Loading...
HomeMy WebLinkAbout20081327 Ver 1_Site Inspection_20120224'L�, A� NC®ENR North Carolina Department of Environment and Beverly Eaves Perdue Governor Mr J B Setzer P E Division 14 Engineer N C Department of Transportation 253 Webster Road Sylva North Carolina 28779 Dear Mr Setzer Division of Water Quality Charles Wakild Director February 22 2012 V-.5 Natural Resoew ! %� 2 tkt, ee eman 40gi*� Secretary Subject Inspection NCSR 1783 Upward Road DWQ Project 08 1327 TIP No R 4430 Henderson County On February 8 2012 I inspected the construction work on Upward Road between US Highway 176 and Howard Gap Road in Henderson County Construction work is continuing all along Upward Road between Howard Gap Road and US Highway 176 with the main focus on the new 126 Bridge Please ensure that all sediment and erosion control structures are being maintained as required and that seeding and mulching are being performed as needed to protect State surface waters Please refer to the attached copy of the inspection report for additional comments regarding the inspection If you have questions please call me at 828 296 4500 Attachment cc Aaron Powell Mark Davis Division 14 DEO Ed Ingle Roadside Environmental Transportation Permitting Unit Mike Parker Asheville Regional Office Upward Road R 4430 Inspection Letter February 2012 SURFACE WATER PROTECTION SECTION — Asheville Regional Office 2090 U S 70 Highway Swannanoa NC 28778 8211 Phone 828 296 45001 FAX 828 299 7043 Internet www ncwaterouality mg „n Equal Opporhmit 1 „ ffirmative Action Employer Sincerely /�? W-Z�— Michael R Parker Environmental Senior Specialist NorthCarohna Natural& A* � Wetland Inspection Report Project Num 20081327 Version 1 Status Issued Project Name NCDOT SR 1783 (R 4430) Project Type Road /Highway Widening County Henderson Region Asheville Location NCDOT SR 1783 (R 4430) Latitude +35 1751 Longitude 82 2425 SW Plan Location Site Owner Name NC DOT PDEA Inspection Date 02/08/2012 Reason for Inspection Routine Inspection Type Site Inspection (DOT) Inspection Contact Person Title Phone On Site Representative(s) Primary Inspector Michael R Parker Phone 828 296 4500 Secondary Inspector(s) Facility compliance Status M Compliant n Not Compliant Program Area 401 (includes isolated /non 404) Question Areas 0 Permit (401 WQC) Inspection Summary Reviewed project with DOT Staff Construction on the roadway is at a slow pace with most work being conducted on the new 1 26 Bridge Seeding and /or mulching need to be performed at areas needing seeding Clean and maintain sediment and erosion control structures Remove sediment from ut to King Creek and install measures to prevent sediment from entering stream at Station 27 +00 Page 1 Project Num 20081327 Owner NC DOT PDEA Inspection Date 02/08/2012 Inspection Type Site Inspection (DOT) Reason for Visit Routine Permit (401 WQg Does the impact(s) match what was approved in the 401 WQC or non 404 permit? Are the culverts and /or filled areas installed properly? Is the site compliant with additional conditions of the 401 WQC or non 404 permit? Comment Sediment is reaching stream (ut to King Creek) near Station 27 +00 Sediment should be removed upstream of the new culvert and actions taken to reduce the sediment from entering the stream 0000 ■ n n n n ■nn Page 2