ap ry Issue Status Code A Preliminary B Fabrication Only C For Information D Bid E Construction F For Review & Comments G For Approval H See Remarks Action Status Code 1 No Exceptions Taken 2 Make Corrections Noted 3 Other 4 Amend & Resubmit 5 Rejected See Remarks Alan Attached is our Nationwide 29 Permit submittal with a revised Pre Construction REMARKS Notification Form Call me should you have any questions about the site Email wboles@mckuncreed com Phone 704 8412588 cc McKIM & CREED, Inc Signed Documentl Weston Boles PE W A TE9 O�pF QG o -c ►2, -DZoLo \ Office Use Only Corps action ID no DWQ project no Form Version 1 3 Dec 10 2008 Page 1 of 10 PCN Form - Version 1 3 December 10 2008 Version Pre - Construction Notification PC Fornr A Applicant Information 1 Processing la Type(s) of approval sought from the Corps ®Section 404 Permit ❑Section 10 Kermit 1 b Specify Nationwide Permit (NWP) number 29 or General Permit (GP) number 1c Has the NWP or GP number been verified by the Corps? IF] Yes ® No 1 d Type(s) of approval sought from the DWQ (check all that apply) ® 401 Water Quality Certification - Regular ❑ Non404 Jurisdictional General Permit ❑ 401 Water Quality Certification - Express ❑ Riparian Buffer Authorization le Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification ® Yes ❑ No For the record only for Corps Permit ® Yes ❑ No 1f Is payment into a mitigation bank or in lieu fee program proposed for mitigation of impacts? If so attach the acceptance letter from mitigation bank or in' n lieu fee program El Yes ®No 1g Is the project located in any of NC s twenty coastal counties If yes answer 1 h below ❑ Yes ® No 1h Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ® No 2 Project Information 2a Name of project Belmont Apartments 2b County Mecklenburg 2c Nearest municipality / town Charlotte 2d Subdivision name Belmont Apartments 2e NCDOT only T I P or state project no J IdAQ a )n 3 Owner Information 3a Name(s) on Recorded Deed 1152 LLC (SOSID #0923643) DENR Wafla WAT R Q A-L-14 3b Deed Book and Page No DB 22345 PG 210 3c Responsible Party (for LLC if applicable) Alex Pete Kotandes 3d Street address 5601 Virginia Beach Blvd 3e City state zip Virginia Beach VA 23462 3f Telephone no 757 -461 1000 3g Fax no 757 -461 4433 3h Email address Danny @kotandes corn Page 1 of 10 PCN Form - Version 1 3 December 10 2008 Version 4 Applicant Information (if different from owner) 4a Applicant is ❑ Agent ❑ Other specify 4b Name 4c Business name (if applicable) 4d Street address 4e City state zip 4f Telephone no 4g Fax no 4h Email address 5 Agent/Consultant Information (if applicable) 5a Name Weston Boles PE 5b Business name (if applicable) McKim & Creed 5c Street address 8020 Tower Point Drive 5d City state zip Charlotte NC 28227 5e Telephone no 704 841 2588 5f Fax no 704 841 2567 5g Email address wboles @mckimcreed com Page 2 of 10 PCN Form — Version 1 3 December 10 2008 Version B Project Information and Prior Project History 1 Property Identification 1a Property identification no (tax PIN or parcel ID) 02906494 1b Site coordinates (in decimal degrees) Latitude 35 203544 Longitude 8042217 (DD DDDDDD) ( DD DDDDDD) 1c Property size 20 78 acres 2 Surface Waters 2a Name of nearest body of water (stream river etc ) to proposed project Mallard Creek 2b Water Quality Classification of nearest receiving water C 2c River basin Yadkin 3 Project Description 3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application The existing site is wooded 3b List the total estimated acreage of all existing wetlands on the property 0 AC 3c List the total estimated linear feet of all existing streams (intermittent and perennial) on the property 3512 LF 3d Explain the purpose of the proposed project To allow an internal roadway connection within the apartment complex 3e Describe the overall project in detail including the type of equipment to be used An 84 and 66 CMP pipe will be installed to convey stormwater to allow a road connection The pipe will be installed using a large track hoe or crane 4 Jurisdictional Determinations 4a Have Jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? Comments ❑ Yes ® No ❑ Unknown 4b If the Corps made the jurisdictional determination what type of determination was made? ❑ Preliminary ❑ Final 4c If yes who delineated the jurisdictional areas? Name (if known) Agency /Consultant Company Other 4d If yes list the dates of the Corps Jurisdictional determinations or State determinations and attach documentation 5 Project History 5a Have permits or certifications been requested or obtained for this project (including all prior phases) in the pasty ❑Yes ® No ❑ Unknown 5b if yes explain in detail according to help file instructions 6 Future Project Plans 6a Is this a phased project? ❑ Yes ® No 6b If yes explain Page 3 of 10 PCN Form — Version 1 3 December 10 2008 Version C Proposed Impacts Inventory 1 Impacts Summary la Which sections were completed below for your project (check all that apply) ❑ Wetlands ® Streams tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2 Wetland Impacts If there are wetland impacts proposed on the site then complete this question for each wetland area impacted 2a 2b 2c 2d 2e 2f Wetland impact Type of Jurisdiction number — Type of impact Type of wetland Forested (Corps 404 10 Area of impact Permanent (P) or (if known) DWQ — non -404 other) (acres) Tem ora T W1 ❑ P [:IT ❑ Yes ❑ Corps ❑ No ❑ DWQ W2 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W3 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W4 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W5 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ Wg ❑ p ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ 2g Total wetland impacts 2h Comments 3 Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site then complete this question for all stream sites impacted 3a 3b 3c 3d 3e 3f 3g Stream impact Type of impact Stream name Perennial Type of Jurisdiction Average Impact number Permanent (P) or (PER) or intermittent (Corps 404 10 DWQ — non 404 stream width length (linear Temporary (T) (INT)? other) (feet) feet) S1 ®P ❑ T Roadway UT1 to Mallard ❑ PER ® Corps Crossing Creek ® INT ❑ DWQ g 90 If S2 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S3 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S4 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S5 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S6 El [:3 T 7— E:1 PER El ❑ INT [:1 DWQ 3h Total stream and tributary impacts 90 If 31 Comments Page 4 of 10 PCN Form — Version 1 3 December 10 2008 Version 4 Open Water Impacts If there are proposed impacts to lakes ponds estuaries tributaries sounds the Atlantic Ocean or any other open water of the U S then individually list all open water impacts below 4a 4b 4c 4d 4e Open water Name of waterbody impact number — (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary T 01 ❑P ❑T 02 ❑P ❑T 03 [3P [IT 04 ❑P ❑T 4f Total open water impacts 4g Comments 5 Pond or Lake Construction If pond or lake construction proposed then complete the chart below 5a 5b 5c 5d 5e Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f Total 5g Comments 5h Is a dam high hazard permit required ❑ Yes ❑ No If yes permit ID no 51 Expected pond surface area (acres) 51 Size of pond watershed (acres) 5k Method of construction 6 Buffer Impacts (for DWQ) If project will impact a protected riparian buffer then complete the chart below If yes then individually list all buffer impacts below If any impacts require mitigation then you MUST fill out Section D of this form 6a ❑ Neuse ❑ Tar Pamlico ❑ Other Project is in which protected basin? ❑ Catawba ❑ Randleman 6b 6c 6d 6e 6f 6g Buffer impact number— Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary impact required? 61 ❑ PEI T El Yes ❑ No B2 ❑ P ❑ T ❑ Yes ❑ No B3 ❑P ❑T L1 Yes ❑ No 6h Total buffer impacts 61 Comments Page 5 of 10 PCN Form — Version 1 3 December 10 2008 Version D Impact Justification and Mitigation 1 Avoidance and Minimization 1a Specifically describe measures taken to avoid or minimize the proposed impacts in designing project 1 b Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques 2 Compensatory Mitigation for Impacts to Waters of the U S or Waters of the State 2a Does the project require Compensatory Mitigation for impacts to Waters of the U S or Waters of the State? ❑ Yes ® No 2b If yes mitigation is required by (check all that apply) ❑ DWQ ❑ Corps 2c If yes which mitigation option will be used for this project? ❑ Mitigation bank ❑ Payment to in lieu fee program ❑ Permittee Responsible Mitigation 3 Complete if Using a Mitigation Bank 3a Name of Mitigation Bank 3b Credits Purchased (attach receipt and letter) Type Quantity 3c Comments 4 Complete if Making a Payment to In lieu Fee Program 4a Approval letter from in lieu fee program is attached ❑ Yes 4b Stream mitigation requested linear feet 4c If using stream mitigation stream temperature ❑ warm ❑ cool []cold 4d Buffer mitigation requested (DWQ only) square feet 4e Riparian wetland mitigation requested acres 4f Non riparian wetland mitigation requested acres 4g Coastal (tidal) wetland mitigation requested acres 4h Comments 5 Complete if Using a Permittee Responsible Mitigation Plan 5a If using a permittee responsible mitigation plan provide a description of the proposed mitigation plan Page 6 of 10 PCN Form — Version 1 3 December 10 2008 Version 6 Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a Will the project result in an impact within a protected riparian buffer that requires ❑ Yes ® No buffer mitigation? 