June 29, 2009
North Carolina Department of Transportation
Project Analysis and Environmental Analysis Branch
Attn: Gregory J. Thorpe, Ph D
1 South Wilmington Street
Raleigh North Carolina 27699 -1548
Dear Mr. Thorpe:
JUL 2 2009
y�EitANDS AND S70`�1�A � S��
This letter confirms the final Interagency Review Team's (IRT) evaluation of the May 2009
Privateer Farm Addendum (enclosed) to the North Carolina Department of Transportation
Umbrella Mitigation Banking Instrument ( NCDOT UMBI). The addendum describes the stream
and wetland restoration within the 430 -acre site of Privateer Farm, which is one of several legacy
mitigation sites that will be incorporated in the NCDOT UMBI. The Privateer Farm Mitigation
Site, containing a tributary of Harrison Creek and Little Alligator Swamp, and is located west of
NC Hwy 53, north of Elizabethtown, at the Bladen/Cumberland County line, North Carolina.
Our office, in coordination with the IRT, has approved the May 2009 Privateer Farm
Addendum and its use for stream and wetland compensatory mitigation in accordance with the
NC DOT UMBI. However, please be aware that the initial release of credits, as described in the
NC DOT UMBI, will not be implemented until it has been executed. Approximately 266.5 total
riverine wetland credits and 8,066 linear feet of credits are expected to be generated in the bank
site. Once the UMBI is executed, 65 percent, or 173 credits, of riverine wetlands and 70 percent,
or 5,646 linear feet, of stream shall be made available.
Thank you for your time and cooperation. If you have any questions, please do not hesitate
to contact Mr. Mickey Sugg at (910) 251 -4811.
Sincerely,
Mickey Sugg, Project Manager
Wilmington Regulatory Field Office
Enclosure
-2-
Copies Furnished (with enclosure):
Mr. Gary Jordan
U.S. Fish and Wildlife Service
Post Office Box 33726
Raleigh North Carolina 27636 -3726
Mr. Steve Sollod
Transportation Project Coordinator
N.C. Division of Coastal Management
1638 Mail Service Center
Raleigh, North Carolina 27699 -1638
Mr. Travis Wilson
N.C. Wildlife Resources Commission
1142 I -85 Service Road
Creedmoor, North Carolina 27522
Mr. Ron Sechler
National Marine Fisheries Service
Pivers Island
Beaufort, North Carolina 28516
M . Tammy Hill
ivision of Water Quality
.C. Department of Environment
and Natural Resources
2321 Crabtree Boulevard
Raleigh, North Carolina 27626 -0535
Ms. Kathy Matthews
U.S. Environmental Protection Agency
Wetlands Regulatory Section- Region IV
109 T.W. Alexander Drive
Durham, North Carolina 27711
Copies Furnished (without enclosure):
Ms. Leilani Paugh
N.C. Department of Transportation
1 South Wilmington Street
Raleigh North Carolina 27699 -1548
Mr. Pete Benjamin
U.S. Fish and Wildlife Service
Fish and Wildlife Enhancement
Post Office Box 33726
Raleigh North Carolina 27636 -3726
Ms. Molly Ellwood
N.C. Wildlife Resources Commission
127 Cardinal Drive Extension
Wilmington, North Carolina 28405
Mr. John Dorney
Division of Water Quality
N.C. Department of Environment
and Natural Resources
2321 Crabtree Boulevard
Raleigh, North Carolina 27626 -0535
Mr. Steve Everhart
Division of Coastal Management
N.C. Department of Environment
and Natural Resources
127 Cardinal Drive Extension
Wilmington, North Carolina 28405
Privateer Farm
Addendum to the NCDOT UMBI
May 2009
A. Site History
The Privateer Farm stream and wetlands restoration site (the Site) is located in United
States Geological Survey (USGS) Hydrologic Unit (HU) 03030005 and North Carolina
Division of Water Quality (NCDWQ) Cape Fear River sub - basins 15 and 16 along Little
Alligator Swamp and Harrison Creek. The Site is located in the Southeastern Plains
Level III Ecoregion (Southeastern Floodplains and Low terraces Level IV Ecoregion) and
includes portions of Cumberland and Bladen Counties, approximately 6 miles from the
southern boundary of CU 03030004 (see Figure 1). The surrounding area includes
hundreds of elliptical shaped wetlands, called Carolina Bays, and is listed by the National
Audubon Society as an Important Bird Area (IBA) for its unique habitats.
