Loading...
HomeMy WebLinkAbout20120202 Ver 1_Site Plan_20120223ar° I otl I 1 r\ ' t u r \\ I o �Ijatl cl I I ' • � o �s ;r NEUSE00A yd. 11\ LAKE S'h�u91 R rY.reo� � I � I s- vrrF,, 9 i,e' c H \ cT:rad D cm,e �rcr A ford fc s ^ D slat Pi U PROJE�rT J` r 4l1 New F I E e. / R °ugh Bpa:h d II 44) RNIAVEN US 6 S i BJ6 n" Ta 0 4 sa 64L CUvie+Dc III �I r cy , �I► s° �U u / IIII� II a r o i Dr lMn , C ��U o,A a / IWedicsl _ � far �yo 0 6 y C RE CEnlep M � � II� ❑ 9ara�' Medlr, Cr Cr C� � � y /� � 3 0� 1I P s C:Icl Wk i ' Cal�uieri !I' 7 . P,e sem / oti Nge Rd Tal I EI.R, soh I .. I\ / I � r + 00". ^ / g SON I T Rtl �C / RI +EryNI nda 6ulaC I Gaar ` c Bugg Isctn MND a C lop ma � l'o C g4arlau y� oc`e I Pxl= Rd o 1 CE I � Plat. ; r O z �t 0 00° srzaar o \ O hem a \\ y I/ 7 O c �I / � POa9f Dr. I m Wi I nBµ� D I 4 O hle Rd ' w 64 o � I�Eala " II VICINITY MAP CITY OF RALEIGH NORTH CRROLINR CP A R TP PP CREEK GREENWRYTRRIL LOCRTION; FROM END OF EXISTING GREENWAY ON MILBURNIE ROAD TO A D S NT PARK TYPE OF WORK; GRADING, PAVING, STRUCT RAINAG , E, E ROSION CONTROL, LANDSCAPING Fnl 1ATIM I INDEX OF SHEETS I 1R IB THRU 1C 2 THRU 2D 3 4 THRU 19 X-1 THRU X-12 TITLE SYMBOLOGY SHEET NOTES TYPICAL SECTIONS &DETAILS DRAINAGE SCHEDULE, SIGN SCHEDULE PLAN &PROFILE SHEETS CROSS SECTIONS -V2- S I , W H Uj Z W Z Uj 0 z < 0 a QQUj Uj N N� > UW Q � U00 W ��OZVI O WO W W QWUO � dmUlOL01 � Z H U ui Y U U 0 Q � QW 0 m U > } m 0 W Q a W a Z Q J a Y� Uj~ WQ U� Uj} UjQ> �Z Uj LU Ul7 L u �o r n0Nv ' N,,L U��� 3W PRELIMINARY CLANS I DO NOT USE FOR CONSTRUCTION RTE. FEBRUARY 22, 2012 RAWN 8Y'. MET NECKED BV: BRC EVISIONS: N0. DATE I PROJECT NO.. CALE: WATER: BOUND4RIES AND PROPERTYe" A4ILROJDS10 VEGETATION' Water Manhole Sin gle tree W Water Meter State line Standard Gauge County li RR Signal Milepost Single Shrub � �� Water Valve ne township li -- Switch Hedge �m�r��- Water Hydrant ne City Line RR Abandoned Woods Line Recorded U/G Wafer Line Reservation Line RR Dismantled Orchard � ,� r, � Designated U/G Wafer Line 5,U, E,�� V'i Above Ground Wafer Line � G ��'a}er Prope�y Line — RIGHT OF WAY, "' ° `� °r° Existing Iron Pin 'EP Baseline Control Point ' Property Corner —» Existing Right of Way Marker EXISTING STRUCTURES NI D xis iing Rig hi of Way Lme ON Satellite Dish Prope�y Monument E,� arcel/Sequence Number z3 Proposed Right of Way Line nR grdge, i�� Tunnel or Box Culver �C N Pedestal D xisting fence Line d Rg o f W Line with v Pro pe I V n / Bridge Wing Wall, Head Wall and End Wall - CO��C W ; N Tower W Iron in and Cap Marker �r MINOR; U/G TV Cable Hand Hole "H Proposed Woven Wire fence � Proposed R'Ight of Way Line with ()R ..��,C N,. Head and End Wall Recorded WG N Cable 1V Proposed Chain ['In ence a Concrete or Granite Marker a Q Q� Uj Pipe Cu lvert Designated WG TV C able �S.U,E,`) ---- �- - -- Proposed Barbed Wire fence $ Existing Control of Access U00 W O OZVI WO W W footbridge �QWUO � Recorded U/G fiber Optic Cable I; f° xis ing wetlan oun a ropose on ro o IL I Proposed Wetland gounda x'isti'ng Easement Line --E xis ing Endangered Animal Boundary DP Existing Greenway Easement Line Fyi finn FndnnnArPd Plnnf Rniindnry Efe Prnnn Pd Tpmnorm Cm frurf'inn E Box; Catch Basin, DI or JB Paved Ditch Gutter Storm Sewer Manhole DCs Desi U/gnated G fiber Optic Cable S,U, -IV f0- - - GAS. Storm Sewer as Valve BUILDINGS AND OTHER CULTURE' Propose ermonen reenway Easement —PGE- GasMeter q Gas Pump Venf or U/G Ton Ca Proposed Permanent Drainage Easement — —POE- UTILITI�S, Recorded lvi Gas line Sign �s Proposed Permanent Drainage /UiiliiyEasement ouE e'gnated lVG Gas Line SUE -- -G- - -- POWER; Well o roposedPermanenfUfilifyEasemenl —PUE— A;,,a, "� xI siing Power Pole Above Ground Gas Line Small Mine a Proposed temporary Utility asemen I TUE ❑ Proposed Permanent Easement wil P roposed Power Pole oundafih ' b o� Iron Pin and Cap Marker Exis ting Joint Use Po le + 5ANIiRRV SEWER. Area Outline 0 ROADS AND RELATED FEATURES' Proposed loins Use Pole � Sanitary Sewer Manhole �$' Cemetery � Existing Edge of Pavement — Power Manhole �P Sanitary Sewer Cleanout + gui ing _ � xisting Curb - - - -- Power Line tower � U/G Sanitary Sewer Line S. School .1 Limits of Disturbance Above Ground Sanita Sewer A,G anitary .F��er Power transformer D ry u rch � Proposed Slope Slakes Cut - -- � - -- l,� Power Cable Hand Hole H Recorded SS forced Main Line FSS Dam Proposed Slope Slakes '111 - -- F - -- H - frame Pole Designated SS forced Main Line S,U, ---- F <s- - -- HYDROIOGY' temporary 8'11t fence Recorded U/G Power line P Stream or Body o Water temporary tree Protection fence —'— — Designated U/G Power Line S,U, P - - - - MISCELLANEOUS; Hydro, Pool or Reservoir temporary Combination tree - X —x —X- Utility oePole 1 L J rofeclio�$ilf fence I l Pith Base urisdictional Stream _iS TELEPHONE; ry 0 Buffer lone 1 IBZ I — Proposed Wheel Chair Ramp �� Ezisiing telephone Pale + Utility Located Object Buffer lone 2 IBZ z Existing Meta uor rai T T T Proposed telephone Pole 0 Utility traffic Signal Box D 100 Year flood Plain — Proposed Guardrail T T T T telephone Manhole �� Utility Unknown U/G Line ?UIL 500 Year flood Plain — soo — Existing Cable Guiderail ielephooe Boafh � UG To n k Wafer, Gas, Oil 00 way —fw— Proposed Cable Gu'dero'l telephone Pe destal T RAG tank Wa fer, Gas, Oil flow Arrow qual'ity Symbol � telephone Cell tower � U/G test Hole 5,U, E'� � Disappearing Stream — -- Pavement Removal H Abandoned Acor in Utilit Record� telephone Cable Hole D 9 V AATUR S pring - - Recorded U/G telephone Cable nd oi Information E001. Wet an Culvert Inlet Protection Designated lVG telephone Cable roposed La teral, tail, Head Ditch � Silt fence Outlet Fff - Recorded U/G telephone Conduit false Sump Des'ignote U/G Teepone Conduit S,U,E' Recorded U/G fI berOpficsCable �F Designated U/G fiberOp tics Cable S.U.E,�t I , W H Uj Z W Z Uj 0 z < � a Q Q� Uj N N� > UW Q � U00 W O OZVI WO W W �QWUO � LL dmUlOL01 � Z H U � Y U U 0 0 Q � QW I If U > } m 0 W Q a W a Z Q J L Y� W~ UjQ U� W} UjQ> �Z mw LU Ul7 �E L u �o = n °N r v �' N��L 41 1011, M 41 °s 3W KU M ARY ANS DO NOT USE FOR CON STRUCTION RTE. FEBRUARY 22, 2012 RAWN 8Y'. MET NECKED BV: BRC EVISIONS: N0. DATE PROJECT NO.. I I �IIl CALE: NTS1 iA GENERAL NOTES THE CONTRACTOR SHALL PERFORM ALL CONSTRUCTION ACTIVITIES IN ACCORDANCE WITH THE APPLICABLE REQUIREMENTS OF THE JULY 2006 NCDOT STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES. ALL DEMOLITION SHALL BE APPROVED BY CITY OF RALEIGH INSPECTIONS DEPARTMENT, ALL DEMOLITION AND SUBSEQUENT CONSTRUCTION TO BE IN ACCORDANCE WITH PERMITS ISSUED AND APPLICABLE STATE, COUNTY, AND LOCAL CODES. THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL INSPECTIONS, C RTIFICAT 0 S) PERMITS, EQUIPMENT, ETC. THAT MAY BE REQUIRED. WHERE ASPHALT SECTION IS REMOVED, CONTRACTOR SHALL USE A SAW CUT AT THE LIMITS OF DEMOLITION TO OBTAIN A CLEAN EDGE. ALL TREE PROTECTION FENCING SHRLL B ALLE AND RBAN ERATIONS INCLUDING TREE REMOVAL, IN SUCH A MANNER AS TO CLEARLY AND ADEQUATELY SEPARATE ALL TREES TO BE REMOVED FROM REMAINING VEGETATION, CONTACT CITY Of RALEIGH PARKS AND RECREATION DEPARTMENT TO SET UP R PREmCONSTRUCTION MEETING PRIOR TO LAND DISTURBANCE. TREE PROTECTION FENCING CAN AND SHOULD BE INSTALLED PRIOR TO PREmCONSTRUCTION, NOTES DISCLAIM ASSOCIATED WITH PROJECT RS SET FANY N HPLANS, METHODS ESE ICONSTRUCTION FROM THE SPECIFICATIONS OR DRAWINGS ARE DEEMED NECESSARY BY THE CONTRACTOR, DETAILS OF SUCH DEPARTURES AND REASONS THEREOF SHALL BE SUBMITTED TO THE OWNER IN WRITING FOR REVIEW. NO DEPARTURES FROM THE C01 TRACT DOCUMENTS SHALL BE MADE WITHOUT THE WRITTEN PERMISSION OF THE OWNER, TO PRE VENT THE INTRODUCTION OF INVASIVE SPECIES, CONTRACTOR SHALL ASH ALL CONSTRUCTION EQUIPMENT PRIOR TO ACCESSING PARCEL 42. EQUIPMENT MAY BE WASHED OFF SITE, BUT ALL DEBRIS AND VEGETATION MUST BE REMOVED. SEE SPECIFICATION 01535 FOR MORE IN-FORMATION, SEQUENCE nF CONSTRUCTION ACTIVITIES 1. R PRECONSTRUCTION CONFERENCE MUST BE HELD PRIOR TO THE START OF ANY CONSTRUCTION ACTIVITIES, A MANDATORY PRE,CONSTRUCTION MEETING WILL ALSO BE REQUIRED WITH THE LAND QUALITY SECTION OF NCDENR BEFORE LAND DISTURBING ACTIVITIES BEGIN. CALL 919•]91.4200 TO SCHEDULE R MEETING. 2, INSTALL CONSTRUCTION ENTRANCES AS NEEDED AT LOCATIONS SHOWN ON SHEET 1D. OTHER STAGING AREAS WILL NEED TO BE DISCUSSED WITH CITY OF RALEIGH PRIOR TO THE START OF CONSTRUCTION, CONTACT THE CITY OF RALEIGH AT (919516.283), 3. DETERMINE AND MARK LIMITS OF DISTURBANCE. I , W H � Z W Z UJ 0 z < � � a Q Q N N� UW Q � W U� ZVI O W �QWUO � LL d m UlOL01 � Z H U � Y U 0 Q g � � QW �J 0 m u > 4. INSTALL TREE PROTECTION FENCING, SILT FENCE, COMBINATION FENCE AND, SILT FENCE OUTLETS, NO GRRDING IS TO OCCUR IN THE TREE PROTECTION RRERS OR TREE CRITICRL ROOT ZONES, SILT FENCE OUTLETS SHALL BE INSTALLED PER FIELD LOCATED LOW POINTS AND RS SHOWN ON uiRPPROVED PLANS. Q THE CONTRACTOR SHALL OBTAIN AND PRY FOR ALL INSPECTIONS, C RTIFICATIONS, EQUIPMENT, ETC, THAT MAY BE REQUIRED. 5, CLEAR ONLY AS NECESSARY TO INSTALL THESE DEVICES. CALL FOR ON SITE INSPECTION BY ENVIRONMENTA INSPECTOR AND OBTAIN CERTIFICATE OF COMPLIANCE, CALL FOR TREE PROTECTION u THE CONTRACTOR MUST, AT A L TIMES, KEEP THE PREMISES FREE FROM ACCUMULATIONS OF WASTE FENCE INSPECTION BY CHRIS CRUM OF THE CITY OF RALEIGH. 919.516.2561 MATERIALS OR RUBBISH CAUSED BY HIM, HIS EMPLOYEES, OR HIS WORK, ALL DEBRIS SHALL BE W } REMOVED FROM THE SITE ON A DAILY BASIS. 