Loading...
HomeMy WebLinkAbout20120147 Ver 1_More Info Received_20120217UNITED STATES MARINE CORPS MARINE CORPS BASE PSC BOX 20004 CAMP LEJEUNE NC 28542 -0004 �-7 M RULY URR TO 5090 11 2 BEMD JAN 3 i 2012 From Commanding Officer, Marine Corps Base, Camp Le3eune To Commanding Officer, United States Army Corps of Engineers, Wilmington District 69 Darlington Avenue, Wilmington, NC 28403 Attn Brad Shaver Subs PRE - CONSTRUCTION NOTIFICATION FOR DEPARTMENT OF THE ARMY PERMIT FOR THE CAMP GEIGER ACCESS UPGRADES ON MARINE CORPS BASE CAMP LEJEUNE NORTH CAROLINA Encl (1) Pre - Construction Notification Form for P1268B Camp Geiger Access Upgrades on Marine Corps Base (MCB) Camp Le3eune (CamLej) 1 The enclosed application to discharge fill into Section 404 wetlands to construct the Camp Geiger Access Upgrades, a road widening project, on Marine Corps Base (MCB), Camp Le3eune (CamLe3) is submitted for your review and approval 2 MCB CamLej proposes to permanently impact 0 16 acres of Section 404 wetlands, to complete the project described in the application This project does not require compensatory mitigation for impacts to Waters of the U S or Waters of the State 3 The point of contact for this project is Mr Martin Korenek, Environmental Conservation Branch, Environmental Management Division, at telephone (910) 451 -7235 or email n martin korenek@usmc mil nD i'S(t?t -nr—wr m Copy to NCDENR, DWQ, NCDENR, DWQ, NCDENR, DCM 401 Section RAL 401 Section WRO R J� JOHN R TOWNSON By direction FEB 1 7 2012 0 co, P �