The Site encompasses a 430 -acre boundary contained within the 4,600 acre farm
propeiy-. The pr6perty'6Wners, Ms. Sharon Valen`t`ine' Arid Mt. Marvin Johnson; intend to
restore the entire property to its historic wetland ecosystem. The restoration project
involving historic Harrison Creek is the first step toward this goal and is the centerpiece
of the restoration effort (see Figure 2).
The North Carolina Department of Transportation ( NCDOT) holds a conservation
easement over the Site; the easement was signed December 24`x', 2003. A minor
correction was made to the document's notary page and the corrected easement was
signed July 7"', 2005. Both copies are available at:
http: / /www.ncdot.org/ doh /preconstruct/pe /neu /Monitoring /default.htmi.
The remainder of the farm property to be restored has entered into the Natural Resources
Conservation Services (MRCS) Wetlands Reserve Program. Currently the easement has
been obtained by NRCS. NRCS is planning to complete the engineering design in- house,
which will most likely consist of ditch plugs, with review and comments provided by
Baker Engineering. NRCS is fully aware of the NCDOT easement and mitigation credit
and are committed in preserving the integrity of the NCDOT project.
Prior to restoration, stream and riparian functions on the Site had been severely impacted
as a result of agricultural conversion. Harrison Creek was channelized in the early 1980s
to reduce flooding and provide a drainage outlet for the extensive ditching across the Site.
As a result, the stream existed as a very large canal through the project site. Backwater
conditions were imposed along extensive sections of the stream due to culverts and debris
blockages, and natural riffle and pool sequences were nearly non - existent. Harrison
Creek is classified as Class C waters, which are suitable for aquatic life propagation and
survival, fishing, wildlife, secondary recreation, and agriculture.
B. Project Goals
The goal of the project is to restore functional stream and wetland systems to the Site.
The stream system that historically flowed through the Site was channelized and, as a
result, was highly incised ( "Gc" type stream — Rosgen classification) prior to restoration.
The natural channel design for the restored stream involved the construction of a new,
meandering channel across the agricultural fields. The furthest upstream portion of the
project used sections of the remnant historic channel for Harrison Creek that were still
visible within the existing wetland areas. The remaining portion of the restored channel
was constructed as a Rosgen "C" stream type with design dimensions based on historic
reference parameters for Harrison Creek. These reference parameters were determined
from historic aerial photographs (see Figure 3), the topography of the valley, and local
reference reach information. The total stream length across the Site was increased from
approximately 25,000 LF to 34,000 LF. Restoration activities for the Site involved
moving the stream channel back to its historic location and elevation, and filling drainage
ditches to raise the local water table and restore wetland and stream hydrology. The plan
also included scarification of the fields and breaking of the local plow pan to increase
surface water storage and provide a range of hydrologic conditions suitable for a variety
of native wetland plant species.
The following excerpt from the original mitigation plan, titled Privateer Farm Restoration
Plan, July 2004, completed by Buck Engineering, details the performance standards for
the Site:
Wetland Hydrologic Monitoring
Success Criteria: To meet the hydrologic success criteria, the monitoring data must show
that for each normal year within the monitoring period, the Site has been inundated or
saturated within 12 inches of the soil surface for a minimum of 12.5% of the growing
season (30 consecutive days). This targeted hydroperiod is based on hydrologic model
analyses of the Site, as presented in Section 3.6. WETS tables for Cumberland County
will be utilized to determine normal precipitation. If the restored Site is inundated or
saturated within 12 inches of the soil surface for less than 12.5% of the growing season,
but the post- restoration monitoring data reflect that the Site meets applicable USACE
criteria for wetlands and the Site is performing with similar hydrology as a monitored
reference site, then the regulatory agencies may consider the Site for mitigation of in -kind
impacts on a case -by -case basis.
