HomeMy WebLinkAbout20110720 Ver 1_edit requests for Forrest Creek BPDP_20120215 Strickland, Bev
From: Merritt, Katie
Sent: Wednesday, February 15, 2012 1:46 PM
To: Strickland, Bev
Subject: FW: Forrest Crk UT2 BPDP/AsBuilt
Bev,
Please place the email below into laserfishe for 2011-0720v1. Please name the document"edit requests for Forrest
Creek BPDP". Please print a copy of the email for my file. I really appreciate it0
Thank you,
Katie
From: Merritt, Katie
Sent: Wednesday, February 15, 2012 1:43 PM
To: 'Tommy Cousins'
Subject: Forrest Crk UT2 BPDP/AsBuilt
Tommy,
Both the BPDP and the As-Built report for Forrest Creek UT-2 have inconsistencies with the signed UMBI that need to be
addressed prior to the first credit release. Please submit a memo that addresses the following inconsistencies in both of
these documents:
• Sponsor name needs to be the same as on the signed UMBI
• Bank name needs to be the same as on the signed UMBI
• Reference DWQ project number 2011-0720 for the UMBI as well as DWQ project number 2011-0720v1 for the
Forrest Creek UT-2 Bank Parcel
• Vegetative Success Criteria shall be measured as described in the approved UMBI
By submitting a memo, we won't have to go through and edit/change the BPDP and As-Built report. The memo will be
attached to both documents. If you would like me to edit the memo prior to submittal, you may send it to me via .pdf.
Before I can submit the BPDP via public notice, I will have to have this memo. It would benefit EBX to have both the
BPDP and UMBI submitted to public notice at the same time so that it doesn't affect the timeliness of getting your credit
release. Both have to be submitted to public notice prior to the first credit release. If there is any way a memo can be
submitted to me by this Friday, that would be wonderful since I was hoping to get the public notice out by this Friday.
Please let me know if you have any questions, any concerns, or any further comments to make in the memo.
Thank you,
Katie
Katie Merritt
Environmental Compliance Specialist & Nutrient Offset Coordinator
Wetlands & Stormwater Branch
Division of Water Quality
Work: 919-807-6371
Website: http://Portal.ncdenr.org/web/wq/swp/ws/webscape
Email correspondence ence to an f 1"orn this address 7"ess is.su .?"iect to the North 'aaro inci Public Records Ls�iw s�i,n �t uy e
disclosed to 'th rr. pu ties unless the content is exempt L� r/stcit-.ute or other Yeg-.'dIu'tion
Please consider the environment before printing this email.
1
II - o1aa
u �
Environmental Banc 8t Exchange
Capital Experience Expertise
10055 Red Run Boulevard
February 23 2012 Suite 130
Owings Mills MD 21117
p 410 356 5159
Katie Merritt p 888 7817075
NC Division of Water Quality f 410 356 5822
1650 Mail Service Center
Raleigh NC 27699 909 Capability Drive
Suite 3100
Subject Umbrella Mitigation Banking Instrument in the Upper Neuse River Basin for Riparian Buffer Raleigh NC 27606
and Nutrient Offset Mitigation Credits Pursuant to the Falls Lake Water Supply Nutrient p 919 829 9909
Strategy (DWQ # 2011 0720) and Forrest Creek UT 2 (DWQ # 2011 0720vl) BPDP and f 919 829 9913
As Built Report 604 Greene street
Suite 100
Dear Mrs Merritt Camden SC 29020
p 803 432-4890
The purpose of this letter is to address some inconsistencies between the previously submitted Forrest f 410 356 5822
Creek UT 2 Bank Parcel Development Package(BPDP)and As Built Report with the recently approved
Umbrella Mitigation Banking Instrument in the Upper Neuse River Basin for Riparian Buffer and www ebxusa corn
Nutrient Offset Mitigation Credits Pursuant to the Falls Lake Water Supply Nutrient Strategy (UMBI)
Environmental Banc and Exchange LLC(EBX) is hereby making the following changes to the Forrest
Creek UT 2 BPDP and As Built Report in order to address the inconsistencies with the UMBI
1) The Sponsor for the Forrest Creek UT 2 BPDP and As Built Report will be Environmental Banc
and Exchange LLC and not EBX EM LLC
2) The Forrest Creek UT 2 Site will be established under the terms of the UMBI
3) Vegetative Success Criteria will be measured as described in the UMBI
We trust this memo will be sufficient to serve as an addendum for both the Forrest Creek UT 2 BPDP and
As Built Report If you require any additional information please don t hesitate to contact us Thank you
for your help with this matter
Sincerely
Tommy Cousins
Project Manager
Environmental Banc&Exchange LLC
R V LS
D
MAR 5 2012
TLANDS AND STORMWA R BRANCH