Loading...
HomeMy WebLinkAboutNCG030500_DMR_20201202 rill, /Th Stormwater Dischargonitoring Report for North Carolina Division of Energy, Mineral and Lad 'Resources General Permit No. NCG030000 Date submitted (2/z1 20 CERTIFICATE OF COVERAGE NO. NCGO3 c: 0 Q SAMPLE COLLECTION YEAR .W hali2oX FACILITY NAME CgA1'/'er.4 t ' s6/(11-.vs SAMPLE PERIOD ❑Jan-June Q July-Dec COUNTY ey ,cN or El Monthly' (month) PERSON COLLECTING SAMPLES `c7 K— Aye/ DISCHARGING TO CLASS ❑ORW ❑HQW QTrout ❑PNA LABORATORY TC'1- ,me4 a.. Lab Cert.# Z- J ['Zero-flow ❑Water Supply ❑SA Comments on sample collection or analysis: tther CASS //e" r`E PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 --> Part A: Stormwater Benchmarks and Monitoring Results BAN 04 ?021 ❑ No discharge this period?2 C��'T/ - • 91 .S 1 F<<E Non-Polar O&G/ Date Sample 24-hour rainfall '. { , `C i Total Toxic Outfall No. Total 5nspended soils `'4 - ' F.� topper Total Lead Total Zinc Total Petroleum s Collected' eirioOnt, ., h+ddhl OWN Organics Hydrocarbons (mo/dd/yrj inches ti Benchmarks _ 100 mg/L or b0 ms/L4 t$,o.s9 d; .0.010 mg/I. 0.075 mg/L 0.126 mg/L 15 mg/L 1 mg/L Parameter Code - 46529 C0530 00400 < ' 01119 01051 01094 00552 78141 PA —00 i ii be/20 .L-/�� 7 5 ice F‘3 4P4.CeSac [,dozsu* L.024. G. Z.Au'1 19,OD ' Monthly sampling(instead of semi-annual)must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 2 For sampling periods with no discharge at any single outfall,you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on-site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit,Section B,Table 1 to identify the especially sensitive receiving water classifications where the more protective benchmark applies. s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals,or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample(for metal finishing use the definition as found in 40 CFR 433.11;for semiconductor manufacture use the definition as found in 40 CFR 469.12;for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date:11/1/2018-05/31/2021 SWU-245,last revised 11/1/2018 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify,and the requirement for TTO monitoring may be waived. The solvent management plan Shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver,the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO),I certify that to the best of my knowledge and belief,no dumping of concentrated toxic organics Into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Name(Print name) Tit(1;rin title) f� 12121.2. Signature Date Note:Results must be reported In numerical format Do not report Below Detection Limit,BDL,<PQI,Non-detect,ND,or other similar non-numerical format. When results are below the applicable limits,they must be reported in the fof nat,"<XX mg/L",where XX is the numerical value of the detection limit, reporting limit,etc. in mg/L. Note: If you report a sample value in excess of the benthmark,you must Implement Tier 1,Tier 2,or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results:only for facilities averaging>55 gal of new oil per month. ❑No discharge this period?2 Outfall No. Date Sample Collected' 24-hour rainfall amain Motor Oil or Non-Polar Oilt►G/Total Total Suspended (mo/dd/yt) Inches "WII Oil Osage Petroleum Hydrocarbons Solids Benchmat t 15 mg/L 100 mg/L or 50 mg/0 Parameter Code 46529 NCOIL 00552 C0530 Footnotes from Part A also apply to Part B Note: If you report a sample value In excess of the benchmark,you must Implement Tier 1, Tier 2,or Tier 3 responses. See General Permit text. Permit Dater/2018 05/31/2021 SWU-245,last revised 11f'"�01s3 Page 2 of 3 FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALLTttIGGtR TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 On MORE hENCHMARK EXCEEDANCES FOR ThE SAME PARAMETER AT ANY ONE OUTFALL? YES Ei NO IF YES,HAVE YOU CONTACTED THE bEMLR REGIONAL OFFICE? YES W Nd b REGIONAL OFFICE CONTACT NAME: Mail on original copy of this MR,inctudhi'g all"No DifcharOe"reports,W1thl i tel tletifs of receipt of the lab results(or at end of monitoring period in the case of"NO Dlscharee"reports)to: Division of Water Quality Attn:DWQ Central Files 1617 Mail Service Center Raleigh,North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR AN1 IN00hIYMATION REPORTED: "I certify,under penalty of law,that this doctirheht and all attachments Were prepared tindet my direction or supervision in accordance with a system designed to assure that qualified personnel properly gatheir anti eiialtlate the Information Suflrtfftted.