HomeMy WebLinkAbout20200518 Ver 2_Modification Request_20210203Staff Review
Does this application have all the attachments needed to accept it into the review process?*
r Yes r No
ID#*
20200518
Version* 2
Is this project a public transportation project?* r Yes
r No
Reviewer List:* Robert Tankard:eads\rbtankard
Select Reviewing Office:* Washington Regional Office - (252) 946-6481
Does this project require a request for payment to be sent?*
r
Yes
r
No
How much is r $240.00
owed? * r $570.00
Project Submittal Form
Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all
mandatory questions are answered.
Project Type: * r
For the Record Only (Courtesy Copy)
r
New Project
r
Modification/New Project with Existing ID
r
More Information Response
r
Other Agency Comments
r
Pre -Application Submittal
r
Re-Issuance\Renewal Request
r
Stream or Buffer Appeal
Pre -Filing Meeting Information
Before submitting this form please ensure you have submitted the Pre -Filing Meeting Request Form as we will not
be able to accept your application without this important first step. The Pre -Filing Meeting Request Form is used in
accordance with 40 C.F.R. Section 121.4(a) "At least 30 days prior to submitting a certification request, the project
proponent shall request a pre -filing meeting with the certifying agency" and in accordance with 40 C.F.R. Section
121.5(b)(7), and (c)(5) all certification requests shall include documentation that a pre -filing meeting request was
submitted to the certifying authority at least 30 days prior to submitting the certification request. Click here to read
more information on when this form is needed prior to application submission or here to view the form.
Attach documentation of Pre -Filing Meeting Request here:
DWR Pre -Filing Meeting Request Form 01012021.pdf
Date for Meeting Request 1/4/2021
ID# 200518 Version 2
Project Contact Information
Name: Jeff McDermott
Who is subnitting the inforrration?
Email Address: Kenny@sunenergyl.com
Project Information
52.89KB
Existing ID #: Existing Version:
200518 2
20170001(no dashes) 1
Project Name: Albemarle Beach Solar Site
Is this a public transportation project?
r Yes
r No
Is the project located within a NC DCM Area of Environmental Concern (AEC)?
r Yes r No r Unknown
County (ies)
Washington
Please upload all files that need to be submited.
aick the upload button or drag and drop files here to attach document
Impacts Map 01012021.pdf 1.97MB
Only pdf or Iv17 files are accepted.
Describe the attachments
or comments:
The attachment shows the final impacts proposal for the Albemarle Beach Solar Site. All crossings are stand
alone crossings.
Sign and Submit
W By checking the box and signing box below, I certify that:
■ I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to
the best of my knowledge and belief.
■ I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401
certification request within the applicable reasonable period of time.
■ I agree that submission of this online form is a "transaction" subject to Chapter 66, Article 40 of the NC General
Statutes (the "Uniform Electronic Transactions Act');
■ I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General
Statutes (the "Uniform Electronic Transactions Act');
■ 1 understand that an electronic signature has the same legal effect and can be enforced in the same way as a
written signature; AND
■ I intend to electronically sign and submit the online form.
Signature:
Submittal Date: Is filled in automatically.
Albemarle Beach Tract N
Washington County, NC 4LMG
LaNDMnNnGEMErrTCRoun Section 404/401 Preliminary
L:\WETLANDS\2020 WETLANDS FILES\LMG20.280 ---Albemarle a. company Delineation Sketch
Beach, SE1\Maps Map Date: 12/30/2020 3805 Wrightsville Avenue
Boundaries are approximate and not meant to be absolute. LMG20.280 Wilmington, NC 28403
GIS World Imagery 1 (910) 452-0001
0 750 1,500 3,000
Feet
Scale applies to 11X17" print.
ID#* 20200518
Version* 2
Regional Office * Washington Regional Office - (252) 946-6481
Reviewer List* Robert Tankard
Pre -Filing Meeting Request submitted 11/4/2020
Contact Name* Jeff McDermott
Contact Email Address* jeffrey.mcdermott@sunenergyl.com
Project Name* Albemarle Beach Solar Site
Project Owner* Albemarle Beach Solar, LLC
Project County* Washington
Owner Address: Street Address
192 Raceway Dr.
Address Line 2
aty
State / Province / Region
Mooresville
NC
Postal / Zip axle
Country
28117
us
Is this a transportation project?* r Yes (' No
Type(s) of approval sought from the DWR:
* 401 Water Quality Certification - F 401 Water Quality Certification -
Regular Express
* Individual Permit W Modification
F Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes C No
Please list all existing project ID's associated with this projects.*
DWR Project # 20-0518, SAW-2018-
02357
Do you know the name of the staff member you would like to request a meeting with?
Chris Pullinger, Billy Standridge
Please give a brief project description below.*
Albemarle Beach Solar is a utility sized solar farm, consisting of
approximately 1,236 acres, located near Roper, NC. A preliminary
jurisdictional determination and PCN have already been approved by both
NCDWR and the USACOE. This modification involves a slight increase in
wetland impacts associated with main drive through the site. An application
for an approved jurisdictional determination has already been submitted
prior to the date of this modification, and should be consulted when the
modification is reviewed.
Please give a couple of dates you are available for a meeting.
11 /17/2020
11 /18/2020
11 /19/2020
11 /20/2020
12/1 /2020
Please attach the documentation you would like to have the meeting about.
Impacts Map 10282020.pdf 713.44KB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
1 understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
C%t�C7I
Submittal Date 11/4/2020