HomeMy WebLinkAbout20191233 Ver 2_Meeting Request Review_20210203DWR Pre -Filing Meeting Request Form
ID#*
Regional Office*
Reviewer List*
20191233
Version *
Central Office - (919) 707-9000
Rob Ridings
Pre -Filing Meeting Request submitted 2/3/2021
Contact Name *
Contact Email Address*
Project Name*
Project Owner*
Project County*
Owner Address:
2
Courtney A. Carpenter
ccarpenter@vhb.com
Crabtree Creek Greenway - Lindsay Drive to Ebenezer Church Rd.
City of Raleigh, NC
Wake
Street Address
222 W. Hargett Street
Address Line 2
Suite 601
City State / Rovince / Region
Raleigh NC
Fbstal / Zip Code Country
27601 USA
Is this a transportation project?* 0' Yes r No
Type(s) of approval sought from the DWR:
I— 401 Water Quality Certification - I— 401 Water Quality Certification -
Regular Express
I— Individual Permit IW Modification
I— Shoreline Stabilization
Does this project have an existing project ID#?*
(' Yes r No
Please list all existing project ID's associated with this projects.*
20191233
Do you know the name of the staff member you would like to request a meeting with?
Rob Ridings
Please give a brief project description below.*
The proposed project consists of constructing a greenway trail along
Crabtree Creek between Lindsay Drive and Ebenezer Church Road. The
greenway will be designed as a multi -use bicycling and pedestrian trail.
The project will require two bridges across Crabtree Creek and three
bridges across Richland Creek. Tributaries to Crabtree and Richland
Creeks will be crossed with boardwalk structures.
This project has been previously permitted but design changes have
required updates to buffer and bank stabilization impacts which require a
permit modification.
Please give a couple of dates you are available for a meeting.
2/9/2021
2/12/2021
2/17/2021
Please attach the documentation you would like to have the meeting about.
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
Submittal Date 2/3/2021
Reviewer Meeting Request Decision
.....................................................................................................................................................................................................
Has a meeting been scheduled?* C Yes a No