`�,,Ili- ltii flty inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the thforntatioh,the Inftirtnation stiliitiitted Icy tothe best of my knowledge and belief,true,accurate,and complete. I am a re t there are significant pe ities ffr submitting false information,including the$B Sibilitq of fines and Imprisonment for knowing violations." Signature of Permittee Date Permit Date: 11/1/2018-05/31/2021 SWU-245,last revised 11/1/2018 Page 3 of 3 Stormwater Discharg ; onitoring Report for North Carolina Division of Energy, Mineral and La9d resources General Permit No. NCG030000 Date submitted I2//1/ 0 CERTIFICATE OF COVERAGE NO. NCGO3 0 5 (V P SAMPLE COLLECTION YEAR L�^ A ZP20 r FACILITY NAME C�vr,^wa"+- q. :6 5e4 %i.v, SAMPLE PERIOD ❑Jan-June Ditty-Dec • COUNTY lii rr$4,n1 or []Monthly (month) PERSON COLLECTING SAMPLES ,j{eve- flay DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA LABORATORY rc54'e1' , -ica Lab Cert.St zbq RECEI\/ED ❑Z ro-flow Water Supply ❑SA Comments on sample collection or anaiysis: ther G/4'S5 JAN 04 2Q21 CENT R.'-AL FILE.EASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 -* DWR SECTION Part A:Stormwater Benchmarks and Monitoring Results ❑ No discharge this period?2 Non-Polar O&G/ Date Sample 24-bodr tairl�`al� r ij Total Toxic Outfall No. 1 total Suspended Sotids a fotal Copper Total Lead Total Zinc Total Petroleum s Collected aMOtiiii, • Stan all l# Hydrocarbons Organics (mo/dd/yr) tnchesi Benchmarks A= . 100 mg/L or SO mg/L4 " 0 010 rng/L 0.075 mg/L 0.126 mg/L 1S mg/L 1 mg/L Parameter Code - 46529 C0530 00400 01119 01051 01094 00552 78141 ll 4- 2.. /diokO . 2. Si 0764O g 7 L. u'' aL.Ch7Z.4 L. /i 1:2. 1 0.06 Monthly sampling(instead of semi-annual)must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 2 For sampling periods with no discharge at any single outfall,you must still submit this discharge monitoring report with a checkmark here. 'The total precipitation must be recorded using data from an on-site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. See General Permit,Section B,Table 1 to identify the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals,or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample(for metal finishing use the definition as found in 40 CFR 433.11;for semiconductor manufacture use the definition as found in 40 CFR 469.12;for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). • Permit Date:11/1/2018-05/31/2021 SWU-245,last revised 11/1/2018 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify,and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver,the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO),I certify that to the best of my knowledge and belief,no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report 'further certify that this facility is implementing the all the provisions of the solvent management plan included in the stormwater Pollution Prevention Plan." J i i r? MA iz_n Name(Print name) PLAIT 1•414 NIAC-1(je___ i%r? Titl title) i�/� Z�Z7Zb Signature Date Note:Results must be reported In numerical format Do not report Below Detection Limit,BDL,<PQI.,Non-detect,ND,or other similar non-numerical format. When results are below the applicable limits,they must be reported hl the fo"ritiat "<XX mg/L",where XX is the numerical value of the detection limit, reporting limit,etc. in mg/L. Note: If you report a sample value In excess of the benchmark,you must Implement Tier 1,Tier 2,or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results:only for facilities averaging>55 gal of new oil per month. ❑No discharge this period?2 Outfall No. Date Sample Collected' 24-hour rainfall arnottnti Oil tor Non-Polar 0*I6/Total Total Suspended (mo/dtd/yr) Inch& Call thhaae Petroleum Hydrocarbons Solids