Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20070616 Ver 1_Application_20070430
~~ ~~ ~A ~~o ~ . °rM ~. 3 ~t ~Y~rr~NOSq ~ ~qrF ©~~~~ L.1.~~ R ~ ~~~, sr~~;~wq~Re'~ro Cy STATE of NORTH CAROLINA DEPARTMENT OF TRANSPORTATION~~o TIPPETT MICHAEL F. EASLEY SECRETARY GOVERNOR April 25, 2007 Mr. David Baker, NCDOT Project Manager O~~ n meers ~~ U.S. Army Corps of E g 151 Patton Avenue, Room 208 Asheville, NC 28801-2714 Nationwide 14 and Nationwide 33 Permit Application - Re~'ised Subject: SR 1757 - Neddie Mountain Road Jackson County State Project No. 140.050058 (D`'~'Q Minor Permit Fee S200) Dear Mr. Baker: During a recent evaluation of the above road a were lditch is located from dstation 101+40 to previously submitted culvert replacements. The ~~ lication to reflect this change as station 104+00. Therefore, we are revising our permit app follows. I am sending permit drawings and a revised impact chart from the PCN application. The North Carolina Natural Heritage Database was ch ciesao~Nedd e Croeek or Cub Branch. endangered species. There are no records of listed spe dditionall ,there are no records for the adjacent watersheds, Sminore The sdtreamseare small and A Y impacts from culvert replacement/extensions will be relative y are not of sufticient size to support mussels. For these reasons, there will be "no effect" on threatened or endangered species. acts to historic or cultural resources are not anticipated• fines thattfurther in e sigations are Imp Q determ Office (SHPO) and the Office of State Archaeology uired NCDOT will conduct the appropriate site investigations and obtain compliance from ieq , SHPO prior to project construction. best management practices will be used to minimize and iontcontr almeasures daddy to Sion The on this project. The construction foreman will review all eros ensure sedimentation and erosion is being effectively controlled. If the planned devices are not functioning as intended, they will be immediately replaced with better devices. The rock silt screens and other erosion control devices will be in place prior to pipe culvert construction and will remain in place until the project is stabilized. Impacts to Waters of the United States Neddie Creek and Cub Branch are shown on the USGS topographic maps as perennial streams. The streams appear to have sufficient flow to support fish. The unnamed tributaries appear to lack sufficient flow to support fish. The channels are composed of bedrock, cobble, gravel and sand. The channels lack vegetation. For these reasons, we believe these streams are under the jurisdiction of the U.S. Army Corps of Engineers. In order to construct the project in accordance with our current secondary road standards, it will be necessary to impact waters of the United States in the Little Tennessee River BasiClasp WS IIII HQW),Orve metal culverts intunnamed ce one metal culvert in Cub Branch (DWQ W three metal culverts in unnamed tributaries s to Cub Branch (DWQ Class WS III, HQ ), tributaries to Neddie Creek (DWQ Class WS III) and one metal culvert in Neddie Creek (DWQ Class WS III). Listed below is a summary of the proposed impacts. Site No. E~cisting Pro osed Condition p Net Impacts Station Condition Site 1 (2) 33' x 24" 65' x 54" CMP 32' extension 6+17 CMP Site lA Open Channel Temporary Dike w/ Sandbags 15 fr' 6+17 Site 1 A Free Flowing Temporary Flow Diversion 90 6+17 Channel Site 2 33' x 24" 60' x 24" CMP 27' extension 