Loading...
HomeMy WebLinkAbout20001432 Ver 9_Emails_20111031Sanford Bypass mod Page 1 of 2 �U —t-4 'I)Z Sanford Bypass mod L' ,e Herndon, Mason Sent Monday October 31 2011 10 42 AM To Beauregard Rachelle King Art C Cc Smith Ronnie D SAW [Ronnie D Smith @usace army mill Tillman Marty C Carrillo Sonia Rachelle and Art I have reviewed the permit mod request for R 2417AA The following corrections and additional information is required for DWQ to complete your request Site 5 —The impacts for this site in the original 401 were permitted as impacts to a perennial stream which required mitigation I need a mitigation proposal for the additional permanent impacts that occurred at this site The additional impacts to Site 6 are considered permanent because the original dimensions and profile of the stream were permanently altered by the actions of the contractor Furthermore I will need a revised impact summary sheet that reflect the 50 ft of additional permanent impacts that occurred at this site FYI during my last visit the culvert was perched about 0 9 ft which appeared to be more than it was at my last visit I have arranged for Galen Cail to come to the next review on Nov 15 to make recommendations on how to correct this issue Site 6 — Was permitted as intermittent system and DWQ will reserve the right to determine if the impacts for the crossing are indeed temporary after the temporary crossing is removed At the time of permitting DWQ was not requiring mitigation for impacts to intermittent systems therefore if the impacts for this crossing are deemed permanent additional mitigation will not be required In the meantime to process the permit mod as currently proposed I will need a revised impact summary sheet reflecting the additional 30 ft of impacts for the crossing at this site Site 9i Sta 177 +29(LT /RT) —was permitted as impacts to a perennial system and DWQ will reserve the right to determine if the impacts for the crossing are indeed temporary after the crossing is removed If DWQ deems that the stream has been altered from its original dimension and profile after the crossing is removed DOT will be required to mitigate for the entire reach that was permentantly impacted by the crossing In the meantime to process the permit mod as currently proposed I will need a revised impact summary sheet reflecting the 10 ft of additional impacts for the crossing The above clarifications and additional information needs to be submitted as soon as possible If we do not receive it within 15 days of this a mail we will be forced to issue an official hold letter on your modification request Ronnie did I cover everything? Is there any additional information you need to process this? Marty & Art it would be great if the crossings are removed and the stream restored to its natural state prior to our next visit so we can close this issue out Please see if this can be done If you have any questions or if I can be of any further assistance please do not hesitate to contact me Thanksl MH Mason Herndon Environmental Senior Specialist https //mail nc gov /owa/ ?ae= Item &t =IPM Note &id= RgAAAADMSzLcd9W2TJHI4 %2bm 11/3/2011 Sanford Bypass mod NCDENR Division of Water Quality Surface Water Protection mason herndon @ncdenr gov Phone (910) 308 4021 E mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties Page 2 of 2 https //mail nc gov /owa/ ?ae= Item &t =IPM Note &id= RgAAAADMSzLcd9W2TJHI4 %2bm 11/3/2011