Vegetation Monitoring
Success Criteria: Success will be defined as 320 stems per acre after five years. When
rooted vegetation does not survive, a determination will be made as to the need for
replacement; in general, if greater than 25% die, replacement will be done.
Stream Monitoring
Bankfull Events
Success Criteria: Data collected from the stream gages should indicate that
bankfull events are occurring on a natural cycle, as compared to return intervals
documented by Sweet and Geratz (2003). At least two bankfull events should be
documented within the five year monitoring period.
Cross - sections
Success Criteria: There should be little or no change in as -built cross - sections. If
changes do take place they should be evaluated to determine if they represent a
movement toward a more unstable condition (e.g., down - cutting, erosion) or are
minor changes that represent an increase in stability (e.g., settling, vegetative
changes, deposition along the banks, decrease in width -to -depth ratio and/or
cross sectional area).
Longitudinal Profile
Success Criteria: The longitudinal profiles should show that the bedform features
are remaining stable, i.e. they are not aggrading or degrading. The pools should
remain deep with flat water surface slopes and the riffles should remain steeper
and shallower.
Photo Reference Sites
Success Criteria: Photographs will be used to subjectively evaluate channel
aggradation or degradation, bank erosion, success of riparian vegetation, and
effectiveness of erosion control measures. Longitudinal photos should indicate
the absences of developing bars within the channel or an excessive increase in
channel depth.
Lateral photos should not indicate excessive erosion or continuing degradation of
the bank over time. A series of photos over time should indicate successional
maturation of riparian vegetation. Vegetative succession should include initial
herbaceous growth, followed by increasing densities of woody vegetation, and
then ultimately a mature overstory with herbaceous understory.
C. Site Construction
While restoration of the stream channel followed the historic pattern of Harrison Creek,
the restored stream would most appropriately be considered a tributary to Harrison Creek.
Flow from the headwaters of Harrison Creek was channelized around the perimeter of the
farm as part of the conversion of the Site to agricultural land. Due to elevation differences
between the restored stream and the channelized stream around the perimeter of the farm,
flow from the headwaters of Harrison Creek could not be diverted into the restoration
channel without causing significant hydrologic trespass issues beyond the property
boundary of Privateer Farm. Therefore, the restored channel was designed to function as
a headwater to Harrison Creek, with a drainage area of approximately one square mile,
increasing to a drainage area of six square miles at the downstream end of the project
(Figure 2).
Due to the extensive length of stream restoration and changes in drainage area from the
beginning to the end of the project, the project was divided into five stream reaches.
Design ratios were the same for each design reach and were based on reference reach
information. The size of each restored channel reach increased from upstream to
downstream to reflect the increasing drainage area.
The channel design allows discharges greater than bankfull flows to spread onto the
floodplain, dissipating flow energies and reducing stress on streambanks. In- stream
structures were used to control streambed grade, reduce stress on streambanks, and
promote bedform sequences and habitat diversity. The in- stream structures consisted of
root -wads, log vanes, and log weirs that promote a diversity of habitat features in the
restored channel. Streambanks were stabilized using a combination of erosion control
matting, bare -root planting, and transplants. Transplants provided immediate shading to
the restored stream, as well as living root mass to increase streambank stability and create
holding areas for fish and other aquatic biota.
The new stream channel was constructed "in the dry" and all stabilization practices were
in place prior to routing stream water into the new sections of channel. When
construction of a new reach was completed, plugs were installed in the old channel to re-
direct the water into the new channel. After the water had been diverted, the process of
filling the old channel with soil began.
The large road that ran from north to south through the middle of the project area was
graded to floodplain level in order to fill the road -side canals, and to allow flood flows to
spread over the restored floodplain. The north -south road was completely removed within
the limits of the project. Two roads that cross the project area from east to west were left
in place and to allow for access across the Site to other parts of the farni.