12+40 CMP Site 2A Open Channel Temporary Dike w/ Sandbags 15 fr- 12+40 Site 2A Free Flowing Temporary Flow Diversion 8~ 12+40 Channel Site 3 52' x 15" 50' x 18" CMP -2' extension 14+15 CMP ' Site 3A Open Channel Temporary Dike w/ Sandbags 15 ft 14+15 Site 3A Free Flowing Temporary Flow Diversion ~ 14+15 Channel Site 4 58' x 24" 45' x 36" CMP -13' extension 20+29 CMP ' Site 4A Open Channel Temporary Dike w/ Sandbags 1 ~ tt 20+29 Site 4A Free Flowing Temporary Flow Diversion 70 20+29 Channel 13' extension Site 5 42' x 18" 55' x 30" CMP 24+33 CMP Site SA Open Channel Temporary Dike w/ Sandbags 15 ft2 24+33 Site SA Free Flowing Temporary Flow Diversion 80' 24+33 Channel Site 6 52' x 18" 60' x 30" CMP 8' extension 25+38 CMP Site 6A Open Channel Temporary Dike w/ Sandbags 30 ft' 25+38 Site 6A Free Flowing Temporary Flow Diversion 85' 25+38 Channel Site 7 40' x 18" 55' x 24" CMP 1 ~' extension 63+70 CMP Site 7A Open Channel Temporary Dike w/ Sandbags 15 ft' 63+70 Site 7A Free Flowing Temporary Flow Diversion 80' 63+70 Channel Site 8 50' x 30" 10~' x 42" CMP ~~' extension 92+33 CMP Site 8A Open Channel Temporary Dike w/ Sandbags 30 ft' 92+33 Site 8A Free Flowing Temporary Flow Diversion 130' 92+33 Channel Site 9 33' x 48" g5'x 64"x 43" Arch CMP ~?' extension 103+94 CMP Site 9 Open Channel Temporary Dike w/ Sandbags 25 ft' 103+94 Site 9 Free Flowing Temporary Flow Diversion 110' 103+94 Channel Site 10 37' x 18" Sg' x 24" CMP 21' extension 109+94 CMP Site l0A Open Channel Temporary Dike ~v/ Sandbags 15 ft' 109+94 Site l0A Free Flowing Temporary Flow Diversion 83' 109+94 Channel Site 11 40' x 30" 55' x 42" CMP 1 ~' extension 119+90 CMP Site I 1 A Open Channel Temporary Dike w/ Sandbags 25 ft' 119+90 Site 11 A Free Flowing Temporary Flow Diversion 80' 119+90 Channel Site 9A 101+40 Wet Ditch Vet Ditch to 104+00 260' ~'ofal Permen,~mpa t ~ ~ -,~,~ ~'~Xr~223~near ee~ ~. Temporary Impacts for Flow Diversion and Dikes 1228 linear feet Permits Requested NCDOT is hereby requesting authorization under Section 404 of the Clean Water Act to proceed with the construction project outlined above. By copy of this letter, I am asking Mr. David McHenry, Mountain Region Coordinator, of the North Carolina Wildlife Resources Commission (NCWRC) to comment directly to you concerning the 404 Nationwide Permit request. Also, by copy of this letter, I am requesting authorization under Section 401 of the Clean Water Act from the North Carolina Department of Environment and Natural Resources (DENR), Division of Water Quality (DWQ). In addition, I am requesting Mr. McHenry and Mr. Ed Ingle, Roadside Environmental Field Operations Engineer (NCDOT), to comment directly to me concerning this permit request. If you have any questions or need additional information, please contact me at (828) 488-2131. Your early review and consideration will be greatly appreciated. Sinc ely, ~ onathan L. Woodard, P.E. District Engineer cc: Mr. John Hennessy, DWQ, DENR, Raleigh (four copies) Mr. Mike Parker, DWQ, DENR, Asheville Mr. David McHenry, Mountain Region Coordinator, NCWRC Mr. J. B. Setzer, P.E., Division Engineer, NCDOT Mr. Mark Davis, Division Environmental Officer, NCDOT Mr. E. L. Ingle, Roadside Environmental Field Operations Engineer, NCDOT 4. Individually list all intermittent and perennial stream impacts. Be sure to identify temporary impacts. Stream impacts include, but are not limited to placement of fill or culverts, dam