Loading...
HomeMy WebLinkAbout20210244 Ver 1_Meeting Request Review_20210204 DWR Pre-Filing Meeting Request Form NORTH CAROLINA EnWmnnacnlrtl Quelfuy ID#* 20210244 Version* 1 Regional Office* Asheville Regional Office-(828)296-4500 Reviewer List* Kevin Mitchell Pre-Filing Meeting Request submitted 2/4/2021 ......................................................................................................................................................................................................................................................................................................................................................................................................................................................... Contact Name* Jason Dilday Contact Email Address* jldilday@ncdot.gov Project Name* Broadband installation along US 74 from Wilmington to Asheville Project Owner* NCDOT Project County* Union Owner Address: Street Address 1000 Birch Ridge Drive Address Line 2 City State/Rovince/Region Raleigh NC Fbstal/Zip Code Country 27604 USA Is this a transportation project?* r Yes r No Type(s)of approval sought from the DWR: rJ 401 Water Quality Certification- I— 401 Water Quality Certification- Regular Express • Individual Permit I— Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes (' No Do you know the name of the staff member you would like to request a meeting with? Kevin Mitchell Please give a brief project description below.* NCDOT proposes to install three 1.25"diameter conduits containing broadband fiber optic cable in the right-of-way of the 280-mile US 74 corridor from 1-140 near Wilmington to 1-40 in Asheville. Please give a couple of dates you are available for a meeting. Please attach the documentation you would like to have the meeting about. pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. . I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing meeting request. . I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired,and you can submit an application. Signature Submittal Date 2/4/2021 Reviewer Meeting Request Decision Has a meeting been scheduled?* r Yes r No