HomeMy WebLinkAbout20120013 Ver 1_Approval Letter_20120228ER
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Beverly Eaves Perdue Charles Waklid P E
Governor Director
February 28 2012
Mr John W Colbert and Ms Cala B Colbert
c/o Stone Pigman
546 Carondelet St
New Orleans LA 70130 3588
Subject 401 Water Quality Certification - Approval
Summer Hill Lot #8 (John Colbert Property)
DWQ Project # 12 0013
Jackson County
LTN02 / Glenville Lake (Thorpe Lake)/ 2 79 23 (1) / WS III HQW B
Dear Mr Colbert and Ms Colbert
Dee Freeman
Secretary
The Division of Water Quality has completed the review of your 401 Water Quality Certification application
associated with the subject project listed above A site visit was conducted with your contractor Mr Young as
well as Steve Beasley of Jackson County Planning on February 23 2012
Approval has been granted to place fill within or otherwise impact approximately 0 041 acres of open waters
(below full pool approximately 300 linear feet of shoreline) for the purpose of shoreline stabilization at the
subject property This approval requires you to follow the conditions listed in the attached Certification
and any additional conditions listed below
Project impacts are covered by General Water Quality Certification Number 3693 This Certification allows
you to use Regional General Permit 30 when issued by the US Army Corps of Engineers ( USACE)
Authorization to proceed with your proposed impacts or to conduct impacts to waters as depicted in your
application and as authorized by this Certification shall expire upon expiration of the corresponding USACE
Permit Verification In addition you should obtain or otherwise comply with any other required federal state
or local permits before you proceed with your project including (but not limited to) Jackson County Erosion and
Sediment Control regulations and Duke Energy Lake Services guidelines
This approval is for the purpose and design that you described in your application If you change your project
you must notify us and may be required to submit a new application
Impacts Approved
The following impacts are hereby approved as long as all of the other specific and general conditions of
this Certification are met No other impacts are approved including incidental impacts
Location 2090 U S Highway 70 Swannanoa North Carolina 28778
Phone 828 29645001 FAX 828 299 7043
Internet www rimaterquality org
An Ea ial Onnnrt in t Aff m t a A t Fm I
NorthCarohna
VVaturlimy
Mr Colbert and Ms Colbert
February 28 2012
Page 2 of 2
Violations of any condition herein set forth may result in revocation of this Certification and may result in
criminal and/or civil penalties
If you do not accept any of the conditions of this Certification (associated with the approved wetland or stream
impacts) you may ask for an adjudicatory hearing You must act within 60 days of the date that you receive
this letter To ask for a hearing send a written petition which conforms to Chapter 150B of the North Carolina
General Statutes to the Office of Administrative Hearings 6714 Mail Service Center Raleigh N C 27699
6714 This certification and its conditions are final and binding unless you ask for a hearing
This letter completes the review of your application by the Division of Water Quality under Section 401 of the
Clean Water Act If you have any questions please contact Susan A Wilson in the Asheville Regional Office
at 828 296 4665
Sincerely
Ar,y� A
Charles Wakild PE Director
CW /saw
Enc GC3693
Certificate of Completion
cc USACE Asheville Regulatory Field Office
401 Permitting Unit — Central Office
Bill Young Mill Creek Development Inc P O Box 537 Glenville NC 28736
Jackson County Planning Steve Beasley
File Copy
S \SWP\Jackson \401sWon DOT Colbert John Glenville\APRVL Summer Hill Lot 8 Colbert 2 2012 doc
Amount Approved (Units)
Plan Location or Reference
Waters
Appx 0 041 (acres below
Boulder wall and rip rap
full pool)
as specified in application
[appx 300 linear feet]
*Refer to Duke Energy
guidelines for boulder
wall design
Violations of any condition herein set forth may result in revocation of this Certification and may result in
criminal and/or civil penalties
If you do not accept any of the conditions of this Certification (associated with the approved wetland or stream
impacts) you may ask for an adjudicatory hearing You must act within 60 days of the date that you receive
this letter To ask for a hearing send a written petition which conforms to Chapter 150B of the North Carolina
General Statutes to the Office of Administrative Hearings 6714 Mail Service Center Raleigh N C 27699
6714 This certification and its conditions are final and binding unless you ask for a hearing
This letter completes the review of your application by the Division of Water Quality under Section 401 of the
Clean Water Act If you have any questions please contact Susan A Wilson in the Asheville Regional Office
at 828 296 4665
Sincerely
Ar,y� A
Charles Wakild PE Director
CW /saw
Enc GC3693
Certificate of Completion
cc USACE Asheville Regulatory Field Office
401 Permitting Unit — Central Office
Bill Young Mill Creek Development Inc P O Box 537 Glenville NC 28736
Jackson County Planning Steve Beasley
File Copy
S \SWP\Jackson \401sWon DOT Colbert John Glenville\APRVL Summer Hill Lot 8 Colbert 2 2012 doc