Bench►llarks • 15 ma 100 mg/L or 50 mg/L4 Parameter Code 46529 NCOIL 00552 C0530 Footnotes from Part A also apply to Part B Note: If you report a sample value In excess of the benchmark,you must Implement Tier 1, Tier 2,or Tier 3 responses. See General Permit text. Permit Date: r1111.7 f2018 OS/31/2021 SWU 245,last revised i1 '�Ols Page 2 of 3 FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTPALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES MANE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑NO Ei IF YES,HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE? YES d Nti ti REGIONAL OFFICE CONTACT NAME: Mall an original copy of this DMVIR, including oil"1Vo DiSilan lse"reports,itithhi 10&Os Of receipt of the lab results(or at end of monitoring period in the case of"NO Dischome"reports)to: Division of Water Quality Attn:DWQ Central Files 1617 Mail Service Center Raleigh,North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANI INFORMATION REPORTED: "I certify,under penalty of law,that this doci meat Mid Mt attachments were prepared Under`,my direction or supervision in accordance with a system designed to assure that qualified personnel properly Mather dnd tivditiite the Infotniation submiltW 1 iltl my Inquiry of the person or persons who manage the system,or those persons directly responsible for gatherit►g the information,the ihfcittiation stibitilititi Ili tothe best of my knowledge and belief,true,accurate,and complete. I am aw4 there are significant penalties for submitting false information,including the possibility of fines and imprisonment for knowing violations." ' le-4 W /212_/2_, Signature of Permittee Date Permit Date: 11/1/2018-05/31/2021 SWU-245,last revised 11/1/2018 Page 3 of 3 Stormwater Discharg conitoring Report for North Carolina Division of Energy, Mineral and l7n4Resources General Permit No. NCG030000 Date submitted 24 215 CERTIFICATE OF COyERAGE NO. NCGO3 O S O D SAMPLE COLLECTION YEAR 2..q .$/i- 2'd FACILITY NAME Girrc .t ti,41,ty 5�p ,'cwS SAMPLE PERIOD ❑Jan-June Enuly-Dec • COUNTYrrxw or Monthly1 (month) PERSON COLLECTING SAMPLES &vg-- c11d DISCHARGING TO CLASS DORW ❑HQW ❑Trout ❑PNA LABORATORY e6+ /74esec-1. Lab Cert.# 2/09 ❑Zero-flow nWater Supply ❑SA ❑Other Comments on sample collection or analysis: t.SS PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 -4 Part A: Stormwater Benchmarks and Monitoring Results No discharge this period?2 ! Non-Polar O&G/ Date Sample 14-hour laltl�`a ' Total Toxic Outfall No. 1 total Suspeni�ed Solids `" ' Total Copper Total Lead Total Zinc Total Petroleum s Collected efriotlil , ": ' ' aili�l iii Organics (mo/dd/yr) inthest, ` � Hydrocarbons 3 Benchmarks - 100 mg/L or 50 mg/L' 6.fi+ 1/JA 0.010 mg/I. 0.075 mg/L 0.126 mg/L 15 mg/L 1 mg/L Parameter Code - 46529 C0530 j 00400 01119 ' 01051 01094 00552 78141 —00 3 /1/10/2i, , 2 f " ./.ou 7 5" E,ocsool i,0025; o' [.0204,'* Z 2,Vo "r 0, "20 ' Monthly sampling(instead of semi-annual)must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 2 For sampling periods with no discharge at any single outfall,you must still submit this discharge monitoring report with a checkmark here. 'The total precipitation must be recorded using data from an on-site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. See General Permit,Section B,Table 1 to identify the especially sensitive receiving water classifications where the more protective benchmark applies. s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations,manufacture semiconductors, manufacture electronic crystals,or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample(for metal finishing use the definition as found in 40 CFR 433.11;for semiconductor manufacture use the definition as found in 40 CFR 469.12;for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date:11/1/2018-05/31/2021 SWU-245,last revised 11/1/2018 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify,and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver,the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO),I certify that to the best of my knowledge and belief,no dumping of coWet ited toxic organics