6. TOPSOIL AND STONE BASE REMOVAL ANDIOR STORAGE AREAS SHALL BE CONTAINED WITHIN THE W Q PROPOSED LIMITS OF DISTURBANCE, RELOCATION OF EXISTING UTILITIES TO BE COORDINATED WITH THE LOCAL UTILITY PROVIDER S�, ], BEGIN GRADING & C A G DG G, DEVICES RS NEEDED, ROUGH GRADE SITE, � Z EXISTING UTILITIES AND STRUCTURES SHOWN BOTH UNDERGROUND AND ABOVE ARE BASED ON THE BEST INSURE THAT SEDIMENT LADEN WATER IS DIRECTED TO SEDIMENT CONTROL DEVICES. m W AVAILABLE RECORD DRAWINGS, THE CONTRACTOR SHALL VERIFY FIELD CONDITIONS PRIOR TO W BEGINNING RELATED CONSTRUCTION, ANY DISCREPANCIES SHALL BE REPORTED TO THE OWNER'S 8, INSPECT AND MAINTAIN ALL EROSION CONTROL MEASURES EVERY 1 DRYS AND AFTER EACH SIGNIFICANT REPRESENTATIVE IMMEDIATELY, RAINFA (0,5 INCHES OR GREA AND DOCUMENT WITH INSPECTION REPORTS, u CONTRACTOR SHALL LOCATE ALL UTILITIES AND UTILITY ELEVATIONS PRIOR TO CONSTRUCTION, ALL UTILITIES TO REMAIN SHALL BE PROTECTED BY THE CONTRACTOR, ANY UTILITIES DAMAGED DURING CONSTRUCTION SHALL BE REPAIRED BY CONTRACTOR, CONTRACTOR SHALL RESTORE ALL LAY DOWN AND STAGING AREAS TO ORIGINAL CONDITIONS AND TO THE SATISFACTION OF THE OWNER, PRIOR TO DEMOBILIZATION AT THE CONCLUSION OF THE PROJECT. ANY EXCAVATION MUST BE FILLED IN AND TAMPED AT THE CONCLUSION OF EACH WORK PERIOD, AND EQUIPMENT AND SUPPLIES RETURNED TO THE CONSTRUCTION STAGING AREA, CONSTRUCTIONISAFETY FENCING REMOVED TO FACILITATE ACCESS BY THE CONTRACTOR FOR CONSTRUCTION MUST BE REPLACED AT THE END OF EACH WORK PERIOD TO DIRECT PEDESTRIAN TRAFFIC AWAY FROM HAZARDOUS AREAS, DEMOLITION, AND SUBSEQUENT CONSTRUCTION Of STORM DRAINAGE FACILITIES SHALL BE PERFORMED IN SUCH A MANNER THAT THE OLD PIPE AND STRUCTURES ARE REMOVED AND NEW STRUCTURES AND PIPING ARE IMMEDIATELY PUT INTO SERVICE. CONTRACTOR SHALL ENSURE THAT STORM DRAINAGE DOES NOT REMAIN OUT OF SERVICE FOR LONGER THAN 12 HOURS AT R TIME. PROVISIONS SHALL BE MADE TO MAINTAIN STORM WATER DRAINAGE DURING CONSTRUCTION, CONTRACTOR SHALL STAKE CENTERLINE OF TRAIL ACCORDING TO PLANS AND OBTAIN APPROVAL FROM OWNER'S REPRESENTATIVE PRIOR TO CONSTRUCTION. ANY DISCREPANCIES SHALL BE RESOLVED PRIOR TO CONSTRUCTION, STATIONING IS APPROXIMATE, CONTRACTOR SHALL VERIFY ALL STATIONING FOR APPLICABILITY TO EXISTING CONDITIONS PRIOR TO CONSTRUCTION, DEVIATION FROM ALIGNMENT DUE TO LARGE TREES OR OTHER OBSTACLES ETC SHALL BE APPROVED BY CITY OF RALEIGH, CONTRACTOR SHALL MAINTAIN ALL ABOVE AND BELOW GROUND STORM WATER DRAINAGE AND PATTERNS AND PIPING AS THEY CURRENTLY EXIST UNLESS NOTED OTHERWISE, ANY DISTURBANCE OF THE PATTERNS OR STRUCTURES BY THE CONTRACTOR SHALL BE CORRECTED BY THE CONTRACTOR TO CONDITION PRIOR TO DISTURBANCE, CLEAN OUT STORM WATER PIPE ONLY IF NOTED ON PLAN AND ACCORDING TO DETAIL, CONTRACTOR ACCESS FOR TRAIL CONSTRUCTION SHALL BE CONFIRMED BY CONTRACTOR WITH OWNER'S REPRESENTATIVE AND PROPERTY OWNER PRIOR TO CONSTRUCTION, CONTRACTOR SHALL REVIEW TREE REMOVAL WITH OWNER'S REPRESENTATIVE AND OBTAIN APPROVAL PRIOR TO TREE REMOVAL, CONTRACTOR SHALL REMOVE ALL VEGETATION TO 3'BEYOND ASPHALT EDGE OF TRAIL OR WITH IN REQUIRED DRAINAGE DITCHES. TRIM UP BRANCHES OF TREES TO PROVIDE 8' VERTICAL ClEARANCE, ALL CONSTRUCTION SHAL PLY WITH CITY OF RAL ANDARDS. CONTRACTOR SHALL PROVIDE SILT FENCING IN ALL AREAS AND EROSION CONTROL MEASURES RS NEEDED OR DIRECTED BY THE EROSION CONTROL INSPECTOR, IF ADDITIONAL MEASURES ARE REQUIRED IN ADDITION TO THE PLANS, COMPENSATION WILL BE PROVIDED PER THE CONTRACT PROVISIONS, ALL DISTURBED AREAS THAT WILL BE IDLE 14 DAYS OR LONGER SHALL BE SEEDED BV CONTRACTOR, VEGETATION ON BANKS AND WETLANDS SHOLD BE HAND CUT WITH ROOT MATS UNDISTURBED. 9, THE AMOUNT Of DISTURBED AREA REQUIRED TO BE TEMPORARILY SEEDED IS LIMITED TO 2,000 LF OF TRAIL OR 14 DRYS, WHICHEVER IS SHORTER. THE CONTRACTOR CANNOT EXCEED 2,000 LF OF DISTURBED AREA WITHOUT TEMPORARY SEEDING. THE CONTRACTOR SHALL PLACE TEMPORARY SEEDING ON ALL DISTURBED AREAS THAT WILL BE IDLE 14 DAYS OR LONGER, 10. INSTALL STORM SEWER SYSTEMS AND CULVERTS AND PROTECT INLETS WITH INLET PROTECTION, INSTALL CULVERTS IN JURISDICTIONAL AREAS ACCORDING TO NCDOT BEST MANAGEMENT PRACTICES FOR CONSTRUCTION AND MAINTENANCE ACTIVITIES MANUAL, CULVERT INSTALLATIONS IN STREAMS WILL REQUIRE DEWATERING BY USE Of COFFER DAMSIIMPERVIOUS DIKES AND PUMPS TO MAINTAIN WATER QUALITY STANDARDS, PER DETAIL ON SHEET 2C. CONTRACTOR TO COORDINATE WITH EROSION CONTROL INSPECTOR. RNY TEMPORRRV COFFER DAM SHRLL BE CONSTRUCTED Of MRTERIRLS SUCH RS SHEET PILING, SA DBAGS OR CLEAN CLASS 1 RIP RAP OR LARGER STONE THAT WILL NOT CONTRIBUTE TO TURBIDITY OR SILTATION OF THE WATER BODY, R TEMPORARY SEDIMENTATION BAG SHALL BE USED PER NCDOT STANDARD DRAWING NUMBER 1630.06. SANDBAGS SHALL BE OF THE FILTER FABRIC TYPE, DOUBLE BAGGED AND INDIVIDUALLY TIED TO PREVENT SAND LEAKAGE, THEY SHALL BE PLACED AND REMOVED MANUALLY TO PREVENT SPILLAGE. ONLY CLEAN SAND, FREE OF DEBRIS, SILT, FINE PARTICLES OR OTHER FOREIGN SUBSTANCES, S ALL BE USED TO FILL THE BAGS. THE COFFERDAM SHA L BE ENTIRELY REMOVED IMMEDIATELY UPON COMPLETION OF WORK, DURING PERIODS OF WORK ACTIVITY, FLOW IMMEDIATELY DOWNSTREAM OF THE WORKSITE SHALL EQUAL FLOW IMMEDIATELY UPSTREAM OF THE WORKSITE, ALL OTHER OPTIONS WILL NEED PRIOR APPROVAL, SEE SHEET 2D FOR DETAIL. NO DIRECT PAYMENT SHALL BE MADE FOR THE WORK OF INSTALLATIO , AINTENANC , A D REMOVAL OF IMPERVIOUS DIKE S AS DESCRIBED IN THIS PROVISION, PAYMENT FOR SUCH WORK SHA L BE DISTRIBUTED AMONG THE VARIOUS PAY ITEMS. 12. RS AREAS ARE BROUGHT UP TO FINISH GRADE, SPREAD TOPSOIL OVER ALL AREAS TO RECEIVE TURF OR LANDSCAPING. SEED ALI AREAS WITHIN 14 DRYS OF COMPLETING ACTIVITY, PERMANENT GRASS SHALL BE INSTALLED FOR ALL AREAS AT FINAL GRADE AND IN SEASON, FERTILIZE, WATER AND RESEED RS REQUIRED TO ESTABLISH AND MAINTAIN R VIGOROUS STAND OF GRASS. 13, AFTER COMPLETION OF CONSTRUCTION AND THE SITE IS STABILIZED, REMOVE ALL ACCUMULATED SEDIMENT FROM SEDIMENT TRAPPING MEASURES AND SPREAD EVENLY ACROSS THE SITE. THEN REMOVE TEMPORARY EROSION CONTROL MEASURES, SMOOTH AREA AND APPLY APPROPRIATE GRASS, WHEN VEGETATION HAS BECOME ESTABLISHED, CALL FOR FINAL SITE INSPECTION BV ENVIRONMENTAL OFFICER, OBTAIN CERTIFICATE OF COMPLIANCE, 14. CONTRACTOR IS REQUIRED TO MAINTAIN A WEEKLY WRITTEN REPORT OF SEDIMENT AND EROSION CONTROL DEVICES. } m 0 W Q a W a Z Q J a L u � 0 r = ON 3W PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION RTE. fEBRURRY 22, 2012 RAWN 8Y'. MET NECKED BV: BRC EVISIONS: N0. DATE PROJECT NO.. CALE: NTS EROSION CONTROL NOTES TOTAL ACREAGE OF DISTURBED AREA IS 22.81 ACRES TOTAL PROJECT AREA IS 582.15 ACRES. ACREAGE OF PERMANENT AND TEMPORARY SEEDING IS 10 ACRES, SEE CONTRACT DOCUMENTS AND SHEET 2P FOR SEEDING SPECIFICATIONS, ON -SITE BURIAL PITS ARE NOT ACCEPTABLE, ANY GRADING BEYOND THE LIMITS SHOWN ON THE PLAN IS R VIOLATION OF THE STATEICOUNTY EROSION CONTROL ORDINANCE AND IS SUBJECT TO FINE. STABILIZATION IS THE BEST FORM OF EROSION CONTROL, TEMPORARY SEEDING IS NECESSARY TO ACHIEVE EROSION C01 TROL IN L.A.. R GE DENUDED AREAS AND ESPECIALLY WHEN SPECIFICALLY REQUIRED RS PART Of THE CONSTRUCTION SEQUENCE SHOWN ON THE PLAN. ALL GRADED SLOPES MUST BE SEEDED AND MULCHED WITHIN 14 CALENDAR DRYS OF COMPLETION OF GRRDING, DURING UNSUITABLE GROWING SEASONS, MULCH WILL BE USED RS R TEMPORARY COVER ON SLOPES THAT ARE 4;10R STEEPER, MULCH WILL BE ANCHORED, ADDITIONAL MEASURES TO CONTROL EROSION AND SEDIMENT MAY BE REQUIRED BY A LOCAL REPRESENTATIVE OF THE STATEICOUNTY STORM WATER MANAGEMENT SECTION AND THE LOCAL INSPECTIONS DEPARTMENT. CONSTRUCTION, MAINTENANCE, REMOVA OF ALL EROSION CONTROL DEVICES, ALL FINES, LEGAL FEES AND RESTORATION COSTS ARE THE RESPONSIBILITY OF THE CONTRACTOR UNLESS OTHERWISE NOTED. A COPY OF THE APPROVED PLANS MUST BE ON FILE AT THE JOB SITE. CONTRACTOR SHALL OBTAIN R COPY OF EACH SUBSURFACE INVESTIGATION REPORT AND FOLLOW THE RECOMMENDRTIONS OR A IRECTED FOR GRADING, COMPLETION AND PAVEMENT DESIGN, ETC. THE AMOUNT OF DISTURBED AREA REQUIRED TO BE TEMPORARILY SEEDED IS LIMITED TO 2,000 LF Of TRAIL OR 14 DRYS, WHICHEVER IS SHORTER. THE CONTRACTOR CANNOT EXCEED 2,000 LF OF DISTURBED AREA WITHOUT TEMPORARY SEEDING. THE CONTRACTOR SHALL PLACE TEMPORARY SEEDING ON ALL DISTURBED AREAS THAT WILL BE IDLE 14 DRYS OR LONGER, EROSION PROVISION THE CONTRACTOR SHALL BE REQUIRED TO TAKE EVERY REASONABLE PRECAUTION THROUGHOUT THE CONTRACT TO PREVENT THE EROSION OF SOIL AND THE SEDIMENTATION OF STREA S, AKES, RESERVOIRS, OTHER WATER IMPOUNDMENTS, GROUND SURFACES, OR OTHER PROPERTY RS REQUIRED BY THE SEDIMENT POLLUTION CONTROL ACT OF 1913 AND THE 19]4 AMENDMENTS TO THE ACT. FAI URE ON THE PART OF THE CONTRACTOR TO COMPLY WITH THE PROVISIONS OF THE EROSION CONTROL PLAN OR TO PERFORM EROSION CONTROL WORK RS DIRECTED WILL RESULT IN THE ENGINEER, INSPECTOR OR NCDENR NOTIFYING THE CONTRACTOR TO COMPLY WITH THESE PROVISIONS, IN THE EVENT THAT THE CONTRACTOR FAILS TO BEGIN SUCH REMEDIAL ACTION OR FAILS TO BEGIN EROSION CONTROL WORK WITHIN 24 HOURS AFTER RECEIPT OF SUCH NOTICE WITH ADEQUATE FORCES AND EQUIPMENT, THE ENGINEER MAY PROCEED TO HAVE THE WORK PERFORMED WITH OTHER FORCES, NO PAYMENT WILL BE MADE TO THE CONTRACTOR FOR WORK PERFORMED BY OTHERS. ANY COSTS INCURRED BY THE CITY DUE TO THE FAILURE OF THE CONTRACTOR TO COMPLY WITH THESE PROVISIONS WILL BE BORNE BV THE CONTRACTOR. SUCH COSTS WILL INCLUDE CIVIL PENALTIES ASSESSED FOR SOIL EROSION AND SEDIMENTATION CONTROL VIOLATIONS, ANY COSTS INCURRED BY THE CITY FOR WORK PERFORMED BY OTHERS AS PROVIDED ABOVE IN THE EXCESS OF THE COSTS THAT WOULD HAVE BEEN INCURRED HAD THE WORK BEEN PERFORMED BY THE CONTRACTOR WILL BE DEDUCTED FROM RETAINAGE OR OTHER MONIES DUE THE CONTRACTOR OR HIS CONTRACT, MISC • WETLRNDS, TREES. STORM PIPING CONTRNCTOR TO VERIFY A TUAL WETLAND BOUNDARY IN THE FIELD PRIOR TO CONSTRUCTION OF BOARDWALK, WETLAND LOCATION WILL DETERMINE BOARDWALKS STARTINGISTOPPING LOCATION, NO EQUIPMENT IS ALLOWED IN THE WETLANDS, EQUIPMENT MUST BE ON TIMBER MATS, TIMBER MATS SHALL BE CAROLINA MAT INCORPORATED BRIDGEITIMBER MA 6" MIN, THICKNESS) OR APPROVED ALTERNATE. TEMPORARY WETLAND CROSSING SHALL REQUIRE TIMBER MATS, RLL DISTURBED RRERS TO BE OVERSEEDED WITH RPPROVED MIX. CONTRRCTOR SHRLL MNINTRIN A WETLAND SEEDING MIX ON SITE TO BE APPLIED TO TEMPORARILY DISTURBED WETLAND AREAS AS DIRECTED BY ENGINEER IN THE FIELD. WETLAND SEED MIX IS PROVIDED IN THE SPECIFICATIONS IN SECTION 02910. WETLRND LOCRTIONIDELINERTION BY ESI DATED 1212009 LOCRTION Of PIPING FOR DITCHES IS RPPROXIMRTE, CONTRRCTOR SHRLL FIELD VERIFY LOCRTION AND MATCH PIPING TO DITCH CENTERLINE, SAVE ALL PROMINENT EXISTING TREES PLUS EXISTING TREES AS FLAGGED, IF JUDGMENT IS REQUIRED, CONTACT DESIGNER FOR FIELD ADJUSTMENT. IF EGREGIOUS VIOLATIONS OCCUR AS DETERMINED BY THE OWNER, EPLANTING MAY BE ORDERED AT R COMPENSATORY RATE AT THE CONTRRCTORS EXPENSE. RLL STORM PIPING SHRLL BE HDPE DBL WRLLm