Loading...
HomeMy WebLinkAbout20120150 Ver 1_401 Application_2012021320� W aT SRO 201 20 1 50 Office Use Only Corps action ID no DWQ project no Form Version 13 Dec 10 2008 Page 1 of 10 PCN Form - Version 13 December 10 2008 Version Pre - Construction Nohi ication PC Form 1 A Applicant Information 1 Processing 1a Type(s) of approval sought from the Corps ®Section 404 Permit C3 Section 10 Permit 1b Specify Nationwide Permit (NWP) number 18 or General Permit (GP) number 1c Has the NWP or GP number been verified by the Corps? ® Yes ❑ No 1d Type(s) of approval sought from the DWQ (check all that apply) ® 401 Water Quality Certification - Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification - Express ❑ Riparian Buffer Authorization le Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification ® Yes ❑ No For the record only for Corps Permit ❑ Yes ® No If Is payment into a mitigation bank or in lieu fee program proposed for mitigation of impacts? If so attach the acceptance letter from mitigation bank or in -lieu fee program ❑ Yes ® No 1g Is the project located in any of NC s twenty coastal counties If yes answer 1h below ® Yes ❑ No 1 h Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ® No 2 Project Information 2a Name of project Lot 28, Section Seven, Stately Pines Subdivision 2b County Craven ( No 6 Township) 2c Nearest municipality / town Havelock 2d Subdivision name —P Section Seven, Stately Pines p R21 M53 99* n 2e NCDOT only T I or state project no IKN L--J U 3 Owner Information 3 2012 3a Name(s) on Recorded Deed Stately Pines Partnership DENR WATER QUALITY 3b Deed Book and Page No Deed Book 932, Page 720 645A D"MMERIMIe 3c Responsible Party (for LLC if applicable) Lonnie E Pridgen, Jr 3d Street address 233 Middle Street, Suite 107 -A, P 0 Box 907 3e City state zip New Bern N C 28560 3f Telephone no 252 637 -3115 3g Fax no ( 252) 637 -3117 3h Email address pridgen @pamlico net Page 1 of 10 PCN Form - Version 13 December 10 2008 Version 4 Applicant Information (if different from owner) 4a Applicant is ❑ Agent ❑ Other specify 4b Name 4c Business name (if applicable) 4d Street address 4e City state zip 0 Telephone no 4g Fax no 4h Email address 5 AgentlConsultant Information (if applicable) 5a Name Edward B Latham, P E, P L S 5b Business name (if applicable) Edward B Latham, P A 5c Street address 3412 Windsor Drive 5d City state zip New Bern N C 28562 5e Telephone no ( 252) 637 -4265 5f Fax no ( 252) 637 -4265 5g Email address edwardlathamhsd@embargmall com Page 2 of 10 PCN Form - Version 13 December 10 2008 Vernon B Project Information and Prior Project History 1 Property Identification 1a Property identification no (tax PIN or parcel ID) 6- 213 -1 -128 1b Site coordinates (in decimal degrees) Latitude 34 968422' Longitude 76 948753 (DD DDDDDD) ( DD DDDDDD) 1c Property size 16,793 2 sq ft acres 0 386 2 Surface Waters 2a Name of nearest body of water (stream river etc ) to proposed project Neuse River 2b Water Quality Classification of nearest receiving water SB Sw, NSW 2c River basin Lower Neuse 3 Project Description 3a Describe the existing conditions on the Bite and the general land use in the viciV of the yro ect at the time of this Mixed Deciduous - Coniferous land application orest (44) Spe i 1ca 1 , Oak -Pine Forest(441) The adjoining lots have existing dwellings with establ1 ed lawns The ad3oini lots in the subdivision meet the maximum impervious requirements in the restrictive 3b List the total estimated acreage of all existing wetlands on the property 11,822 19 sq ft. = 0 271 Acres 3c List the total estimated linear feet of all existing streams (intermittent and perennial) on the property None 3d Explain the purpose of the proposed pprofect� To decrease the area of wetland woods by 0 4G99 acres the 25 %maximum r 10 o er Q increase allowable impervious area to accomoaate a minimum size ing 3e D�scnbe the o�er�Ilpro)ect in detail incl iinVhe ty$e of e�ui ntient o bQ used Doze and /or backkhoes to clear t e we i.ng area & a ea ump yar r c s o au away ie c earing deipris Excavation eciulDment for constructing footings and foundations Landscape Equipment 4 Jurisdictional