HomeMy WebLinkAboutSW6210101_Supplement form_20210204
SUPPLEMENT-EZ COVER PAGE
FORMSLOADED
PROJECT INFORMATION
Project Name
Grays Creek Safe Storage
1
2Project Area (ac)4.32
3Coastal Wetland Area (ac)0
4Surface Water Area (ac)0
5Is this project High or Low Density?High
Does this project use an off-site SCM?No
6
COMPLIANCE WITH 02H .1003(4)
7Width of vegetated setbacks provided (feet)0
8Will the vegetated setback remain vegetated?N/A
9If BUA is proposed in the setback, does it meet NCAC 02H.1003(4)(c-d)?N/A
Is streambank stabilization proposed on this project?No
10
NUMBER AND TYPE OF SCMs:
11Infiltration System1
12Bioretention Cell
13Wet Pond
14Stormwater Wetland
15Permeable Pavement
16Sand Filter
17Rainwater Harvesting (RWH)
18Green Roof
19Level Spreader-Filter Strip (LS-FS)
20Disconnected Impervious Surface (DIS)
21Treatment Swale
22Dry Pond
23StormFilter
24Silva Cell
25Bayfilter
Filterra
26
FORMSLOADED
DESIGNER CERTIFICATION
27Name and Title:Scott Brown, PE
28Organization:4D Site Solutions Inc.
29Street address:409 Chicago Dr. Ste. 112
30City, State, Zip:Fayetteville, NC 28306
31Phone number(s):910-426-6777
Email:sbrown@4dsitesolutions.com
32
Certification Statement:
I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that
the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans,
specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here.
Designer
______________________________________________
Signature of Designer
______________________________________________
Date
Seal
DRAINAGE AREAS
1Is this a high density project?Yes
ge areas/SCMs1
2 If so, number of draina
3Does this project have low density areas?No
4 If so, number of low density drainage areas0
Is all/part of this project subject to previous rule
5versions?No
FORMSLOADED
Entire Site1
DRAINAGE AREA INFORMATION
4Type of SCM Infiltration
ge area (sq ft)139568
5Total draina
6Onsite drainage area (sq ft)114042
7Offsite drainage area (sq ft)25526
ject(sq ft)114042 sf
8Total BUA in pro
New BUA on subdivided lots (subject to
9permitting)(sq ft)
New BUA not on subdivided lots (subject to
10permitting)(sf)114042 sf
11Offsite BUA (sq ft)
12Breakdown of new BUA not on subdivided lots:
- Parking(sq ft)53727 sf
- Sidewalk (sq ft)458 sf
- Roof (sq ft)59857 sf
- Roadway(sq ft)
- Future (sq ft)
- Other, please specify in the comment box
below(sq ft)
New infiltrating permeable pavement on
13subdivided lots (sq ft)
New infiltrating permeable pavement not on
14subdivided lots (sq ft)
Existing BUA that will remain (not subject to
15permitting)(sq ft)
16Existing BUA that is already permitted (sq ft)
17Existing BUA that will be removed (sq ft)
18Percent BUA82%
19Design storm (inches)1.0 in
20Design volume of SCM (cu ft)5930 cf
Calculation method for design volumeSimple method
21
ADDITIONAL INFORMATION
Please use this space to provide any additional information about the
22drainage area(s):
INFILTRATION SYSTEM
1
1Drainage area number
9122 cf
2Minimum required treatment volume (cu ft)
GENERALMDCFROM02H.1050
Yes
3Is the SCM sized to treat the SW from all surfaces at build-out?
Yes
4Is the SCM located away from contaminated soils?
What are the side slopes of the SCM (H:V or enter "Vertical" for
5
3:1
)?
trenches
Does the SCM have retaining walls, gabion walls or other
6
No
engineered side slopes?
Are the inlets, outlets, and receiving stream protected from erosion
7
Yes
(10-year storm)?
Is there an overflow or bypass for inflow volume in excess of the
8
Yes
design volume?
Pump (preferred)
9What is the method for dewatering the SCM for maintenance?
Yes
10If applicable, will the SCM be cleaned out after construction?
Yes
11Does the maintenance access comply with General MDC (8)?
Yes
12Does the drainage easement comply with General MDC (9)?
If the SCM is on a single family lot, does (will?) the plat comply with
13
N/A
General MDC (10)?
14Is there an O&M Agreement that complies with General MDC (11)?
Yes
Yes
15Is there an O&M Plan that complies with General MDC (12)?
Yes
16Does the SCM follow the device specific MDC?
Yes
17Was the SCM designed by an NC licensed professional?
INFILTRATIONSYSTEMMDCFROM02H.1051
18Proposed slope of the subgrade surface (%)
19
Are terraces or baffles provided?
Other
20
Type of pretreatment:
{ƚźƌƭ5ğƷğ
Was the soil investigated in the footprint and at the elevation of the
21
Yes
infiltration system?
124.33
22SHWT elevation (fmsl)
89.00
23Depth to SHWT per soils report (in)
131.75
24Ground elevation at boring in soils report (fmsl)
Is a detailed hydrogeologic study attached if the separation is
25
No
between 1 and 2 feet?
0.66
26Soil infiltration rate (in/hr)
1.00
27Factor of safety (FS) (2 is recommended):
Elevations
127 ft
29Bottom elevation (fmsl)
129. ft
30Storage elevation (fmsl)
129 ft
31Bypass elevation (fmsl)
For Basins Only
2
4379 ft
32
Bottom surface area (ft)
2
8916. ft
33
Storage elevation surface area (ft)
For Trenches Only
34Length (ft)
35Width (ft)
36Perforated pipe diameter, if applicable (inches)
37Number of laterals
38Total length of perforated piping
39Stone type, if applicable
40Stone porosity (%)
41Is stone free of fines?
42Is the stone wrapped in geotextile fabric?
43Has at least one inspection port been provided?
Volumes/Drawdown
5930 cf
44Design volume of SCM (cu ft)
33 hrs
45Time to draw down (hours)
ADDITIONAL INFORMATION
Please use this space to provide any additional information about
46
the infiltration system(s):
Infiltration110:52AM2/4/2021