Into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." DA\11 R- Mk12-7 K Name(Print name) Pc ~r Mii/J/G ►=-�— Tit! (Pr title) Signature Date Note:Results must be reported in numerical format. Do not report Below Detection Limit, WDL,<PQL,Non-detect,ND,or other similar non-numerical format. When results are below the applicable limits,the,must be reportNt in fhb**Mat"<XX mr1L",where XX is the numerical value of the detection limit, reporting limit,etc. in mg/L. Note: If you report a sample value In excess of the benchmark,you must Implement Tier 1, Tler 2,or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results:only for facilities averaging>55 gal of new oil per month. No discharge this period?2 Date Sample Collectedt 24-hour rainfall amcit Irlevi llsertor Oil Or Non-Polar OiliG/Total Total Suspended Outfatl No. (mo/da/y'rr Inchess +: itlAteditic Otl Wake Petroleum Hydrocarbons Solids Benchmarks 100 mg/L or S0 mg/I4 Parameter Code 46529 NCOIL 00552 COS30 Footnotes from Part A also apply to Part B Note: If you report a sample value In excess of the benchmark,you must Implement Tier 1, Tier 2,or Tier 3 responses. See General Permit text. Permit Date: /2018 05/31/2021 SWU-245,last revised 11e10153 frtow Page 2 of 3 FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL fiRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDANCES FOlt tHE SAME PARAMETER AT ANY ONE OUTFALL? YES 0 NO 0 IF YES,HAVE YOU CONTACTED THE DEMO REGIONAL OFFICE? YES d Nti Ii REGIONAL OFFICE CONTACT NAME: Mail an original copy of this DIV►R,Including all"1Vo Dlstharpe"reports witllhi 30 Oats of re of the lab results(or at end of monitoring period in the case of"hVO Discharge to: Division of Water Quality Attn:DWQ Central Files 1617 Mail Service Center Raleigh,North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANI'INFORIVIATiON-REPORTED: "I certify,under penalty of law,that this docNtrheltt shed all attachments were prepared Under my direction or supervision in accordance with a system designed to assure that qualified personnel properly th l'arid evaluate the ihforttiation Subritittt 1, Mit*MY Inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the Information,the infottnation stibmtitid Iti iiithle best of my knowledge and belief,true,accurate,and complete. I am a hat there are significant penalties for submitting false Information,including the po sfbiiity of fines and imprisonment for knowing violations." 02‘("e P..._ izii/z, Signature of Permittee Date Permit Date:11/1/2018-05/31/2021 SWU-245,last revised 11/1/2018 Page 3 of 3 oeN Stormwater Discharg w: onitoring Report for North Carolina Division of Energy, Mineral andncliResources General Permit No. NCG030000 Date submitted I u i f lq CERTIFICATE OF COVERAGE O. NCGO3 C? 5 0 O SAMPLE COLLECTION YEAR G%�''� �� 7P20 FACILITY NAME C�rn�.J ° ,SoTri '':vs SAMPLE PERIOD ❑Jan-June �uly-Dec COUNTY /lepiSeN or Monthly' (month) PERSON COLLECTING SAMPLES oS1-cvC-- /5071 DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA LABORATORY Te54— / mmcYcz Lab Cert.If 249? 1:Zero flo rw $ t e ,uppIy ❑SA Comments on sample collection or analysis: PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 -* Part A: Stormwater Benchmarks and Monitoring Results Ei No discharge this period?' t Non-Polar O&G/ Date Sample 24-hoi r rainfall s Total Toxic outfall No. Total Suspended Solids a total topper Total Lead Total Zinc Total Petroleum Collected' amotinf;, Star art!Wks Hydrocarbons Organics (mo/dd/yrl lnchesi Benchmarks - , 100 mg/L or 50 mg/L4 6 b 9 0, 0.010 mg/I. 0.075 mg/L 0.126 mg/L 15 mg/L 1 mg/L Parameter Code - 46529 C0S3 MOO 01119 01051 01094 00552 78141 7)79 —coq I///o� , V" 2./"die Zg L.eccoc, .o4:1z71% 02.A 42. /10, .00ce5y► ' Monthly sampling(instead of semi-annual)must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 2 For sampling periods with no discharge at any single outfall,you must still submit this discharge monitoring report with a checkmark here. 