Loading...
HomeMy WebLinkAbout20120037 Ver 2_401 Application_20120212�i vi&Associates V U Inc Since1918 Engineers Planners Surveyors Landscape Architects February 15 2012 �c'�- 00 3 7 U 2 Mr Ian McMillan NCDENR Wetlands, Buffers Stormwater Compliance and Permitting Unit 1650 Mail Service Center Raleigh NC 27699 1650 Subject The Heritage at Arlington Apartments Gravity Sanitary Sewer Improvements 2011086 D Dear Mr McMillan The Heritage at Arlington Apts LLC is proposing to install gravity sanitary sewer improvements to serve The Heritage at Arlington Apartments within the City of Greenville The City of Greenville is reviewing the Stormwater Management Plan associated with the apartment site construction for compliance with the Tar Pamlico Nutrient Management Strategy as well as their local program Enclosed for your review are the following 1 PCN Form (5 copies) 2 USGS quad maps illustrating the project locations (5 copies) 3 USDA soils maps illustrating the project locations (5 copies) 4 NCDENR On site Determination for Applicability to the Tar Pamlico Riparian Area Protection Rules (DWQ EXP# 12 0037) (5 copies) 5 US Army Corps of Engineers Notification of Jurisdictional Determination (Action Id SAW 2012 00027) (5 copies) 6 Rivers Drawing No W 3387 plan sheets 1 2 13 20 (2 full sized & 3 11 x17 ) 7 Application Fee ($240 00) On behalf of The Heritage at Arlington Apts LLC thank you for your assistance with this project Please do not hesitate to contact our office if you have any questions or need any additional information With best regards Rivers & Associate Bryan Fagundus Project Engineer Enclosures Cc The Heritage at Arlington Apts LLC Ms Emily Jernigan USACOE D FER 1 6 2012 DENR WATER (1UALI r t *TLAND'AND STORMWATER BRANCH VP 107 past Second Street Greens ille NC 27858 Post Office Box 929 Greenville NC 27835 (252) 752 4135 FAX (252) 752 3974 E mail nvers @nversandassociates com D &Associates Inc Since1918 February 15 2012 Ms Emily Jernigan US Army Corps of Engineers PO Box 1000 2407 W 5th Street Washington NC 27889 Subject The Heritage at Arlington Apartments Gravity Sanitary Sewer Improvements 2011086 D Dear Ms Jernigan Engineers Planners Surveyors Landscape tU chitects As we have previously discussed, The Heritage at Arlington Apts , LLC is proposing to install gravity sanitary sewer improvements to serve The Heritage at Arlington Apartments within the City of Greenville Enclosed for your review are the following 1 PCN Form 2 1 set of Rivers Drawing No W 3387 (plan sheets 1 2 13, 20) 3 USGS quad maps illustrating the project locations 4 USDA soils maps illustrating the project locations 5 NCDENR On site Determination for Applicability to the Tar Pamlico Riparian Area Protection Rules (DWQ EXP# 12 0037) 6 US Army Corps of Engineers Notification of Jurisdictional Determination (Action Id SAW 2012 00027) On behalf of The Heritage at Arlington Apts LLC thank you for your assistance with this protect Please do not hesitate to contact our office if you have any questions or need any additional information With best regards Rivers & Associates Inc Bryan Fagundus E Project Engineer Enclosures Cc The Heritage at Arlington Apts LLC Mr Ian McMillan NCDENR DWQ 107 Lnst Second Sttect Gieentille NC 27838 Post Office Box 929 Gieenville NC 27833 (232) 7-)2 4133 FAX (202) 752 3974 C mail t n ei s @nN ei sand- ►ssomtes com CF WATF9OG o < 1 :� -DV3"1 U �- Office use Only Corps action ID no DWQ project no Form Version 13 Dec 10 2008 Page 1 of 11 PCN Form — Version 13 December 10 2008 Version Pre - Construction Notification CN) Form A Applicant Information 1 on Processing la Type(s) of approval sought from the Corps ® Section 404 Permit ❑Section 6ermft 1b Specify Nationwide Permit (NWP) number 12 or General Permit (GP) number 1c Has the NWP or GP number been verified by the Corps? ® Yes ❑ No 1d Type(s) of approval sought from the DWQ (check all that apply) ® 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ® Riparian Buffer Authorization 1e is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification ❑ Yes ® No For the record only for Corps Permit: ❑ Yes ® No If Is payment into a mitigation bank or in lieu fee program proposed for mitigation of impacts? If so attach the acceptance letter from mitigation bank or in lieu fee program 0 Yes ® No 1g Is the project located in any of NC s twenty coastal counties if yes answer 1h below ❑ Yes ® No 1h Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ® No 2 Project Information 2a Name of project The Heritage at Arlington Apartments 2b County Pitt 2c Nearest municipality /town City of Greenville 2d Subdivision name