Determinations 4a Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? ® Yes ❑ No ❑ Unknown Comments Shown on subdivision plat and attached site plan 4b If the Corps made the jurisdictional determination what type ❑ preliminary © Final of determination was made? 4c If yes who delineated the jurisdictional areas? Agency /Consultant Company Name (if known) Scott Jones Other USACE 4d if yes list the dates of the Corps jurisdictional determinations or State determinations and attach documentation USACE Action ID 200511127, dated 05/23/2005 (Copy Attached ) 5 Project History 5a Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? Yes ❑ No ❑ Unknown 5b If yes explain in detail according to help file instructions USACE Nationwide 14 Permit No 200511836 DWQ Wastewater Collection Permit No WQ 0030343 6 Future Project Plans 6a Is this a phased project? ❑ Yes No [6b If yes explain Page 3 of 10 PCN Form - Version 13 December 10 2008 Version C Proposed Impacts Inventory 1 Impacts Summary 1a Which sections were completed below for your project (check all that apply) ® Wetlands ❑ Streams tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2 Wetland Impacts If there are wetland impacts proposed on the site then complete this question for each wetland area impacted 2a 2b 2c 2d 2e 2f Wetland impact number - Type of impact Type of wetland Forested Type of jurisdiction (Corps - 404 10 Area of impact Permanent (P) or (d known) DWQ - non -404 other) (acres) Temporary W1 ®P ❑ T Vegetation clearing & ar Hardwood- ial pine Flats ® Yes ❑ No ® Corps -404 1:1 DWQ 0 0999 ❑Yes ❑Corps W2 ❑ P ❑ T ❑ No ❑ DWQ ❑ Yes ❑ Corps W3 ❑ P ❑ T ❑ No ❑ DWQ ❑ Yes ❑ Corps W4 ❑ P ❑ T ❑ No ❑ DWQ ❑ Yes ❑ Corps W5 ❑ P ❑ T ❑ No ❑ DWQ ❑ Yes ❑ Corps W6 P ❑ T ❑ ❑ No ❑ DWQ 2g. Total wetland impacts 0 0999 2h Comments other than the im2grvious area the balance of the wetland reduction will rema 3 Stream Impacts wco a awn then this If there are perennial orQnlermdtent stream impacts (including temporary impacts) proposed on the site complete question for all stream sites impacted 3a 3b 3c 3d 3e 3f 39 Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact length number (PER) or (Corps 404 10 stream (linear Permanent (P) or Temporary (T) intermittent (INT)? DWQ - non-404 other) width (feet) feet) ❑ PER ❑ Corps S1 ❑ P ❑ T None ❑INT ❑ DWQ ❑ PER ❑ Corps S2 ❑ P ❑ T ❑ INT ❑ DWQ ❑ PER ❑ Corps S3 []POT ❑ INT ❑ DWQ ❑ PER ❑ Corps S4 ❑ P ❑ T ❑ INT ❑ DWQ ❑ PER ❑ Corps S5 ❑ P ❑ T ❑ INT I ❑ DWQ ❑ PER ❑ Corps S6 ❑ P ❑ T ❑ INT ❑DWQ 3h Total stream and tributary impacts 31 Comments Page 4 of 10 PCN Form - Version 13 December 10 2008 Version 1 as 4 Open Water Impacts None If there are proposed impacts to lakes ponds estuaries tributaries sounds the Atlantic Ocean or any other open water of the U S then individually list all open water impacts below 4a 4b 4c 4d 4e Open water Name of waterbody impact number — (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary T 01 ❑P ❑T 02 ❑P ❑T 03 []POT 04 ❑P ❑T 4f Total open water impacts None 4g Comments 5 Pond or Lake Construction None If pond or lake construction proposed th en complete the chart below 5a 5b 5c 5d 5e Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f Total 5g Comments 5h Is a dam high hazard permit required? ❑ Yes ❑ No If yes permit ID no 51 Expected pond surface area (acres) 5j Size of pond watershed (acres) 5k Method of construction 6 Buffer Impacts (for DWQ) None If project will impact a protected riparian buffer then complete the chart below if yes then individually list all buffer impacts below If any Impacts require mitigation then you MUST fill out Section D of this form 6a ❑ Neuse ❑ Tar Pamlico ❑ Other Project is in which protected basin? ❑ Catawba ❑ Randleman 6b 6c 6d 6e 6f 6g Buffer impact number — Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary T impact required? B1 ❑P [IT ❑Yes ❑ No B2 ❑P ❑T El Yes ❑ No B3 ❑P ❑T ❑Yes ❑ No 6h Total buffer impacts 61 Comments Page 5 of 10 PCN Form — Version 13 December 10 2008 Version D Impact Justification and Mitigation 1 Avoidance and Minimization 1a Specifically describe measures taken to avoid or minimize the proposed impacts in designing