'The total precipitation must be recorded using data from an on-site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit,Section B,Table 1 to identify the especially sensitive receiving water classifications where the more protective benchmark applies. s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals,or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample(for metal finishing use the definition as found in 40 CFR 433.11;for semiconductor manufacture use the definition as found in 40 CFR 469.12;for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2018-05/31/2021 SWU-245,last revised 11/1/2018 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify,and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver,the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO),I certify that to the best of my knowledge and belief,no dumping of concentrated tbxlt organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." DAI In M 1 Name(Print name) PLIr MiiJAC Titl A title) e__//‘A\ /2/Z-72-0 Signature Date Note:Results must be reported in numerical format. DO not report Below Detection Limit,BDI.,<PQL,Non-detect,ND,or other similar non-numerical format. When results are below the applicable limits,they must be repotted in the font*,"cXX mg/i.",where XX is the numerical value of the detection limit, reporting limit,etc. in mg/L. Note: If you report a sample value in excess of the benchmark,you must Implement fler 1,Tier 2,or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results:only for facilities averaging>55 gal of new oil per month. El No discharge this period?2 - - Date Sample Collected' 24-hour rainfall Outfall No, amountstie*Motor ON or Non-Polar OjfiG/Total Total Suspended mode 1 / /yrj : Ntcfre33 � ��dtelilir:0>�I U3ag! Petroleum Hydrocarbons Solids Benchmarks is mg/L 100 mg/L or S0 mg/L4 Parameter Code 46529 Nt011 00552 C0530 Footnotes from Part A also apply to Part B Note: If you report a sample value in excess of the benchmark,you must implement Tier 1, Tier 2,or Tier 3 responses. See General Permit text. Permit Ddte: (2018 OS/31/2021 1111 SWU-245,last revised 11 1019 Page 2 of 3 FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION 8. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFAILTRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 Olt MORE BENCHMARK EXCEEbENCEs FOk THE$AM€PARAMETER AT ANY ONE OUTFALL? YES ©NO IF YES,HAVE YOU CONTACTED THE DEMO REGIONAL OFFICE/ YES Ii NCI Ii REGIONAL OFFICE CONTACT NAME: Mall an original copy of this DMR,,►ntuding pn IVO DlsNla►geN reports,iviitiki 30 of rticelpt of the lab results(or at end of monitoring period in the case of'CVO Ditch-IOW reporttl to: Division of Water Quality Attn:DWQ Central Files 1617 Mail Service Center Raleigh,North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR AN'f INOfRMATiOH REPORTED: "I certify,under penalty of law,that this dotiltheiit kid ell attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather kid dilate the information submit bii inquiry of the person or persons who manage the system,or those pers directly responsible for gathetiNg the information,the ItifoHriation stlbmfi$d t flit best of my knowledge and belief,true,accurate,and complete. I am aw e that there are significant naities for submitting false information,including thepiissibility of fines and imprisonment for knowing violations." co.ze:L- p //72 Signature of Permittee Date Permit Date:11/1/2018-05/31/2021 SWU-245,last revised 11/1/2018 Page 3 of 3 !? !"1 Stormwater Discharg onitoring Report for North Carolina Division of Energy, Mineral and L nc.Resources General Permit No. NCG030000 Date submitted 124 Z / CERTIFICATE OF 3rra.i# RAGE NO. NCGO3 0 5 o O SAMPLE COLLECTION YEAR 2: �/C ZD2O FACILITY NAME Z 70 "S SAMPLE PERIOD ❑Jan-June my-Dec COUNTY a �3:o.� /J or ❑ Monthly' (month) PERSON COLLECTING SAMPLES O ICI ye DISCHARGING TO CLASS ❑ORW ❑HQW ETrout ❑PNA LABORATORY TpSf / urIta Lab Cert.it 22(09 ❑Z ro-flow ]Water Supply ❑SA Comments on sample collection or analysis: [eher �S5 'fC" PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 Part A: Stormwater Benchmarks and Monitoring Results No discharge this period?' Date sample 24ho rainfall �� f, Non-Polar O&G/ Outfall No. v Total Toxic i 'otal Suspended Solids Total Copper Total Lead Total Zinc Total Petroleum s Collected ainodnt, *dollOrganics u ,� Hydrocarbons (mo/dd/yr) • Inches ° �, . , :, _4.'