HomeMy WebLinkAbout240095_30 day poa_20210203PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): JJerryJohnson 24-95
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
2/3/2021
a. current liquid level according to marker 17.0 inches
b. designed 25 yr./24 hr. storm & structural freeboard JQ .5l inches
c. line b - line a (inches in red zone) = 2.5 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 73206 ft2
e. line c/12 x line d x 7.48 gallons/ft3 114079 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 432000 ft3
h. current herd # 3200 certified herd # 3200
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 1 12/21/2020
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
432000 ft'
Oft3
44625 ft3
594193 gallons
1.45 Ibs/1000 gal.
1027.0 Ibs. PAN
PoA (30 Day) 2/21 /00
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1.
Structure ID: Jerry Johnson
line m =
1027.0 lb PAN
2.
Structure ID:
line m =
lb PAN
3.
Structure ID:
line m =
lb PAN
4.
Structure ID:
line m =
lb PAN
5.
Structure ID:
line m =
lb PAN
6.
Structure ID:
line m =
lb PAN
n. lines 1 +2+3+4+5+6= 1027.0 lb PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD.
o. tract #
p. field #
q. crop
r. acres
s. remaining IRR
2 PAN balance
(lb/acre)
t. TOTAL PAN
BALANCE FOR
FIELD (lbs.)
column r x s
u. application window'
1745
6a-b
Small Grain Overseed
3.23
20.00
64.6
10/1 - 3/31
1745
7a-b
Small Grain Overseed
4.35
20.00
87.0
10/1 - 3/31
1745
8a-b
Small Grain Overseed
1.91
20.00
38.2
10/1 - 3/31
1745
9a
Small Grain Overseed
1.97
20.00
39.4
10/1 - 3/31
1745
9b
Small Grain Overseed
2.52
20.00
50.4
10/1 - 3/31
1745
9c
Small Grain Overseed
3.20
20.00
64.0
10/1 - 3/31
8503
1
Small Grain Overseed
4.10
20.00
82.0
10/1 - 3/31
8503
1 b
Small Grain Overseed
1.10
20.00
22.0
10/1 - 3/31
8503
2
Small Grain Overseed
3.20
20.00
64.0
10/1 - 3/31
8503
2b
Small Grain Overseed
0.75
20.00
15.0
10/1 - 3/31
8503
3
Small Grain Overseed
3.20
20.00
64.0
10/1 - 3/31
8503
3b
Small Grain Overseed
0.80
20.00
16.0
10/1 - 3/31
8503
4
Small Grain Overseed
3.60
20.00
72.0
10/1 - 3/31
8503
4b
Small Grain Overseed
2.50
20.00
50.0
10/1 - 3/31
8503
5b
Small Grain Overseed
1.10
20.00
22.0
10/1 - 3/31
1745
6a-b
Bermuda Pasture
3.23
184.00
594.3
10/1 - 3/31
1745
7a-b
Bermuda Pasture
4.35
184.00
800.4
10/1 - 3/31
1745
8a-b
Bermuda Pasture
1.91
184.00
351.4
10/1 - 3/31
1745
9a
Bermuda Pasture
1.97
184.00
362.5
10/1 - 3/31
1745
9b
Bermuda Pasture
2.52
184.00
463.7
10/1 - 3/31
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 3322.9 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) = 1027.0 lb. PAN
x. Crop's remaining PAN balance (line v from section III) = 3322.9 lb. PAN
y. Overall PAN balance (w - x) = -2296 lb. PAN
PoA (30 Day) 2/21 /00
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
This a update to last report. Hard to pump much with it raining every other day. Waste will be applied
agronomically and hydraulically as weather permits.
PoA (30 Day) 2/21 /00