SMOOTH INTERIOR EXCEPT WERE OTHERWISE NOTED, SEE DRAINAGE SUMMARY SHEET. ON ALL STORM PIPING, BURY INVERTS ONLY AS NEEDED. CMP PIPING SHA L HAVE ASPHALT COATING INSIDE AND OUT WHEN DESIGNATED (SEE SPECS, ALL PROPOSED CONCRETE WALKWAYS, ASPHALT TRAILS, ETC. WILL BE CONSTRUCTED TO EXISTING GRRDES UNLESS OTHER WISE NOTED ON THE PROFILE. NOTES COMPACTION NOTES STRUCTURAL FILL BENEATH THE PAVED AREAS SHOULD BE PLACED IN UNIFORM LIFTS OF 8 INCHES OR LESS (LOOSE MEASURE, AND COMPACTED TO AT LEAST 95 PERCENT OF MAXIMUM DRY DENSITY AND WITHIN 2 PERCENT OF THE OPTIMUM MOISTURE AS DEFINED BV THE STANDARD PROCTOR COMPACTION TEST. HOWEVER, THE UPPER 12 INCHES OF THE FILL PLACED SHOULD BE COMPACTED TO 98 PERCENT OF THE STANDARD PROCTOR MAXIMUM DRY DENSITY, TO CONFIRM THAT THE SPECIFIED DEGREE OF COMPACTION IS OBTAINED, FIELD DENSITY TESTING SHOULD BE PERFORMED IN EACH LIFT BY R SOILS TECHNICIAN, 2006 NCDUT ROAD VAY ENGLISH STD. DRAWINGS THE FOLLOWING ROADWAY STAN DARDS RS APPEAR IN ROADWAY STANDARD DRAWINGS" HIGI IWAY DESIGN BRANCH, N.C. DEPARTMENT OR TRANSPORTATION, RA EIGH, N,C,, DATED JULY 18,2006 ARE APPLICABLE TO THIS PROJECT AND BY REFERENCE HEREBY ARE CONSIDERED R PART OF THESE PLANS: STD,NO, DIVISION 2 • EARTHWORK 200.02 DIVISION 3 •PIPE CULVERTS 300D.01 DIVISION 8, INCIDENTALS 838.01 838.80 846.01 816.01 816.02 816.04 TITLE Meihod of Clearing - Method II Melhod of Pipe Installation • Melhod'A' Concrete En dwall for Single and Double Pipe Culue�s • 15" fhru 48 "Pipe 90 °Skew Piecasi Comele Endwall •for Single 12" lhiu 72" Pipe 90' S ew Concrete Curb, Gu lei, and Curb &Guyer Rip Rap in Channels Guide for Rip Rap at Pipe u e-.-s Drainage Dliches with Class ip Rap RDDITIONAL NCDOT STRNDRRDS NOT ON THE LIST ABOVE MRV BE REQUIRED AS PER PLAN DETRILS AND SPECIFICATIONS, SEEDING R. ACCOMPLISH SEEDING BY MEANS OF RN APPROVED POWERmDRAWN SEED DRILL, COMBINATION CORRUGATED ROLLER,SE A PROVED HAND OPERATED MECHANICAL SEEDER, OR OTHER APPROVED METHODS TO PROVIDE EVEN DISTRIBUTION OF SEED, B. DO NOT SEED WHEN GROUND IS EXCESSIVELY WET OR EXCESSIVELY DRY. RFTER SEEDING, ROLL AREA WITH R ROLLER, NOT LESS THAN 18 INCHES IN DIAMETER AND WEIGHING NOT MORE THAN 210 POUNDS PER FOOT OF WIDTH. UPON COMPLETION OF ROLLING, WATER AREA WITH A FINE SPRAY, C. IMMEDIATELY FOLLOWING SEEDING APPLY MULCH OR MATTING, DO NOT SEED AREAS IN EXCESS OF THAT WHICH CAN BE MULCHED ON SAME DRY. D. APPLY WATER WITH R FINE SPRAY IMMEDIATELY AFTER EACH AREA HAS BEEN MULCHED, SATURATE TO 41NCHES OF SOIL DEPTH. E. THE AMOUNT OF DISTURBED AREA REQUIRED TO BE TEMPORARILY SEEDED IS LIMITED TO 2,000 LF Of TRAIL OR 14 DAYS, WHICHEVER IS SHORTER. THE CONTRACTOR CANNOT EXCEED 2,000 LF OF DISTURBED AREA WITHOUT TEMPORARY SEEDING. THE CONTRACTOR SHALL PLACE TEMPORARY SEEDING ON ALL DISTURBED AREAS THAT WILL BE IDLE 14 DRYS OR LONGER, MULCHING AND MATTING R. APPLY MULCH OR MATTING AS REQUIRED TO RETAIN SOIL AND GRASS, BUT NO LESS THEN THE FOLLOWING; 1. SLOPES FROM 5;10R FLATTER BY SPREADING R LIGHT COVER OF MULCH OVER SEEDED AREA AT THE RATE OF NOT LESS THAN 92 LBS, PER 1000 SQ,FT, 2, SLOPES GREATER THAN 5:1 MULCH WITH MATTING. PIN MATTING TO THE GROUND WITH WIRE STAPLES AT 5 FOOT INTERVALS, IMMEDIATELY AFTER SEEDING. 3, USE TACK TO PREVENT DISRUPTION OF MULCH. B. FOR TACK USE RN ASPHALT TlEmDOWN OF EMULSIFIED ASPHALT GRADE AEmE OR CUTmBACK ASPHALT GRADE RCm2 OR OTHER APPROVED EQUAL, RN APPROVED JUTE MESH OR NET MAY BE USED IN LIEU OF TACKING STRAW MULCH, C. OTHER TYPES OF MULCH c G METHODS AY BE USED UPON A OVA V THE ENGINEER. D. EXCELSIOR MATTING SHALL MEET NCDOT STANDARD SPECIFICATIONS AND SHALL BE INSTALLED PER APPROVED PLANS, PROTECTION R. PROTECT SEEDED AREA DA A BY BARRI A AND OTHER APPROPRIATE MEANS. MAINTAIN AND PROTECT SLOPES FROM WEATHERmDAMAGE, I , 0 W H uj Z W Z uj 0 0 z < a QQJ 0 J N N N� UW Q � Uco W ZVI O W QWUO � d m UlOL01 � Z H U � Y U U0 0 z u 0 u > } m 0 W Q a W a Z Q J a Y� W~ WQ U� W} WQ> �Z mw QW Ul7 L u � 0 r = n0Nv M ' N��L w lz 3W R ANS DO NOT USE FOR CON STRUCTION RTE. FEBRUARY 22, 20121 DRAWN 8Y'. MET CHECKED BV: BRC REVISIONS; N0. DATE PROJECT NO.. CALE: NTS �C - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 4 ORIGINAL GROUND 25 'r1�3'1 uJfl �vv u n ---------------------------------------------------- INSET 1 i USE INSET 1WHEN ` 31 3 > 5 CONDITIONS PERMIT �1 M R1l. 0.02 ORIGINAL GROUND 6. _ � � PAVEMENT SCHEDULE Cl PROPOSED APPROX, 2" ASPHALT CONCRETE SURFACE COURSE, TYPE S9,5B, AT AN AVERAGE RATE Of 224 LBS, PER SQ, YD. JI PROPOSED 6" AGGREGATE BASE COURSE. T EARTH MATERIAL, V1 GEOTEXTILE SEPERATOR FABRIC BOARDWALK PLATFORM 0 a BORRDWRLK N0. 51 6'SHLD, 4'WI SAFETY RAIL GRADE FCl POINT 6:1 MAX GRADE TO THIS LINE ASPHALT TRAIL TYPICAL SECTION CHAIN BEGIN STATION END STATION SAFETY RAIL* SEE SHEET 2B •Y2• (BEGIN CONSTRUCTION) 10 +60.00 11 +00.00 (BEGIN BOARDWALK 1) •y2• (END BOARDWALK 1) 20 +60.00 32 +80.50 (BEGIN BOARDWALK 2) -Y2- (END BOARDWALK 2) 33 +20.50 51 +41.46 BEGIN BRIDGE S1) •Y2• (END BRIDGE S1) 58 +81.46 96 +24.81 STATION EQUATION BK) •Y2• STATION EQUATION) 96 +25.62 100 +35.00 (BEGIN BOARDWALK 3) 'Y2' (END B 3) 101 +45.00 113 +04.83 (BEGIN BOARDWALK 4) MY2M (END BRIDGE S2) 111 +62.30 130 +20.00 S ATION EQUATION) •Y2REV1• (s OTRTIN EQ UATION) 130 +20.11 152+15.00 (BEGIN BOARDWALK 1) •Y2REV1• (END BOARDWALK ]) 153 +55.00 182 +80.00 (BEGIN BOARDWAL 8) •Y2REV1• (END BOARDWALK 8) 185 +80.00 191 +31.41 (BEGIN BOARDWALK 9) •Y2REV1• (END BOARDWALK 10) 198 +66.59 201 +22.00 (BEGIN BOARDWALK 11) •Y2REV1• (END BOARDWALK 11) 202 +02.00 208 +56.81 (END CONSTRUCTION) A DWAL K TYPICAL SECTION CHRIN BEGIN STRTION END STRTION 1 Y2 11 +00.00 20 +60.00 2 Y2 32 +80.50 33 +20.50 4 Y2 100 +35.00 101 +45.00 5 V2 113 +04.83 113 +84.83 6 Y2 114 +24.83 116 +22.30 N0. y v 52 +05.00 153 +55.00 8 Y2REVI 182 +80.00 185 +80.00 9 Y2REVI 191 +31.41 193 +11.4] 10 Y2REVI 196 +86.59 198 +66.59 11 Y2REVI 201 +22.00 202 +02.00 1 Y2REVI 193 +11.41 2 Y2REVI 196 +69.18 193 +29.18 196 +86.59 i A DIET I NOTES; uj uj •USE 6' SHOULDER IN FILL SECTIONS " z F UJ z AND 3'SHOULDER IN CUT SECTIONS. � 0 W 0 g J 0 •TRRNSITION SUPERELEVATION AS SHOWN u W u co 3 ON PLANS. TRANSITION DISTANCE SHALL BE 10'. k o ? � W FOR DR1 DEPTH OF ABC TO BE 8 W � 0 � Y Fw, p Qm�QN 0 amN m Z N w U N PROVIDE R SAFETY RAIL FOR THE FOLLOWING CIRCUMSTANCES. SLOPE? 3:1 AND DROP Of 6' SLOPE? 2:1 Rl D Di OP Of 4' SLOPE? 1.1 AND DROP Of 1' BRIDGE TYPICAL SECTION BRIDGE N0. CLEAR WIDTH) CHAIN BEGIN STATION END STATION } m 0 W Q a W a Z Q J a Y� ui~ uiQ u� ui} I IQ> �Z mw QW Ul7 E L u � 0 = n °N r v ' NLrns�L 0 U��� °s � 4�j 3W REJ M '& A I Y I A N S DO NOT USE FOR CON STRUCTION si Y2 51 +41.46 58 +81.46 S2 Y2 113 +84.83 114 +24.83 DATE: FEBRUARY 22/ 2012 S3 Y2 116 +22.30 111 +62.30 DRAWN BY: MET CHECKED BV: BRC S4 Y2REV1 193 +29.18 196 +69.18 REVISIONS: N0. DATE PROJECT NO.. CALE: NTS 8'MAX. VARIABLE AS DIRECTED BY THE ENGINEER MIN. 12-112 GA MIN. 10 GA. SILT FENCEFABRIC INTERMEDIATE vv LINE WIRES INSTALLED TOSECOND WIRES _7 �V\/v WIRE FROM TOP STEEL FENCE POST WIRE FENCE HARDWARE CLOTH n �n nu `; n ^ v �i ru �� NCDOT SEDIMENT CONTROL STONE p�riry v n vri un nu Un un n 3'FILTER FABRIC OP non n s,t1 n i+ fi,t1ri ^ U v n riven �u v vun'zn. n "n t1 ri U v.";nu u U V a fl V n 4J'� v nu n L un t/ fi n flu U k V ^ 'm n vrJn nUn n u t!ri un�n„ n, � n „tu t,n un nun n ^ n v v a v �',1 v u BURY WIRE FENCE AND HARDWARE CLOTH BURY 6" OF UPPER EDGE OF FILTER FABRIC IN TRENCH NOTES: • END OF SILT FENCE SHOULD BE TURNED UPHILL STEEL POST TOP OF SILT FENCE • SEE N. C. STATE DENR PRACTICE STANDARDS &SPECIFICATIONS WOVEN WIRE FABRIC MUST BE AT LEAST I' IS ALWAYS REQUIRED ABOVE THE TOP OF SEDIMENT FENCE SET FOR CONDITIONS WHERE PRACTICE APPLIES SILT FENCE GEOTEXTILE FABRIC THE WASHED STONE P 0 SHALL NOT RUN PARALLEL WITH THE TOE OF THE FENCE� � : ZI FILL SLOPE N �o FOR REPAIR OF SILT FENCE FAILURES, USE No. 57 WASHED STONE "3 ,GRADE FOR ANCHOR WHEN SIFT FENCE IS PROTECTING CATCH BASIN. IN EACH CASE THE SILT FENCE IS TO BE PROPERLY ENTRENCHED & THE 0 6" MIN. COVER' STONE SHALL BE AT A MINIMUM OF 16" ABOVE GRADE AT THE N J OVERSKIRT DIRECTION OF FLOW &BETWEEN 60 -45 DEGREES. ANCOR SKIRT AS DIRECTED BY ENGINEER. SIDE VIEW n STRNDRRD TENIPORRRY SILT FENCE W W Q 0 X C,O,R, STD # 40.01 TYPE A CHAIN STATION TYPE B PIPE OUTLET TO FLAT AREA WITH NO DEFINED CHANNEL •Y2• 33 +00 PIPE OUTLET TO WELL- DEFINED CHANNEL SINGLE -Y2- 100 +80 48" DOUBLE •V2• 114 +00 48 11 DOUBLE 42Revl- 152+80 48" TRIPLE T iA n N -4 DIAMETER . T FILTER FABRIC SEE PLANS FOR QUANTITIES SECTION A-A 0 3 B FILTER FABRIC � SEE PLANS FOR QUANTITIES SECTION B-B 1 PIPE OUTLET PROTECTION ".q 40" P_ m ' TREE PROTECTION AREA p 18" m DO NOT ENTER 0 0 N WARNING SIGN DETAIL STD. 816.02 ICHR OTTOM 4'MIN. -1 DESIGN CRITERIA NOTES j THE DRAINAGE AREA IS LIMITED TO ONE HALF ACRE. 1. PLACE STONE TO THE LINE AND DIMENSION SHOWN IN THE PLAN KEEP A MAXIMUM HEIGHT OF 2 FEET AT THE CENTER OF ON A FILTER FABRIC FOUNDATION. H , , FINER C�OiH n - - - — CHE CK DRM THE DAM. 2. KEEP THECENTERSTONESECTIONRTLFAST9INCHESBELOW ON � g KEEPTHECENTEROfTHECHECKDRMRTLERST9INCHES NATURAL GROUND LEVEL WHERE THE DAM ABUTS THE CHANNEL J w LOWER THAN THE OUTER EDGES AT NATURAL GROUND BANKS. J ELEVATION. 3. EXTEND STONE AT LEAST 1.5 FEET BEYOND THE DITCH BANK TO OUND KEEP THE SIDE SLOPES OF THE DAM AT 2:1 OR FLATTER KEEP WATER FROM CUTTING AROUND THE ENDS OF THE CHECK zN z k o 0 w ENSURETHRTTHEMRKIMUMSPRCINGBE1NEENDRMS DAM. ° PLACES THE TOE OF THE UPSTREAM DAM AT THE SAME 4. SET SPACING BETWEEN DAMS TO ASSURE THAT THE ELEVATION ELEVATION AS THE TOP OF THE DOWNSTREAM DAM. AT THE TOP OF THE LOWER DAM IS THE SAME AS THE TOE S TABIlITEOUTfIOWNRfASRLONGTHECHRNNElTO ELEVATION OF THE UPPER DAM. m � C) RESIST EROSION. 5. PROTECT THE CHANNEL AFTER THE LOWEST CHECK DAM FROM 0 0. m m USE NCDOTCIASSBRIPRRPRND LINE THE UPSTREAM HEAVY fLOWTHRTCOULDCRU3EER0310N. w SIDE OF THE DAM WITH NCDOT SEDIMENT CONTROL STONE. 