Loading...
HomeMy WebLinkAbout20111115 Ver 1_More Info Received_20120220of W ATF9 T ti 14, I 0 > 1 lio�0 o < o�— m5 Office Use Only Corps action ID no DWQ project no Form Version 13 Dec 10 2008 N C Dept of ENR FEB 16 2012 Winston Salem Re tonal office Page 1 of 11 PCN Form — Version 1 3 December 10 2008 Version Pre - Construction Notification PC Form A Applicant Information 1 Processing la Type(s) of approval sought from the Corps 0 Section 404 Permit ❑ Section 10 Permit 1 b Specify Nationwide Permit (NWP) number 14 or General Permit (GP) number 1c Has the NWP or GP number been verified by the Corps? ® Yes ❑ No 1 d Type(s) of approval sought from the DWQ (check all that apply) ® 401 Water Quality Certification — Regular ❑ Non 404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization le Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification ® Yes ❑ No For the record only for Corps Permit ❑ Yes ❑ No if Is payment into a mitigation bank or in lieu fee program proposed for mitigation of impacts? If so attach the acceptance letter from mitigation bank or in lieu fee program ❑ Yes ® No 1 g Is the project located in any of NC s twenty coastal counties If yes answer 1 h below ❑ Yes ® No 1h Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ® No 2 Project Information 2a Name of project Champion Hills Jones Keystone 2b County Randolph 2c Nearest municipality / town Trinity 2d Subdivision name Harold Lee Briles 2e NCDOT only T I P or state project no ' ' 3 Owner Information F 3a Name(s) on Recorded Deed Linda B Hunt 3b Deed Book and Page No 211111218 JALITY DSMI)ST 3c Responsible Party (for LLC if applicable) Mr Aaron Keay 3d Street address 4962 Rex Rd 3e City state zip Winston Salem NC 27107 3f Telephone no 336 785 1286 3g Fax no N/A 3h Email address N/A N C Dept of ENR FEB 16 2012 Winston Salem Re tonal office Page 1 of 11 PCN Form — Version 1 3 December 10 2008 Version 4 Applicant Information (if different from owner) 4a Applicant is ® Agent ❑ Other specify 4b Name Mr Peter H Evans 4c Business name (if applicable) Revolution Resources Corp 4d Street address 1500 -409 Granville Street 4e City state zip Vancouver BC Canada V6C 1TB 4f Telephone no 336 959 8302 4g Fax no 4h Email address pevans123 @triad rr com 5 Agent/Consultant Information (if applicable) 5a Name H Mack Summey Jr PE 5b Business name (if applicable) Summey Engineering Associates PLLC 5c Street address 1342 E Salisbury Street 5d City state zip Asheboro NC 27204 5e Telephone no 336 328 0902 5f Fax no 336 328 0922 5g Email address mack @asheboro com Page 2 of 11 PCN Form — Version 1 3 December 10 2008 Version B Project Information and Prior Project History 1 Property Identification la Property identification no (tax PIN or parcel ID) 6792754441 Latitude 35 723886 Longitude 0043387 lb Site coordinates (in decimal degrees) (DD DDDDDD) ( DD DDDDDD) lc Property size 163 88 acres 2 Surface Waters 2a Name of nearest body of water (stream river etc ) to UT to Uwharne River proposed project 2b Water Quality Classification of nearest receiving water WS 111 2c River basin Yadkin 3 Project Description 3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application Existing site is wooded with old saw mill roads through the property Area consists of sparsely located single family residential Disturbance consisted of stream crossing 3b List the total estimated acreage of all existing wetlands on the property Less than 1/2 acre 3c List the total estimated linear feet of all existing streams (intermittent and perennial) on the property 3d Explain the purpose of the proposed project Reuse old logging roads and /or construct short narrow drive and install a 50 x60 pad for exploratory drilling operation 3e Describe the overall project in detail including the type of equipment to be used Drill rig hauled into site on tractor trailer & pulled off trader with DC 9 catepolar Road construction also uses dump truck bob cat/loader and tractor to install erosion control measures 4 Jurisdictional Determinations 4a Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / ® Yes ❑ No ❑ Unknown project (including all prior phases) in the past? Comments 4b If the Corps made the jurisdictional determination what type Preliminary ® Final of determination was made? 4c If yes who delineated the jurisdictional areas? Agency /Consultant Company Name (if known) Sue Homewood /John Thomas Other 4d If yes list the dates of the Corps jurisdictional determinations or State determinations and attach documentation November 2 2011 no documents received 5 Project History 5a Have permits or certifications been requested or obtained for Yes ® No ❑ Unknown this project (including all prior phases) in the past? 5b If yes explain in detail according to help file instructions Page 3 of 11 PCN Form — Version 1 3 December 10 2008 Version 6 Future Project Plans 6a is this a phased project? ® Yes ❑ No 6b If yes explain This could possibly be a phased project in that if gold is found the company may need to do further exploration If this ocurs further permitting will be requested and appealed for Page 4 of 11 PCN Form — Version 1 3 December 10 2008 Version C Proposed Impacts Inventory 1 Impacts Summary la Which sections