Loading...
HomeMy WebLinkAbout20201872 Ver 1_Shoreline Stabilization_20210204Submission Form Pre -Filing Meeting Information Before submitting this form please ensure you have submitted the Pre -Filing Meeting Request Form as we will not be able to accept your application without this important first step. The Pre -Filing Meeting Request Form is used in accordance with 40 C.F.R. Section 121.4(a) "At least 30 days prior to submitting a certification request, the project proponent shall request a pre -filing meeting with the certifying agency" and in accordance with 40 C.F.R. Section 121.5(b)(7), and (c)(5) all certification requests shall include documentation that a pre -filing meeting request was submitted to the certifying authority at least 30 days prior to submitting the certification request. Click here to read more information on when this form is needed prior to application submission or here to viewthe form. Attach documentation of Pre -Filing Meeting Request here: DWR Pre -Filing Meeting Request Form.pdf 49.43KB Pre -fling Meeting or Request Date 12/8/2020 ID# 20201872 Version 1 I. Applicant Information [15A NCAC 02H .0502(a)] Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Primary Contact Email * lkndock@gmail.com Rease provide an email address for payrrent and requests for pure information here. Owner Information: Name:* Kelly Quinn Email: * quinikelly@yahoo.com Phone Number:* (980)722-9324 (xxx)xxx-xxxx Mailing Address:* Street Address 20928 Dec ora Drive Address Line 2 City State / Frovince / Region Denver NC Fbstal / Zip Code Country 28037 United States Is there an agent working on the F Yes project?* r No Agent/Consultant Information Name:* Dean Fisher Company Affiliation: * Lake Norman Custom Dock & Pile Driving, Inc Email:* lkndock@gmail.com Phone Number:* (704)483-2144 (xxx)xxx-xxxx Address:* Street Address PO Box 1439 Address Line 2 City State / Province / Region Denver NC Fbstal / Zip Code Country 28037 United States Asigned and dated copy of the Agent Authorization letter:* 20210128100300_001 1.pdf 221.98KB 20210128100300_001.pdf 398.4KB Link to: Sample Agent Authorization Form Project Information [15A NCAC 02H .0502(a) & (b)] Project Name:* Quinn shoreline If your project has a formal name please use this. If your project does not have a formal name, please identify your project by the owner name and proposed activity (Jones Property Access Road, Smith Guest House, etc.) List in parentheses any other names that have been used to identify the project in the past. 1. Provide a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. r Upload File r Lookup address Upload Map: 20928 Decora Dr - Google Maps.pdf 272.01KB Latitude:* 35.497924 Longitude:*-80.887768 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces, etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram under section 12.normal pool lake level/normal water level* DWRplotplan.pdf 98.87KB DWRdrawing.pdf 1.2MB Please use the diagram at the link below: https://edocs.deq.nc.gov/WaterResources/0/edoc/616616/Shoreline%20Layout.docx 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.)* unnamed (1).jpg 39.91KB unnamed (2).jpg 56.28KB unnamed (3) Jpg 37.45KB unnamed. jpg 37.73KB 4. Location of the property (where work is to be conducted) Nearest Town:* Cornelius County:* Mecklenburg Lake/ river/ ocean adjacent to Norman property: Subdivisions name or site address:* 20928 Decora Dr lot number 9 Include phasellot nunber Directions to site:* Take NC-73 E. Turn left onto W Catawba Ave. Turn left onto One Norman Blvd. Turn right onto Knox Rd. Turn left onto Torrence Chapel Rd. Turn right onto Decora Dr. Property is on the right. Rease include road narres and numbers, landmarks etc. 5. Describe the existing land use or condition of the site at the time of this application:* residential Fbsidential, undeveloped, etc. 6. Pro pertySize .64 Acres 7. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): Installation and grading of approx 6x66ft along shoreline for RipRap 8. How will the work be done? * m From Land r From Water 9. Total amount of disturbance below the normal pool lake level/ normal water level:* (including all clearing, backfill, excavation, rip rap, retaining walls, etc.) 330 sq ft square feet 10. Total amount of disturbance above the normal pool lake level/ normal water level and 50 feet land -ward:* (including all clearing, backfill, excavation, rip rap, retaining walls, etc.) 726 sq ft square feet 11. Please describe the vegetation above the normal pool lake level/ normal water level and 50 feet landward to be impacted:* (number of trees, for instance) manicured lawn Sketch: Application Fee: Once the application has been accepted. You will need to send a corresponding fee in with the appropriate DWR#. The application fee is as follows (pursuant to G.S. 143-215.3D): o $240.00 for impacts to lake (below normal water level) of less than 1 acre 0 $570.00 for impacts to lake (below normal water level) of greater or equal to 1 acre By digitally signing below, I certify that: o I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief o I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. o I agree that submission of this Shoreline Stabilization online form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); 0 1 understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND o I intend to electronically sign and submit the Shoreline Stabilization online form. Full Name:* Dean Fisher Signature: eA-0eI Initial Review Is this accepted into the review process?