Loading...
HomeMy WebLinkAbout20201440 Ver 1_More Info Received_20210204Strickland, Bev From: Peoria McDougald <pmcdougald@critekgroup.com> Sent: Thursday, February 4, 2021 1:41 PM To: Homewood, Sue Subject: RE: [External] 401 Water Quality Certification Requirements Attachments: Mitchell FM City Detail Approval.pdf Follow Up Flag: Follow up Flag Status: Flagged CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Good afternoon, I attached the email thread of the City approving the Temporary Coffer Dam Creek Crossing with a partial dam. Please let me know if this is acceptable. I can also forward you the email if needed. Thanks, Peoria L. McDougald, El CDT Staff Engineer CriTek Engineering Group, P.C. 1 Centerview Drive Suite 307 Greensboro, NC 27407 Cell: 336.709.5525 From: Homewood, Sue <sue.homewood@ncdenr.gov> Sent: Thursday, January 28, 2021 1:19 PM To: Peoria McDougald <pmcdougald@critekgroup.com> Subject: RE: [External] 401 Water Quality Certification Requirements Hi Peoria, Are you still waiting for City approval on this? Thanks. Sue Homewood Division of Water Resources, Winston Salem Regional Office Department of Environmental Quality 336 776 9693 office 336 813 1863 mobile Sue. Homewood@ncdenr.gov 1 450 W. Hanes Mill Rd, Suite 300 Winston Salem NC 27105 N '� v �...: x x � x.� .. 0(.. x.. '�,. tx :. t ,. �..: :......... ............ ....+�.'� x..... w� as �x.a i. t....A 4' ..,.. From: Peoria McDougald <pmcdougald@critekgroup.com> Sent: Wednesday, January 6, 20214:19 PM To: Homewood, Sue <sue.homewood@ncdenr.gov> Subject: RE: [External] 401 Water Quality Certification Requirements CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Good afternoon Sue, We have sent the detail to the City for their approval, and we are hoping to hear from them soon. Thanks, Peoria L. McDougald, Ell CDT Staff Engineer CriTek Engineering Group, P.C. 1 Centerview Drive Suite 307 Greensboro, NC 27407 Cell: 336.709.5525 From: Homewood, Sue <sue.homewood@ncdenr.gov> Sent: Monday, January 4, 2021 3:50 PM To: Peoria McDougald <pmcdougald@critekgroup.com> Subject: RE: [External] 401 Water Quality Certification Requirements Hi Peoria, Yes, that is much more acceptable. If you can confirm with the City that they will use this detail instead and then just submit an email to me with confirmation I can incorporate it into the file as "more information submitted". Thanks Sue Homewood Division of Water Resources, Winston Salem Regional Office Department of Environmental Quality 336 776 9693 office 336 813 1863 mobile Sue. Homewood@ncdenr.gov 450 W. Hanes Mill Rd, Suite 300 PEI Winston Salem NC 27105 From: Peoria McDougald <pmcdougald@critekgroup.com> Sent: Monday, January 4, 2021 3:45 PM To: Homewood, Sue <sue.homewood@ncdenr.gov> Subject: RE: [External] 401 Water Quality Certification Requirements CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Good afternoon Sue, I verified the width of the creek at the crossing, and the distance is 50 feet. That was a typo on my end. We were trying to use the city standard details, but we have another detail I attached that we can use. This detail will only dam half of the creek while performing construction in the creek. Will this detail be acceptable? If so, will we need to resubmit for the permit including that detail? Thanks, Peoria L. McDougald, Ell CDT Staff Engineer CriTek Engineering Group, P.C. 1 Centerview Drive Suite 307 Greensboro, NC 27407 Cell: 336.709.5525 From: Homewood, Sue <sue.homewood@ncdenr.gov> Sent: Monday, January 4, 2021 12:28 PM To: Peoria McDougald <pmcdougald@critekgroup.com> Subject: RE: [External] 401 Water Quality Certification Requirements Hello Peoria, I have reviewed the 401 application for the Mitchell WTP line. I have concerns about the proposed temporary dewatering plan for North Buffalo Creek. The application says the creek is 60 feet wide there and the details show a standard full dam with pump around. We don't typically allow for a full dam/pump around system on a such a big system. Is that truly the plan for this project/location? Sue Homewood Division of Water Resources, Winston Salem Regional Office Department of Environmental Quality 336 776 9693 office 336 813 1863 mobile Sue. Homewood@ncdenr.gov 450 W. Hanes Mill Rd, Suite 300 Winston Salem NC 27105 3" i From: Peoria McDougald <pmcdougald@critekgroup.com> Sent: Thursday, November 5, 2020 10:36 AM To: Homewood, Sue <sue.homewood@ncdenr.gov> Subject: RE: [External] 401 Water Quality Certification Requirements