were completed below for your project (check all that apply) ❑ Wetlands ® Streams tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2 Wetland Impacts If there are wetland impacts proposed on the site then complete this question for each wetland area impacted 2a 2b 2c 2d 2e 2f Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps 404 10 Area of impact Permanent (P) or (if known) DWQ —non 404 other) (acres) Temporary T ❑ Yes ❑Corps W1 ❑ P ❑ T ❑ No ❑ DWQ ❑ Yes ❑ Corps W2 ❑ P ❑ T ❑ No ❑ DWQ ❑ Yes ❑ Corps W3 ❑ P ❑ T ❑ No ❑ DWQ ❑ Yes ❑ Corps W4 ❑ P ❑ T ❑ No ❑ DWQ ❑ Yes ❑ Corps W5 ❑ P ❑ T ❑ No I ❑ DWQ ❑ Yes ❑ Corps W6 ❑ P ❑ T ❑ No ❑ DWQ 2g Total wetland impacts 2h Comments 3 Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site then complete this question for all stream sites impacted 3a 3b 3c 3d 3e 3f 3g Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number (PER) or (Corps 404 10 stream length Permanent (P) or intermittent DWQ — non 404 width (linear Temporary (T) (INT)? other) (feet) feet) S1 ®P ❑ T Permanent UT to Uwharne ® PER ® Corps 15 30 Crossing River ❑ INT ® DWQ S2 ❑ P ®T Temporary UT to Uwharne ❑ PER ® Corps 15 20 Crossing River ❑ INT ® DWQ ❑ PER ❑ Corps S3 ❑ P ❑ T ❑ INT ❑ DWQ ❑ PER ❑ Corps S4 ❑ P ❑ T ❑ INT ❑ DWQ ❑ PER ❑ Corps S5 ❑ P ❑ T ❑ INT ❑ DWQ ❑ PER ❑ Corps S6 ❑ P ❑ T ❑ INT ❑ DWQ 3h Total stream and tributary impacts 31 Comments Crossing #1 to be made permanent stone to be leveled out to prevent water ponding This crossing was an old logging road that was just reused Stone was put on stream bed Crossing #2 will be removed and restored immediately Page 5 of 11 PCN Form — Version 1 3 December 10 2008 Version 4 Open Water Impacts If there are proposed impacts to lakes ponds estuaries tributaries sounds the Atlantic Ocean or any other open water of the U S then individually list all open water impacts below 4a 4b 4c 4d 4e Open water Name of waterbody impact number — (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary T 01 ❑P ❑T 02 ❑P ❑T 03 ❑P ❑T 04 ❑ PEI T 4f Total open water impacts 4g Comments 6 Pond or Lake Construction If pond or lake construction proposed then complete the chart below 5a 5b 5c 5d 5e Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f Total 5g Comments 5h Is a dam high hazard permit required ❑ Yes ❑ No If yes permit ID no 51 Expected pond surface area (acres) 5l Size of pond watershed (acres) 5k Method of construction 6 Buffer Impacts (for DWQ) If project will impact a protected riparian buffer then complete the chart below If yes then individually list all buffer impacts below If any impacts require mitigation then you MUST fill out Section D of this form 6a ❑ Neuse ❑ Tar Pamlico ❑ Other Project is in which protected basin? ❑ Catawba ❑ Randleman 6b 6c 6d 6e 6f 6g Buffer impact number — Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary T im act re uiredl 131 ❑P ❑T ❑Yes ❑ No B2 ❑P ❑T ❑Yes ❑ No B3 ❑P ❑T ❑Yes ❑ No 6h Total buffer impacts 61 Comments Page 6 of 11 PCN Form — Version 1 3 December 10 2008 Version D Impact Justification and Mitigation 1 Avoidance and Minimization 1a Specifically describe measures taken to avoid or minimize the proposed impacts in designing project Project used existing road beds for stream crossing no new crossings were made 1 b Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques No digging in the stream was done rip rap placed carefully on existing stone in stream bottom 2 Compensatory Mitigation for Impacts to Waters of the U S or Waters of the State 2a Does the project require Compensatory Mitigation for impacts to Waters of the U S or Waters of the State ❑ Yes ® No 2b If yes mitigation is required by (check all that apply) ❑ DWQ ❑ Corps 2c If yes which mitigation option will be used for this project'? ❑ Mitigation bank ❑ payment to in lieu fee program ❑ Permittee Responsible Mitigation 3 Complete if Using a Mitigation Bank 3a Name of Mitigation Bank 3b Credits Purchased (attach receipt and letter) Type Quantity 3c Comments 4 Complete if Making a Payment to In lieu Fee Program 4a Approval letter from in lieu fee program is attached ❑ Yes 4b Stream mitigation requested linear feet 4c If using stream mitigation stream temperature ❑ warm ❑ cool ❑cold 4d Buffer mitigation requested (DWQ only) square feet 4e Riparian wetland mitigation requested acres 4f Non riparian wetland mitigation requested acres 4g Coastal (tidal) wetland mitigation requested acres 4h Comments 5 Complete if Using a Permittee Responsible Mitigation Plan 5a If using a permittee responsible mitigation plan provide a description of the proposed mitigation plan Page 7 of 11 PCN Form — Version 1 3 December 10 2008 Version 6 Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes ❑ No 6b If yes then identify the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the amount of mitigation required Zone 6c Reason for impact 6d Total impact (square feet) Multiplier 6e Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1 5 6f Total buffer mitigation required 6g If buffer mitigation is required discuss what type of mitigation is proposed (e g payment to private mitigation bank permittee responsible riparian buffer restoration payment into an approved in lieu fee fund) 6h Comments Page 8 of 11 PCN Form —Version 1 3 December 10 2008 Version E Stormwater Management and Diffuse Flow Plan (required by DWQ) 1 Diffuse Flow Plan la Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes ® No within one of the NC Riparian Buffer Protection Rules? 