Addison Place 2e NCDOT only T i P or state project no 3 Owner Information 3a Name(s) on Recorded Deed The Heritage at Arlington Apts LLC 3b Deed Book and Page No DB 2931 PG 32 3c Responsible Party (for LLC If applicable) Thomas F Taft Sr D �S l� 3d Street address 2217 Stantonsburg Road UU 3e City state zip Greenville NC 27834 7 6 3f Telephone no 252 752 7101 DEN 3g Fax no 252 758 1002 UWDS AND TORMWATER 3h Email address ttaftoffice @yahoo com Page 1 of 11 PCN Form — Version 13 December 10 2008 Version 4 Applicant Information (if different from owner) 4a Applicant is ❑ Agent ❑ Other specify 4b Name 4c Business name (if applicable) 4d Street address 4e City state zip 4f Telephone no 4g Fax no 4h Email address 5 Agent/Consultant Information (if applicable) 5a Name F Durward Tyson Jr P E 5b Business name (if applicable) Rivers and Associates Inc Sc Street address 107 E 2nd Street 5d City state zip Greenville NC 27858 5e Telephone no 252 752 4135 5f Fax no 252 782 3974 5g Email address dtyson @nversandassociates com Page 2 of 11 PCN Form — Version 13 December 10 2008 Version B Project Inforination and Prior Project History 1 Property Identification 1a Property Identification no (tax PIN or parcel ID) 19350 Latitude 35 616964 Longitude lb Site coordinates (in decimal degrees) 77 407312 (DD DDDDDD) ( DD DDDDDD) 1c Property size 29 67 acres 2 Surface Waters 2a Name of nearest body of water (stream river etc ) to School House Branch proposed project 2b Water Quality Classification of nearest receiving water C NSW 2c River basin Tar - Pamlico 3 Project Description 3a Describe the existing conditions on the site and the general land use In the vicinity of the project at the time of this application Site is currently open lawn with a wooded buffer along School House Branch 3b List the total estimated acreage of all existing wetlands on the property 7 72 Ac +/ 3c List the total estimated linear feet of all existing streams (intermittent and perennial) on the property 670 LF +/ 3d Explain the purpose of the proposed project Gravity sanitary sewer extension 3e Describe the overall project in detail including the type of equipment to be used This project consists of connecting to an existing Greenville Utilities Comrrussion sanitary sewer outfall and extending a new gravity sewer main Heavy excavation equipment will be utilized i e hydraulic excavators rubber tired loaders tracked dozers dump trucks See attached narrative and plan sheets 4 Jurisdictional Determinations 4a Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / ® Yes 0 No 0 Unknown project (including all prior phases) in the past? Comments 4b If the Corps made the jurisdictional determination what type 0 preliminary 0 Final of determination was made? 4c If yes who delineated the jurisdictional areas? Agency /Consultant Company Name (if known) Emily Jernigan USACOE Roberto Schaller NCDENR DWQ Other 4d If yes list the dates of the Corps jurisdictional determinations or State determinations and attach documentation USACOE Action Id SAW 2012 -00027 dated January 4 2012 NCDENR DWQ EXP# 12 -0037 dated January 18 2012 5 Project History 5a Have permits or certifications been requested or obtained for 0 Yes 0 No 0 Unknown this project (including all prior phases) in the past? 5b If yes explain in detail according to help file instructions Page 3 of 11 PCN Form — Version 13 December 10 2008 Version 6 Future Project Plans 6a Is this a phased project? ❑ Yes ® No 6b If yes explain Page 4 of 11 PCN Form — Version 13 December 10 2008 Version C Proposed Impacts Inventory 1 Impacts Summary 1a Which sections were completed below for your project (check all that apply) 0 Wetlands ® Streams tributaries ® Buffers 0 Open Waters 0 Pond Construction 2 Wetland Impacts If there are wetland impacts proposed on the site then complete this question for each wetland area impacted 2a 2b 2c 2d 2e 2f Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps 404 10 Area of impact Permanent (P) or (if known) DWQ — non -404 other) (acres) Temporary T W1 0 P ®T Excavation for 0 Yes ® Corps 00743 Sanitary Sewer ❑ No I 0 DWQ W2 0 P 0 T ❑ Yes 0 Corps 0 No 0 DWQ W3 0 P 0 T 0 Yes 0 Corps ONo ❑DWQ W4 0 P 0 T 0 Yes 0 Corps 0 No 0 DWQ WS 0 P 0 T 0 Yes 0 Corps 0 No 0 DWQ WS 0 P 0 T 0 Yes 0 Corps 0 No 0 DWQ 2g Total wetland impacts 00743 2h Comments Temporary impact areas will be returned to pre - construction contours and seeded See attached narrative 3 Stream Impacts If there are perennial or Intermittent stream impacts (including temporary impacts) proposed on the site then complete this question for all stream srtes impacted 3a 3b 3c 3d 3e 3f 