Loading...
HomeMy WebLinkAbout20200518 Ver 2_Modification Request_20210203Staff Review Does this application have all the attachments needed to accept it into the review process?* r Yes r No ID#* 20200518 Version* 2 Is this project a public transportation project?* r Yes r No Reviewer List:* Robert Tankard:eads\rbtankard Select Reviewing Office:* Washington Regional Office - (252) 946-6481 Does this project require a request for payment to be sent?* r Yes r No How much is r $240.00 owed? * r $570.00 Project Submittal Form Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Project Type: * r For the Record Only (Courtesy Copy) r New Project r Modification/New Project with Existing ID r More Information Response r Other Agency Comments r Pre -Application Submittal r Re-Issuance\Renewal Request r Stream or Buffer Appeal Pre -Filing Meeting Information Before submitting this form please ensure you have submitted the Pre -Filing Meeting Request Form as we will not be able to accept your application without this important first step. The Pre -Filing Meeting Request Form is used in accordance with 40 C.F.R. Section 121.4(a) "At least 30 days prior to submitting a certification request, the project proponent shall request a pre -filing meeting with the certifying agency" and in accordance with 40 C.F.R. Section 121.5(b)(7), and (c)(5) all certification requests shall include documentation that a pre -filing meeting request was submitted to the certifying authority at least 30 days prior to submitting the certification request. Click here to read more information on when this form is needed prior to application submission or here to view the form. Attach documentation of Pre -Filing Meeting Request here: DWR Pre -Filing Meeting Request Form 01012021.pdf Date for Meeting Request 1/4/2021 ID# 200518 Version 2 Project Contact Information Name: Jeff McDermott Who is subnitting the inforrration? Email Address: Kenny@sunenergyl.com Project Information 52.89KB Existing ID #: Existing Version: 200518 2 20170001(no dashes) 1 Project Name: Albemarle Beach Solar Site Is this a public transportation project? r Yes r No Is the project located within a NC DCM Area of Environmental Concern (AEC)? r Yes r No r Unknown County (ies) Washington Please upload all files that need to be submited. aick the upload button or drag and drop files here to attach document Impacts Map 01012021.pdf 1.97MB Only pdf or Iv17 files are accepted. Describe the attachments or comments: The attachment shows the final impacts proposal for the Albemarle Beach Solar Site. All crossings are stand alone crossings. Sign and Submit W By checking the box and signing box below, I certify that: ■ I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief. ■ I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. ■ I agree that submission of this online form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); ■ I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); ■ 1 understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND ■ I intend to electronically sign and submit the online form. Signature: Submittal Date: Is filled in automatically. Albemarle Beach Tract N Washington County, NC 4LMG LaNDMnNnGEMErrTCRoun Section 404/401 Preliminary L:\WETLANDS\2020 WETLANDS FILES\LMG20.280 ---Albemarle a. company Delineation Sketch Beach, SE1\Maps Map Date: 12/30/2020 3805 Wrightsville Avenue Boundaries are approximate and not meant to be absolute. LMG20.280 Wilmington, NC 28403 GIS World Imagery 1 (910) 452-0001 0 750 1,500 3,000 Feet Scale applies to 11X17" print. ID#* 20200518 Version* 2 Regional Office * Washington Regional Office - (252) 946-6481 Reviewer List* Robert Tankard Pre -Filing Meeting Request submitted 11/4/2020 Contact Name* Jeff McDermott Contact Email Address* jeffrey.mcdermott@sunenergyl.com Project Name* Albemarle Beach Solar Site Project Owner* Albemarle Beach Solar, LLC Project County* Washington Owner Address: Street Address 192 Raceway Dr. Address Line 2 aty State / Province / Region Mooresville NC Postal / Zip axle Country 28117 us Is this a transportation project?* r Yes (' No Type(s) of approval sought from the DWR: * 401 Water Quality Certification - F 401 Water Quality Certification - Regular Express * Individual Permit W Modification F Shoreline Stabilization Does this project have an existing project ID#?* r Yes C No Please list all existing project ID's associated with this projects.* DWR Project # 20-0518, SAW-2018- 02357 Do you know the name of the staff member you would like to request a meeting with? Chris Pullinger, Billy Standridge Please give a brief project description below.* Albemarle Beach Solar is a utility sized solar farm, consisting of approximately 1,236 acres, located near Roper, NC. A preliminary jurisdictional determination and PCN have already been approved by both NCDWR and the USACOE. This modification involves a slight increase in wetland impacts associated with main drive through the site. An application for an approved jurisdictional determination has already been submitted prior to the date of this modification, and should be consulted when the modification is reviewed. Please give a couple of dates you are available for a meeting. 11 /17/2020 11 /18/2020 11 /19/2020 11 /20/2020 12/1 /2020 Please attach the documentation you would like to have the meeting about. Impacts Map 10282020.pdf 713.44KB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. 1 understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature C%t�C7I Submittal Date 11/4/2020