* Project Number:* 20201872 Select Reviewer:* Select Reviewing Office Has payment been received?* What amount is owed?* rYes allo Version:* 1 Alan Johnsomeads\adjohnsonl Mooresville Regional Office - (704) 663-1699 r No Payment Needed r Fee Received r Need Fee - send electronic notification r $240.00 f $570.00 SAMPLE AGENT AUTHORIZATION FORM PROPERTY LEGAL DESCRIPTION: LOT NO. 9 PLAN NO. PARCEL ID: 00174228 STREET ADDRESS: 20928 Decora Dr. Cornelius NC 28031 Please print: Property Owner: Kelly Quinn Property Owner: 1 _ cunTC 6 The undersigned, registered property owners of the above noted property, do hereby authorize Dean Fisher _ -- of Lake Norman Custom Dock & Pile Driving, Inc (Contractor / Agent) — (Name of consulting firm) to act on my behalf and take all actions necessary for the processing, issuance and acceptance of this permit or certification and any and all standard and special conditions attached. Property Owner's Address (if different than property above): Telephone: 9807229324 — _----_ We hereby certify the above information submitted in this application is true and accurate to the best of our knowledge. Authorized Si ture _ �_ 2-7' 2 �------- Date: _ — _ _./ CATAWBA RIPARIAN BUFFER NOTIFICATION FORM Project Name/address: Quinn shoreline County: Mecklenburg Owner: Kelly Quinn Ca6r-� J ✓}Cfi S YArvSq__ Print Signature Contractor/agent: Dean Fisher Dda-vl Print Signature The approval is for the purpose and design described in your application. Impacts not indicated in the application is a violation of the Buffer Rule. Site specific work should be provided in the application. [15A NCAC 02H .0506 and 15A NCAC 02B .0243(8)] Trees are not allowed to be removed from Zone 1 of the Buffer (within 30 ft of the full pond elevation), unless approved. Exception, those trees that are severely undermined along the immediate shoreline can be removed. Minimal shaping and sloping along the immediate shoreline is allowed. [15A NCAC 02B .0243(6)] Benching and grading in the buffer is not allowed. Excessive disturbance of ground cover. [15A NCAC 026 .0243 (6)] Beaches, impervious patios, impervious walkways, etc. are not allowed in the buffer unless specifically approved by the Division. There are limitation on size for decks. [15A NCAC 02B .0243(4) and (6)] Work to be conducted from land must indicate an access and indicate any trees that are to be removed. The work corridor should be described. The approved access corridor shall be restored. Staging, spoil, construction material must be outside the buffer. [15A NCAC 02H .0502 and 15A NCAC 02B .0243 (4), (6), (8)] Stormwater cannot be piped or channeled for direct discharge to the lake. All constructed stormwater discharges must be at the natural elevation and discharged prior to entering the buffer directed as diffuse or sheet flow at non -erosive velocities to the lake. [15A NCAC 02B .0243(5), (6)] Acknowledgement of Notification Kelly Quinn , hereby state that I have been informed of the Catawba Riparian Buffer Rule. Any work conducted in the buffer, not specifically stated in the application and approved by the Division of Water Resources (DWR), is a violation and subject to enforcement. Due diligence will be taken such that the construction will be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the app materials. Z Signature (owner): n(s) and specification(s), and other supporting Date: /" Z -7' ? rL o gle Map� 20928 Decora Dr x�os "ate S Rick's Custom Marine Canvas & Sail Repair V ��"cc lllllllllllllllllllI"Uavidson Airn z Conditioning Co NewmanQ �u�ep Services r� 2 �q l 4°a qle Paintworks q 140 - rp 1 a 1 SO ra 2092i3 Decors Dr, Cornelius, NC 2SC31 30 min drive -home � a � a i Crcwr G � 0 and Angus Q s �q �vcm z It x�95 Torrence Chapel 3 All Zion Church © 91AA.11 lea d, 9Seen 10, 9 Torrence Chapel Park wave c'/ Adkins CourtO © Reporting, LLC 7 o I ASuoerior Pools � Map data ©2021 500 ft , 3XV ;I r y W { cr an I •7 � �� � f r # k;F 7L47117 YTOI': ] Y ] Lil'. L;1 Ls r i 14 19 k i rt I'17tY�1L'. yy '.It31111LL1 S L nz ■ S ti 5 ft rip rap x 66 ft = 330 ft below 760 Access 1 ft rip rap 10 ft access 11 ft x 66 ft = 726 sq ft above Lot �. �l _. - -_. " -'�' � ���.,V LI W � i Contact Name* Dean Fisher Contact Email Address* Ikndock@gmail.com Project Owner* Kelly Quinn Project Name* Quinn Shoreline Project County* Mecklenburg Owner Address:* Street Address 20928 Decora Dr Address Line 2 aty Cornelius Postal / Zip axle 28031 Is this a transportation project?* (- Yes c: No Type(s) of approval sought from the DWR: F- 401 Water Quality Certification - F- 401 Water Quality Certification - Regular Express F- Individual Permit F- Modification W Shoreline Stabilization Does this project have an existing project ID#?* (- Yes c: No State / Province / Pegion NC Country USA Do you know the name of the staff member you would like to request a meeting with? Alan Johnson Please give a brief project description below.* Installation and grading of approx 6x60ft along shoreline for RipRap with fabric Please give a couple of dates you are available for a meeting. 12/8/2020 12/10/2020 Please attach the documentation you would like to have the meeting about. pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that Icannot submit myapplication until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature * Submittal Date 12/3/2020