The as -built data collected after construction documented that the total area of restored
riverine wetlands was 402.5 acres (excluding 2.5 acres for road accesses), with 25 acres
of enhanced riverine wetlands, and 34,005 LF of restored stream channel. Construction
of this project was completed in April 2005.
Bare root trees were planted within all areas of the conservation easement. A minimum
50 -foot buffer was established along all restored stream reaches. In most areas, the final
buffer area was more than several hundred feet wide and included restored wetland areas.
In general, bare -root vegetation was planted at a target density of 680 stems per acre, or
an 8 -foot by 8 -foot grid. Planting of bare -root trees was conducted during the dormant
season, with all trees installed prior to March 20, 2005.
Observations were made during construction of the Site regarding the relative wetness of
areas to be planted. Planting zones were determined based on these assessments, and
planted species were matched according to their wetness tolerance and the anticipated
wetness of the planting area. Species planted are summarized in Table 1.
Table 1
Bare -root Tree Planted Across the Privateer Farm Restoration Site.
qr "'�rn.#Ta'Y:t} a:aYiS' S�� � ?M
#��+i� +,,,8", ��n, e�' R�� ���' Fd� T
�_ ,n '`�5,� .g �s�w��aj,,��
m . "1 "�,��y�y�
+i� °'_'`�i.' yr" ♦`i° '� � 9$3.��a
� a �• .� .,�'"�,,� "` n� ' � ,��p
�
� 4 �x. E, . �
1 i
^•"�i '�'v •�ii! it
�— f 'x°
�. ;:
6 °v r.:R�'�i�_., ..:{, ''{1' �f: �i",N•i
'm z* �. '
fl� ,�, �� °f4 -,„,
Willow oak
Quercus phellos
8.6%
23,300
weak — moderate
Swamp chestnut
Quercus michauxii
8.6%
23,300
weak
Laurel oak
Quercus laurifolia
6.0%
16,200
moderate — weak
Overcup oak
Quercus lyrata
6.3%
17,000
moderate
Swamp tupelo
Nyssa bii fora
7.9%
21,300
tolerant
Water tupelo
Nyssa aquatica
8.2%
22,000
tolerant
Bald cypress
Taxodium distichum
11.6%
31,200
tolerant
Water oak
Quercus nigra
8.6%
23,300
weak — moderate
Sycamore
Platanus occidentalis
10.8%
29,200
moderate
Green ash
Fraxinus pennsylvanica
10.8%
29,200
moderate
Shumard oak
Quercus shinnardii
6.5%
17,500
weak
Cherrybark oak
Quercus pagoda
5.9%
15,900
weak — intolerant
Notes:
1. Based on information from US Army Corps of Engineers (USACE) Wetland Research Program
(WRP) Technical Note VN- RS -4.1 (1997).
D. Current Status
The project has completed its fourth year of annual monitoring. Data for Year 4
monitoring was collected during the fall of 2008, and will include data from 30
hydrologic monitoring stations and 15 vegetation monitoring stations placed throughout
the Site, in addition to stream monitoring data, as required by the approved Restoration
Plan. Complete monitoring reports for the Privateer Farm site are available at:
http: / /www.ncdot.org/ doh/ preconstruct/ pe /n.eu /Monitoring//default.html.
E. Community Types
Following construction, the as -built data indicated that the total area of restored riverine
wetlands was 402.5 acres (excluding 2.5 acres for road accesses), with 25 acres of
enhanced riverine wetlands. The upper portion of the project area to the northern road
crossing (approximately 72 acres) has subsequently been classified as Headwater Forest,
as shown in Figure 4. The middle portion of the project area (from the northern road
crossing to the southern road crossing the property (approximately 333 acres), has been
classified as Bottomland Hardwood Forest. The lower portion of the project area
(approximately 25 acres) has been classified as Riverine Swamp Forest.