6b If yes then identify the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the amount of mitigation required 6c 6d 6e Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 3 (2 for Catawba) Zone 2 1 5 6f Total buffer mitigation required 6g If buffer mitigation is required discuss what type of mitigation is proposed (e g payment to private mitigation bank permittee responsible riparian buffer restoration payment into an approved in lieu fee fund) 6h Comments 8 886 sf of Mecklenburg County Post Construction Storm Water Ordinance vegetated buffer impacted by creek crossing is being mitigated on site to meet Mecklenburg County requirements Page 7 of 10 PCN Form — Version 1 3 December 10 2008 Version E Stormwater Management and Diffuse Flow Plan (required by DWQ) 1 Diffuse Flow Plan 1a Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes ® No within one of the NC Riparian Buffer Protection Rules? 1 b If yes then is a diffuse flow plan included? If no explain why ❑ Yes El No Comments 2 Stormwater Management Plan 2a What is the overall percent imperviousness of this project? 44% 2b Does this project require a Stormwater Management Plan? ® Yes ❑ No 2c If this project DOES NOT require a Stormwater Management Plan explain why 2d If this project DOES require a Stormwater Management Plan then provide a brief narrative description of the plan Stormwater Management is review by the City of Charlotte ® Certified Local Government 2e Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program ❑ DWQ 401 Unit 3 Certified Local Government Stormwater Review 3a In which local government s jurisdiction is this project? City of Charlotte ® Phase II 3b Which of the following locally implemented stormwater management programs ❑ NSW ❑ USMP apply (check all that apply) ❑ Water Supply Watershed ❑ Other 3c Has the approved Stormwater Management Plan with proof of approval been ® Yes ❑ No attached? 4 DWQ Stormwater Program Review ❑ Coastal counties 4a Which of the following state implemented stormwater management programs apply ❑ HQW ❑ ORW (check all that apply) ❑ Session Law 2006 246 ❑ Other 4b Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ❑ No 5 DWQ 401 Unit Stormwater Review 5a Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 8 of 10 PCN Form — Version 1 3 December 10 2008 Version F Supplementary Information 1 Environmental Documentation (DWQ Requirement) la Does the project involve an expenditure of public (federal /state /local) funds or the ❑ Yes ® No use of public (federal /state) land? lb If you answered yes to the above does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c If you answered yes to the above has the document review been finalized by the State Clearing House? (If so attach a copy of the NEPA or SEPA final approval letter ) ❑ Yes ❑ No Comments 2 Violations (DWQ Requirement) 2a Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500) Isolated Wetland Rules (15A NCAC 2H 1300) DWQ Surface Water or Wetland Standards ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 2B 0200)? 2b is this an after the fact permit application? ❑ Yes ® No 2c If you answered yes to one or both of the above questions provide an explanation of the violation(s) 3 Cumulative Impacts (DWQ Requirement) 3a Will this project (based on past and reasonably anticipated future impacts) result in E] Yes No additional development which could impact nearby downstream water quality? 3b If you answered yes to the above submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy If you answered no provide a short narrative description 4 Sewage Disposal (DWQ Requirement) 4a Clearly detail the ultimate treatment methods and disposition (non discharge or discharge) of wastewater generated from the proposed project or available capacity of the subject facility Charlotte Mecklenburg Utilities will serve the site Page 9 of 10 PCN Form — Version 1 3 December 10 2008 Version 5 Endangered Species and Designated Critical Habitat (Corps Requirement) 5a Will this project occur in or near an area with federally protected species or El Yes ®No habitat 5b Have you checked with the USFWS concerning Endangered Species Act El Yes No impacts? 5c If yes indicate the USFWS Field Office you have contacted El Raleigh ❑ Asheville 5d What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? 6 Essential Fish Habitat (Corps Requirement) 6a Will this project occur in or near an area designated as essential fish habitat? ❑Yes No 6b What data sources did you use to determine whether your site would impact Essential Fish Habitat? 7 Historic or Prehistoric Cultural Resources (Corps Requirement) 7a Will this project occur in or near an area that the state federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ® No status (e g National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b What data sources did you use to determine whether your site would impact historic or archeological resources? 8 Flood Zone Designation (Corps Requirement) 8a Will this project occur in a FEMA designated 100 year floodplain? ❑ Yes ® No 8b If yes explain how project meets FEMA requirements 8c What source(s) did you use to make the floodplain determination? FEMA Flood Map Alex Pete Kotarides �/ 1 �j 229 12 Applicant/Agents Printed Name Applicant/Agents Signature Date (Agents signature is valid only if an authorization letter from the applicant is provided Page 10 of 10 PCN Form — Version 1 3 December 10 2008 Version