1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spilEways; and from the current liquid level
in the 12gaon to the bottom of the spillway for lagoons with spillways.
Structure 1
Lagoon Name/Identifier (ID) -
Spillway (Yes or No). -
Level (inches):
2. Check all applicable items
14 0
Structure 2 StructureStructure tructu r Structure
Liquid level is within the designed structural freeboard elevations of one or more structures. Fire
and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within
acceptable ranges.
Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day
Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to
pumped and hauled is reflected in section Ill tables. Included within this plan is a list of the
proposed sites with related facility nu b r(s)f number acres and receiving crop information.
Contact and secure approval from the Division of Water Resources prior to transfer of
waste to a site not covered in the facility's certified animal waste management pla m
Operation will be partially or fully depopulated.
- attach a complete schedule with corresponding animal units and dates for depopulation
- if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levers and herd population for the receiving facility
3. Earliest possible date to begin lard application of waste:
saw &s & el � cor4�. uws A ►1 a �
I hereby certify that 1 have reviewed the information fisted above and included within the attached Plan
f Action, and to the lest of my knowledge and ability, the information is accurate and correct.
�nA
cility Owner�I�Aanager (print)
Facility Owner/Manager (signature)
PoA Cover Page 2121100
Phone: it 3-drll-$O`12-
Date;
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
THIRTY (30) DAY DRAW DOWN PERIOD
!. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1
gallons
Structure Namelldentifier (ID): 1
. Current liquid volume In 25 yr./4 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr./ 4 hr. storm & structural freeboard
c, line b - line a finches in rid gone) _
d. top of dike surface area according to design
(area at below structural freeboard elevation)
. line c x lire d x 7.48 gall n
12 ft
Fir,
� 0.
—.
3. Projected volume of waste liquid produced during draw dawn period
145882
inches
inches
inches
ft
f. temporary storage period according to structural design _180 days
g. volume of waste produced according to structural design 94947.6
h. actual waste produced
current herd #
certified herd #
line g = 94947.6 ft
i. volume f wash water according to structural design
j. excess rainfall over evaporation according to design
. (lines h + i +i 0 d _
line f
4. Total PAN to be lard applied during draw down period
I. current waste analysis dated
m. �lines e +
1000
line I
REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE
Po (0 Day) 2121100 1
0
170742.58
'I
ft
Ih PAN
ft3
ft3
I!. TOTAL POUNDS OF PAN STARED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR.124
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1 . structure I: I
. structure ID:
. structure I D
F structure ID:
5. structure ID
. structure ID:
n. lines 1 + + + + +
line rn = 497
lire m =
lb PAN
lb PAN
line m = 1b PAN
line =
line r=
lb PI
lb PAN
lire rr = lb PAN
497,
Ib PAN
Ill. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 0 DAYDRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIES DURING THIS 30 DAY PERIOD.
o. tract #
p. field #
q. crop
r. acres
s. remaining
!RR-2 PAN
balance
�Iblacre}
t. TOTAL PAN
BALANCE
FOR FIELD
(lbs.)
column r x s
u.
application
window'
72435
pivot
Small Grain
8.83
37.5
331.12
Se t-a ril
72435
8
Small
rain
2.97
56.98
169.23
Sept.
-April
'State
current
crop ending
application date or next crop application beginning date for available receiving crops
during
30 day
drawn
down
period
v. Total PAN available for all fields (sum of column t) _ 500.35 1b. PAN
Po (0 Day) / 1/00
IV. FACILITY'S PoA OVERALL PAN BALANCE
. Total PAN to be land applied (line n from section II) 497 1 .
PAN
. Crop's Crop'remaining FLAN balance (line v from section III) �500-35
lb. PAN
. Overall PAN balance ( - ) 3.35 lb.
PAN
Line y mu t show as a deficit. If line does not show as a deficit, list course of action here
including pinup and haul, depopulation, herd reduction, etc. For pump & haul and herd
reduction options, recalculate new PAN based on now *Information. If new fields are to b
included as are option for lowering lagoon level, add these fields to the PAN balance table and
recalculate the overall PAN balance., If animal waste is to be hauled to another permitted
facility provide 'Information regarding the herd population and lagoon freeboard levels at the
receiving facility.
NARRATIVE: Irrigation will Continue as weather and field conditions permit. Additional land i