Operation & Maintenance Agreement
Project Name:Grays Creek Safe Storage
Project Location:Near 4291 Hondo Drive, Fayetteville, NC 28306
Cover Page
Maintenance records shall be kept on the following SCM(s). This maintenance record shall be kept in a log in a known set location.
Any deficient SCM elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can
affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the SCM(s).
The SCM(s) on this project include (check all that apply & corresponding O&M sheets will be added automatically):
Infiltration Basin
Quantity:1Location(s):Noth side of the site
Infiltration TrenchQuantity:Location(s):
Quantity:Location(s):
Bioretention Cell
Wet PondQuantity:Location(s):
Stormwater Wetland
Quantity:Location(s):
Permeable PavementQuantity:Location(s):
Sand Filter
Quantity:Location(s):
Rainwater Harvesting
Quantity:Location(s):
Green Roof
Quantity:Location(s):
Level Spreader - Filter StripQuantity:Location(s):
Proprietary System
Quantity:Location(s):
Treatment Swale
Quantity:Location(s):
Dry PondQuantity:Location(s):
Disconnected Impervious Surface
Present:NoLocation(s):
User Defined SCM
Present:NoLocation(s):
Low DensityType:
Present:No
I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for
each SCM above, and attached O&M tables. I agree to notify NCDEQ of any problems with the system or prior to any changes to
the system or responsible party.
Responsible Party: Harold Kidd
Owner
Title & Organization:
Street address:6885 Cliffdale Road
City, state, zip:
Fayetteville, NC 28314
Phone number(s):
910-864-9727
Email:
hkidd864@earthlink.net
Signature: Date:
I,, a Notary Public for the State of
County of, do hereby certify that
personally appeared before me thisday of and
acknowledge the due execution of the Operations and Maintenance Agreement .
Witness my hand and official seal, _____________________________________________.
SealMy commission expires
STORM-EZ2/4/2021
O&M Agreement
Version 1.5 Page 1 of 1
Infiltration Basin Maintenance Requirements
Important operation and maintenance procedures
The drainage area will be carefully managed to reduce the sediment load to the infiltration b
-
No portion of the infiltration basin will be fertilized after the initial fertilization that is
- required to establish the vegetation. Lime may be allowed if vegetation is planted on
the surface of the infiltration basin and a soil test shows that it is needed.
Thevegetationinandaroundthebasinwillbemaintainedataheightoffourtosix
-
inches
Aftertheinfiltrationbasinisestablished,itwillbeinspectedquarterlyandwithin24hoursafter
every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of
operation and maintenance shall be kept in a known set location and shall be available upon
request
ection activities shall be performed as follows. Any problems that are found shall be repaired immediately.
SCM element:Potential problem:How to remediate the problem:
Trash/debris is
The entire infiltration
Remove the trash/debris.
basinpresent.
Areas of bare soil Regrade the soil if necessary to remove the gully,
and/or erosive gullies plant ground cover and water until it is established.
The grass filter strip
have formed.Provide lime and a one-time fertilizer application.
SedimenthasSearchfor the source of the sediment and remedy the
or other pretreatment
areaaccumulated to a problem if possible. Remove the sediment and
depth of greater than dispose of it in a location where it will not cause
three inches. impacts to streams or the SCM.
Unclog the conveyance and dispose of any sediment
The structure is
in a location where it will not cause impacts to
The flow diversion
clogged.
streams or the SCM.
structure (if
applicable)The structure is Make any necessary repairs or replace if damage is
damaged.too much for repair.
The inlet pipe is Unclog the pipe and dispose of any sediment in a
clogged (if location where it will not cause impacts to streams or
Theinletpipeis
cracked or otherwise
Repair or replace the pipe.
damaged (if
applicable)
The inlet deviceErosion is occurring in Regrade the swale if necessary and provide erosion
the swale (if control devices such as reinforced turf matting or
applicable).riprap to avoid future erosion problems.
Stonevergeis
clogged or covered in Remove sediment and clogged stone and replace
sediment (if with clean stone.
applicable)
Searchfor the source of the sediment and remedy the
More than four inches
problem if possible. Remove the sediment and
of sediment has
dispose of it in a location where it will not cause
accumulated.
impacts to streams or the SCM.
Erosion of the basin Provide additional erosion protection such as
The basin
surface has occurred reinforced turf matting or riprap if needed to prevent
or riprap is displaced.future erosion problems.
Water is standing Replace the top few inches of soil to see if this
more than three days corrects the standing water problem. If not, consult an
after a storm event.appropriate professional for a more extensive repair.
Infiltration Basin Maintenance Requirements (continued)
SCM element:Potential problem:How to remediate the problem:
Shrubs or trees are
growing on the Remove shrubs and trees immediately.
embankment.
An annual inspection
The embankment
by an appropriate
Make needed repairs immediately.
professional shows
that the embankment
needs repair.
Clean out the outlet device and dispose of sediment
Clogging has
in a location where it will not cause impacts to
occurred.
streams or the SCM.
The outlet device
The outlet device is
Repair or replace the outlet device.
damaged
Erosion or other signs
Repair the damage and improve the flow dissipation
of damage have
structure.
occurred at the outlet.
Discharges from the
The receiving water
infiltration basin are
Contact the local NCDEQ Regional Office.
causing erosion or
sedimentation in the
receiving water.