6. MAKE SURE THAT THE CHANNEL REACH ABOVE THE MOST z > Q rc p > 0 KEY THE STONE INTO THE DITCH BANKS AND EXTEND IT UPSTREAM IS STABLE y BEYOND THE ABUTMENTS A MINIMUM OF 1.5 FEET TO 7. ENSURE THAT OTHER AREAS Of THE CHANNEL, SUCH NSCULVERT u m AVOIDWRSHOUTFROMOVERFLOWNROUNDTHEDAM ENTRANCES BELOWTHECHECKDRMS ,RRENOTSUBJECTTO /—SILT FENCE DAMAGE OR BLOCKAGE FROM DISPLACED STONES. Um uj 12" OF NCDOT SEDIMENT u 9 " MIN � 1 5 p 15MIN CONTROLSTONE v A, CLASS BRIP-RAP 2'MAXRT Iv, CENTER vv/, FILTER CLOTH 4'T06' PORN VIEW CROSS-SECTION VIEW PURPOSE: TO REDUCE EROSION IN A CHANNEL BY REDUCING THE :FENCE V EOCITVOffLOW. L : THE DISTANCE SUCH THAT POINTS 3RIC A AND B ARE OF EQUAL ELEVATION .WRRE DO NOT USE CHECK DAM IN INTERMITTENT OR PERENNIAL STREAMS, -/v"""- CLOTH IN TRENCH p g L SEE DENR STANDARDS & SPECS. FOR COMPLETE DESIGN CRITERIA & V' v uj MAINTENANCE SIDE VIEW O STEEL FENCE POST SET MAX 2'APART� I� IN. 18" INTO SOLID GROUND FRONT VIEW 2 SILT FENCE OUTLET NOTES: FOOTING SIZE PIPE SIZE WIDTH DEPTH 8" 12" >2411-3611 1211 24" >3611-5411 1811 3611 = H. FILTER FABRIC T H = RIP RAP TO TOP OF PIPE �MAX. H = D +T� i =15" CLASSTRIPRAP T 12" CLASS'B'RIP RAP 112 DIAMETER OF PIPE OR 12" WHICHEVER 15 GREATER FILTER FABRIC � CAPACITY OF PIPE CULVERTS TOGETHER = BANK FULL FLOW TEMPORARY STREAM CROSSING SUMMARY CHAIN STATION DIAMETER NOTES •Y2• 33 +00 48 11 SINGLE -Y2- 100 +80 48" DOUBLE •V2• 114 +00 48 11 DOUBLE 42Revl- 152+80 48" TRIPLE T A' NOTES: 1. WARNING SIGNS TO BE MADE OF DURABLE, WEATHERPROOF MATERIAL. 2. LETTERS TO BE 3" HIGH MINIMUM, CLEARLY LEGIBLE AND SPACED AS DETAILED. 3. SIGNS SHALL BE PLACED AT 50'MAXIMUM INTERVALS. 4. PLACE A SIGN AT EACH END OF LINEAR TREE PROTECTION AND 50'ON CENTER THEREAFTER. 51 FOR TREE PROTECTION AREAS LESS THAN 200'IN PERIMETER, PROVIDE NO LESS THAN ONE SIGN PER PROTECTION AREA. 6. ATTACH SIGNS SECURELY TO FENCE POSTS AND FABRIC. 11 MAINTAIN TREE PROTECTION FENCE THROUGHOUT DURATION OF PROJECT 8. ADDITIONAL SIGNS MAY BE REQUIRED BY CITY OF RALEIGH INSPECTIONS DEPARTMENT BASED ON ACTUAL FIELD CONDITIONS. 9. PLACE A SIGN AT EACH END OF LINEAR TREE PROTECTION AND 50'ON CENTER THEREAFTER. 10, FOR CONDITIONS WHERE PRACTICE APPLIES-, PLANNING CONSIDERATIONS � HOWEVER FLOW SHALL NOT RUN PARALLEL WITH THE FENCE� AND DESIGN CRITERIA. 11. END OF SILT FENCE NEEDS TO BE TURNED UPHILL. 12, SEE N.C. STATE DENR PRACTICE & SPECIFICATION SEDIMENTS FENCE SECTION FOR CONDITIONS WHERE PRACTICE APPLIES� PLANNING CONSIDERATIONS. 13. SEE N.C. STATE DENR PRACTICE & SPECIFICATION SEDIMENTS FENCE SECTION. (HOWEVER FLOW HALL NOT RUN PARALLEL WITH THE FENCE) STEEL POST -WOVEN WIRE FABRIC —WARNING SIGN ;- SILT FENCE GEOTEXTILE FABRIC MIN. 10 GA. W IRES y 3 FILL SLOPE Z GRADE 6" MIN. COVER OVERSKIRT` �— E�TEN� WIRE 6' MIN. INTO TRENCH AND ANCHOR SKIRT AS DIRECTED BY ENGINEER' ' FOR REPAIR OF SILT FENCE FAILURES, USE No. 57 WASHED STONE. FOR ANCHOR WHEN SIFT FENCE IS PROTECTING CNiCH BRSIN AIR V Ivil ull VARIABLE AS DIRECTED BY THE ENGINEER -WOVEN WIRE FABRIC —WARNING SIGN — ORRNGE, UV RESISTANT HIGH • TENSILE STRENGTH POLY BARRICADE FABRIC JYPICAL� DATE: FEBRUARY 22/ 2012 TREE PROTECTION AREA DO NOT ENTER CHECKED BV: BRC REVISIONS; N0. DATE T A' lvv �' , SILT FENCE FABRIC INSTALLED TO SECOND WIRE FROM TOP ` /vv xvx FRONT VIEW M N. 12-112 GA. INTERMEDIATE WIRES GRRDE 6 COMBINRTION SILT I TREE PROTECTION FENCE STD # 40.03 MIN. iD GR. LINE WIRES 6" DEEP COARSE AGGREGATE ELEVATION �v � J FOR USE IN PROPOSED DITCHES EARTH FILL COVERED BY LARGE ANGULAR ROCK 25'MINIMUM 25'MINIMUM S A C ANNEL TOP Of BANK TOP Of BANK o w PORN Q a w STRNDRRD TEMPORRRY STRERM CROSSING Z 4011 � 'a m� a1 m 'a1 WARNING SIGN DETAIL 18•• NOTES: W G SIGNS TO BE MRDE OF DURABLE, WEATHERPROOF MATERIAL. LETTERS TO BE 3" HIGH MINIMUM, CLEARLY LEGIBLE AND SPACED AS DETAILED. SIGNS SHALL BE PLACED AT 50' INTERVALS. PLACE A SIGN AT EACH END OF LINEAR TREE PROTECTION RNA 50'ON CENTER THEREAFTER. FOR TREE PROTECTION AREAS LESS THAN 200'IN PERIMETER, PROVIDE NO LESS THAN ONE SIGN PER PROTECTION AREA. ATTACH SIGNS SECURELY TO FENCE POSTS AND FABRIC. MAINTAIN TREE PROTECTION FENCE THROUGHOUT DURATION Of PROJECT. ADDITIONAL SIGNS MAY BE REQUIRED BY CITY OF RALEIGH INSPECTIONS DEPARTMENT BASED ON ACTUAL FIELD CONDITIONS. LACE A SIGN AT EACH END OF LINEAR TREE PROTECTION RNA 50'ON CENTER THEREAFTER. MIN. 12-112 GA. j INTERMEDIATE WIRES GRADE FRONT VIEW � TREE PROTECTION FENCE 40.04 0 0 N _- SIDE VIEW i Y� W~ WQ U� ui} WQ> �Z mw lu Ul7 E L u 2"j ' NULL z�o °s 0 lw 3W STEED POST VARIABLE AS DIRECTED BV THE ENGINEER WARNING SIGN -WOVEN WIRE FABRIC —WARNING SIGN — ORRNGE, UV RESISTANT HIGH • TENSILE STRENGTH POLY BARRICADE FABRIC JYPICAL� DATE: FEBRUARY 22/ 2012 TREE PROTECTION AREA DO NOT ENTER CHECKED BV: BRC REVISIONS; N0. DATE A' lvv /vv xvx ORANGE UV RESISTANT HIGH - TENSILE STRENGTH POLY BARRICADE FABRIC �TYPICAL) MIN. 12-112 GA. j INTERMEDIATE WIRES GRADE FRONT VIEW � TREE PROTECTION FENCE 40.04 0 0 N _- SIDE VIEW i Y� W~ WQ U� ui} WQ> �Z mw lu Ul7 E L u 2"j ' NULL z�o °s 0 lw 3W STEED POST -WOVEN WIRE FABRIC —WARNING SIGN — ORRNGE, UV RESISTANT HIGH • TENSILE STRENGTH POLY BARRICADE FABRIC JYPICAL� DATE: FEBRUARY 22/ 2012 DRAWN 8Y'. MET CHECKED BV: BRC REVISIONS; N0. DATE NOTE: FOR TREE PROTECTION ONLY PROJECT NO.. H9001,00 SCALE: NTS zA I NOTES: N W z 1. PUT SI�TfENCEORTREEPROiECTIONfENCEUPTO W 0 N ., � z g EXISTING ENSURE CON3TR�CTIONENTRANCEISUSED. � W 0 ° ' ROADWAY BOLLARD OR W� N Q �" N } Q 2 IF CONSTRUCTION ON THE SITES ARE SUCH THAT THE MUD TRAIL w VIVII � IS NOT REMOVED BY THE VEHICLE TRAVELING OVER THE LL o n � k ? 2"� w o w STONE ,THENTHETIRESOFTHEVEHIC�EMUSTBE STOP SIGN GREENWAYiRAI� HINGED BO�IAR� LL w � Y Q � ° �7 �D �T WASHED BEfOREENTERINGTHEPUBlICROAD. BOU��ER INP.I SEE DETAIL w� }� m F J m Q r� � Q� p 0 �m mho BOULDERS TO E SUPPLIED PAINT STRIPE- SOLIDYELLOWLINE2" � amm m Z D 0 3IfRPROJECTCONTINUE3i0PU��MUDNNDDEBRISON BY CITY OF RALEIGH TRANSPORT AND PLACEMENT BY CONTRACTOR � N N z TO THE PUBLIC ROAD, THE GOVERNING AUTHORITY WILL �D NO CLEAN THE AREA AND INVOICE THE FINANCIALLY — 2 " YELLOW PAVEMENT � mm RESPONSIBLE PERSON AS INDICATED ON THE FINANCIAL MARKING � � FW f% v" V V'v'tl v � RESPONSIBILITY fORM. I 2 "EXPANSION J OINT �SEEDETRI�3,THISSHEET) � z "I 1v v V I WHEN TIEING TO TIE TO EXISTING g�a � pU u> I PLAN CONCRETE SURFACE CONCRETEIASHPALT 5FT RADIUS UNLESS 0 0 25'OR FULL WIDTH OTHERWISE NOTED r OF PROPOSED STREET NEW CONSTRUCTION OR ENTRANCE, EXISTING ROADWAY _ ----------- 10 FT. WHICHEVER IS 75'MIN. 25'MIN. GREATER. 12" MIN. PLAN VIEW 6 "MIN 0 oc 0 0 r � �'j Y� FABRIC UNDER STONE ui ~ WQ c ONSTRUCTION ENTRANCE GREENWRY ENTRRNCE TRAIL OBSTRUCTION WITHIN PAVEMENT MRRKING � � 1 2 3 NOTE: SEE 2009 MUTCD ui} Q 3 uj 111 BEVEL 450 JYP) �4 61IX311 X ! -411 ---- STEEL BOLLARD BOULDER �TYP.� 6 "x 6 "POST,— ro � � - 3IIX1 3"All � 'a5'-6 W "CLFAR 5'-6 "CIENR S.Y.P. PRESSURE TREATED FOR 7��^ STEE�P�RTE �s'� HOLE FOR ACK WELD PIN CAP � � _7�/ IL 11 GROUND CONTACT (SEE SPECS� a LOCK 112 DIA, TYP. ip r u �'e TOP OF "' �N � LOCK CONCRETE FOOTING TO FINISH GRADE m7'g 1 "X10 "STEEL 7, DRAIN AWAY HINGE PIN '9 FROM BOLLARD STEEL PLATE BOLLARD HINGED BOLLARD Y2 r SEE DETAIL AT RIGHT HOLE FOR Y4 LOCK PIN co FINISHEDGRRDE � lOCK112 "DIA LOCK B STEEL PL�TE I Y 4 HINGE PIN� � 00 HINGE PIN / 3 11 M12„ - - - - - - - - - - - - `- N CONCRETE STEEL PLATE - _X11311= 11EII�1131EII�1�11311 =III �" 11�1�1�11= III= IIEII�IEIIEII�I�IEI IIi�1�11311�1�1�11= III= IIEII�IEIIE � 11EII�11= 11EIIEII�I�IL- CONCRETE- - IIEII�11311: �p A " FOOTING7 2-672-67211 � _ - FOOTING - = m F � RIIa11= 11FIIRIIaIFIIRIRIla11= III= 11RIpIFIIFIIRIpI i E R R TYP. < 114 } � : B � 4" LOCK PIN 2 X1 � , m ON Q w ��� �00 " GRAVEL BASE COMPACTED ;Xq l< zti p 6z4 �om Q ii_u�uou�u�T� UBGRADE PLAN W W i n Q a iucF�3 N 21-611 QUARE FOOTIN SECTION A-A SECTION B-B HINGED BOLLARD & BOULDERS PERMANENT BARRIER WOOD BOLLARD HINGED BOLLLARD NOTE: BOULDERS PROVIDED BY THE CITY Of RALEIGH 4 BOLLRRDS B'-0" CTR TO CTR p � B PROPOSED SAFETY RAIL 71-7" FACE TO FACE POST CAP� 2" C 61-611 T � 10!z" A B PRELIMINARY PLANS 54 DO NOT USE FOR CONSTRUCTION 1''z "X5!7' RAIL a C 6" LG. PVC SLEEVES TYP. 6 11 11 6 0 N � �4� #4 RE-BAR CONT, NW uW, � FINISHED GRADE I2I #4 RE-BAR @ 11-611 CTS, DATE: FEBRUARY 22, 2012 > 142 DRAWN 8Y'. MET — 30 CHECKED BV: REVISIONS; BRC '!�IIQII �Ir��t III �I�IFI 9 NO. DATE -�I CONCRETE FOOTING 1 61 18 "MINIMUM NOTES', J z 1. FENCE TO BE MASTER HALCO THREE -RAIL RANCH STYLE ----- GRAVELBASE 3C`R�P � FENCE WITH NOMINAL 8'SECTION LENGTH 1 .011 —III LO FOOTING WIDTH TO BE j2X� POST WIDTH. MINIMUM PROJECT NO,: GENERALNOTES 'K'DIMENSION DEPTH 3011, 1. ALL CONCRETE TO BE 3600 PSI COMPRESSIVE STRENGTH 2 TYPE OF PIPE TO BE USED IS 1-518" MAX. O.D. BLACK IRON, LOW CARBON PIPE 42" SAFTEY RAIL: X : 11-211 H7OOl�OO 3. ALL JOINTS TO HAVE A 2" FILLET WELD, 48 " SAFETY RAIL: X =1' -0" SCALE: NTS 4. ALL METAL SHALL BE GALVANIZED PER SPECIFICATIONS. 