All three wetland types were evaluated in the summer of 2007 with the North Carolina
Wetland Assessment Method ( NCWAM) and received an overall score of high quality.
The Riverine Swamp and Bottomland Hardwood forests received a low score for the
habitat function. These low habitat scores reflect the lack of mature trees and expected
strata. However, the habitat scores are expected to improve over time as the vegetation
trends toward the expected canopy and diversity.
Based on 2008 vegetation monitoring, twelve of the fifteen vegetation plots are currently
meeting the stated success criteria. All of the wetlands on the Site are on a trajectory to
meet restoration goals of 260 stems per acre after five years.
Three sections of the restored stream, corresponding to the three wetland evaluation
locations, were evaluated using the draft North Carolina Stream Assessment Method
( NCSAM) during the summer of 2008. While the NCSAM is still under development,
the draft metrics and procedures were used to gain a general measurement of restored
stream function. The stream sections adjacent to the Riverine Swamp and Bottomland
Hardwood forests received a low quality score for the habitat function. These scores are
characteristic of a site with low richness and diversity of benthic macro invertebrates, lack
of mature vegetation in the stream -side area and lack of in- stream habitat types. The
drought conditions and age of the Site contributed to these reduced scores. However,
these factors are expected to improve over time since the Site is protected in perpetuity.
The NCWAM forms for Privateer Farms can be found at:
http: / /www.ncdot.org/ doh /preconstruct /pe /neu /Monitoring.
E. Proposed Credits
Based on the following ratios, the Privateer Farm Mitigation Bank is expected to generate
the 415 credits of Riverine Wetland (402.5 acres restoration and 25 acres enhancement)
and 34,005 credits of Stream (all restoration):
Stream Restoration - 1:1
Wetland Restoration - 1:1
Wetland Enhancement - 2:1
Of these credits, approximately 148.5 wetland credits and 25,939 stream credits have
been debited from the Bank for various permitted projects prior to inclusion in the
NCDOT UMBI. The remaining mitigation credits for Riverine Wetlands are 266.5
credits and 8,066 linear feet for Streams. See Table 3 attached to this document for the
Current Ledger for exact credit amounts debited and remaining.
F. Credit Release Schedule
Wetland Credit Release Schedule
If deemed appropriate by the Interagency Review Team (IRT), 15% of a bank's total
restoration credits shall be available for sale immediately upon completion of all of the
following:
1. Execution of the mitigation banking instrument by the Sponsor, the Corps, and
other agencies eligible for membership in the IRT who choose to execute the
agreement;
2. Approval of the final mitigation plan;
3. Delivery of the financial assurances;
4. Recordation of the preservation mechanism, as well as a title opinion acceptable
to the Corps covering the property;
Additionally, the NCDOT must complete the initial physical and biological
improvements to each bank site pursuant to its mitigation plan no later than the first full
year following initial debiting of the Umbrella Bank for the Bank Site.
Provided such physical and biological improvements are made in accordance with an
approved mitigation plan, an additional 15% (total 30 %) of the banks total credits shall
be available for sale.
Subject to a bank sponsor's continued satisfactory completion of all required success
criteria and monitoring, additional restoration mitigation credits will be available for sale
by a bank sponsor on the following schedule:
• 10% after first year, if interim success measures are met (total 40 %);
• 15% after second year, if interim success measures are met (total 55 %);
• 20% after third year, if interim success measures are met (total 75 %);
• 10% after fourth year, if interim success measures are met (total 85 %); and
• 15% after fifth year, if Success Criteria are met (total 100 %).
Stream Credit Release
The following credit release schedule applies only to those stream projects where
Restoration or Enhancement I has been performed where pattern, dimension, and profile,
or dimension and profile (respectively) have been improved.
If deemed appropriate by the IRT, 15% of a banks total stream credits shall be available
for sale immediately upon completion of all of the following:
1. Execution of the mitigation banking instrument by the Sponsor, the Corps, and
other agencies eligible for membership in the IRT who choose to execute the
agreement;
2. Approval of the final mitigation plan;
3. Delivery of the financial assurances;
4. Recordation of the preservation mechanism, as well as the title opinion covering
the property that is acceptable to the Corps.
