HomeMy WebLinkAbout20130743_Stormwater Plans_20120222Beverly Eaves Perdue
Governor
t4 o
NC®ENR
North Carolina Department of Environment and Natural Resour*s
Division of Water Quality 2
Charles Waklld P E � � �W <21 F�22ma n
Directors, Secretar
February 22 2012
Mr J J Swain Jr P E
Division 13 Engineer
N C Department of Transportation
Post Office Box 3279
Asheville North Carolina 28802
Subject Stormwater Inspection
US Highway 19/19E
DWQ Project No 3706
TIP No R 2519A
Yancey County
Dear Mr Swain
NA y
On February 7 2012 I conducted a stormwater inspection for TIP Project No R 2519A US Highway 19
construction project in Yancey County The monitoring reports for rainfall data and inspection of sediment
and erosion control devices appeared to be in good order
Continue to ensure that these records are maintained during the life of the project Please refer to the attached
inspection report for additional comments and/or recommendations
If you have questions please call me at 828 296 4500
Sincerely
Michael R Parker
Environmental Senior Specialist
Attachment
cc Randy McKinney P E
Roger Bryan Division 13 DEO
Ed Ingle Roadside Environmental
Transportation Permitting Unit
Mike Parker Asheville Regional Office
(Swain) R 2519A February 2012 Stormwater Inspection
Location 2090 U S Highway 70 Swannanoa North Carolina 28778
Phone 828 296 45001 FAX 828 299 t043
Internet www ncwaterquallty org
An Equal Opportunity Affirmative Action Employer
NorthCarohna
Naturally
Wetland Inspection Report
Project Num 20071134 Version 6 Status Issued
Project Name NCDOT US 19 /US 19E R 2518 A R 2518 B & Project Type Road /Highway Widening
R 2519A
County Madison Region Asheville
Location NCDOT US 19 /US 19E R 2518 A R 2518 B & R 2519A
Latitude Longitude
SW Plan Location
Site Owner Name NC DOT PDEA
Inspection Date 02/07/2012
Reason for Inspection Routine
Inspection Type Records /File Review (DOT)
Inspection Contact Person Title Phone
On Site Representative(s)
Primary Inspector Michael R Parker
Secondary Inspector(s)
Facility compliance Status E Compliant n Not Compliant
Program Area Construction SW (NCG010000)
Question Areas
E NCG010000 Permit
Inspection Summary
Project 2519A Reviewed stormwater data for January and February 2012
Records and reporting requirements appears to be adequate
Phone 828 296 4500
Page 1
Project Num 20071134 Owner NC DOT PDEA
Inspection Date 02/07/2012 Inspection Type Records /File Review (DOT) Reason for Visit Routine
NCGO10000 Permit
# Is this inspection related to a DLR/delegated program inspection?
If Yes what was the DLR/delegated program inspection date?
Is the site following its E &SC Plan as per DLR or delegated program?
Is the site maintaining their E &SC measures as per DLR or delegated program?
Is a copy of the approved E &SC plan on site?
Is a rain gauge present on site or is MPE in use for the site?
Is rain gauge data or MPE data recorded?
Are inspection records complete?
Is the site compliant with other conditions of the NCG010000 permit?
Comment R 2519A
Stormwater records appear to be maintained In good order
As a reminder when recording rainfall data numbers should be entered for each day
Example (0 0 0 2 etc ) Dash Imes or other means to Indicate data are not acceptable
V.. ill, MA Mt:
■nnn
■nnn
■ n n n
■nnn
■ n n n
■ n n n
■ n n n
■nnn
Page 2