5 42" OR 48" SRFETY RRIL SRFETY RAIL EMBEDDED IN CONCRETE TRRIL 6 DETAIL FOR WHITE VINYL FENCE 1 � B TEMPORARY SEDIMENTATION BAG EXISTING TERRAIN SCOPE DRAIN INLET NOTE: PROVIDE STABILIZED OUTLET TO STREAMBANK 01111u unu%) IMPERVIOUS DIKE. THE WORK COVERED BY THIS SECTION CONSISTS OF FURNISHING, INSTALLING, MAINTAINING, AND REMOVING RN IMPERVIOUS DIKE FOR THE PURPOSE OF DIVERTING NORMAL STREAM FLOW AROUND THE CONSTRUCTION SITE. THE CONTRACTOR SHALL CONSTRUCT AN IMPERVIOUS DIKE IN SUCH R MANNER APPROVED BY THE ENGINEER. THE IMPERVIOUS DIKE SHALL NOT PERMIT SEEPAGE Of WATER INTO THE CONSTRUCTION SITE OR CONTRIBUTE TO SILTATION OF THE STREAM, THE IMPERVIOUS DIKE SHALL BE CONSTRUCTED OF AN ACCEPTABLE MATERIAL IN THE LOCATIONS NOTED ON THE PLANS OR RS DIRECTED BV THE ENGINEER. ACCEPTABLE MATERIALS SHALL INCLUDE BUT NOT BE LIMITED TO SHEET PILES, SANDBAGS, ANDIOR THE PLACEMENT OF AN ACCEPTABLE SIZE STONE LINED WITH POLYPROPYLENE OR OTHER IMPERVIOUS FABRIC, EARTH MATERIAL SHALL NOT BE USED TO CONSTRUCT RN IMPERVIOUS DIKE WHEN IT IS IN DIRECT CONTACT WITH THE STREAM. NO DIRECT PAYMENT SHALL BE MADE FOR THE WORK OF INSTALLATION, MAINTENANCE, AND REMOVAL Of IMPERVIOUS DIKE S AND RELATED WORK RS DESCRIBED IN THIS PROVISION. PAYMENT FOR SUCH WORK SHALL REDISTRIBUTED AMONG THE VARIOUS PRY ITEMS. I , W H uj Z W Z uj 0 z < r� � a Q Q� UJ� N N� UW Q � U� W ZVI O WO � W W �QWUO � LL dmUlOL01 � Z H U � Y U U 0 Q � QW 0 m u > Y� ui~ TEMPORARY SEDIMENTATION BAG S �; UJ THE WORK COVERED BY THIS SECTION CONSISTS OF FURNISHING, PLACING, AND REMOVING A TEMPORARY SEDIMENTATION BAG S) RS DIRECTED BY THE ENGINEER. U THE TEMPORARY SEDIMENTATION BAGS) SHALL BE USED TO FILTER PUMPED WATER W } DURING THE DRILLED PIER OPERATION, FOOTING EXCAVATION, ANDIOR CULVERT OR W Q PIPE CONSTRUCTION, THE FILTER FABRIC SHALL MEET THE REQUIREMENTS OF SECTION 1056 FOR TYPE 2 � z FABRIC, m W SEDIMENT CONTROL STONE SHALL MEET THE REQUIREMENTS OF SECTION 1005 AND W SHALL BE CLEAN OF DIRT AND DEBRIS. INSTALL STONE ACCORDING TO THE DETAIL SHOWN ON THE PLANS, U THE TEMPORARY SEDIMENTATION BAG S SHALL BE A WATER PERMEABLE FABRIC BAG THAT TRAPS SA SILT, A D FINES RS SEDIMENT LADEN WATER IS PUMPED INTO IT. THIS DEVICE SHRLL BE CONSTRUCTED SUCH THAT IT IS PORTRBLE AND CRN BE USED ADJACENT TO THE DRILLED PIER OPERATION, FOOTING EXCAVATION, ANDIOR CULVERT OR PIPE CONSTRUCTION, THE TEMPORARY SEDIMENTATION BAG S SHALL BE A BAG CONSTRUCTED TO A MINIMUM SIZE OF 10'X 15'MADE FROM A NONWOVEN FABRIC, IT SHALL HAVE A SEWNmIN 8 IN. MAXIMUM SPOUT FOR RECEIVING PUMP DISCHARGE, THE BAG SEAMS SHALL BE SEWN WITH R DOUBLE NEEDLE MACHINE USING A HIGH STRENGTH THREAD. THE SEAMS SHALL HAVE A MINIMUM WIDE WIDTH STRENGTH RS FOLLOWS; TEST METHOD MINIMUM SPECIFICATIONS ASTM Dm4884 60 LB11N THE A CONSTRUCT THE BAG SHALL BE STABILIZED TO PROVIDE RESISTANCE TO ULTRAVIOLET DEGRADATION AND MEET THE FOLLOWING SPECIFICATIONS FOR FLOW RATES, STRENGTH, AND PERMEABILITY. PROPERTY TEST METHOD UNITS MIN. SPECIFICATIONS SPECIFICATIONS WEIGHT GRAB TENSILE PUNCTURE FLOW RATE )RAIN PERMITTIVITY UV RESISTANCE DRAW DETAIL FOR CULVERT CONSTRUCTION AT WET STREAMS AND DITCHES ASTM D -3]16 OZND ASTM D•4632 LB ASTM D•4833 LB ASTM D•4491 GALIMINISF ASTM D•4991 11SEC ASTM D•4355 °lo } m 0 W Q a W a Z Q J a L u r� � 0 C = n °N v N�r, 6 co 00 3W Nff"' THE CONTRACTOR SHALL INSTAL THE TEMPORARY SEDIMENTATION BAG IN ACCORDANCE WITH THE DETAILS IN THE PLANS AND AT LOCATIONS AS DIRECTED BY THE ENGINEER. PRELIMINARY ;, PLANS THE TEMPORARY SEDIMENTATION BAG S SHALL BE PLACED SO THE INCOMING WATER FLOWS INTO AND THROUGH THE BAG WITHOUT CAUSING EROSION, THE NECK OR SPOUT Of THE BAG SHALL BE TIED Off TIGHTLY TO STOP THE WATER FROM FLOWING OUT Of THE BAG WITHOUT GOING THROUGH THE WALLS, THE O N ( S EDIMENTRTION BAGS) SHALL BE REPLACED AND DISPOSED Of WHEN IT IS 314 FULL OF SEDIMENT OR WHEN IT IS IMPRACTICAL FOR THE BAG TO FILTER THE SEDIMENT OUT AT A REASONABLE FLOW RATE, PRIOR APPROVAL FROM THE ENGINEER MUST BE RECEIVED BEFORE REMOVAL AND REP ACEMENT, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING R SUFFICIENT QUANTITY OF BAGS TO CONTAIN SILT FROM PUMPED EFFLUENT DURING THE DRILLED PIER OPERATIO OOTING EXCAVATION, ANDIOR CULVERT OR PIPE CONSTRUCTION, TEMPORARY SEDIMENTATION BAG (S) WILL BE MEASURED AND PAID FOR PER EACH, THIS PAYMENT WILL BE FULL COMPENSATION FOR ALL WORK COVERED BY THIS PROVISION, INCLUDING BUT NOT LIMITED T0, FURNISHING ALL MATE A S, PLACING AND MAINTAINING THE TEMPORARY SEDIMENTATION BAG S, AND REMOVAL AND DISPOSAL OF SILT ACCUMULATIONS AND BAG, RTE. FEBRUARY 22, 2012 RAWN 8Y'. MET NECKED BV: BRC EVISIONS: N0. DATE PROJECT NO.. CALE: NTS 2c + , Pracke Standari, and3pecijicatiunr � Practice Standards and Sperocadons Table VI)a Seeding mhre Table 6,10b Seeding mixture Table 6,10c Seeding mixture Tkle 6,11 k Seeding miture Temporary Seeding Species Rate (Iblacrej Temporary Seeding Species Rate (Iblacrej Temporary Seeding 3pcies Rats jlblacre� Seoding No. I P for; Steep SpRik' Raie pblacrej Recommendations fof Lana Rye (grainj 120 Recommendallons for German mille� 40 REcommendations for Fall R�e Igraln) 120 Slopes or Poor Solls; Low Till fescue 100 Winker and Early Spdng Annual lespedeza �Kobe in Summer LL Mainlawce SerICes leS�2d828 30 dmUlOL01 Piodmanf aid Coaol Plah H U in the PiklmoN and Mourtiams, a smaB•s#emmed Sudangzs gay be � Seeding dales Kobe fespdera 10 Y Wean in @,louot�ins� 50 subslituted at ra1eo(5Olhlacr2. Montaios— Aug.15. Dec, 15 Q � QW WO Plan an0 Pis�monl,4ag.15 • Dec. 30 Seeding notes 0 Omit annual #aspetleza when duration of iemporary cower is not �o Ssediog dales Mou�fains—May1S- Aug.95 Wl iwdmenls 1. In Eastern Pietlmonf, 425(blacrePensaoola Bahiagrassor10lbl aaecommon Beim udqass. Use common Bafmudagrass only wlere exi2od beyoptl June. Piedmonl— fay i -Aug. la Fallow soil ids or ably 2,OM Vaae ground agacuhuial limssfona it is 41kel� to berme a p2si, Seeding k9s Coastal Plain —Rpu, 35 • R4. 95 and 1,000 Iblacre 10.3 -10 feqilaer, 2. Ater Aug, 15, use u�seaik seicea sped, Mou�6a�s�boue 2500 i�t: Feb. 15 •May 15 SCI amendmpr� Mulch 3. Where a Deaf �pearanco is desired, amil sericea and su6siitule4D Below 25D0le el: F�.1•May1 PiedmonWan.1- May I Follow raromm�d�i�sof soil �storapp1y2 ,0001blacregrou� A�I,y4, 00pIblactsslr�w. Rochotsl&wbyfackipgw�hasphalt,netting, Iblac�s Bahia ray or 1 � Iblac�a Bermuda s� � � 4. To 2�t�d spring seetlir� dales i�lo 3u�2, add 15 Iblaae hulled Coastal Plain -D�c,1 •Rpt� 95 agia�llural limestone aid 7501b1acra 10.10.10 f�rtilizec or a malr� anchoring fool A disk w�h blad� �t neady slraigM ray be Bem�dqas, �lowevar, it � preferable la s�tl E2mporary cover and Mulch used asa mulch an�h�ing fod, seed fescue in Sept Salamandme�s Follow recommenda�o�s of soil 1a�s or apps 1,000 �biaa�e ground Ap�y4, 000lbfaaeslr�► u. ar�horsfrawbyiackingwifha�haif ,ne�ng, Maintenance Nurseplan�s #CuNfal limasto�� and iSQ 1�1�re 10.10.10 fe�daer, of a mulch an�o�g fool. Atlisk w�h blades sei nearly saaight cap b� Rapa� and ra��ili�a damaged arcs �mediatelg. %pdr�s with 50 Between May i aid Rug.15, add 10 Iblacre German millet or 15 IbI used as a mulch ardhodng tool, Nacre of nkcgeo in March. 11 it is wessary � exlenl tampora� acre Sudan ass, Prior fo day 1 or after qug.15, add 40 Iblacre rye Mulch sonar beyond June 15, oversaed wb 50 lblacre Kobe (Piedmd and �graln), 4ply 4,000 lbkm s1taw. Anchorsiraw by laftg Ah asph4, nelling, Refa�iliYerfgrowlhis�otfu�yacfe ,quake. Reseed,r�3e�iE�e and mulch Coas�l P�iR� or Kor�a� ftun�ains� lespsdera in late February or Qa�yh9arch. era mulch anchor�g fool. Adislc w�h blades set nearlyslraghl can be �nmedialaly following erasion or other damage, Seeding dates 4ssd � a mull ancha��g tool. Mainf�na� Besl Possible Re��ili�eilg�ou�hisnoff�l�adepuat�, Reseed, refeNlize and mulch Fall: bug, 25- Sept 15 Aug, 24.Oct25 irnmediafely following erosk or dhEr *age, Lie Wi►ier Feb, 15 • Mar, 21 Fah.1 -4t. 15 E811 is bell for fall fescue, and lespederas in We kler, puerseedirg piKoIx iespeka over fall - seeded lalf fescue is very effecfiva. Use Adled Bermudagmss seed in fall. Sail amendments Apply lime and felilizer accotding to soil tesfs or apply 4tXO Iblacre ground agricullu4 limestone and I ,000 Tacna 40.10-10 felilizer. Mulch Apply 400-57040 Iblws g* straw or equivale�t coue� of anothef suitable Mulching material, Anchor mush by fack�ng with asphall, rouirig,ornettiog, NettingisEhepreferiedankringmefhodon sleep slopes, Malntenance ReferGEizein1he second yexun�essgrowchisfullyadequafe. Maybe yawed once ofNce a year, bu# mowing is not nanssary. R2soed7 kilite, and mach damaged arias immediately, �Refer io APP andix $.02forbolaniol mmQS, Gf0,4 6.1Q,� 6,19,6 b,1f,19 Proedee Standards and Speeiculions Practice Standards and5pecocafiw Table 6,191 Se4ing mlulure Table 6.19m Seeding mixfure Table 6.99n Soedingmixture Tible 6.910 Seeding mlxlure Seeding No, 2P for: Gentle Species' Rats { Seging No. 3P for, Gentle 5gOclOs' Ralo (IblweJ Seeding No. 4P for-, Gentle Species' Rats (Iblaclt) SeedIng No, 5P for: Specie' date (Wacref Slopes, Average Soil; Low Tall fescue 80 Slopes, Soils Ah Average 8le�d of (wo [urf•lype tali Slopes, Sails kmewhat Byrd of 56 °fo KY-31 fall fescue Grass,lined channels Tall fescue V (4.5 I0 1000 Ma0enance Sericealespedeta 20 arBafierMoislure fescues(90%jandtwoor Wormer or Drier Phan 3P,or and 50°lo mike o!twoor purse pl�n� Kobe I�p�eza 10 Retention, more improved Kam�cky ! wlth physical LlmiiaPia�s; more turf -hype tall kscues 2�0.2� Cooler Sides; Nigh bluegrass va�efies X169'0} 200 -250 High Malolenance Or Beiv een May 1 and Aug, 15, �tl 151Nacr� Suda�g�ass or 1� lblacr� Seeding ��e� Maintenance � Bleed o(t�r� or mop tu�.�p German millel, Prior to May 1 or offer A�g, 15, add 40 lblacre rye 1. Aer Aag,15, use unscariified s6rea seed Seeding dales � tall iesaues 200.25 Egrain� 2. Where p2n'odic mowing is plan* oranEat appearance isdesired, � amilserirea and kieaseKobe lespedezafo9Q IblacN. ��f Posslbl$ � Seeding dotes Seedlng dais 8esl�ug,2�•0�. 3. To extend sprig �e�'ng dates iota dupe, add 15 Iblacre hulled Be�mudagrass, However, aft mid-Apr. it i5 pref2rablo fo sped FAIL' Aug, ��Sspi,1� Aug. 0 -Ock2� ! Possible �ossible;f2b,•Apr.1� �mpota� cower. � lNi�ter. — Feb. I • Mai, 31 1`811. Rig, 2S • Sept 15 Aug.20. Oct 25 Avoid seeding from Nov. fa Jai, if seeding must b2doi� 84fhis tme, Nurse plants For gGalily lug, avoid spn'ng siding. Where grading is complk I Wider — Feb, 1- Mar. 31 add 401b1acfe �E grain and use a charnel Going �ai oflers maximum 9eiweep May 1 and Aug, 15, add 10 Ib1acie Gefrra millet or 1 � V dOng data windar a spring, an ahemalive is to seed 30 Vacie Kobe prolecfion aye Sudqtass. Pia fo May 1 or Aer Aug. 15, add 40 Vacre rye iespetleza, keep sowed, pfepafe seeded, and sk a permaienl For qoalily turf, avoid sp�►g seeding. Where grading is compleW {grainj, r��luro iR early tall, during fad winter or spring, an alfer�aliue � fa seed 30 �lac�e Kobe Soil amendments I%pEdeza, keep mowed, pmpara se�b¢d, and seed permaqen1 4p� limy and felliter anrding � wil lists, or apply 4,000 Iblaae SeedIng dates Soil amendments � miKi�re bei�e� ��, 25 and �ept� 1�, gmund agriculpural limesiope a� 1,000 �1acre 10.10.1p ie�iliiac Rely lima and fedl;zeracoording to soil Ws, or app1y4,0001blacre � Ope �i� Pillage quipmentaeross�ewatenvay, Best passlbla g[ouod agricuIluraE limesfame and 1,000 INacre 40.10.10 fediiaer, $oil amendments Rp�p lime and f�tiU� ac�r�'�g to sal les1s or ably 4,006 �1aae Mulch Fall: Aug, 2� • SepL 95 Aug. 20.Oc1, 2� Mulch ground agdcu�►al �mesfo�e a�tl 1,0� �bfaae 10 -1 a10 fe�ilizer, Use a rolled erusioi co�Ual product to couEr the 6�lom of channels Late Wine. Feb, 15 • Mar, 21 Feb.1 -Apr. 15 Apply 4,000 �1aae small grain slaw or eqdvalenf cover of anofhor and ditches, a�d saple securely, The lining should 0end above the suable mulch, A�k s�awby4acking Qh aspha�, PkAg, fovng, or Mulch highest calculaied depth of haw, On channel side slopes above tlhis Fall is 6es1 fori�t fescue and tale winder lof lesodws. Ovemeding by crimping with a mulch anchoring tool A disk with blades set nealy Apply Q,00 Ib' &gyre fain straw x Qqu�al�i cover of ar�h�r sui�able hei#, and in dra�ages not �egoir�g f�mporary llnipgs,apply 4,004 of Kobe lespedeaa overialkeeN tall fescue is very ellective. sfralghf can 6e used as a mulch antring tool, mach. Anchor straw by king I'1h asphalt, roving, nding, or by Iblacre grain slaw, and archor s�faw by s1spling neNing over the top, Sail amandme� Nlai�ie�a�ce crimpirg witl� a mulch anhoring tool. fl ask with bides sef neatly s�aighl ray be used �s a mulch an�anng roof, Mulch and anhori�g �tE�als mud ool he allowed to wash down Apps lime and ferlilir�rar�ordiog to soil ios�, o� apply 4,0W nacre f act�td�g to sal �2sfs otapply 40 lbl8m nitog�► in Jan, or slopes where l�yca�dagdrai�agadavices, g�und agdcultural limeslane and 1,N0 Vacre 10- 10. 