Loading...
HomeMy WebLinkAboutUS 13/US 158 (9)Section 404/NEPA Merger Project Team Meeting Revised Concurrence Point 2 — Alternatives for Detailed Studies Revised Concurrence Point 3 LEDPA Meeting Minutes TIP No R 2507A US 13 /US 158 Widening Improvements from US 158/NC 45 near Winston to the US 158 Bypass in Tarheel Hertford and Gates Counties North Carolina 0000 a ... a a a a 0000 a a a. a a a■■ a .. a ... a a. a a a a a a a .. a s .. g ... a.■ ■ ... a. a a. m a a a. a a .. m m m. a a a. a■■ Date September 14 2011 Time 1 00 PM Place Structure Design Conference Room Century Center Present Mr Tommy Peacock RK &K Mr Mike Merritt RK &K Mr Bryan Badey RK &K Mr Frank Vick RK &K Mr John Stewart RK &K Mr Keith Skinner RK &K Ms Tina Swiezy RK &K Mr Mark Osenbaugh E V Williams Mr Chris Martin E V Williams Mr Michael Wood Catena Group Ms Ivy Kimbrough Catena Group Ms Renee Gledhill Early DCR/SHPO Mr Mr Bill Biddlecome USACE Mr Travis Wilson NCWRC Mr David Wainwright NCDWQ Ms Cathy Brittingham DCM Mr Christopher Militscher USEPA Mr Gary Jordan USFWS Mr Justin Oakes Peanut Belt RPO Ms Olivia Farr NCDOT PDEA Mr Bill Zerman NCDOT —Hydraulics Ms Amy James NCDOT — NEU Mr Chris Rivenbark NCDOT — NEU Mr Rob Hanson NCDOT — PDEA Mr Jay McInnis NCDOT PDEA Mr Mark Laugisch NCDOT — Roadside Env Unit Mr Kerry Morrow NCDOT — TPB Mr Scott Emory NCDOT — Division 1 Mr Jerry Jennings NCDOT —Division I Mr Rodger Rochelle NCDOT — TPM Mr Andy Young NCDOT — TPM . ........... ............................... ...................... among ■■ The above attendees met on September 14 2011 to review and discuss proposed changes to the previously recommended Detail Study Alternatives (Concurrence Point 2) and selected Least Environmentally Damaging Practicable Alternative (Concurrence Point 3) presented in the final environmental document for the project The NCDOT proceeded in December 2010 with advertising R 2507A as a design build project The project design build teams were short listed in February 2011 and price proposal for constructing the project were opened on July 22, 2011 The E V Williams Design Build Team won the project The 1