project Thy m }nimum siz foot r�nti for the ro osed dwellin will be located as close to the ft 1b Spec cally describe measures taken to avoid or minimize the proposed impacts through construction tachrn ues The use of wooden decks & minimum width walks and drives Pervious concrete if needed 2 Compensatory Mitigation for Impacts to Waters of the U S or Waters of the State 2a Does the project require Compensatory Mitigation for impacts to Waters of the U S or Waters of the State? ❑ Yes ® No 2b If yes, nvhgation is required by (check all that apply) ❑ DWQ ❑ Corps 2c If yes which mitigation option will be used for this project? ❑ Mibgabon bank ❑ payment to in lieu fee program ❑ Permittee Responsible Mitigation 3 Complete if Using a Mitigation Bank N A 3a Name of Mitgabon Bank 3b Credits Purchased (attach receipt and letter) Type Quantity 3c Comments 4 Complete if Making a Payment to In -lieu Fee Program N A 4a Approval letter from in lieu fee program is attached ❑ Yes 4b Stream mitigation requested linear feet 4c if using stream mitigation stream temperature ❑ warm ❑ cool ❑cold 4d Buffer mitigation requested (DWQ only) square feet 4e Ripanan wetland mitigation requested acres 4f Non riparian wetland mitigation requested acres 4g Coastal (tidal) wetland mitigation requested acres 4h Comments 5 Complete if Using a Pennittee Responsible Mitigation Plan N A 5a If using a permittee responsible mitigation plan provide a description of the proposed mitigation plan * structural integrity of the dwelling Page 6 of 10 PCN Form — Version 13 December 10 2008 Version ont they 6 Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes ® No 6b If yes then identify the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the amount of mitigation required Zone 6c Reason for impact 6d Total impact (square feet) Multiplier 6e Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 15 6f Total buffer mitigation required 6g If buffer mitigation is required discuss what type of mitigation is proposed (e g payment to private mitigation bank permittee responsible riparian buffer restoration payment into an approved in lieu fee fund) 6h Comments Page 7 of 10 PCN Form — Version 13 December 10 2008 Version E Stormwater Management and Diffuse Flow Plan (required by DWQ) 1 Diffuse Flow Plan 1a Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? ❑ Yes ® No lb If yes then is a diffuse flow plan included? If no explain why Comments ❑ Yes ❑ No 2 Stonrnvater Management Plan 2a What is the overall percent imperviousness of this project? 25% 2b Does this project require a Stormwater Management Plan? ❑ Yes ® No 2c The ermi�ojegiQ,OEp MOTs reu�r�e �etormyvater Management Plan explain why the tai 1 d disturbanc s �iresho�� requirement or 2d If this project DOES require a Stormwater Management Plan then provide a brief narrative description of the plan 2e Who will be responsible for the review of the Stormwater Management Plan? ❑ Certified Local Government ❑ DWQ Stormwater Program ❑ DWQ 401 Unit 3 Certified Local Government Stormwater Review N A 3a In which local government s jurisdiction is this project? 3b Which of the following locally implemented stormwater management programs apply (check all that apply) ❑ Phase 11 ❑ NSW ❑ USMP ❑ Water Supply Watershed ❑ Other 3c Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ❑ No 4 DWQ Stormwater Program Review 4a Which of the following state - implemented stormwater management programs apply (check all that apply) ® Coastal counties ❑ HQW ❑ ORW ❑ Session Law 2006 -246 ❑ Other 4b Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ®No 5 DWQ 401 Unit Stormwater Review N A 5a Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 8 of 10 PCN Form — Version 13 December 10 2008 Version eloG a F Supplementary Information 1 Environmental Documentation (DWQ Requirement) 1a Does the project involve an expenditure of public (federal/state/local) funds or the 0 Yes ® No use of public (federal/state) land? 1b If you answered yes to the above does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c If you answered yes to the above has the document review been finalized by the State Clearing House? (If so attach a copy of the NEPA or SEPA final approval letter) ❑ Yes ❑ No Comments 2 Violations (DWQ Requirement) 2a Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500) Isolated Wetland Rules (15A NCAC 2H 1300) DWQ Surface Water or Wetland Standards ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 26 0200)? 