External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Good Morning, I hope you are doing well. Thanks for your help so far. Are you familiar with how the 401 permit fee should be submitted since the pandemic? Can we still send the check through the mail addressed to N.C. Division of Water Resources? Peoria L. McDougald, Ell CDT Staff Engineer CriTek Engineering Group, P.C. 1 Centerview Drive Suite 307 Greensboro, NC 27407 Cell: 336.709.5525 From: Homewood, Sue <sue.homewood@ncdenr.gov> Sent: Wednesday, October 7, 2020 11:22 AM To: Peoria McDougald <pmcdougald@critekgroup.com> Subject: RE: [External] 401 Water Quality Certification Requirements If your project triggers any of the thresholds listed on Page 2 of GC #4133 then you'll need written authorization. You'll need to determine what category the buffer impacts fall into from the Table of Uses, Exempt, Allowable, Allowable with Mitigation etc. Sue Homewood Division of Water Resources, Winston Salem Regional Office Department of Environmental Quality 336 776 9693 office 336 813 1863 mobile Sue. Homewood@ncdenr.gov 450 W. Hanes Mill Rd, Suite 300 Winston Salem NC 27105 t €€ # .. ..... ..t €...€.. From: Peoria McDougald <pmcdougald@critekgroup.com> Sent: Wednesday, October 7, 2020 11:19 AM To: Homewood, Sue <sue.homewood@ncdenr.gov> Subject: RE: [External] 401 Water Quality Certification Requirements �=Externa l email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to 11Fo-?21ffn@nc.gov Good Morning, I have an additional question. If we are filing for a NWP 12 will it be required to get the 401 Water Quality Permit also. Peoria L. McDougald, Ell CDT Staff Engineer CriTek Engineering Group, P.C. 1 Centerview Drive Suite 307 Greensboro, NC 27407 Cell: 336.709.5525 From: Homewood, Sue <sue.homewood@ncdenr.gov> Sent: Monday, October 5, 2020 1:01 PM To: Peoria McDougald <pmcdougald@critekgroup.com> Subject: RE: [External] 401 Water Quality Certification Requirements Within the Table of Uses of the buffer rules (link provided in previous email) Sue Homewood Division of Water Resources, Winston Salem Regional Office Department of Environmental Quality 336 776 9693 office 336 813 1863 mobile Sue. Homewood@ncdenr.gov 450 W. Hanes Mill Rd, Suite 300 Winston Salem NC 27105 et ...:€:. sr t. t#...xr:. g.. a . ...j:: ..€£:# From: Peoria McDougald <pmcdougald@critekgroup.com> Sent: Monday, October 5, 2020 1:00 PM 5 To: Homewood, Sue <sue.homewood@ncdenr.gov> Subject: RE: [External] 401 Water Quality Certification Requirements External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Thanks, Where can I find the exempt category? Peoria L. McDougald, Ell CDT Staff Engineer CriTek Engineering Group, P.C. 1 Centerview Drive Suite 307 Greensboro, NC 27407 Cell: 336.709.5525 From: Homewood, Sue <sue.homewood@ncdenr.gov> Sent: Monday, October 5, 2020 12:32 PM To: Peoria McDougald <pmcdougald@critekgroup.com> Subject: RE: [External] 401 Water Quality Certification Requirements Hi, Yes, North Buffalo Creek is subject to the Jordan Buffer Rules. Depending on the impacts, utility lines are sometimes able to be constructed under the "exempt" category which then wouldn't trigger threshold j. Sue Homewood Division of Water Resources, Winston Salem Regional Office Department of Environmental Quality 336 776 9693 office 336 813 1863 mobile Sue. Homewood@ncdenr.gov 450 W. Hanes Mill Rd, Suite 300 Winston Salem NC 27105 From: Peoria McDougald <pmcdougald@critekgroup.com> Sent: Monday, October 5, 2020 12:22 PM To: Homewood, Sue <sue.homewood@ncdenr.gov> Cc: Richard Hansman <rhansman@critekgroup.com>; Dawayne Crite <dcrite@critekgroup.com> Subject: [External] 401 Water Quality Certification Requirements External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Good afternoon Sue, I hope all is well. I am contacting you in regards to the 401 permit. We are designing a 12-inch force main from Mitchell Water Treatment Plant in Greensboro, NC that will cross North Buffalo Creek by open cut trench excavation. I believe North Buffalo Creek has a Riparian Buffer that will be impacted by clearing to install the new 12-inch pipe. If so, this will trigger threshold j of the water quality certification. I just wanted to confirm that North Buffalo Creek does have a Riparian Buffer and we will need for obtain a 401 permit. I attached the preliminary plan and profile for your reference. Thanks, Peoria L. McDougald, Ell CDT Staff Engineer CriTek Engineering Group, P.C. 1 Centerview Drive Suite 307 