3g Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number (PER) or (Corps 404 10 stream length Permanent (P) or intermittent DWQ — non -404 width (linear Temporary (T) (INT)? other) (feet) feet) S1 0 P ®T Aerial Sanitary School House ® PER ® Corps 25 40 Sewer Crossing Branch 0 INT ® DWQ S2 0 P 0 T ❑ PER 0 Corps 0 INT 0 DWQ S3 0 P 0 T ❑ PER 0 Corps 0 INT 0 DWQ S4 []POT 0 PER 0 Corps 0 INT 0 DWQ S5 0 P 0 T 0 PER 0 Corps 0 INT 0 DWQ S6 [:]POT 0 PER 0 Corps 0 INT 0 DWQ 3h Total stream and tributary impacts 40 31 Comments Page 5 of 11 PCN Form — Version 13 December 10 2008 Version 4 Open Water Impacts If there are proposed impacts to lakes ponds estuaries tributaries sounds the Atlantic Ocean or any other open water of the U S then indiv ually list alto en water Impacts below 4a 4b 4c 4d 4e Open water Name of waterbody Impact number — (d applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary T 01 OPOT 02 OPOT 03 ❑POT 04 OP[IT 4f Total open water Impacts 4g Comments N/A 5 Pond or Lake Construction If pond or take construction proposed, then complete the chart below 5a 5b 5c 5d 5e Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f Total 5g Comments N/A 5h Is a dam high hazard permit required? ❑ Yes ❑ No if yes permit ID no 51 Expected pond surface area (acres) 5j Size of pond watershed (acres) 5k Method of construction 6 Buffer Impacts (for DWO) If project will Impact a protected riparian buffer then complete the chart below If yes then individually list all buffer impacts below If any Impacts require mitigation, then you MUST fill out Section D of this form 6a Neuse ® Tar Pamlico O Other Project is In which protected basin? O Catawba O Randleman 6b 6c 6d 6e 6f 6g Buffer impact number — Reason Buffer Zone 1 Impact Zone 2 Impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary T Impact required? B1 O P O T Sewery School House branch ® Nos 2 400 1600 82 ❑POT OYes O No 63 O P O T O Yes ❑ No 6h Total buffer impacts 2 400 1600 61 Comments Temporary impact areas will be returned to pre - construction contours and seeded See narrative Page 6 of 11 PCN Form — Version 13 December 10 2008 Version D Impact Justification and Mitigation 1 Avoidance and Minimization Is Specifically describe measures taken to avoid or rrunim¢e the proposed impacts in designing project See Attached Narrative 1b Specifically describe measures taken to avoid or mmff=e the proposed impacts through construction techniques See Attached Narrative 2. Compensatory Mitigation for Impacts to Waters of the U S or Waters of the State 2a Does the project require Compensatory Mitigation for impacts to Waters of the U S or Waters of the State? ❑ Yes ® No 2b If yes, mrtrgatton is ragwred by (check all that apply) ❑ DWQ ❑ Corps 2c If yes which mitigation option vinfl be used for this project? ❑ Mitigation bank ❑ Payment to in -lieu fee program ❑ Pemruttee Responsible Mitigation 3 Complete if Using a Mitigation Bank 3a Name of Mitigation Bank. 3b Credits Purchased (attach receipt and letter) Type Quantity 3c Comments N/A 4 Complete if Making a Payment to In4leu Fee Program 4a Approval letter from m4jeu fee program is attached ❑ Yes 0 Stream mitigation requested linear feet 4c If using stream mitigation stream temperature ❑ warm ❑ cool ❑cold 4d Buffer mitigation requested (DWQ only) square feet 4e Riparian wetland mitigation requested acres 4f Non- npanan wetland mitigation requested* acres 4g Coastal (tidal) wetland m>tggaton requested acres 4h Comments WA 5 Complete If Using a Permittee Responsible Mitigation Plan 5a if using a permuttee responsible mitigation plan provide a description of the proposed mitigation plan N/A Page 7 of 11 PCN Form — Version 13 December 10 2008 Version 6 Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWO 6a Will the project result in an impact within a protected riparian buffer that requires ❑ Yes ® No buffer mitigation? 6b If yes then identify the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the amount of mitigation required 6c 6d 6e Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 3 (2 for Catawba) Zone 2 15 6f Total buffer mitigation required 6g If buffer mitigation is required discuss what type of mitigation is proposed (e g payment to private mitigation bank, permdtee responsible riparian buffer restoration payment into an approved in 4eu fee fund) N/A 6h Comments WA Page 8 of 11 PCN Form — Version 13 December 10 2008 Version E Stormwater Management and Diffuse Flow Plan (required by DWQ) 1 Diffuse Flow Plan 1a Does the project include or is it adjacent to protected riparian buffers identified ® Yes ❑ No within one of the NC Riparian Buffer Protection Rules? 