Additional stream credits would be available according to the following release schedule:
• 15% upon completion of all physical and biological improvements made pursuant
to the mitigation plan: (30% cumulative).
• 10% after first year, provided channel is stable and all other success criteria are
met (40 %);
• 10% after second year, provided channel is stable and all other success criteria are
met (50 %);
• 10% after third year, provided channel is stable and all other success criteria are
met (60 %);
• 10% after fourth year, provided channel is stable and all other success criteria are
met (70 %).
• 15% after fifth year, provided channel is stable and all other success criteria are
met (85 %).
A reserve of 15% of the banks total stream credits shall be released any time after 2 bank -
full events have occurred, in separate years, provided the channel stable and all other
success criteria are met. In the event that less than two bank -full events occur during the
monitoring period, remaining credit release shall be at the discretion of the IRT.
G. Geographic Service Area
The Geographic Service Area (GSA) for the Site is portions of the Cape Fear River Basin
delineated by the 8 digit hydrologic units 03030005 and 03030004, excluding the
following 14 digit hydrologic units as illustrated by Figure 5:
03030004010010
03030004010020
03030004010030
03030004020010
03030004020020
03030004030010
03030004040010
'03030004050010
03030004050030
03030005030020
03030005030030
03030005030040
03030005030050
N
'Hop Mi.
Privateer Farms
Property Boundary
87
Cumberland ko.
------- a,d`ei—,—,V
_N\
Project Boundary
20
1
Panther Branch
Reference Site
Eliza tht n
saw E.O.-d" soy, b..
mp� "
8— 2W
CUMBERLAN
F. VIQ�3!sW
Figure 1. Project Vicinity Map
BLADEN 0 2 4 8
Miles
7
L;wl A
4—'
�I Watershed Boundary 6 mi"
7-v
'NA
V
I 11-d
Project Boundary
I.V
0 , =--l" 1 0 2,000 41000
l2ker Feet Figure 2. Watershed Map
�:c� � � � a r�, s J91i °iii.' °�r�•�
Y77" Legend
Property Boundr.
Restoration Bou�
Enhancement i I
PA
rw
s{`
Na: ;
L I
K
s
j
of 1 w
-I...* it
iol
�'• A`j
Restored Wetland Types
Headwater Forest (72 acres)
Bottomiand Hardwood Forest (333 acres)
Riverine Swamp Forest (25 acres)
Air
Mlchul Baker E
&I. Ne�euy Dan
� Rw'k i00
Gary. korm Garoea
C)
ca
.2
2
U)
O
d)
<
c
O
C14
0
o
NO
(8)
(L)
0
0
(a
CL
C14
C')
(L)
z-
0
o
0
Cl)
3:
0
M
C)
a)
O
CL
O`
-
��
g
_
N
O
CD
C)
C\j
CD
q;r
0
C)
z °`
0
04
Z 0
C14
0
M
l
Cl)
(D
coe) - -,
C�
O
C)
ca
.2
2
U)
O
d)
<
c
C14
0
0
(8)
(L)
0
(a
CL
cc
c
(L)
z-
r-
0
3:
0
M
cn
0
a)
O
CL
O`
D
:03
LO
No
Ob
CV)
C)
O
cu
cu
C14
0
a)
(D
(8)
(D
0
W
CL
zt
0
CY)
L—
I.J.
C)
cv)
O
LO
n4
0
C)
C\j
CD
q;r
z °`
0
z
+
O
M
CD
Z
'00 1co ■
C)
Cl)
r6
cu
cu
a)
0
a)
(D
(8)
}3
a)
LL cn
Q
W
CL
0
L—
I.J.
LO
z
z
C14
'00 1co ■
C)
Cl)
r6
cu
cu
a)
LO 0
a)
(D
(8)
}3
a)
LL cn
Q
W
CL
0
L—
I.J.