Loading...
HomeMy WebLinkAboutNCG030543_DMR_20200623 Stormwater Discharge Monitoring Report for North Carolina Division of Energy, Mineral and Land Resources General Permit No. NCG030000 Date submitted t., • ? $ -`!iO CERTIFICATE OF COVERAGE NO. NCGO3 Q C.- __q 3 SAMPLE COLLECTION YEAR ZD 20 FACILITY NAME tA,h1,50 n tRopi, NW(iOO • OtOV►w141 SAMPLE PERIOD MJan-June 0 July-Dec COUNTY fAAADO■,l iv/___..__..._ or ❑ Monthlyl (mUnth) PERSON COLLECTING SAMPLES_ jewAt CAN(*CY DISCHARGING TO CLASS ORW 1HQW j Trout DPNA LABORATORY p_cqe, Atha Lab Cert.# 1 Vt'11,-triQ __ I Zero-flow I Water Supply HSA Comments on s mple collection or analysis: RECEIVED Other SO/4 d otivl — --- JUL 13 2020 PLEASE REMEMBER TO SIGN ON PAGES 2 --' Part A: Stormwater Benchmarks and Monitoring Results CENTRAL FILES DWR SECTION I No discharge this period?` Non-Polar O&G/ Date Sample 24-hour rainfall pH, Total Toxic Outfall No. Collected' amount, Total Suspended Solids Standard units Total Copper Total Lead Total Zinc Total Petroleum Organics (mo/dd/yr) Inches' Hydrocarbons Benchmarks _ - 100 mg/L or 50 mg/L4 6.0—9.0 0.010 mg/l 0.075 mg/L 0.126 mg/L 15 mg/L 1 mg/L Parameter Code - 46529 C0530 00400 01119 01051 01094 00552 78141 4-1 CI .(0 . LOU; .3 204 6.8 0.012 0.00 0.46 0 na ' Monthly sampling(instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 'For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. `The total precipitation must be recorded using data from an on-site rain gauge Unattended sites may be eligible for a waiver of the rain gauge requirement. ' See General Permit, Section B, Table 1 to identify the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12;for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2018-05/31/2021 SWU-245, last revised 11/1/2018 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TIC) monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the f,enerai Permit For those facilities electing to employ the {TO monitoring waiver, the discharger shall sign the following certification statement: Based upon my inquiry of the person or persons directly responsible ro' m,in,igiup compliance with the permit monitoring requirement for total toxic organics (TT0), I certify that to the best of my knowledge and belief, no dumping or r oncentrated toxic organics into the Stormwater or areas which are exposer: to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provision, of thr- solvent management plan included in the Stormwater Pollution Prevention Pti, lt. Name(Print name) SI7�_LER b€lc. Title(Print tithe)) Signature Date Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non-detect, ND, or other similar non-numerical format. When results are below the applicable limits,they must be reported in the format, "<XX mg/L", where XX is the numerical value of the detection limit, reporting limit, etc in mg/I-. Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. No discharge this period? i Outfall No. Date Sample Collected' 24-hour rainfall amount, New Motor Oil or Non-Polar O&G/Total Total Suspended (mo/dd/yr) Inches3 Hydraulic Oil Usage Petroleum Hydrocarbons Solids Benchmarks - - - 15 mg/L 100 mg/L or 50 mg/L° Parameter Code - 46529 NCOIL 00552 CO530 i I 1 ' Footnotes from Part A also apply to Part B Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Permit Date. 11/1/2018 05/31/2021 SWU 245, last revrst r: 11 L2018 Page 2 of 3 FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFAI TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR UHF_ SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO❑ IF YES, HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE? YES❑ NO❑ REGIONAL OFFICE CONTACT NAME. Mail an original copy of this DMR, including all"No Discharge"reports, within 30 days of receipt of the lab results(or at end of monitoring period in the case of"No Discharge"reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 i`VMOO` ;I`.r °3ti{4(fRIN,ILAfiOf` MR ANY INFORMA';iON REPORTED certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed fo assure that qualified personnel properly gather and evaluate the information submitted Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." Signatufe of Permittee Date Permit Date: 11/1/2018-05/31/2021 SWU-245, last reviser: 11/1 2018 Page 3 of 3