1b If yes then is a diffuse flow plan included? If no explain why Comments Base stream flow will be controlled during excavation activities and will ® Yes ❑ No be discharged outside the Riparian Buffer through a sediment control bag 2 Stormwater Management Plan 2a What is the overall percent imperviousness of this project? 0% 2b Does this project require a Stormwater Management Plan? ❑ Yes ® No 2c If this project DOES NOT require a Stormmter Management Plan explain why Sanitary sewer main extension 2d if this project DOES require a Stormwater Management Plan then provide a brief narrative descnpbon of the plan This project is a gravity sanitary sewer main extension ❑ Certified Local Government 2e Who will be responsible for the review of the Storms vater Management Plan? ❑ DWQ Stormwater Program ❑ DWQ 401 Unit 3 Certified Local Government Stormwater Review 3a In which local governments jurisdiction is this project? City of Greenville ® Phase II 3b Which of the following locally - implemented storrtmrater management programs ® NSW ❑ USMP apply (check all that apply) ❑ Water Supply Watershed ❑ Other 3c Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ® No attached? 4 DWQ Stormwater Program Review ❑ Coastal counties ❑ HQW 4a Which of the following state - implemented stommmter management programs apply ❑ ORW (check all that apply) ® Session Law 2006 -246 ® Other Tar - Pamlico Nutrient Management Strategy 4b Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ®No 5 DWQ 401 Unit Stormwater Review 5a Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 9 of 11 PCN Form — Version 13 December 10 2008 Version F Supplementary InfonnaUon 1 Environmental Documentation (DWQ Requirement) 1a Does the project involve an expenditure of public (federallstatellocal) funds or the 0 Yes ® No use of public (federallstate) land? 1b If you answered yes to the above does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c If you answered yes to the above has the document review been finalized by the State Clearing House? (If so attach a copy of the NEPA or SEPA final approval ❑ Yes ❑ No letter) Comments 2. Violations (DWQ Requirement) 2a Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500) isolated Weband Rules (15A NCAC 2H 1300) DWQ Surface Water or Wetland Standards ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 213 0200)? 2b Is this an after the fad permit application? ❑ Yes ❑ No 2c If you answered yes to one or both of the above questions provide an explanation of the wotatfon(s) 3 Cumulative Impacts (DWQ Requirement) 3a Will this probed (based on past and reasonably anticipated future impacts) result in 0 Yes ® No additional development, which could impact nearby downstream water quality? 3b If you answered yes to the above submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy If you answered no provide a short narrative description 4 Sewage Disposal (DWQ Requirement) 4a Clearly detail the uitunate treatment methods and disposition (non - discharge or discharge) of wastewater generated from the proposed project or available capacity of the subject facility The gravity sanitary sewer main wig convey new wastewater flows from a new development into the existing Greenville Utilities Commission sewer collection system that will treated at the Greenville Utilities Commission Wastewater Treatment Plant The new wastewater flows are being permitted through Greenville Utilities Commission and NCDENR Page 10 of 11 PCN Form — Version 13 December 10 2008 Version 5 Endangered Species and Designated Critical Habitat (Corps Requirement) 5a Will this project occur in or near an area with federally protected species or ❑ Yes ® No habitat? 5b Have you checked with the USFWS concerning Endangered Species Act ❑ Yes ® No impacts? ❑ Raleigh Sc If yes indicate the USFWS Field Offioe you have contacted ❑ Asheville 5d What data sources did you use to detemune whether your site would impact Endangered Species or Designated Critical Habitat? NC Natural Heritage Websde and on-sde investigation 6 Essential Fish Habitat (Corps Requirement) 6a Will this project occur in or near an area designated as essential fish habitat? FO Yes No 6b What data sources did you use to detemune whether your site would impact Essential Fish Habitat? on-sde investigation 7 Historic or Prehistoric Cultural Resources (Corps Requirement) 7a Will this project occur in or near an area that the state federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ® No status (e g National Historic Trust designation or properties significant to North Carolina history and archaeology)? 