10 (edilizer. Fib., 401b in Sep1., and 40 Ib i� Nov., ftom a 124.8,164.81 or similar Mwtenance larf foiilizer, Avoid (actilizer applications du�ng wpm weather, as this Fe�il:,ae accotdiRg to sail Pests or apply 40 Iblac�a n�ragao in Jan. or Maintenance ���� increases slab losses fo �sease. Mop la a heigh( of 2.��,5 ipcfes Feb,, 40 Ib in Sept,, a� 40 lb � Nov,, iroa a 12-4, 164-8, or similar Inspr�f and repair mulch (req��lly Relertilite in late winter o� the apply 4,000 I�lacre grain sh�aw ar equivale�f suer of a�ofh�r su��le �s �ee�2d. R�926d, i�t�9, aid mulch damage a�aas imm�ia�ly. turf f�r�lizer. Avoid �iiGze� appliGabo�s tlu�►g wpm wealhe {, as tallrnving year, use soil ies� or apply 150 INacre 10.10.1. Mir mule. Rn�hor straw by tac�pg wig �p�al� neltmg, or roving � ay this kreases s�an0 lasses to disease, Reseed, f��ille, and mulch �egu:a�� 10 a height of 2� inches. crimping wilh a mulch anchoring fool, A disk pith blades set n0y damage areas immediately. Maw to a height of 2,515 inches as slraighE can � used as kh aochoingtaol, 'Refer toapp6fldix 02for bola oiCal names. needed. 'Refer to #endix 8.02 for bolanical games. Maintenance Reldifize iP tlhe seooRd year unless growh is fully adequate. May N 'Refer �o Appendix 8.02 for boanical games. mowed once or lurice a year, buI sowing is no! necQSSa�, Reseed, Wilite, and mulch damaged area immedialehy b,1120 'Refer lo Appendix 8,07' bOl2kal names, 6,11,21 6.11012 61113 TEMPORARY AND PERMANENT SEEDIN CHARTS I , W H Uj Z W Z Uj 0 0 z < � a Q Q� Uj N N� > UW Q � U00 W ��OZVI O WO W W �QWUO � LL dmUlOL01 � Z H U � Y U U 0 0 Q � QW 0 } m 0 W Q a W a Z Q J L Y� Uj~ UjQ U� Uj} UjQ> z Uj LU U0 L L U � 0 r = n°Nv �' NN�L U �� °s 3W PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION RTE. FEBRUARY 22, 2012 RAWN 8Y'. MET NECKED BV: BRC EVISIONS: N0. DATE PROJECT NO.. CALE: CHARTS FROM NCDENR PRACTICE qTA I n AQ n q A N1 n SPECIFICRTIONS (REV 606) 2D I LIST OF PIPES ETC. (FOR PIPES 48" &UNDER) uj � W �p z uj zF z o 0 g ENDWRLIS } w m ABBREVIATIONS- F W 0 o a Q W � n > Qm � �H N a Q "0 w k w LL o? n STD. 838.01, STRTION Z CLASS IIIR.0 PIPE BITUMINOUS COATED C.S PIPETYPEB HDPE DOUBLE WALL . . LL tX �Q � N FRAME,GRATES C.B. CATCH BASIN o � ^ i N p p �UNLESSNOTE�OTHERWISE I �UNLESS N OTEDOTHERWISE I � STD. 838.8a z�o �� � D. R 4 00 7 W4 (rc 0 z 0 0 PIPE �UNLESS D� J+ 00 F Q F " o STANDARD 840.03 � D.I. DROP INLET m � } m<m Z am Q NOTED �p N Q? 0 o � o � a co G.D.I. GRATED DROP INLET � > > ORWISE F a 0 G.D.I. G�I�N.S� DROPIN�ET W ,� � w w � W W w w IN> F N F N uFi N 3 NARROW SCOT) u p LI. N FT. SIZE Z 0 w a F � F � a 1211 1511 1811 2411 3011 3611 4211 4811 1211 1511 1811 2411 30" 36" 42" 46" 12" 15" 18" 24" 3011 3611 4211 4811 QQj CU.YDS. 0 W Q m J.B. JUNCTION 80X `� b�, F 0 F p 0 F W z W z � N F � � W D � q g 0 a� � W M.H. MANHOLE � � um q � F J 0 N F ° W >° ° rl o� B.D.I w T TRAFFIC BEARING DROP INSET z u THICKNESS OR GAUGE 2 a � Q a 00 OfGRRTE TYPE 0� N T.B.J.B.TRAFFIC BEARING JUNCTION BOX � j �a 0 LLF 0 a o 0 0 , 0 r 0 o o p 0 W o b o m 0 o REMARKS E F G a N - Y2-30 +00 Cl 1 176.20 116.00 32 •Y2.35 +80 CL 2 178.20 178.00 40 •Y2.61 +35 CL 3 114.90 114.70 80 DUAL36" HDPE - V2-19 +20 CL 4 177.20 177.00 96 D1 - 1 1 1 1 CL 1]2.80 171.80 48 I ui~ - Y2-89 +30 5 UJ - Y2 -96 +90 CL 6 180.10 178.00 32 -Y2- 102+90 Cl 1 113.00 172.50 36 •Y2.125 +00 CL 8 1]5.50 112.90 32 -V2Reu1-136 +50 CL 9 170.00 16).90 32 I ui [� uj •V2Reu1.131+65 Cl 10 112.00 170.00 36 >1 LLL /7 •Y2Reu1.141 +40 CL 11 110.80 169.50 36 •V2Reu1.162+65 CL 12 112.30 171.90 36 M III LLI u� •V2Reu1.169 +95 Cl 13 112.50 112.00 32 Q W -Y2 Rev 1-181 +15 CL 14 168.80 166.70 44 TOTALS 136 196 12 124 84 u } $ 1L m m° aQ N Ln api °z3 W WAS' W aiucF�3 ol F g a I,i�'vn�ii PRELIMINARY PLANS DO NOT USE FOR CoNsm,Ureios DATE: FEBRUARY 22, 2012 DRAWN 8Y'. MET CHECKED BV: BRC REVISIONS; N0. DATE PROJECT NO.. H9001,00 SCALE: NITS 3 SS SS ss BEGIN PROJECT BEGIN CONSTRUCTION -Y2- STA 10 +60.00 (N n1i ,r 10 +00 11 n �y N N m N N m ro COMBINATION FENCE PP� pis 0/ ti0 �i tih I , W H uj Z W Z uj 0 z < � a Q Q� UJ� N NN UW Q � U� W — � O OZVI WO W W �QWUO � LL dmUlOL01 � Z H U � Y U U 0 Q � QW 0 m u > i r t tt It 1 i 1 alt. m 1100® 110 I 1'' 1' //—� 01 PC SfGol5 +64o42 s PT SfcoI5 +15o93 N 0 0 ODy f; f -1 a +oa.oa ENO 10'APP sus BEGIN BOARDWALK a� n 00 O �\ O ln'y, S m W Q a W oC a z Q J a E L u �o r = n0NI �' N�r,6 0 U�00 °s M M 3W IN i i - IL I Jv,vv rJU,UU I'I = 14t7U,UU -IL- 11 TVV,VV El = 187.70 V it = 192.10 i EL = 190,42' EL = 191,11' EL = 191,63 cc INT MH �MH 25Al -Y2- 5TA, n +7394 cc INT MH MH zs �MH I- 15,0000% CT p H P4� VC = I00/ 0/ A ��l� 84 �Off PPROXRIME19191 OffSEi44.09Ri 19 �-1400QO� ^oo RIM [1, 192.11 � APPROX INVERT EL110.6 RIM iL 192.11 OffSiT4038 RT �- I3,0000� � INVERT IN EL 163.46 INVERT IN it. 163A9 RIM El, 18948 INVERT OUT E1.163.46 I INVERT OUT it. 163.43 INVERT IN it. 163.02 INVERT OUT E1.163.02 I- Il,0000� f +10°3644% I +10, 90070 _ _4350% __r -- _l- 10,8000— _ _ _ _ _ _ _ _ —.� _ _ (-JO,�000% � no PRELIMINARY PLANS _v mom move No 0" Opp mm-mmw-mm ftb momm NINE NINE[ 0000 001 no Olt -Y2- 5TA, 16 + 86-58 � 0ROX ROCK • ... , . • • ,. 00 8' DIP WATERLINE ,% OfFSiT 16.94 IT � tOCATION � � 42_ STA, i9 +si.sa APPRON.RIM El, 188.13 oFSIr 14,68 Rr �OCAiION APPROXIMATE aPPROH iNVERi El. 170.53 r A I a� _ 20 +00,00 �•' �,.� APPROX. RIM E1. 189.98 I Et - �g9,�a P1 _ 16f50,OO �� � � PPROX INVERT E1. 170.54 III � 80 DATE: FEBRUARY 22, 2012 811 FM J� EL = 19250' III �I III III PI = p � _ �0 +20,00 DRAWN BY: MET 10CATION I III � EL = 189.60 APPROXIMATE �/c = 60 ' � - - -- �______ EL = 189.401 CHECKED BV: BRC �r � �IIIII XISTING 42'PVC (EWER III EXISTING 421'�VC SEWER REVISIONS; ---- � - - - -- �`�-------------- ��----- - - - - -- �7O N0. DATE III III PROPOSED 72'PVC SEWER PROPOSED 72'PVC SEWER 72' PROPOSED SEWER PI = 20 +30.00 PI = 20 +40. 6 PROJECT NO,; EL = CROSSES UNDERGREENWAY 42- 11 -S4.8S 189.10' = �88,%O^001'00 AT THIS [OCATION [XISTING 42" SS J -Y2 -16 +66.11 APPROX it. 110.64 INVERT it = 163.41 150 SCALE: r =so' 11 +00 12 +00 13 +00 14 +00 15 +00 16 +00 11 +00 18 +00 19 +00 20 +00 21 +00 171, OD N Q zi +oo ti `f tjt r� 0 %ft ,� OAF 1.105 01 �� n DISTURBANCE V I I Imo/ r,. ,`11� \ �. \ i� l \!n` All p1pik 1^101 t'tl ilk A" 1 �� ll, V� tl Jk 7w n , 00, Ir.......................... ........... c 5 r, E l NI F 0 E 22 +00 23 +00 - 0 Irt, LQ T I/, - w ) jo 0 /0 24 +00 1 t1� X /M�/ COI OI O 00 1 \ Q 0 � o' `, \ 00 oy � 100 ° r. 004 lOp ooS 100 ooS wvvvvvto 25 +00 26 +00 21 +00 10 � , , OOS 0 p, Q� X11 X�� " -y2- 5TA, 32 + QG �� END 10'APP 51A Q` �\ BEGIN BOARDWALK 2 ho° a�G 42- srA.33 +zo.so PRC Sfa.33 +11,98 END BORRDWRIK 2 BEGN ID'RPPSNB I , ���1, �� + 1 uj BEGIN BORRDwRIK 1 H uj Z uj z W 0 z < DRAWN BY: MET H uj 0 J 0. I < j 0 UJ J N — — — — — — — H N� U > Q NO. UJ U Z N Z [L 0 WO w uj om < 00 m 4 LL uJ �q J 0 III dmUlOL01 H Z H u ui 0 U b`6� b���� 0 U Q 42- � �. El= X � z u 0 m VC 50/ u > 15O SCALE: 1 " =50' LL 32 +00 {r X LL ,� OAF 1.105 01 �� n DISTURBANCE V I I Imo/ r,. ,`11� \ �. \ i� l \!n` All p1pik 1^101 t'tl ilk A" 1 �� ll, V� tl Jk 7w n , 00, Ir.......................... ........... c 5 r, E l NI F 0 E 22 +00 23 +00 - 0 Irt, LQ T I/, - w ) jo 0 /0 24 +00 1 t1� X /M�/ COI OI O 00 1 \ Q 0 � o' `, \ 00 oy � 100 ° r. 004 lOp ooS 100 ooS wvvvvvto 25 +00 26 +00 21 +00 10 � , , OOS 0 p, Q� X11 X�� " -y2- 5TA, 32 + QG �� END 10'APP 51A Q` �\ BEGIN BOARDWALK 2 ho° a�G 42- srA.33 +zo.so PRC Sfa.33 +11,98 END BORRDWRIK 2 BEGN ID'RPPSNB I , ���1, �� + 1 uj BEGIN BORRDwRIK 1 H uj Z uj z W 0 z < DRAWN BY: MET H uj 0 J 0. I < j 0 UJ J N — — — — — — — H N� U > Q NO. UJ U Z N Z [L 0 WO w uj om < 00 m 4 LL uJ �q J 0 III dmUlOL01 H Z H u ui 0 U b`6� b���� 0 U Q 42- � uj El= 179.65 E� _ �915 z u 0 m VC 50/ u > 0 Y� ui WQ U� W} WQ> �Z mw QW Ul7 E L u ri 4j n0NI > N rLn s rV) 41 , 6 0 u co 00 z 40J w N wv I I vi it CL I�Ioff II11LNI III LL, IUL.IJ 63 IT INVERT OUT 11. 162-75 PRELIMINARY PLANS 919 . DO NOT USE FOR CONSTRUCTION 11,169,59 1 IT El 1LO A A 0\1 00 0 �o 1 v 0 I I ���1, �� + 1 4�111111111r909% BEGIN BORRDwRIK 1 . �. DATE: fEBRURRY 22/ 2012 00070 42 -32 +80,50 DRAWN BY: MET J21f -8 HDPE El = 180-33 I CHECKED BY: BRC — — — — — — — REVISIONS: NO. DATE EXISTING 4P °PVf SEWER III PROPOSED 72' PVC SEWER III END BORRDWRIK 2 - PROJECT NO,: 42- 33+20.50 El= 179.65 E� _ �915 VC 50/ HJ0o1�o0 15O SCALE: 1 " =50' 28 +00 29 +00 32 +00 i oa, V PI STAo 5+12o4J PI S � PI STAo 36 +45042 / D = 30'06'06o3'(RT) D _ 450 38.5" (tT) Q = 28a 16' 16,8° (RT) n rrninnnn fl �717AAA n _ c7i7innOil 1 1 l r, ;J� • . �J '"��� j916183 PISTA,38 +8IJ8 F1 STAo 42 +67o67 PISTA,43 +81.66 PISTA,45 +19,38 � D = I °43' 08,g' (LT) D = I 34.8" (RT) D = 76'591 55.1" (tT) D = 21 °45' 29,9" (RT) UJ 0 D = 53.2, D =14 °19'26.2" D = 5i11'4408" D =14 °19'26,2" a QQuj L = 60,01' L = 81,171 L = 134,39' L = 151,90' N > N� UW Q � T= 30.01' T= 40,12' T= 19.54' 1= 16.88' O — R = 2,000.00' R = 400.00' R = 100.00' R = 400.00' � P302 NIF WAKERIDGE,Z OB 11453,PC 1341 BY PI��2))�fi 8J �"��` -f'/ / 1 \.