Loading...
HomeMy WebLinkAbout820689_30 Day POA_20210201PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: AWS820689 County: Sampson Facility Name: Steed Farm Inc. Certified Operator Name: Julius Frank Steed Operator Number: AWA26567 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway far lagoons with spillways. Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lagoon Name/ID: 1 Spillway(Y or N): N Level(inches): 7 2. Check all applicable items X Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to be pumped and hauled is reflected in section Ill tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates for depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: as conditions permit 1 hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Steed Farm Inc./ Julius Frank Steed Facility Owner/Manager (print) Phone: 910-284-2994 5ive (c. ��.� � F� c\I S krJ\ = Date: ` .-- Facility Ow er/Manager (signature) 0 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES FIVE (5) DAY DRAW DOWN PERIOD I. TOTAL VOLUME TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 2. Current liquid volume in structural freeboard a. current liquid level according to marker 1 b. designed structural freeboard zone (Normally 12 inches or greater) c. line b - line a (inches within structural freeboard) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 2580 certified herd # 7.0 12.0 inches inches 5.0 inches 64056 ft2 199641 gallons 180 85264 2580 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j_ excess rainfall over evaporation according to design k. (lines h + i+ j) x 7.48 x 5 days/line f 4. Total volume of waste to be land applied during 5 day draw down I. total volume to be land applied line e + line k = days ft3 85264 ft3 0 39200 ft3 ft3 25861 gallons 225502 gallons REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE WITH A LIQUID LEVEL WITHIN THE STRUCTURAL FREEBOARD ELEVATIONS. (Click on the next Structure tab shown below) PoA (5 Day) 2/21/00 II. TOTAL VOLUME OF WASTE STORED WITHIN STRUCTURAL FREEBOARD ELEVATIONS FOR ALL WASTE STRUCTURES FOR FACILITY 1. structure ID: 2. structure ID: 3. structure ID: 4. structure ID: 5. structure ID: 6. structure ID: 1 line l = 225502 gallons line I = gallons line I = gallons line I = gallons fine I = gallons fine I = gallons n. lines 1 + 2 + 3 + 4 + 5 + 6 = 225502 gallons o. line n /27154 = 8.30 acre -inches III. TOTAL ACRES AVAILABLE TO RECEIVE WASTE DURING 5 DAY DRAW DOWN PERIOD1'2 'While this section deals with hydraulic loading capacities, applications cannot exceed agronomic rate for receiving crop according to its certified waste plan. 2Fields with no remaining PAN balance, no receiving crop, and/or completely saturated are not considered available to receive waste. p. tract # q. field # r. soil type 7152 7152 7152 1 2 3 Lynchburg Blanton Lynchburg s_ crop overseed hay overseed hay overseed hay t. acres 24.32 1.17 u. remaining IRR-2 PAN balance (Iblacre) 45 45 45 v. maximum application rate (in/hr) 0.65 0.35 0.65 w. maximum application amount (inches) 1 1 1 x. total acres available during 5 day draw down (sum of column t) = 26.60 acres IV_ FACILITY'S PoA OVERALL HYDRAULIC LOAD TO BE LAND APPLIED PER ACRE PoA (5 Day) 2/21/00 y- line o - 0.31 inches per acre to be applied within 5 days linex If unable to land apply hydraulic Toad listed in line y, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new hydraulic load based on new information. Plan to land apply hydraulic load: 1. Describe moisture conditions of fields? (e.g. Is there water standing in field; does irrigation equipment mar down in field; "trafficability" across soils; will soils absorb application without runoff, etc.) Wet field conditions - will apply as weather permits. 2. Date and amount of last rainfall event? DATE: 01/02/21 3. Dates of last waste application event per field: AMOUNT: 14.50 'inches 4. Given optimum soil and weather conditions, is irrigation equipment capable of applying the volume in line "n" at appropriate seasonal (i.e. winter) application rates within 5 days? 5. Irrigation schedule for next 5 days - include daily schedule; proposed application rates and amounts per irrigation event; changes made in gun sizes, nozzles, "o" rings, operating time, travel speed, etc. to meet proposed changes in application rates and amounts; and any other information for consideration PoA (5 Day) 2/21/00