� . ,ii. P j Benchmarks - ; . 100 mg/L or 50 ma/I4 6,0 9:d 0.010 mg/I.. 0.075 mg/L 0.126 mg/L 15 mg/L 1 mg/L Parameter Code - 46529 C0530 • 004 01119 A 01051 01094 00552 78141 DA--(>r I «I,a1 . Z i'� /, 2 Ale4e s g tco��� .eaves,'*.�.a2o. Z 2'4 u .64030' ' Monthly sampling(instead of semi-annual)must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 2 For sampling periods with no discharge at any single outfall,you must still submit this discharge monitoring report with a checkmark here. 'The total precipitation must be recorded using data from an on-site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. °See General Permit,Section B,Table 1 to identify the especially sensitive receiving water classifications where the more protective benchmark applies. 'Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations,manufacture semiconductors, manufacture electronic crystals,or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample(for metal finishing use the definition as found in 40 CFR 433.11;for semiconductor manufacture use the definition as found in 40 CFR 469.12;for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2018-05/31/2021 SWU-245,last revised 11/1/2018 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify,and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver,the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO),I certify that to the best of my knowledge and belief,no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. !further certify that this facility is implementing the all the provisions of the solvent management plan included in the stormwater Pollution Prevention Plan." Name(Print name) i NIT M A G it Till Pr title) ct,„:4' 2 4/1-(cJ7 ---,_ tz,(2_11ao Signature Date Note: Results must be reported in numerical format. Do not report Below Detection Limit,BDL,<PQL,Non-detect,ND,or other similar non-numerical format. When results are below the applicable limits,the,must be reported tit tf*ferind,"<XX mg/i.",where XX is the numerical value of the detection limit, reporting limit,etc. in mg/L. Note: If you report a sample value In excess Of the benchmark,you must Implement tier 1, Tier 2,or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results:only for facilities averaging>55 gal of new oil per month. 0 No discharge this period?2 Outfall No. Date Sample Coilectedi 24-hour rainfall amou Ne*lalotor Oil or Non-Polar OWTotal Total Suspended (mo/dd/yri Inches' drau11c Oil Osage Petroleum Hydrocarbons Solids Benchmarks ,,: IS nfg/I 100 mg/L or S0 mg/L' Parameter Code 46529 NCOIL 00552 C0530 Footnotes from Part A also apply to Part B Note: If you report a sample value in excess of the benchmark,you must Implement Tier 1, Tier 2,or Tier 3 responses. See General Permit text. Permit Dater/2018 OS/31/2021 al SWu-245,last revised 11/"'�018 � Page 2 of 3 FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFAtLt tRIG1 E1 TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES MIRi'HE SAME PARAMETER AT ANY ONE OUTFALL? YES Q NO 0 IF YES,HAVE YOU CONTACTED THE!AMER REGIONAL OFFICE? YES d NO a REGIONAL OFFICE CONTACT NAME: Moll an original copy of this DIVIR,IndWhig all"No Dlsthar e"reports,Withh►tO days of receipt of the lab results(or at end of monitoring period in the case of"IVO Discharge"reports)to: Division of Water Quality Attn:DWQ Central Files 1617 Mail Service Center Raleigh,North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify,under penalty of law,that this ddturrteiit Arid all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather diriti dilate the ihfortiietitin subrtii erktgd dd'ittY inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the Information,the Information stibi'Hl d l thtfie best of my knowledge and belief,true,accurate,and complete. I am awar there are significant penalties for submitting false information,including the fiOssibility of fines and imprisonment for knowing violations." .,,,,-,e .4f Signature of Permittee Date Permit Date:11/1/2018-05/31/2021 SWU-245,last revised 11/1/2018 Page 3 of 3 current David R.Martin powered