•f j'� ` n --.- -� ' 4o �, I �l ` t I I 1 L L V UIVS L I 1 V 1 I I IUIV �i 1 I L ` \ - . _. f "��� n�,'1�� ,_ 1z" (BY 2007o PG 882-883) �Od FT Sto, 0 v' OUTLET TYP� COMBINATION 3 TONS SS B Sto044 f42050 F RYPI i c� b CD, 180 i +io�ooc 17� - - - - -- EX151 PROPOSED 12" PVC 160 -- - - - - -- I IVIIVI IN H. 162. OUT 116" 34 +00 35 +00 36 +00 100 100 r^n "1 � v � 1 PC SfcO38 +51017 JJ111,10 t L — 31 It 1 7,93— 0 FC Sfoo42 +26o95 VIII Illii��� PRC Sfc04 +08012 G ,00 PT StGo45 +94o4l 0 0 0 0 OOS SD 0 Ito IV I Vw 7.24 IT 18648 IN El.? OUT El.? I , W H uj Z W Z UJ 0 z 0 a QQuj uj j N N > N� UW Q � U00 W O OZVI WO � � W W �QWUO � UJ dmUlOL01 � Z H U � Y U U 0 Q � QW 0 m u > } m 0 W Q a W a Z Q J L Y� W~ WQ U� W} ujQ> �Z uj Lu Ul7 �E L u �o = n °N r v �' NLrns�L 0 U��� °s m 3W 190 I PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION � V - - — — — — — — '' r J3 — - - - -- - - (-)00750000 -' ,. �0 ' 00 � PI 46 +9..85 15. EL = 831' IA I DarE, FESRUaRrzz,zoiz PI = 43fB5 °00 DRAWN 8Y'. MET HDPE I III III VC = 1840021 v C = ISO III CHECKED BV: BRC ---------------- - - - - -- REVISIONS; EXISTING 42" PVC SEWER III ENISTING 4P °PVC SEWER III �III EXISTING 42° PVf SFNER � �7O N0. DATE PROPOSES 72' PVC SEWER III PROPOSED 72' PVC SEWER III PROPOSED 72' PVC SEWER --------------------- �------------------------------------------- �--------- - - - - -- - - - -- -1160 PROJECT NO.. H9001,00 15O SCALE: 1 " =50' 37 +00 38 +00 39 +00 4 0 +00 41 +00 42 +00 4 3 +00 4 4 +00 45 +00 4 6 +00 47 +00 6 OF 1 `I I �Jf fl t ( /�I ' �/ � Jr�� � � ••••jj j� ,,,, .,� / � t Q -0000 /A At �t /�a �, t da 0000� F it I PT an 0 40 10 PROPO r) ir t��' ` ASPHALT TRA PC an 53 �41068 20 °Mf' 00 EL= 182,35' r2 "srAnsi +''iis4'' I 1 1 41- � IA. SHYN OFFSET 17.05 Ri EX MH RIM E1.185.81 OFFSET 15-13 RT RIM E1.18429 -Y2- 5TA. 52 + 47.28 INVERT IN EL 155.89 RIM EL 184-80 it �4 1f10 VC loo/ INVERT OUT EL 155.89 INVERT IN EL 172.92 �6 "� 2 7 INVERT IN E1.16138 OFFSET 15.92 lT INVERT IN EL 172.05 INVERT OUT EL 162.38 RIM EL 186.32 INVERT IN El, 167-80 211 INVERT IN EL 168.30 INVERT OUT 11. 16765 0 INVERT OUT EL 168-07 0 10 0,44487o ( +10.4448% -.0% ftft)2 A (f) A — mo - -- wmlb� +IOi500% ,0% 0 0277 o ftw %ft am wo Ono v v L v oft ow sm om ma 00, %mo wo 000 om 000% *s �. vv 070 00 50070 / 584J0 OO � PI= 51 ±50.00 � � PI= 54 +50,00 I PL = ' r`` -•__ � � \` -J' �� EL = 183,43' Et 180o4J/ EL 185.351 UC loo/ ,z� fM II �\ A �c = 200 vc = loo/ v c = ioa 110 �-------------------------------------------- ���-- ��--------------------- �-------- - - - - -- � EXISTING 42' PVC SEWER ENISTING 42' PVC SEWER EXISTING 41 °PVC SEWER 4211 RCP REMAiNSON WEST EL = IB4,69' I� PROPOSEDIP °PVfSEWER SIDE OfCRA6TREEfK. 16O �---------------------------------------- - - - -�, PROPOSED 12 °WC... III \\�'��,, I PROPOSED 1P "PVf SEWER 15� 41 +00 48 +00 49 +00 50 +00 51 +00 52 +00 53 +00 54 +00 55 +00 56 +00 51 +00 58 +00 59 +00 0 rr 0 E L u � 0 r n0Nv > N rLn s rV) 41 , 6 0 u co 00 z M w N 190 I PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION DATE: fEBRURRY 22 2012 DRAWN 8Y'. MET CHECKED BY: BRC 110 REVISIONS: NO. DATE 160 PROJECT NO,: H9001,00 15O SCALE: 1 " =50' 60 +0o I 1 SA Pw fW a Fw0-100 aooirioNU C\n" O 71 -On 07 uj —10 uj 0+53-05 W 0 J� 45.00 u i I Ip D 0 0. Sad 7< Sod I � t S W D c W-� APJ HA TRAII } I v v :,j U, < 0 u "JIV Q I J1 Id (BY 1979PG 2041 G dmUlOL01 fW a Fw0-100 aooirioNU C\n" O 71 -On 07 uj —10 uj H J� f ai W I ai 0 0. Sad 7< Sod I � > H N� u Q 10' OPOSM VICTIvr el 01TV nc EXISTiNG 40'C17 OF ��' U N APJ HA TRAII RALEiGH SANIT0 0 < 0 SEWER EASEMENT Q I LL (BY 1979PG 2041 G dmUlOL01 ._ 0 Sod —�3ad ��1� � "r v v I-v4v-i--- %.01 1 QL�- v cwg- fflffzff� V I 1 "91 V� , ------------------------------------ SS PUE PUE SS -SS PUE PUE SS SS SSA PUE PUE ME Pu /Mi/ 100 00ol — %; I no VL T 7't,'t 1 CC INT MH �MH 12� EX MH —IL— J I I'l, V7 T "N, 'SET 16,35 RT V1 CTA 0 1 N A V1 CTA LC i Al V Cr INT MH IMH III OFFSET 16,54 RT —r� T uj H uj Z uj z W 0 z 0 0. Quj uj > H N� u Q uj u W - Z N Z [L 1111111 0 WO m w uj 0 < 0 LL 0 dmUlOL01 H Z H u ui 0 U b`6� b���� 0 U Q � < uj z u 0 m u > 0 2 ui WQ u ui WQ> �Z mw QW Ul7 E L u � 0 r = n °Nv NULL It U � M Z 0 0 00 00 W N 1 O 0 /v 110J Ll vrr)ti 10,41 KI —IL— JIM, VJ I NoW. -IL- JA V7T'tJ.17 INVERT OUT El, PI 60 +25oO INVERT IN K. ? RIM H. 181.96 RIM E1.18071 OffSEi 14,58 li INVERT IN El.? OffSEi 13.50 IT PRELIMINARY PLANS INVERTOUiEI.?INVERiIN E1.1S5.14 INVERT IN El.? IM H. 179.68 INVERT OUT H. RIM E1.11961 DO NOT USE FOR CONSTRUCTION INVERT IN E1.1S5.68 INVERT IN El.1SS.61 0 E� _ �82,�6 INVERT OUT ELISS.14 INVERT OUT H. INVERT OUT E1.15S,68 INVERT OUT El.1SS bl VC 100 (+)0066407o 180 \1 VA Loon v � illilllllllllllll am 1 +12' 0007 3576v 7 180 (-)1,0924% 0 07 " v l o n DATE: FESRUaRrzz,zoiz �—II,4000% "k V F1 61�5OoOO ( +)01614% 11 000 1-11,4800% ouawNSr: �MEi EL 182.89' E� = 18�4� � F1 64 400 CHECKED BY: BRC EL = IBI,OP Fl 66 250L L F1 6' +15oOO REVISIONS: 17 VC 80/ F1 71�55oOO NO. DATE VC = VC 90' Et = 178.67' EL i78,9B' PI 69 +60.00 F1 = ?0 +60.00 VC 80/ VC 801 DUAl40lf -36" HDPE VC 60' Et 179o271 Et = 177o791 E' - IB0,07' � III ul VC = 90' VC = 901 VC =100' III III III PROJECT NO,: PROPOSED 72' PVC SEWER III PROPOSED 72' PVC SEWER III PROPOSED 72' PVC SEWER III PROPOSED 12 °PVC SEWER 15O 15O SCALE: 1 " =50' 60 +00 61 +00 62 +00 61 +00 10 +00 11 +00 12 +00 13 +00 UJ o N g PISTA,14 +10.33 ?!STA75 +60.94 PISTA, 76 +82004 J FW o a D= 8'44'40o6` (RT) D= 61' 44' 4301" (LT) 27' 6' 13.0' (RT) Q W D =1° 09' 43,1° D = 38° li 49a9" D = 28° 38' 52.4° � u W u � 3 L = IP2,10' L = 161,65' 96.� o � W \ �w02 W l = 61J1' l = 89.68' l = 49,13 0 N LL W � � � R ' R = 200.00 } Q m; Q � o ui amN�m Z PI STAO 78+89073 PI S 19 +1420 PI Sly, 84 +87.90 " D = 55'221 232 °fRTI D = 43' 5 31 43o8' (t T) D = 68'161 3709" (LT) ?304 � y D = 570171 4408' D = 51 °17'44,8° D = 9 °32'51,5" � e�, F o L= 96.64' L= 76.61' l = 52o471 T = 40.30' l = 406.82' m PG u 3 R = 6000001 BBB ��9qP �� ago � > 01 M PiN p2 a 1 13+10.00 8.00 � AooirioNA� G �� �o aPPROxi�aTE3owioE PT Sto077 +2921 C Sto076 +32.91 PC Sto18 +3126 F Esr e roNS cuss s aiP IaP �Q uj SY 911 RBPoC Q 8'l X 8' �' 101ROPOSID 45.00 76+30.00 DUA[ 481f - Z4' HDP[ f� [IMITS OF, ASPHAIT TRAII 15 +60.00 F f f pT \fW� DISTURBANCE staa80 +10,52 PC sto.80 +81,08 TREE PROTECTION� HN(tmP� uj 00I ,ii � �i /PROPOSED V � I � SILT FENCE 101ROPOSE uj OUTIF �Typ,� � �� l� Q �(D ✓ / , �Q ASPHAITiRNl \ \� \��� � /n` lD /��' // � Q Lu PR f 1 C S a. 9 33,90 op MN i � \ Ol \ �k a 75 +98.45 � i \ i 42.35 �\ � �� � SILT HNCE PP� FRC SfoQ74+71026 i N i a� m um w uj � t ° "ti W I 6 I 0 meamz� 3 Wrl q� m T � z N F g F C a 'n i uj A i i s a k\ X\l Pl w uj EX MH �oo -Y2- STA. 75+93.26 �oo CL IN MH MH 9 OffSET48]9 RT I � RIM EL 18121 -YP- STA. 73 + 03.14 INVERT IN H. OFFSET 49.69 IT INVERT OUT EL ? RIM 1185.53 CC INT MH �MH 8� INVERT IN EL 1SS.S4 -Y2- STA,16 +31.69 INVERT our L 155.54 OffSIT 11,03 RT PI = 82 +10°00 PI = 83 +90,00 IM It. 181.41 PI= %9 +00.00 PRELIMINARY PLANS PI = 15`05,00 iNVERr IN It. 155.47 EL = 119.38' EL = 114.88' INVERT OUT EL iss.a7 EL 180�221 EL = I19,07' �"°`��"`"��°" VC =130' VC = 60' vc =100' VC =100' A POW 180 I am 00 I- 10,3516% _ k18,�000�° _ ( +111749% mom an -- — __ — - -- - 10,4400% _ -- 1 +112912% _ _' 18� f +)0.3000% +J ,POGO% I � � (—)04750070 �I— )0,0500 f- 10,4400` —__— DRTE fEeRURRY22,2012 Q�oo, / ��II,64OOl DRAWN 8Y'. MET vita 0 / I P� = l6 +lO.00 PI = 77�85,00 �UAt 481f -24° HDPE J PI = 8�f35,QQ CHECKED BV: BRC PI = 85 +00.00 REVISIONS: 17 Q � PI= 74 +05.00 III � EL = 11913' EL = IBI,08' EL = 160,15' P�= 83 +00.00 1%� No. DATE PI = 75 +85,00 EL = 180.55' EL 179.401 EL = 11918' III � VC = B0' VC =10�' VC =100' VC = 80' VC = 40' III VC = 40' VC = 50' II III 160 � ------------------- - - - -�� 160 PROJECT NO,: III PROPOSED 72'PVC SEWER 150 150 SCALE: III =50' 7 3 +00 7 4 +00 7 5 +00 7 6 +00 77 +00 7 8 +00 7 9 +00 80 +00 81 +00 82 +00 83 +00 84 +00 85 +00 86 +00 9 \ 0 NTAII 1 , 5TANDARD 'Y' DITCH W H � Z Notlo kol¢� PSTAO 91i41075 7 p PSTAo 9J +01 ,SU PSTAO 94f05031 Natural Natural D = 6 °31' 260011 (RT) p = 4 °52' 190111 (RT) D = 19 °46' 46,1" (tT) Ground �, 3, Gr° ° ^tl D =14° 19' 2602 " D = 7° 09' 43J" D =14° I9' 262" l' p a L = 45,55' U00 W O T = P2,80' l = 34.03' l = 6914' Min, o= i R. 01 Type of liner= IUiE NEi Max d = os R .R = 400.00' R = 800,00' R = 400.00' � ROM 8TA, 89 + 55 i0 5TA. 9 0 +40 Ri PI S Ao 96 +87,89 P� STAO 91 +8097 PI S Ac 99 +01.95 H U D = 170 411 45o2" (RT) D = !x56'011 "fLTJ D = 210 221 12,7" (RT) S °0 D =14 °19'26.2° D =14 °I °'26.2° D =14 °19'262.. \ oo \ � L = 123,54' ? =F797' L = 831' T = 21 PI/ L = 149,19' T= 747' DITCH DE�INo N �80' 34 y' 0 0 v 0 0 V 0 0 VLeLI oV \ PT Sfco9l +64o5O PC sfco�1112+67055 � � QO 0, 481f - 42" HDH C sf0091 +18095 \1 w -- - -- r 7 poi __ i w i iii i h —) jJly o jj� g I F iOP OF BRIDGE Il m `-7� n u � � v 7 t 0 N %= bobZUblo n Fw 11I , II 9 E� OUTO mP� 1 � 1 r O \✓ 1N — IUJn 1 1 X r +105019% � f +10,5019� 86 +00 81 +00 88 +00 89 +00 90 +00 91 +00 92 +00 93 +00 94 +00 95 +00 96 +00 1 I , W W H � Z W Z Uj 0 z < 0 a Q Q� N �� N� UW Q � U00 W O OZVI WO � � W W �QWUO � LL dmUlOL01 � Z H U � Y U U 0 0 Q g � � QW �J 0 m U > 1, Itl ,11 1 1 11 l 1`t Y� Uj~ UJQ U� Uj} UjQ> z Uj LU U0 �+ E L U JJ � 17 .1 O =W n °Nv �' NLrns�L 0 0011, 3W 11111 0/ , O� �SSI IIN SEAS 1 coo1 1 32606 of 1 A 1 IC ,✓ 111 �� 1 �, 1114111114141 ��� 11 i N 190 I PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION DATE: FEBRUARY 22, 2012 0 06 DRAWN 8Y'. MET CHECKED BV: BRC 9000 REVISIONS; 110 N0. DATE 160 PROJECT No,; H9001,00 15O SCALE: 1 " =50' 91 +00 98 +00 99 +00 I 10 I W Q a W a � � J a 1, Itl ,11 1 1 11 l 1`t Y� Uj~ UJQ U� Uj} UjQ> z Uj LU U0 �+ E L U JJ � 17 .1 O =W n °Nv �' NLrns�L 0 0011, 3W 11111 0/ , O� �SSI IIN SEAS 1 coo1 1 32606 of 1 A 1 IC ,✓ 111 �� 1 �, 1114111114141 ��� 11 i N 190 I PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION DATE: FEBRUARY 22, 2012 0 06 DRAWN 8Y'. MET CHECKED BV: BRC 9000 REVISIONS; 110 N0. DATE 160 PROJECT No,; H9001,00 15O SCALE: 1 " =50' 91 +00 98 +00 99 +00 I 10 STREAK IMPACTS -Y�- PISTA,99 +01095 P!STA,1OO +32°11 PISTA,104 +51,66 STREAM SG5 Q = 21221 121 "(RTI D =14 °33'42°5 "fLTJ � = 115 °1'30.6 °fRTJ PER MGNENi IMP ACTS = 0 LF 0 = 14 °I9'26,P" D = 14 °i9'P62° D =1 °09'43,1" TEMPORARY IMP ACTS = 40 [F t = 1499' L = 10�o661 L = 16691' l = 75,47' l = 51.11' l = 83,19' R = 400.00' a PISTA,107 +23.59 PISTA,109 +98JI Fl STAQ III +49068 � D = 50 °31' 2lo4'(tT) D = 30 °53' 57,8° IRII � _ 26' 07/ 32.5' (t T) � n s ins n� n.. n _ in0 .n, nr nn (1 = 7R° 3R' F74" 0 r I D D o 0 low 0 0 L 91.201 lot T = 18815' l = 11055' T = 46.40' R = 4v )11,111 .00' R = 400,00' � I WEWD Q fw �f�y�fW fw FW_ 00-000 FW � �� FW \J V 'j IJ �i j \Jv o Pr s W0 —10'PROPOSM p306 T 0 I fiPHA1T,TRAk STREAM SG5 yl END 10' APP SAD � CR OF IF p �I � I ucriu uneoniuuv� ! DB2040PGISS FRC SfG0108 f UT,56 mA 7t) FR Sfoolll 9'4o47 FRC Sf0,111 03oLU 0 rw —Fw Pw 3 1 l A5PHAIT TRAII 1 ✓,. �/ � �� oe ftwwI 0 Bl I ( t u ! 