Loading...
HomeMy WebLinkAbout20120001 Ver 1_Approval Letter_20120130�® NC®ENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Charles Wakild P E Governor Director Mr Delbert W Puro 625 Cook Rd Cleveland NC 27013 Subject Stream Crossing Cook Road Puro Tract APPROVAL of 401 Water Quality Certification with Additional Conditions Dear Mr Puro Dee Freeman Secretary January 30 2012 DWQ# 12 0001 Rowan County You have our approval in accordance with the general certification and those conditions listed below to impact 85 linear feet (If) of unnamed stream to Beaver Dam Creek in order to construct the road in Rowan County as described in your application received by the Division of Water Quality (DWQ) on December 30 2011 and subsequent information on January 23 2012 After reviewing your application we have determined that this project is covered by Water Quality General Certification Number 3821 which can be viewed on our web site at http //portal ncdenr orq /web /wq /swp /ws /401 The General Certification allows you to use Nationwide Permit Number 39 once it is issued to you by the U S Army Corps of Engineers Please note that you should get any other federal state or local permits before proceeding with your project including those required by (but not limited to) Sediment and Erosion Control Non Discharge and Water Supply Watershed regulations The above noted Certification will expire when the associated 404 permit expires unless otherwise specified In the General Certification This approval is only valid for the purpose and design that you described in your application If you change your project you must notify us in writing and you may be required to send us a new application for a new certification If the property is sold the new owner must be given a copy of the Certification and approval letter and is thereby responsible for complying with all conditions In addition to the requirements of the certification you must also comply with the following conditions 1 The Mooresville Regional Office shall be notified in writing once construction at the approved impact areas has commenced 2 Culverts placed in streams /wetlands shall be Installed in the dry Immediately upon completion of the installation water flow shall be returned to Its natural course Existing stream dimensions (Including the cross section dimensions pattern and longitudinal profile) must be maintained (or restored via constructed benches) above and below the location of the culvert If the existing culvert becomes perched the appropriate stream grade shall be re established or if the pipes are Installed in a perched manner the pipes shall be removed and re Installed correctly Mooresville Regional Office One Location 610 East Center Avenue Suite 301 Mooresville NC 28115 NorthCarolina Phone (704) 663 1699 \Fax (704) 663 -6040\ Customer Service 1 877 -623 6748 �aturatlr� Internet http //portal ncdenr org /web /wq An Equal Opportunity /Affirmative Action Employer — 50 / Recycled /10 / Post Consumer Paper 3 Deed notifications or similar mechanisms shall be placed on all retained Jurisdictional wetlands waters and protective buffers in order to assure compliance for future wetland water and buffer impact These mechanisms shall be put in place at the time of recording of the property or of individual lots whichever is appropriate A sample deed notification can be downloaded from the 401/Wetlands Unit web site at http //h2o enr state nc us /ncwetlands The text of the sample deed notification may be modified as appropriate to suit to this project Submit a copy to the Central Office and regional office prior to impacts 4 All wetlands streams surface waters and riparian buffers located on the project site where impacts are not allowed shall be clearly marked (example orange fabric fencing) prior to any land disturbing activities 5 Use of native vegetation and other soft stream bank stabilization techniques must be used where practicable instead of nprap or other bank hardening methods If nprap is necessary it shall not be placed in the streambed unless approved by DWQ 6 Stormwater discharge structures at this site shall be constructed in a manner such that the potential receiving streams (of the discharge) will not be impacted due to sediment accumulations scouring or erosion of the stream banks 7 An approved stormwater management plan is required if built upon area exceeds 24% of a drainage area The plan shall be submitted to the 401 Oversight and Express Permitting Unit (1650 Mail Service Center NC 27699 1650) or approved delegated authority within 60 days of the issuance of the 401 Water Quality Certification The storm water management plan shall be approved in writing by this Office or delegated authority before the impacts specified in this Certification occurs Plans submitted to DWQ for approval shall include full size grading and drainage plans BMP sizing information delineated drainage areas surface area sizing data design calculations plan sheets w /planting plans and a signed /notarized Operation and Maintenance agreement(s) The storm water best management practices are required to be appropriate for the surface water classification and designed to remove at least 85% TSS according to the most recent version of the NC DENR Storm water Best Management Practices Manual These facilities must be designed to treat the runoff from the entire project unless otherwise explicitly approved by DWQ Also before any permanent budding is occupied at the subject site the storm water management plan shall be implemented and the facilities shall be constructed and operational The approved structural storm water practices as well as drainage patterns must be maintained in perpetuity No changes to the structural storm water practices shall be made without written authorization from DWQ 8 No waste spoil solids or fill of any kind shall occur in wetlands waters or riparian areas beyond the footprint of the impacts depicted in the Preconstruction Notification application All construction activities associated with this project shall meet and /or exceed those requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual and shall be conducted so that no violations of state water quality standards statutes or rules occur 9 Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable If placement of sediment and erosion control devices in wetlands and waters is unavoidable they shall be removed and the natural grade restored within two months of the date the Division of Land Resources has released the project 10 Upon completion of the project the applicant shall complete and return the enclosed Certificate of Completion form to the 401/Wetlands Unit of the NC DWQ 11 Continuing Compliance The applicant (Delbert Puro) shall conduct all activities in a manner so as not to contravene any state water quality standard (including any requirements for compliance with section 303(d) of the Clean Water Act) and any other appropriate requirements of state and federal law If DWQ determines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that state or federal law is being violated or that further conditions are necessary to assure compliance DWQ may reevaluate and modify this certification to include conditions appropriate to assure compliance with such standards and requirements in accordance with 15 A NCAC 2H 0507(d) Before codifying the certification DWQ shall notify the applicant and the US Army Corps of Engineers provide public notice in accordance with 15A NCAC 2H 0503 and provide opportunity for public hearing in accordance with 15A NCAC 2H 0504 Any new or revised conditions shall be provided to the applicant in writing shall be provided to the United States Army Corps of Engineers for reference in any permit issued pursuant to Section 404 of the Clean Water Act and shall also become conditions of the 404 Permit for the project If you do not accept any of the conditions of this certification you may ask for an adjudicatory hearing You must act within 60 days of the date that you receive this letter To ask for a hearing send a written petition that conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings 6714 Mail Service Center Raleigh N C 27699 6714 This certification and its conditions are final and binding unless you ask for a hearing This letter completes the review of DWQ under Section 401 of the Clean Water Act If you have any questions please telephone Mr Alan Johnson in the Mooresville Regional Office at 704 663 1699 or Ms Karen Higgins in the Central Office in Raleigh 919 807 6360 Sincerely (,-7A o V-,, for Charles Wakdd P E Attachments cc Army Corps of Engineers Asheville Karen Higgins Wetlands Unit Gerald Grant 2351 Simonton Rd Statesville NC 28625