by GE Plant Manager 3010 Spartanburg Hwy East Flat Rock,NC 28726 USA T 828 693 2625 david.martin@ge.com December 2, 2020 Division of Water Quality Attn: DWQ Central Files REC,EI\IED 1617 Mail Service Center Raleigh, North Carolina 27699-1617 JAN 0 4 2021 CEN 1 R/\L FILES DWR SECTION General Permit NO. NCG030000 Certificate of Coverage NO. NCG030500 Attached is our semi-annual July thru December 2020 storm water monitoring report for Current Lighting Solutions, LLC (formerly GE Lighting.) Current Lighting Solutions, LLC has documented .21" as the total event precipitation for the sampling date of 11-10-2020. Please note that www.accuweather.com lists the precipitation total for 11-10-2020 as .09" for the rain event. Accuweather's measured rain event is NOT consistent with the rain gage that is located on the Current Lighting Solutions, LCC property. Our facility rain gage was .21". All sample results are below the benchmark limit for the facility. The five representative outfalls that were sampled are DA- 001, 002, 003, 004, and 011. Please contact site Plant Manager David Martin @ 828-693-2625, if you have any questions. Si.ncereld David R. Martin Plant Manager Current Lighting Solutions, LLC Attachment: .-6 3010 Spartanburg Highway,East Flat Rock,NC 28726 General Electric Company www.currentbyge.com current David R.Martin powered by GE Plant Manager 3010 Spartanburg Hwy East Flat Rock,NC 28726 USA T 828 693 2625 david.martin@ge.com RECEIVED December 2, 2020 JAN 04 2021 Division of Water Quality CEN j �L FQF�. Attn: DWQ Central Files U��R SECTJON 1617 Mail Service Center Raleigh, North Carolina 27699-1617 General Permit NO. NCG030000 Certificate of Coverage NO. NCG030500 Attached is our non-storm water discharges report for the semi-annual July thru December 2020 storm water monitoring report the was conducted in November for Current Lighting Solutions, LLC (formerly GE Lighting.) There are no issues to report. The five representative outfalls that were sampled are DA- 001, 002, 003, 004,and 011. Please contact site Plant Manager David Martin @ 828-693-2625, if you have any questions or contact my EHS Engineer at 828-712-2197. Sincerely (Icei David R. Martin Plant Manager GE Current Lighting Solutions, LLC Attachment: 1T 3010 Spartanburg Highway,East Flat Rock,NC 28726 General Electric Company www.currentbyge.com KC1,17iNir-1. JAN 04 2021 CEN I w& FILE3 DWR SECTION Non-Storm Water Discharges The discharge covered by the storm water permit has been tested or evaluated for the presence of non-storm water discharges and, if applicable, all non-storm water discharges from these outfalls are identified in the plan. The following is a description for the method used, the dates of any testing, and the on- site drainage points that were directly observed during the test: Site EHS Engineer conducted a property wide visual inspection of all storm water basins, culverts, outfalls, impervious surfaces, yards &grounds. Findings of Non-Storm Water Discharge Evaluation conducted on 11/06/20: 1. No non-storm water discharge has occurred during the period between July 1, 2020 and November 6, 2020. 2. All outfalls inspected for signs of non-storm water discharge on 11/6/2020. Inspection consisted of visual observation of all storm water drains, basins, and culverts for each outfall. Work was conducted by grounds crew to clean out the Fall leaves in the edge of the basins prior to sampling. Work was completed on 11/7/20. Findings of Non-Storm Water Discharge Sampling conducted on 11/10/2020: 1. Outfalls, DA-001, DA-002, DA-004, and DA-011 were sampled on 11/10/2020 and no detections were above our benchmark limit. There is no non-storm water discharge above our facilities permitted limit as sampled and reported to the DWQ on 12/2/2020. 2. Two detections of TTO's (.000059 mg/L of Endosulfan 1 in DA-004 and .0030 mg/L of Chlorobenzene in DA-001) during this sampling and were below our permitted benchmark. "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information is, to the best of my knowledge and belief,true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." c 7}04AriC Plant Manager