Loading...
HomeMy WebLinkAbout20120185 Ver 1_Email_20120224FW SR 1523 in Granville Page 1 of 2 FW SR 1523 in Granville Ridings, Rob Sent Friday February 24 2012 12 25 PM To Carrillo Sonia Attachments SR 1523 Landis Rd Granvill -1 pdf (199 KB) Please print for me both the email and the attachment thanksl rob From Montague, Heather W Sent Friday, February 24, 2012 1138 AM To Ridings, Rob Cc Alsmeyer, Eric C SAW (Eric C Alsmeyer @usace army mil), Lee, Jason W, Phipps, Dawn Subject RE SR 1523 in Granville M So sorry for this mistake and sorry for the delay in responding to your email I had the proposed buffer impacts calculated but must have gotten distracted and when I came back to finish the PCN I forgot to fill in the table Please see attached completed PCN form If you could print this update and exchange front and back pages 5 & 6 of 9 within the copies you have that would be great Otherwise let me know if I need to re submit 5 new sets of this completed PCN Everyone cc d please see information for Buffer Impacts presented on the completed page 5 of the attached PCN Heather Montague NCDOT DIV 5 Environmental Specialist (252)492 0111 office (919)691 1596 cell From Ridings, Rob Sent Tuesday, February 21, 2012 9 19 AM To Montague, Heather W Subject SR 1523 in Granville Heather I got the PCN for SR 1523 in Granville County It says it is for a NW 14 plus TarPam Buffer authorization The letter on front says there will be permanent buffer impacts In the buffer portion of the application section 61 says expanding roadway will involve impacts to buffers However the Buffer Table is left completely blank ?? Rob Ridings Transportation Permitting Unit (DOT Divisions 4 5) Wetlands & Stormwater Branch NC Division of Water Quality 919 807 6403 1650 Mail Service Center Raleigh NC 27699 rob ridings @ncdenr gov https / /mail nc gov /owa/9ae= Item &t =IPM Note &1d= RgAAAADMSzLcd9W2TJH14 %2bm 2/24/2012 5a 5b 5c 5d 5e Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose of (acres) number pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 N/A N/A N/A N/A N/A N/A N/A N/A P2 5f Total NONE NONE NONE NONE NONE NONE NONE 5g Comments N/A 5h Is a dam high hazard permit required ❑ Yes ®No If yes permit ID no N/A 51 Expected pond surface area (acres) N/A 5j Size of pond watershed (acres) N/A 5k Method of construction N/A 6 Buffer Impacts (for DWQ) If project will impact a protected riparian buffer then complete the chart below If yes then individually list all buffer impacts below If any impacts require mitigation then you MUST fill out Section D of this form 6a ❑ Neuse ®Tar Pamlico El Other Project is in which protected basin? ❑ Catawba ❑ Randleman 6b 6c 6d 6e 6f 6g Buffer impact number — Reason for Buffer Zone 1 impact Zone 2 impact Permanent (P) or impact Stream name mitigation (square feet) (square feet) Temporary T required? Site 1 ® P ❑ T Pipe extensions for UT to Coon Creek El Yes 2 400 1 600 Buffer Impact 1 road improvements ® No Site 2 ® P ❑ T Pipe extensions for UT to Coon Creek El Yes 2 160 1 440 Buffer Impact 1 road improvements ® No Site 3 ® P ❑ T Pipe extensions for UT to Coon Creek ❑ Yes 2 160 1 440 Buffer Impact 1 road improvements ® No Site 4 ® P ❑ T Pipe extensions for UT to Coon Creek El Yes 2 580 1 720 Buffer Impact 1 road improvements ® No 6h Total buffer impacts 9 300 6200 61 Comments Necessary improvements of expanding this roadway from 40ft maintenance limits to 60ft ROW will involve impacts to buffers D Impact Justification and Mitigation — upgrade to the cross line pipe is necessary to construct this roadway 1 Avoidance and Minimization 1a Specifically describe measures taken to avoid or minimize the proposed impacts in designing project The permanent and temporary impacts to streams are necessary to met safety standards for construction 1 b Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques Sediment and erosion control Best Management Practices for protection of surface waters will be enforced during project construction Page 5 of 9 PCN Form —Version 1 3 December 10 2008 Version