7b What data sources did you use to detemmne whether your site would impact historic or archeological resources? ors -site investigation 8 Flood Zone Designation (Corps Requirement) 8a Will this project occur in a FEMA- designated 100 -year floodplain? lyyes ❑ No 8b If yes explain how project meets FEMA requirements Project area finished grade will be returned to pre - installation conditions 8c What source(s) did you use to make the floodplain determination? FIRM # 3720467800J Thomas F Taft, Sr a 11413, "Date Applicent/Agenrs Printed Name p cant/Ag s n ( o* ti an a tter born the applicant Is v Page 11 of 11 PCN Form — Version 13 December 10 2008 Version The Heritage at Arlington Apartments PCN Narrative D Impact Justification and Mitigation 1 Avoidance and Minimization ]a Specifically describe measures taken to avoid or minimize the proposed impacts in designing project This project consists of installing anew 8 gravity sanitary sewer main Greenville Utilities Commission owns an existing 15 gravity sanitary sewer outfall running along the south side of School House Branch that will be tied into to provide sewer service to the developing property on the north side of School House Branch The new 8 gravity sewer main will be installed perpendicular to School House Branch utilizing a 40 maximum width construction corridor The permanent maintenance corridor for the new 8 gravity sewer will be 10 in width The majority of the new 8 gravity sewer main will be installed as an aerial crossing of School House Branch Timber pile bents will support the sewer main Clearing required for the sewer main installation will involve cutting trees and leaving stumps in place to avoid grubbing activities The permanent maintenance corridor will be maintained by hand clearing Erosion Control Measures Erosion control measures within the Riparian Buffer will include temporary silt fence to control offsite sedimentation Measures within the stream channel are limited to two temporary rock silt check dams that will be installed on the upstream and downstream side of the new sanitary sewer main Heavy equipment will be used to perform excavation work required for the tie in to the existing Greenville Utilities Commission manhole on the south side of School House Branch While this activity is ongoing the existing base stream flow will be pumped from the area between the rock silt check dams into a sediment control bag that will be placed outside the Riparian Buffer to mitigate offsite sedimentation downstream of the construction corridor Once work is completed on the south side of School House Branch the original existing ground contours will be restored and permanent turf reinforcement will be placed along with permanent seeding lb Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques The gravity sanitary sewer main is being installed perpendicular to School House Branch within the areas designated on the plans Trench widths are limited to the minimum width necessary to install the pipe The construction corridor is limited to 40 in width and the permanent maintenance corridor is limited to 10 in width RECEIVED JAN 2 0 2012 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Rivers & Associates, Inc Mr Ben Williams Post Office Box 929 Greenville, NC 27835 Division of Water Quality Charles Wakid, P E Director January 18, 2012 Dee Freeman Secretary DWQ EXP# 12 -0037 Pitt County Subject Property Addison Place Apartment Complex Greenville Tar Pamlico River Basin, School House Branch (TAR 05 28 93 NSW, C) On Site Re- Determination for Appheabdity to the Tar - Pamlico River Riparian Area Protection Rules (15A NCAC 213 0259) - EXPRESS REVEEW PROGRAM Dear Mr Williams On January 13 2012 -it your request [ conducted an on site determination to review drainage features located on the subject property for applicability to the Tat Pamlico Buffer Rules (15A NCAC 2B 0259) The feature is labeled as 12 0037A to 12 0037C on the attached maps initialed by me on December 18 2012 The Division of Water Quality (DWQ) has determined that the featui a labeled as "12 0037A to 12 0037B" on the attached maps, and highlighted in red is not subject to the Tai Pamlico Buffer Rules The section of stream from point 12 00378 to 12 0037C and highlighted in blue is subject to the Tar Pamlico Buffer Rules The stream determination begins at point 12 0038A (N 351 36 472' W 771 24 772') and continues down gradient to point 12 0037B (N 35° 36 538 W 770 24 748') as shown on attached maps and marked on the ground with yellow DWQ flagging From point 12 0037 B to point 12 0037C (N35° 36 583' W77° 24 749 ) the feature is subject to the