2b Is this an after the -fact permit application? ❑ Yes ® No 2c If you answered "yes to one or both of the above questions provide an explanation of the violation(s) 3 Cumulative Impacts (DWQ Requirement) 3a Will this project (based on past and reasonably anticipated future impacts) result in Yes ® No additional development which could impact nearby downstream water quality? 3b If you answered °yes to the above submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy If you answered no provide a short narrative description 4 Sewage Disposal (DWQ Requirement) 4a Clearly detail the ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated from the proposed project or available capacity of the subject facility The City of New Bern Sanitary Sewer Service is available for tapping to serve all lots in the subdivision Page 9of10 PCN Form — Version 13 December 10 2008 Version 5 Endangered Species and Designated Critical Habitat (Corps Requirement) 5a Will this project occur in or near an area with federally protected species or Yes ® No habitat? 5b Have you checked with the USFWS concerning Endangered Species Act ® Yes ❑ No impacts? ® Raleigh 5c If yes indicate the USFWS Field Office you have contacted El Asheville 5d What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? USFWS review prior to subdivision approval 6 Essential Fish Habitat (Corps Requirement) 6a Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ® No 6b What data sources did you use to determine whether your site would impact Essential Fish Habitat? Maps show that the site does not have or border any water areas 7 Historic or Prehistoric Cultural Resources (Corps Requirement) 7a Will this project occur in or near an area that the state federal or tribal governments have designated as having historic or cultural preservation El Yes ®No status (e g National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b What data sources did you use to determine whether your site would impact historic or archeological resources? Site review prior to subdivision approval 8 Flood Zone Designation (Corps Requirement) 8a Will this project occur in a FEMA - designated 100 -year floodplain? ❑ Yes ® No 8b If yes explain how project meets FEMA requirements 8c What source(s) did you use to make the floodplain determination? FEMA Flood Map No 3720640400J,dated07 72./,9 /,,F� Lonnie E Pridgen, Jr Applicant/Agenrs Printed Name Applicant/Agent's Signatu (Agent's signature is valid only if an authorization letter from the applicant Date is provided Page 10 of 10 PCN Form — Version 13 December 10 2008 Version Z /04 -IJ14k o /01 am /N I � Z107 0 7H*/1'ikS kZ.4y //! /LL 5 COG 13b0 -, W, Z) ie .<i u/ 7- -5° ao - .57.3/' O R p\� ,f O zpr 49 03 CrIO) WAY 17�� PROP��YI�Np v zrow R/"r /fit W a .p'F /&S NOT Ta 5CA=E * Iw o PpjnlT Nor' /X�U�A'1F!> V V � Q � rw I� ro O Edo �lt3.Y U77t -I-- N45*4.5 00 .E /oS60 HUNT ING Wp00 IANF (4.51&W) Z I� 44oz-, I WAU0L (peN�K (77E) �1 /moo S r �'PR8�i�11T3 A -wa4e- / 6�i�Y�Y /sriNG WAY 17�� PROP��YI�Np PAaC�tDF[ �p4/ Ya <SNB�At,(,t�ta'v�1✓aye,�lA�✓R zrow R/"r /fit W — Th` /S /5 /t 1��W1POSe� f�TPk.4iY DD NoT f lr Pk 10N Q�OrQO/N6 aR -WAS APIOPA&T .p'F /&S NOT Ta 5CA=E * Iw o PpjnlT Nor' /X�U�A'1F!> I ,Wj1 {RO B t.4,-IIAM coes /,ay 7Mr 711,s �- wAwAw.v �M�Fi�HJ1.tN/II(,7Y.K SGyevEY /J1�9 BY.D�'6 7//jd� /7/g,P,o!/D 61c s�aN /fs ri+tcvl�D ey�nru�f.�o �.�ue�s /S ! is Or�of // Ty eat tw/f,P4.0r A&W.S 77le 4111RAMA47r &)c 7W 5r v4wr 9FRAolexV, W 404/lo— CAV&P W 6K,- W.4 6UNC.fcslr / ,9Da)^ 77,V /t4,0YW�WWW, .Wlt J10,01vxe WO L•1661 suR . 6 "A 7,cyj04,(CS jP%AT11.6ef6#®f0 /2¢ //UNr!/s/G wOD0 ,C*yE,WOW M4VeZOCA( NC 497-,W �/oN -Ce*h SMrZZY PiiYP. sUQv/Y1S/ON f'LW C4b//Y -r /V s1-1oES &3 C #�O No 6 7TitN/t/s/,/iP vCA/E /'I 30 o 30 5v2YEYs� �mRANdY�' 34/Z 1N /NOtO.� LQlY� 4eAve/Y "ivrr SU/e�csY$ f447' �,�evA,ey 6 zo /z