Greensboro, NC 27407 Cell: 336.709.5525 Peoria McDougald From: Dawayne Crite Sent: Thursday, February 4, 2021 1:23 PM To: Peoria McDougald Subject: Fwd: 2019-007 Mitchell WTP Residual Improvements Phase I Permitting ----RE: Mitchell BW FM FYI Sent by (Phone from J. Dawayne Crite Begin forwarded message: From: "Briggs, Danny" <Danny.Briggs @greensboro-nc.gov> Date: February 4, 2021 at 1:15:49 PM EST To: "Keenan, Catherine H." <keenanch@cdmsmith.com>, "Guffey, Jay" <Jay.Guffey@greensboro- nc.gov> Cc: Dawayne Crite <dcrite@critekgroup.com> Subject: 2019-007 Mitchell WTP Residual Improvements Phase I Permitting ----RE: Mitchell BW FM A= On behalf of the Water Resources Department, I acknowledge that you are changing the proposed creek crossing diversion method from a total creek bypass to a partial creek bypass method for the proposed force main installation under the North Buffalo Creek. Thank you Kate for explaining this change to me by phone today. We are in agreement to change the bypass method. Thank you for your assistance! Danny Briggs, El, CDT Senior Civil Project Engineer Water Resources City of Greensboro Phone: 336-373-7898; Fax: 336-412-6305 Mailing Address: Water Resources Dept 2602 S. Elm -Eugene Street, Greensboro, NC 27406 www.greensboro-nc.gov From: Keenan, Catherine H. <keenanch@cdmsmith.com> Sent: Thursday, February 4, 2021 12:35 PM To: Briggs, Danny < Danny. Briggs @greensboro-nc.gov>; Guffey, Jay <Jay.Guffey@greensboro-nc.gov> Cc: Dawayne Crite <dcrite@critekgroup.com> Subject: FW: Mitchell BW FM CAUTION: This email originated from outside the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Report suspicious emails by clicking the "Phishing Alert" button. Dear Danny and Jay, Please see the attached detail from Dawayne Crite. One of the details for the previous submittal needs to be amended. Resubmittal to the state is not required but we do need your acknowledgment that the new detail is acceptable. Could you please email us back that this crossing detail is acceptable? Sincerely, Kate From: Dawayne Crite <dcrite@critekeroup.com> Sent: Tuesday, January 5, 2021 3:14 PM To: Keenan, Catherine H. <keenanch@cdmsmith.com> Cc: Peoria McDougald <pmcdoueald@critekeroup.com> Subject: Mitchell BW FM Kate, Good afternoon. After consultation with the State, we need to change the creek crossing detail that we currently show to the one attached. The issue that arose is that the COG standard detail 213 is for a full creek closure and not partial creek closure like the one attached. We need to have a patial creek closure due to the volume of water that is in the stream. The State is not requiring a resubmittal, only acknowledgement from the Owner (COG) that this standard detail is acceptable. Can you forward this detail the COG PM for the project and have them acknowledge acceptance through an email response? J. Dawayne Crite, PE President CriTek Engineering Group, PC O: 336.348.1889 M: 864.553.9239 Please note that email sent to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. EDGE PART 2 f BARRIER PART 1 FLOW TEMPORARY SILT FENCE OR EARTH BERM PLAN WATER WATER 1 D'x10' DEWATERING BASIN OR SILT BAG 17a A 00fr 0 2:4191=0 CREEK BOTTOM mmi _ - CONSTRUCTIQN SEQUENCE 1, CONSTRUCTION SHALL BE PERFORMED DURING LOW FLOW PERIODS. 2, CROSSINGS SHALL BE ACCOMPLISHED IN A MANNER THAT WILL NOT PROHIBIT THE STREAM FLOW, 3. THE BANK OPPOSITE OF THE BARRIER SHALL BE PROTECTED BY SAND BAGS. THE MINIMUM LENGTH OF PROTECTION REQUIRED IS 25 FT ON EACH SIDE OF THE BARRIER, AT A HEIGHT OF 24" ABOVE NORMAL WATER LEVEL. THE EXTENT OF PROTECTION MAY VARY AS DIRECTED BY THE ENGINEER ON AN INDIVIDUAL BASIS, 4. INSTALL NON -ERODIBLE BARRIER AROUND 1 /2 OF CROSSING, 5. DE --WATERING AREA INSIDE NON -ERODIBLE BARRIER. DEWATERING PUMP SHOULD DISCHARGE INTO A SILT BAG OR A 10*xlO` DE --WATERING BASIN WITH 2:1 SIDE SLOPES. 6, EXCAVATE PIPE TRENCH. 7, INSTALL PIPE, 8, BACKFILL WITH EXCAVATED AND COMPACTED MATERIAL TO ORIGINAL PROFILE. 3, REMOVE BARRIER. 10. RELOCATE TO OPPOSITE SIDE OF STREAM AND REPEAT ABOVE STEPS. 11, AFTER UTILITY CROSSING HAS BEEN INSTALLED AND BARRIERS REMOVED, CONTRACTOR SHALL INSTALL CLASS It RIP -RAP WITH FILTER FABRIC AND STONE UNDERLAYMENT TO STABILIZE CREEK BED. 12. IMMEDIATELY REVEGETATE CREEK BANK BY SEEDING AND MULCHING, AND INSTALLING MATTING AS NECESSARY. 13, INSTALL TEMPORARY SILT FENCE. NOTE: TEMPORARY COFFER DAMS SHALL NOT BE USED FOR CONSTRUCTION EQUIPMENT CROSSING. TEMPORARY COFFER DAM CREEK CROSSING N . T. S.