Loading...
HomeMy WebLinkAbout310849_30 day poa_20210203PLAN OF ACTION (POA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: Facility Name-. 3► e rtifi d Operator Naas: % - 641 r County: operator #. 5n ;? :?.9 r) 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spilEways; and from the current liquid level in the 12gaon to the bottom of the spillway for lagoons with spillways. Structure 1 Lagoon Name/Identifier (ID) - Spillway (Yes or No). - Level (inches): 2. Check all applicable items 14 0 Structure 2 StructureStructure tructu r Structure Liquid level is within the designed structural freeboard elevations of one or more structures. Fire and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to pumped and hauled is reflected in section Ill tables. Included within this plan is a list of the proposed sites with related facility nu b r(s)f number acres and receiving crop information. Contact and secure approval from the Division of Water Resources prior to transfer of waste to a site not covered in the facility's certified animal waste management pla m Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates for depopulation - if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levers and herd population for the receiving facility 3. Earliest possible date to begin lard application of waste: saw &s & el � cor4�. uws A ►1 a � I hereby certify that 1 have reviewed the information fisted above and included within the attached Plan f Action, and to the lest of my knowledge and ability, the information is accurate and correct. �nA cility Owner�I�Aanager (print) Facility Owner/Manager (signature) PoA Cover Page 2121100 Phone: it 3-drll-$O`12- Date; PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN PERIOD !. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1 gallons Structure Namelldentifier (ID): 1 . Current liquid volume In 25 yr./4 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./ 4 hr. storm & structural freeboard c, line b - line a finches in rid gone) _ d. top of dike surface area according to design (area at below structural freeboard elevation) . line c x lire d x 7.48 gall n 12 ft Fir, � 0. —. 3. Projected volume of waste liquid produced during draw dawn period 145882 inches inches inches ft f. temporary storage period according to structural design _180 days g. volume of waste produced according to structural design 94947.6 h. actual waste produced current herd # certified herd # line g = 94947.6 ft i. volume f wash water according to structural design j. excess rainfall over evaporation according to design . (lines h + i +i 0 d _ line f 4. Total PAN to be lard applied during draw down period I. current waste analysis dated m. �lines e + 1000 line I REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE Po (0 Day) 2121100 1 0 170742.58 'I ft Ih PAN ft3 ft3 I!. TOTAL POUNDS OF PAN STARED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR.124 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1 . structure I: I . structure ID: . structure I D F structure ID: 5. structure ID . structure ID: n. lines 1 + + + + + line rn = 497 lire m = lb PAN lb PAN line m = 1b PAN line = line r= lb PI lb PAN lire rr = lb PAN 497, Ib PAN Ill. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 0 DAYDRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIES DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining !RR-2 PAN balance �Iblacre} t. TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application window' 72435 pivot Small Grain 8.83 37.5 331.12 Se t-a ril 72435 8 Small rain 2.97 56.98 169.23 Sept. -April 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day drawn down period v. Total PAN available for all fields (sum of column t) _ 500.35 1b. PAN Po (0 Day) / 1/00 IV. FACILITY'S PoA OVERALL PAN BALANCE . Total PAN to be land applied (line n from section II) 497 1 . PAN . Crop's Crop'remaining FLAN balance (line v from section III) �500-35 lb. PAN . Overall PAN balance ( - ) 3.35 lb. PAN Line y mu t show as a deficit. If line does not show as a deficit, list course of action here including pinup and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on now *Information. If new fields are to b included as are option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance., If animal waste is to be hauled to another permitted facility provide 'Information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: Irrigation will Continue as weather and field conditions permit. Additional land i available for pumping if needed. Po (30 Day) /1 10