Loading...
HomeMy WebLinkAbout20091120 Ver 1_On Hold Request_20100315ff ® NC®ENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H Sullins Governor Director November 2 2009 CERTIFIED MAIL 7008 1140 0003 8505 5454 RETURN RECEIPT REQUESTED Todd Love P E City of Winston Salem Engineering Department PO Box 2511 Winston Salem NC 27102 2511 Subject Proposed improvements to Motor Road and Extension in Forsyth County City Project No 200303 Dear Mr Love Dee Freeman Secretary The NC Division of Water Quality has reviewed your submittal for a 401 Water Quality Certification for the aforementioned project Review of your application revealed it lacking necessary information required for making an informed permit decision The permit application was deficient in the following areas • No mitigation was proposed DWQ requires mitigation on impacts equal to or exceeding 150 feet per stream for both intermittent and perennial streams on linear transportation projects Please refer to page 17 of the PCN help file found at http / /www saw usace army mil /WETLANDS /pcn/ • Streams shown on the plans are not included in the permit application These include Sta 45 +78 91 and potentially Sta 40 +03 Please include all impacts to perennial and intermittent streams in the PCN and clearly document the point of jurisdiction on the plans • Based on the plans there are channel relocations at the pipe outlets for both permit sites Please document on how the channels will be re routed and stabilized • Please provide a more detailed stormwater management plan Please indicate where stormwater will and won t be treated And if no treatment is possible please explain why it is not possible Please also show construction details for all stormwater treatment BMPs and document that these are designed in accordance with the most recent version of the NCDOT Stormwater BMP toolbox Please note that the Division has scheduled a field visit on Nov 13 and additional concerns may arise that need to be addressed Therefore, pursuant to 15A NCAC 2H 0507(a)(5) we will have to place the permit application on hold until we are supplied the necessary information You have 30 days to respond in writing with the requested information or notification to this office that the information is forthcoming If at the end of the 21 days this office has not received this information in writing we will assume you are withdrawing your application and it will be returned Furthermore until the Transportation Permitting Unit 1650 Mail Service Center Raleigh North Carolina 27699 1650 Location 2321 Crabtree Blvd Raleigh North Carolina 27604 Phone 919 733 1786 1 FAX 919 733 6893 Internet http / /h2o enr state nc us /ncwetlands/ An Equal Opportunity Affirmative Action Employer One NorthCarolina Natltrallty information is received by the NC Division of Water Quality we request (by copy of this letter) that the US Army Corps of Engineers place the permit application on hold If you have any questions or require additional information please contact Amy Euliss at (336) 771 4959 S-incer ly .l Coleen H Sullins Director cc John Thomas US Army Corps of Engineers Raleigh Field Office Ron Linville NC Wildlife Resources Commission Wetlands /401 Transportation group File Copy