Tar Pamlico Buffet Rules and points are marked on the ground with yellow DWQ flagging The owner (oi future owners) should notify the DWQ (and other relevant agencies) of this decision in any future correspondences concerning this property This on site determination shalt expire five (5) years from the date of this letter Landowners or affected parties that dispute a determination made by the DWQ or Delegated Local Authority that a surface water exists and that it is subject to the buffer rule may request a determimition by the Director A request foi a deteimmation by the Director shall be referred to the Director in writing c/o Karen Higgins 1650 Marl Service Center Raleigh NC 27699 1650 Individuals that dispute a deteimmahon by the DWQ of Delegated Local Authority that exempts a surface water from the buffer i the may ask foi an adjudicatory hearing You must act within 60 days of the date that you receive this letter Applicants are hereby notified that the 60 day statutory appeal time does not start until the affected party (including downstream and adjacent landowners) is notified of this decision DWQ recommends that North Carolina Division of Water Cluality 943 Washington Square Mall Washingten NC 27889 Phone 252 946 -64611 FAX 252 946 9215 Internet. %wrw ncwaterquality orq An Equal Opportunity t Affirmallo Amn Employer No e hCarolma Natural! the applicant conduct this notification in order to be certain that third party appeals are made in a timely manner To ask for a hearing send a written petition which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Admmistratrve Heaungs 6714 Mail Service Center Raleigh N C 27699 6714 This determination is final and binding unless you ask for a heal ing within 60 days This letter only addresses the applicability to the buffer rules and does not approve any activity within the buffers Nor does this letter approve any activity within Waters of the United States or Waters of the State if you have any additional questions or require additional information please call Roberto Scheller in the Washington Regional Office at (252) 948 3940 inceiely ror Chai les Wakid, P E Attachments Pitt County Soil Survey map USGS Greenville SW Quad map Goggle Earth map cc DWQ 401/Wedand Express Unit DLM- WaRO File Copy E den -ime 12 0037 Ah� Aw , 'IN 77 Reh� k) 4P j* IV, ;Alfons 'Chapel 11-0128 A ti, 1 11-01 as 12-0037C N 36 36.583' W 77 24.749' j �'MO.41i- 0 1 12-0037B N 35 36.538' W 77 24.748' 12-0037A N 35 30.472' W 77 24.772' WNW^ WNW 0 % 08-1619A 08-1619B Carolinn En ironmen agement C- *of OwIty 11667 Coovdaht 1C11 Location: 035*36'38.38" N 077*24'41.88" W Caption: Addison Place, Greenville, PiU Co. 0 G earth feet ' 0 �900 meters i 200 Nor,., I i MLn - xtt Gorrmil—l-ico Division of Water Quality For,TAL-S6tt %n Ofiffer Reviewed by--%�-�� U S ARMY CORPS OF ENGMERS WILMINGTON DISTRICT Action Id SAW 2012 -00027 County Pitt U S G S Quad NC Greenville SW NOTIFICATION OF JURISDICTIONAL DETERMINATION Property Owner /Agent Carroll & Associates. Inc Attn Philip E Carroll Address 2510 S Charles Boulevard Greenville, North Carolina 27858 Telephone No (252) 756 2001 Property description Size (acres) — 28 63 Nearest Town Greenville Nearest Waterway School House Branch River Basin Tar Pamlico River Basin USGS HUC 03020103 Coordinates N 35 61856 W 77 40519 Location description Property is located at the intersection of Arlington Boulevard and NC Highway 43, next to the Trevbroolre development, adjacent to School House Branch and the Tar River, in Greenville. Pitt Countv. North Carolina Indicate Which of the Following Apply A Preliminary Determination _ Based on preliminary information there may be wetlands on the above described property We strongly suggest you have this property inspected to determine the extent of Department of the Army (DA) jurisdiction To be considered final a jurisdictional determination must be verified by the Corps This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process ( Reference 33 CFR Part 33 1) B Approved Determination _ There are Navigable Waters of the United States within the above described property subject to the permit requirements of Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act Unless there is a change in the law or our published regulations this determination may be relied upon for a period not to exceed five years from the date of this notification X There are waters of the U S including wetlands on the above described property subject to the permit requirements of Section 404 of the Clean Water Act (CWA)(33 USC § 1344) Unless there is a change in the law or our published regulations