construction, flooding, relocation, stabilization activities (e.g., cement walls, rip-rap, crib walls, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. To calculate acreage, multiply length X width, then divide by 43,60. Stream Impact Perennial or Average Impact Area of Number Stream Name Type of Impact Intermittent? Stream Width Length Impact (' p) indicate on ma Before Im act p linear feet ( ) (acres) 1 a Station 6+17 Cub Branch Culvert Extension P 3 32 0.00220 lA C Station 6+17 Cub Branch Impervious Dike P 5 (Dike) 5 0.00057 lA ~; Station 6+17 Cub Branch Flow Diversion P 3 85 N.!A 2 Lei Station 12+40 UT to Cub Branch Culvert Extension P 2 27 0.00124 2A @ Station 12+40 UT to Cub Branch Impervious Dike P 4 (Dike) 5 0.00046 2A co Station UT to Cub Branch Flow Diversion P 2 80 N/A 12+40 3 @ Station 14+15 UT to Cub Branch Culvert Extension P 1 I -2 -0.0000 3A a- Station UT to Cub Branch Impervious Dike P 3 (Dike) ~ 5 0.00034 14+15 3A ci Station UT to Cub Branch Flow Diversion P ~ 1 ~ 70 N'A 14+15 4 C Station 20+29 UT to Cub Branch Culvert Extension P 3 ~ -li I -0.00090 4A ci' Station UT to Cub Branch Impervious Dike P 5 (Dike) 5 ~ 0.00057 20+29 4A a Station UT to Cub Branch Flow Diversion P 3 66 i`I/A 20+29 i 5 C Station 24+33 UT to Cub Branch Culvert Extension P 2 ' 13 ~ 0.00060 ~ i SA a Station UT to Cub Branch Impervious Dike P 0.00046 4 (Dike) ~ 5 24+33 i ~ ~ SA n; Station UT to Cub Branch Flow Diversion P 2 7~ N'A 24+33 6 C Station 25+38 UT to Cub Branch Culvert Extension P 2 ~ 8 0.00037 6A a Station UT to Cub Branch lmpervious Dike P 4 (Dike) ~ 5 0.00046 25+38 6 A cc Station UT to Cub Branch Flow Diversion P 2 I 80 ~1!A 2s+3s 7 n Station 63+70 UT to Charley Creek Culvert Extension P 1 ! 1 ~ 0.00034 i 7A G Station UT to Charley Impervious Dike P 5 0.00034 3 (Dike) 63+70 Creek ~ ~ 7A a; Station UT to Charley Flow Diversion P ~ 1 7~ N A 63+70 Creek Page 5 of 11 8 @ Station 92+33 UT to Neddie Creek Culvert Extension P 3 55 0.00379 8A @ Station 92+33 UT to Neddie Creek Impervious Dike P 5 (Dike) 5 0.00057 8A @ Station 92+33 UT to Neddie Creek Flow Diversion P 3 125 N/A 9 @ Station 103+94 Neddie Creek Culvert Extension P 4 52 0.00478 9 @ Station 103+94 Neddie Creek lmpervious Dike P 6 (Dike) 5 0.00069 9 @ Station 103+94 Neddie Creck Flow Diversion P 4 105 N,/A 10 C Station 109+94 UT to Neddie Creek Culvert Extension P 1 21 0.00048 l0A C Station 109+94 UT to Neddie Creek Impervious Dike P 3 (Dike) 5 0.00034 l0A @ Station 109+94 UT to Neddie Creek Flow Diversion P 1 78 N/A 1 1 ci Station 119+7~ UT to Neddie Creek Culvert Extension P 1 1 J 0.00034 11 A C Station 119+75 UT to Neddie Creek lmpervious Dike P 3 (Dike) 5 0.00034 11A @ Station 119+75 UT to Neddie Creek Flow Diversion P 1 7~ N/A 9A Sta. 101+40 to UT to Neddie Wet Ditch 104+00 Creek Relocation P 1 260 0.00,97 Total Stream Impact (by length and acreage) I 223 ~ .01329 Total Temporary Impacts for Flow Diversion & Impervious Dikes Respectively I 1228 0.01111 Page 6 of 11 s•~ ~ 9-A I i I i ! I I ' I I ~ ~ I 1 I 1• 1 I I I _ I I I I I I I I I I I i-TTfTiT i ,~ ,~ ~ ~~ ;~, - I- ` ~ ~ ', t i 1 ~ ;l ~ ' -~ ~I tt z ~~ ~ ~ ~; `~ ~' A' 4 2 ~-- t~ A - ,~ } ', { iI ~ ~P I: I I! I I I I 1 1 1 1 1 I t I I i I I - 1~_ I l l i I t l l l l l l I I i ~ ~ ~ ~ ~ 11 1! I t A ~vco/~ /~1~.!/ s~ i757 I i / o ~-DD II ' io.2~0 I I~ 1~ 1 1 1 1 1 1 1~ 1 LI_! I I I~ I I f I I ~ ~ I I I~_ I i I ~ I I~ I I I I ~ I I 1 1 f I~ I_I I Jai i I I SR 1757 Site 9A Vet Ditch