1 b If yes then is a diffuse flow plan included? If no explain why ❑ Yes ❑ No Comments 2 Stormwater Management Plan 2a What is the overall percent imperviousness of this project? 1313% 2b Does this project require a Stormwater Management Plan? ❑ Yes ® No 2c If this project DOES NOT require a Stormwater Management Plan explain why Project is not creating permanent impervious area 2d If this project DOES require a Stormwater Management Plan then provide a brief narrative description of the plan ® Certified Local Government 2e Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program ❑ DWQ 401 Unit 3 Certified Local Government Stormwater Review 3a In which local government s jurisdiction is this project? Randolph County ❑ Phase II 3b Which of the following locally implemented stormwater management programs ❑ NSW ❑ USMP apply (check all that apply) ® Water Supply Watershed ❑ Other 3c Has the approved Stormwater Management Plan with proof of approval been ® Yes ❑ No attached? 4 DWQ Stormwater Program Review ❑ Coastal counties ❑ HQW 4a Which of the following state implemented stormwater management programs apply ❑ ORW (check all that apply) ® Session Law 2006 246 ❑ Other 4b Has the approved Stormwater Management Plan with proof of approval been ® Yes ❑ No attached? 5 DWQ 401 Unit Stormwater Review 5a Does the Stormwater Management Plan meet the appropriate requirements? ® Yes ❑ No 5b Have all of the 401 Unit submittal requirements been met? ® Yes ❑ No Page 9 of 11 PCN Form — Version 1 3 December 10 2008 Version F Supplementary Information 1 Environmental Documentation (DWQ Requirement) la Does the project involve an expenditure of public (federal /state /local) funds or the ❑ Yes ® No use of public (federal /state) land? lb If you answered yes to the above does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c if you answered yes to the above has the document review been finalized by the State Clearing House? (If so attach a copy of the NEPA or SEPA final approval ❑ Yes No ❑ letter) Comments 2 Violations (DWQ Requirement) 2a Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500) Isolated Wetland Rules (15A NCAC 2H 1300) DWQ Surface Water or Wetland Standards ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 2B 0200)9 2b Is this an after the fact permit application? ® Yes ❑ No 2c If you answered yes to one or both of the above questions provide an explanation of the violation(s) Permittee did not know that a permit of this type was needed since it was only a temporary disturbance at the time Decision has been made to request crossing to be permanent 3 Cumulative Impacts (DWQ Requirement) 3a Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ® No additional development which could impact nearby downstream water quality? 3b If you answered yes to the above submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy If you answered no provide a short narrative description Project disturbance is temporary only crossing will remain however no new permanent Impervious surface will be created 4 Sewage Disposal (DWQ Requirement) 4a Clearly detail the ultimate treatment methods and disposition (non discharge or discharge) of wastewater generated from the proposed project or available capacity of the subject facility None Generated Page 10 of 11 PCN Form — Version 1 3 December 10 2008 Version 5 Endangered Species and Designated Critical Habitat (Corps Requirement) 5a Will this project occur in or near an area with federally protected species or ❑ Yes ® No habitat? 5b Have you checked with the USFWS concerning Endangered Species Act ❑ Yes ® No impacts? El Raleigh 5c If yes indicate the USFWS Field Office you have contacted ❑ Asheville 5d What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? The USFWS website search engine 6 Essential Fish Habitat (Corps Requirement) 6a Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ® No 6b What data sources did you use to determine whether your site would impact Essential Fish Habitat? NOAA Habitat Conservation Website 7 Historic or Prehistoric Cultural Resources (Corps Requirement) 7a Will this project occur in or near an area that the state federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ® No status (e g National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b What data sources did you use to determine whether your site would impact historic or archeological resources? NC Listings in the National Register of Historic Places as of 1/24/12 8 Flood Zone Designation (Corps Requirement) 8a Will this project occur in a FEMA designated 100 year floodplain? ❑ Yes ® No 8b If yes explain how project meets FEMA requirements 8c What source(s) did you use to make the floodplain determination? Randolph County GIS Peter H Evans 1/24/12 Applicant/Agents Printed Name Date Applican Ag is Signature (Agents signature is valid only if an authorization letter from the applicant is provided Page 11 of 11 PCN Form — Version 1 3 December 10 2008 Version