this determination may be relied upon for a period not to exceed five years from the date of this notification _ We strongly suggest you have the wetlands on your property delineated Due to the size of your property and/or our present workload the Corps may not be able to accomplish this wetland delineation in a timely manner For a more timely delineation you may wish to obtain a consultant To be considered final any delineation must be verified by the Corps X The waters of the U S including wetland on your property have been delineated and the delineation has been verified by the Corps We strongly suggest you have this delineation surveyed Upon completion this survey should be reviewed and verified by the Corps Once verified this survey will provide an accurate depiction of all areas subject to CWA jurisdiction on your property which provided there is no change in the law or our published regulations may be relied upon for a period not to exceed five years _ The waters of the U S including wetlands have been delineated and surveyed and are accurately depicted on the plat signed by the Corps Regulatory Official identified below on Unless there is a change in the law or our published regulations this determination may be relied upon for a period not to exceed five years from the date of this notification There are no waters of the U S to include wetlands present on the above described property which are subject to the permit requirements of Section 404 of the Clean Water Act (33 USC 1344) Unless there is a change in the law or our published regulations this determination may be relied upon for a period not to exceed five years from the date of this notification Page 1 of 2 The property is located in one of the 20 Coastal Counties subject to regulation under the Coastal Area Management Act (CAMA) You should contact the Division of Coastal Management in Washington NC at (252) 946 -6481 to determine their requirements Action Id SAW 2012 00027 Placement of dredged or fill material within waters of the US and/or wetlands without a Department of the Army permit may constitute a violation of Section 301 of the Clean Water Act (33 USC § 1311) If you have any questions regarding this determination and/or the Corps regulatory program please contact Ms Emily Jernigan at (910) 251 4567 C Basis For Determination This site is hart of a broad continuum of wetlands, and exhibits wetland critena as descnbed in the 1987 Corps Wetland Delineation Manual and is adjacent to School House Branch, which flows directly into the Tar River D Remarks E Attention USDA Program Participants This delineation /determination has been conducted to identify the limits of Corps Clean Water Act jurisdiction for the particular site identified in this request The del►neation/determmation may not be valid for the wetland conservation provisions of the Food Security Act of 1985 If you or your tenant are USDA Program participants or anticipate participation in USDA programs you should request a certified wetland determination from the local office of the Natural Resources Conservation Service prior to starting work F Appeals Information (This information applies only to approved jurisdictional determinations as indicated in B above) This correspondence constitutes an approved jurisdictional determination for the above described site Ifyou object to this determmation you may request an administrative appeal under Corps regulations at 33 CFR part 331 Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form If you request to appeal this determination you must submit a completed RFA form to the following address District Engineer Wilmington Regulatory Division Attn Emily Jernigan Project Manager Washington Regulatory Field Office Post Office Box 1000 Washington North Carolina 27889 In order for an RFA to be accepted by the Corps the Corps must determine that it is complete that it meets the criteria for appeal under 33 CFR part 3315 and that it has been received by the District Office within 60 days of the date of the NAP Should you decide to submit an RFA form it must be received at the above address by 03/04/2012 * *It is not necessary to submit an RFA form to the District Office if you do not object to the determination m this correspondence ** r`\ Corps Regulatory Official Date 01/04/2012 01/04/2017 The Wilmington District is committed to providing the highest level of support to the public To help us ensure we continue to do so please complete the Customer Satisfaction Survey located at our website at h=..//regulatory usacesurvey coin/ to complete the survey online Copy furnished Page 2 of 2