Loading...
HomeMy WebLinkAbout20001045_Scoping Comments_20100128jfjar NC®ENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H Sullins Governor Director January 28 2010 MEMORANDUM To Mr Jason Elliot NCDOT Natural Environment Unit From David Wainwright Division of Water Qualityyo) Subject Comments on Divisions 1 2 and 3 On Site Wetland and Stream Mitigation Monitoring Reports for 2009 This office has reviewed the on site wetland and stream mitigation monitoring reports for 2009 in NCDOT Divisions 1 2 and 3 Most sites appear to be doing well and the DWQ agrees that monitoring should continue The DWQ offers the following specific comments based on review of the aforementioned documents Division 1 No specific comments Division 2 B 2225WM Greene Street Bridge Mitigation Site This site has been monitored for five years and appears to have met the minimum criteria The NCDOT has expressed a desire to discontinue monitoring at this site The NCDOT is respectfully reminded that an on site meeting with the appropriate agencies will be needed in order for the DWQ to approve close out R 2510WM Campbell Creek Phase I Mitigation Site and R 25 10W Campbell Creek Phase II Mitigation Site — These sites appear to be doing well As suggested it is recommended that the phragmites be monitored so as to not jeopardize the overall success of the site The DWQ recommends the NCDOT continue to monitor this site Dee Freeman Secretai y B 3626 Deep Creek Bridge Mitigation Site (Carteret County) — A first year report was generated in 2007 for temporary impacts associated with the project The NCDOT is required to monitor for three years however there does not appear to be a report available for 2008 or 2009 on the website Division 3 B 2938 Stella Bridge Temporary Impact Site — This site has been monitored for three years and appears to have met the minimum criteria The NCDOT has expressed a desire to discontinue monitoring at this site The NCDOT is respectfully reminded that an on site meeting with the appropriate agencies will be needed in order for the DWQ to approve close out On Carolina Transportation Permitting Unit Naturally 1650 Mail Service Center Raleigh North Carolina 27699 1650 2321 Crabtree Boulevard Suite 250 Raleigh North Carolina 27604 Phone 919 733 1786 / FAX 919 733 6893 / Internet http Nh2o enr state nc usmcvvetlands An Equal Opportunity /Affirmative Action Employer — 50 / Recycled /10 / Post Consumer Paper B 2938 Stella Bridge Mitigation Site — This site appears to be doing well and meeting success criteria The NCDOT wants to discontinue vegetation and hydrological monitoring at this site after four years of monitoring The DWQ does not object to discontinuing hydrologic monitoring The vegetation appears to be doing well The DWQ would like to visit the site before agreeing to discontinue the vegetation monitoring B 3682 Northeast Creek Bridge Mitigation Site — This site has been monitored for three years and appears to have met the minimum criteria The NCDOT has expressed a desire to discontinue monitoring at this site The NCDOT is respectfully reminded that an on site meeting with the appropriate agencies will be needed in order for the DWQ to approve close out U 0092A Third Street Bridge Mitigation Site (New Hanover County) — The third year report was generated in 2008 There does not appear to be a fourth year report from 2009 included on the website There have been some vegetation issues associated with this site in the past which appear to be ongoing The DWQ is interested to see if the issues at this site have improved If they have not then it is suggested that the NCDOT consider other options to replace the required mitigation associated with the construction of Smith Creek Parkway If necessary potential options will need to be discussed with the appropriate resource agencies for approval Resource agency staff visited the site on April 29 2009 and it was agreed that the hydrologic monitoring could cease The NCDWQ appreciates the opportunity to provide comments on your mitigation site monitoring Should you have any questions or require any additional information please contact David Wainwright at (919) 715 3415 cc Tom Steffens US Army Corps of Engineers Washington Field Office Brad Shaver US Army Corps of Engineers Wilmington Field Office Jennifer Derby Wetlands and Marine Regulatory Branch Environmental Protection Agency Atlanta Travis Wilson NC Wildlife Resources Commission (electronic) Steve Sollod Division of Coastal Management Mason Herndon Division 2 Environmental Officer Garcy Ward DWQ Washington Regional Office Ken Averitte DWQ Fayetteville Regional Office File Copy