1 cl Al J ^1 t 4 , w' 11 ml JU LLO = u EL = 115.54' VC = 100' — 10.4000% I +)0.4000% I +)0.4000% ���2,3g�O% � +)( AT, �0 � PI = 104 +10,00 I Oro mo aft MEN 1% v 00000, � PI = 101 +85.00 361F -2a" HDPE EL = 111,68' = 176,78' vc = 80/ VC = 80' 100 +00 101 +00 102 +00 103 +00 104 +00 105 +00 0 0 —�U,b961� u �--I.-IO' -" 106 +00 101 +00 108 +00 109 +00 110 +00 v I , W H uj Z W Z uj 0 z < UJ� N N � UW Q � U00 W ZVI O WO � W W QWUO � LL dmUlOLO1 � Z H U � Y U U 0 Q � QW 0 m u > m W Q a W _ oC r� a z a y� ui~ UJQ u� ui} ujQ> z uj QW Ul7 E L u � 0 = n °N r v �' NULL 41 '1"', 3W IN 190 I PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION DATE: FEBRUARY 22, 2012 DRAWN 8Y'. MET CHECKED BV: BRC REVISIONS; 110 N0. DATE 160 PROJECT No,; H9001,00 15O SCALE: 1 " =50' r T n r n n w i n w n n r T r PC S PT SfooI16 +18o45 Fw ZOO LLOZ 0 0 mol, 0 0 = INC = ii;4gq n 3 �e � or) n () X \1 0 112 +00 113 +00 114 +00 115 +00 116 +00 111 +00 118 +00 119 +00 120 +00 121 +00 0 0 122 +00 123 +00 124 +00 i •Q 10 I0 0 N 1 } m 0 W Q a W a Z Q J a Y� ui~ UJQ u� ui} ujQ> z uj Lu u 0 L L U r� t = n °Nv �' NLrns�L 0 0011, °s 3W 190 I PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION DA T E F EBRUARY 22, 2012 DRAWN 8Y'. MET CHECKED BV: BRC REVISIONS; N0. DATE mmm� 160 PROJECT No,; H9001,00 150 S 1 " =50' 121+0o i 12 I , W uj Z 0 W z 0 < a QQuj UJ N N� > UW Q � U� W O OZVI WO W W �QWUO � LL dmUlOL01 � Z H U � U O Q � QW 0 m u > i •Q 10 I0 0 N 1 } m 0 W Q a W a Z Q J a Y� ui~ UJQ u� ui} ujQ> z uj Lu u 0 L L U r� t = n °Nv �' NLrns�L 0 0011, °s 3W 190 I PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION DA T E F EBRUARY 22, 2012 DRAWN 8Y'. MET CHECKED BV: BRC REVISIONS; N0. DATE mmm� 160 PROJECT No,; H9001,00 150 S 1 " =50' 121+0o i 12 ILnLVI STAo I I +2Oo35 Fl STAo 132 +12o38 = 9 0 24'0109 "fRTI D =16 °5143,9 "IL = 14'191 26o2" 0 = 140191 26o2l' = 65.64' L = 117,72' = 32.89' l = 59o291 = C� T R = 400.00' 00 0 0 0 I , W H uj Z W Z uj 0 z < � a Q Q� UJ N N� > UW Q � U� W ��OZVI O WO � � W W �QWUO � LL dmUlOL01 � Z H U � Y U U 0 Q � QW 0 m u > } m 0 W Q a W a Z Q J a E L u � 0 = n °N r v �' NLrns�L 0 0011, °s 3W 190 I PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION DATE: FEBRUARY 22, 20121 DRAWN 8Y'. MET CHECKED BV: BRC REVISIONS; 110 N0. DATE mmm� 160 PROJECT No,; H9001,00 150 S 1 " =50' 1 136 +00 131 +00 138 +00 � 13 ft� FW PW W FW PI STAo I39 +35.94 PI STAO 143 +35042 PI STAo 147 +34oO P! Sly 149+75004 Fw 001 D= 4 0 I21 45,0 "IUJ D= 8 0 39'3900'I1 TI D= 38'251 01.4' (RT) D= 480 13' 5 3 8' (t T) Fw = 9°32'51.5" D = 470 44'41.3" D = 57 °17'44,8" Fw� � I , W H � Z W Z UJ 0 z < � a Q Q� UJ� N N� UW Q � W U� O OZVI WO � � W W �QWUO � LL dmUlOL01 � Z H U � Y U U 0 Q � QW 0 u > UUILtl pr, ---- rA r�� 0 10 PROPOSED -- , 1 t�C ASPHALT TRAIL � �� �' � ,� � -�=�� � �� PI � C�� 04 F P) t t f'br r1t', fit-,'' ---- _•, 1 `n' n „ ' -^ - '`. /1f1 rr f :t^+_._ r' ________ _ _ /' `, ”` Y.yytKNY 00 00 n / C iy C C 00, i C l zo f ,c F 00 F .00001� F - 1; t , _ � C 100000 ;1 F 0 -v 00000 F TREE PROTECTION C o t PGE _ _ _ _ _ � �� o � — � � �� FENCE PP� - C c c F uj F F F � RPORATION AMwNS AST CO PG IBO a 1 . ASPHALT TRAIL BM 2004 PG 1153 / IT094091 PIN r 0000 ,J 000 nil X ll C C Lu t 1 1 C 1 r 1 ['00 1 k5PHA RAIL 138 +00 139 +00 0 140 +00 0 0 0 0 ow 046407 � vloluuu/ 0 o —)uoj�T7 0 5 N 141 +00 142 +00 143 +00 144 +00 145 +00 146 +00 141 +00 148 +00 149 +00 15 O +oo 151 } m 0 W Q a W a Z Q J L L u � 0 r ' NULL 0 U� �M vozo°� °s co 3W 180 I PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION DATE: FEBRUARY 22, 2012 DRAWN 8Y'. MET CHECKED BV: BRC REVISIONS; 160 N0. DATE 15� PROJECT NO,: H9001,00 140 SCALE: 1 11 =50' 1 I \ � r 1 uu� "i11, 1 PC stool 22.75 W f t� LJ�l` l 1 t I l� t�J lly v r J r j `1 v r tJ I� L �J PT SfGol6 +88oOO FRC Sfool63 +5Oo5O PC '1 r� 1 Stool56 / t h V n •, /V zo ND WG21 n� 101ROUM AV; l / vA)r AhI TRAIL �l ,l n —r iKrI /I — \i /i I,) ti 11) 1111 i r i = n 15 i +oo 152 +00 15 3 +00 154 +00 ON 155 +oo FRC SfG0157 +24oO6 ouuu / I — PI =155 +85,00 T, FRC StGO158 +31095 15 6 +00 157 +00 158 +00 0-11 J G�n FA PT Sto.158+73.30 159 +00 i yC� o m PC SfooI60 +79o92 PCC S FRC stool6l +7 001 0 160 +00 161 +00 r,' /"00,0 I , (�C uj W � H uj Z W Z uj 0 z < 0 a QQuj UJ� N N� UW Q � Q U00 W J O OZVI WO W W �QWUO � LL dmUlOL01 � Z H U � Y U U 0 Q � QW 0 m u > 0 0 rft 3�d q�pd O O S 162 +00 0 0 0 30 m N u" 0 (�C uj 0 � Q L W L Z Q J a N 0 0 E L u � 0 r = nON °' �' NrNNL 0 Uco 0� °s o 3W 190 I PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION ,uUvvo/ DATE: FEBRUARY 22, 2012 / DRAWN 8Y'. MET CHECKED BV: BRC REVISIONS; _ao ^unvF �7O N0. DATE 160 PROJECT No,; H9001,00 15O SCALE: 1 " =50' 163 +00 164 +00 I 1 in 164 +00 0 I 001 v Lu W W LL limiq J Z z W 0 z H Z H < J mi 0 0. Qui UJ J N u H > N� Q b`yd u uj u 00 0 u W . 0 ME Z N 0 Z w 0 r, m 1� ui 0 1% 1 T W v r. N IJ O 03 I �� Ins' IWO Pnl (\ Et = 175,411 = �F7 +titi�� ) es, PI= 112 +35. 0 v 17 165 +00 166 +00 161 +00 110 +00 111 +00 112 +00 040001'0 0 113 +00 114 +00 115 +00 0 0 ro 0 bpd 0 2 ui WQ u ui WQ> z mw QW Ul7 E L u N, n °Nv 1. > N It U Z 0 0 00 00 w 190 l PRELIMINARY PLANS l DO NOT USE FOR CONSTRUCTION I - "'^'u N DATE: FEBRUARY 22/ 2012 = IOO � DRAWN 8Y'. MET CHECKED BY: BRC REVISIONS: no NO. DATE 160 PROJECT NO,: H9001,00 15O SCALE: 1 " =50' 116 +00 177 +00 I � 6 O IN 00 LL limiq J 0 dmUlOL01 H Z H Lu u 0 0 u o b���� 0 b`yd U Q � Lu z u 0 m u > 0 0 bpd 0 2 ui WQ u ui WQ> z mw QW Ul7 E L u N, n °Nv 1. > N It U Z 0 0 00 00 w 190 l PRELIMINARY PLANS l DO NOT USE FOR CONSTRUCTION I - "'^'u N DATE: FEBRUARY 22/ 2012 = IOO � DRAWN 8Y'. MET CHECKED BY: BRC REVISIONS: no NO. DATE 160 PROJECT NO,: H9001,00 15O SCALE: 1 " =50' 116 +00 177 +00 I � 6 1170 ftft ow 177 Elm 00 0 0 =I<aIa,A� N 118 +00 119 +00 180 +00 181 +00 182 +00 0 183 +00 0 r�j TWAVAMAWAF Ell Aflili� n 0 185+00 n 0 0 0 0 N 186 +00 181 +00 188 +00 189 +00 0 } m 0 W Q a W a Z Q J a Y� ui~ UJQ u� ui} ujQ> z uj Lu u 0 E L u � 0 r = n0Nv �' N�r,6 0 Uco 0� °s 3W 180 I PRELIMINARY PLANS I DO NOT USE FOR CONSTRUCTION I DATE: FEBRUARY 22, 2012 DRAWN 8Y'. MET CHECKED BV: BRC REVISIONS; 160 N0. DATE 150 PROJECT NO,: H9001,00 140 SCALE: 1 11 =50,1 190 +00 i 17 I W H uj Z W Z W 0 z < 0 a QQuj UJ N N� > UW Q � U� W ��OZVI O WO W W �QWUO � LL dmUlOL01 � Z H U � Y U U 0 Q � QW 0 H u > } m 0 W Q a W a Z Q J a Y� ui~ UJQ u� ui} ujQ> z uj Lu u 0 E L u � 0 r = n0Nv �' N�r,6 0 Uco 0� °s 3W 180 I PRELIMINARY PLANS I DO NOT USE FOR CONSTRUCTION I DATE: FEBRUARY 22, 2012 DRAWN 8Y'. MET CHECKED BV: BRC REVISIONS; 160 N0. DATE 150 PROJECT NO,: H9001,00 140 SCALE: 1 11 =50,1 190 +00 i 17 uj uj F1 STAo 199 �70o85 F1 STAo 200 �58o44 F1 STAo 202 �59oO2 F1 STAO 204�14026 H uj z z 17' 38' 5 7.4" (t T) 70 341 27o (RT) = 1010 50/ 48oO" (tT) = 51'31'4006'(RT) u < H J 0 0 o D = 114'35' 2906' D = 38' 11' 4909" 0 J N H N L = 12 o22' L = 52088' t = 88088, t = 134o9O' > U uj U 00 = 62.10' = 260 81 T = 61058' T = 72,40' w m Z N Z LL - 0 V) ui ui 0 uj R 50000/ R 150000, m o LL VJ OOARDWAIK PPORM 1A DARDNAIK P0 0 16 F X 16 F C i H 6IGIN 60 z STA 196+5 I wIwVIwu 7804 0 000 0 uj o U '00 \X NX > V�, --------- ------ - "n '1--1 X, D BRIDGE H N BOA K UTPORM V� xxi, 2R 1 69.18 n ;-,\ D' ITAPR, SIAB IN .... ..... . 61GIN BOARDWAIK V/ k 0 4201— 201 +22.00 A I 10' RA IGI 8� WAIK Ivi ti� 31.4 7 .00 IND 60ARD K 000� 0 0 BIGIN 10'APP SW —Y2 H uj N RSAN 0 uj C TYP \v, o i r uj PC sfoof �19 �08 75 Lu N\ 9 0 10'PROPO 50 A5PHAIT TRAII N 0 X U, 0 1, 1, vV71 V Vl� v�\'A A vl/ A Viv: i,V; V", //\,j X NIF F REIGH CR 0 O� N\ OB 4315t PG 284 c� X 1981, PG 915 PIN 1733468660 v, 0 0 \7 1Y, WFA, WGI /V /,z 0, WGI A "N —I 'PROP D FT Sfoo2 0 �84oB' n I (IV ND DWA[ TUM SPHAIT T I W� IGIN 6 GI �11 V/lk 'E BO RDWAIK IVI 19 2 9.18 E APP. U', B I lV\ IND SOARDWAIK A —Y2 0 .01+02. 10 Uj 0 u co 00 M x", f\ 51GIN 50ARDWAIK PIARRM V� C\ il, v, —y2RIV— STA 193+11.47 4j NIF k SUNOCO uj ri w 0) W RE=XVNG &C, "A' DB 13005 PG I PG 1754 \,,7 y 200 N, IN 17333 94 Nwr j- "IX i\ W 1A p 01 �97 50ARDWAIK POORM C StOO2 0 16 F X 16 F V, I V/ V, iA A V �V IV I 0 V\ A \7 IV/ f "Vii, vXX A " END BOARD AtK END BRIDGE BEGIN BRIDGE BEGIN BOARDWAtK END 10'AFF SLAB —�2REVI — STAo 193 f29olB E) BOA�,'111111111 At)`( I R �� — 2REVI— STAoI96�69018 BEGIN 10/ APP StAB —�2REVI — STAo 191 �31o47 EL 181�41' Et 18lo4l/ END BOARDWAtK —�2REVI — STAo 201 �02oOO EL 174,41' BEGIN 10'AFF SLAB Et = 168o73' (—)O00000,o —�2REVI — STAO 198 �66059 �)100000 00 EL 174,41' PRELIMINARY PLANS END10'AFF SLAB DO NOT USE FOR CONSTRUCTION 190 �)200000 00 BEGIN BOARDWAtK EL = 171�84' 0000000 Pi 199�00000 —�2REVI — STAo 201 �22oOO (�)4o00007o t I j / VC = 100/ (—)00000070 EL 172,41' P1 202 �40000 11A VC 50/ 200 �60000 EL 170o78' DATE: FEBRUARY 22 2012 000/0 0 0 0 0 00 0 168.10' VC 701 DRAWN BY: MET 0 000 0000 0 1 00,/0 CHECKED BY: BRC "m .00 fto 111111 ON* 0� 0� Now low oft VC 76' 50 REVISIONS: 00/0 NO. DATE (-0040110 o 0 F1 196 �86059 P1 197�46059 )1�49 0 192 0 0-00-01 0 I= 192�91047 0 0000 0-0 ow 0000, 000 EL 180o2l/ 00 LL 10 00 Et 180.21' EL = 1810211 F1 197 06�59 F1 197�66059 0 F1 192�71047 F1 193 �11047 Et 174,411 Et 00 1 Et 10 1/ moo Et 1021 Et 0 1/ PROJECT NO,: F1 197 �26059 Q Q Q 15 15 SCALE: I =50' uj D 4 9 262 T 4 2 2 2 2 2 2