Loading...
HomeMy WebLinkAbout20120074 Ver 1_401 Application_20120127CREDLE ENGINEERING COMPANY, INC E N G I N E E R I N G \ P L A N N I N G \ L A N D S U R V E Y I N G S E R V I N G T H E C O M M U N I T Y S I N C E 1 9 2 0 204 E MARKHAM AVENUE DURHAM NORTH CAROLINA 27701 TELEPHONE (919) 682 2006 FAX (919) 682 2006 DECEMBER 21 2011 To Lauren Witherspoon NCDT'NR Re Midas I ine Subdivision Dc,ii Ms Witlicispoon 20120074 It is our intentions that you would consider this application for a No Practical Alternative to the proposed stream crossing as shown on the attached plans for Midas Lane Subdivision This application shows that the proposed roadway will cross the existing stream in two locations The first 5trevn crossing has the purpose to traverse the stream to access the rear of the property The second roadway crossing traverses the same stream for the purpose of access to the adjacent parcel per the Durham Unified Development Ordinance (UDO) There are two driveway crossings for the purpose of access to the residential home sites The entrance of the subdivision also has a partial encroachment of the stream buffer This design cannot be altered since the proposed roadway is an extension of an existing roadway with private owners on either side Thanks you for your time and consideration of this project Sincerely Credle Engineering Company Inc I eefc&- William C Credle 0W 19 JAN 2 7 2012 "'k "'111111818", �\A C AR -s Sf 5522 0 4 M C CR�� `��,� �0 wAT�9 O G r ACiO�C I DENR IU 2 7 10121 74TERQU,gL�7y Office Use Only Corps action ID no DWQ project no Form Version 1 3 Dec 10 2008 Page 1 of 10 PCN Form — Version 13 December 10 2008 Version Pre- Construction No W- o C Form A Appheant Information 1 Procesainq 1 a Type(s) of approval sought from the Corps El Section 404 Permit El Section 10 Permit 1 b Specify Nationwide Permit (NWP) number or General Permit (GP) number 1 c Has the NWP or GP number been verified by the Corps? ❑ Yes ❑ No 1 d Type(s) of approval sought from the DWQ (check all that apply) ❑ 401 Water Quality Certification — Regular ❑ Non 404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ® Riparian Buffer Authorization le Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification ❑ Yes ❑ No For the record only for Corps Permit ❑ Yes ❑ No 1f is payment into a mitigation bank or in lieu fee program proposed for mitigation of impacts? If so attach the acceptance letter from mitigation bank or in lieu fee program ❑ Yes ❑ No 1g Is the project located in any of NC s twenty coastal counties If yes answer 1h below ❑ Yes ❑ No 1h Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ❑ No 2 Project Information 2a Name of project Midas Lane Subdivision 2b County Durham 2c Nearest municipality / town Rougemont 2d Subdivision name Midas Lane Subdivision 2e NCDOT only T I P or state project no 3 Owner Information 3a Name(s) on Recorded Deed Carreiro John & Maria 3b Deed Book and Page No D B 5816 PG 59 3c Responsible Party (for LLC if applicable) 3d Street address 3 Foxtad Lane 3e City state zip Brookfield Ct 06A604 t� 3f Telephone no 203 297 2451 3g Fax no 3h Email address Page 1 of 10 PCN Form — Version 13 December 10 2008 Version 4 Applicant Information (if different from owner) 4a Applicant is ❑ Agent ❑ Other specify 4b Name 4c Business name (if applicable) 4d Street address 4e City state zip 4f Telephone no 49 Fax no 4h Email address 5 Agent/Consultant information (if applicable) 5a Name Mr William C Credle 5b Business name (if applicable) Credle Engineering Co 5c Street address 204 E Markham Avenue 5d City state zip Durham NC 27701 5e Telephone no 919 682 2006 5f Fax no 919 682 2005 5g Email address Page 2 of 10 PCN Form — Version 1 3 December 10 2008 Version B Project Information and Pnor Project History 1 Property identification 1a Property identification no (tax PIN or parcel ID) 09030 04 85 0020 lb Site coordinates (in decimal degrees) Latitude Longitude (DD DDDDDD) ( DD DDDDDD) 1 c Property size 47 21 acres 2 Surface Waters 2a Name of nearest body of water (stream river etc ) to prorosf-d protect Deep Creek 2b Water 01.1ality Classification of nearest receiving water 2c Pivcr basin Neuse 3 Project Description 3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application The entire site is vacant woodsd property adjacent to residential parcels 3b List the total estimated acreage of all existing wetlands on the property 3c List the total estimated linear feet of all existing streams (intermittent and perennial) on the property 3802 3d Explain the purpose of the proposed project to create a residential subdivision 3e Describe the overall project in detail including the type of equipment to be used the creation of 16 lots to provide homesites Each lot is large in nature and there is minimal roadway for access 4 Jurisdictional Determinations 4a Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the pasty Comments ❑Yes ®No El Unknown 4b If the Corps made the jurisdictional determination what type of determination was made? [I Preliminary ®Final 4c If yes who delineated the jurisdictional areas? Name (if known) Agency /Consultant Company Other 4d If yes list the dates of the Corps jurisdictional determinations or State determinations and attach documentation 5 Project History 5a Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑ Yes ® No ❑ Unknown 5b If yes explain in detail according to help file instructions 6 Future Project Plans 6a Is this a phased project? ®Yes ® No 6b If yes explain Page 3 of 10 PCN Form — Version 13 December 10 2008 Version C Proposed Impacts Inventory 1 Impacts Summary la Which sections were completed below for your project (check all that apply) ❑ Wetlands ❑ Streams tributaries ® Buffers ❑ Open Waters ❑ Pond Construction 2 Wetland Impacts If there are wetland impacts proposed on the site then complete this question for each wetland area impacted 2a 2b 2c 2d 2e 2f Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps 404 10 Area of impact Permanent (P) or (if known) DWQ —non 404 other) (acres) Temporary T W1 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W2 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W3 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W4 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W5 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W6 ❑ P FIT ❑ Yes ❑ Corps ❑ No ❑ DWQ 2g Total wetland impacts 2h Comments 3 Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site then complete this question for all stream sites impacted 3a 3b 3c 3d 3e 3f 3g Stream Impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number (PER) or (Corps 404 10 stream length Permanent (P) or Intermittent DWQ — non404 width (linear Temporary (T) (INT)? other) (feet) feet) S1 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S2 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S3 ❑ P [IT ❑ PER ❑ Corps ❑ INT ❑ DWQ S4 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S5 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S6 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ 3h Total stream and tributary impacts 31 Comments Page 4 of 10 PCN Form — Version 1 3 December 10 2008 Version 4 Open Water Impacts If there are proposed impacts to lakes ponds estuaries tributaries sounds the Atlantic Ocean or any other open water of the U S then individually list all open water impacts below 4a 4b 4c 4d 4e Open water Name of waterbody impact number — (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary T 01 ❑P ❑T 02 ❑P ❑T 03 ❑P ❑T 04 ❑P ❑T 4f Total open water impacts 4g Comment 5 Pond or Lake Construction If pond or lake construction proposed the complete the chart below 5a 5b 5c 5d 5e Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose of (acres) number pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f Total 5g Comments 5h Is a dam high hazard permit required ❑ Yes ❑ No If yes permit ID no 51 Expected pond surface area (acres) 5j Size of pond watershed (acres) 5k Method of construction 6 Buffer Impacts (for DWQ) If project will impact a protected riparian buffer then complete the chart below If yes then individually list all buffer impacts, below If any impacts require mitigation then you MUST fill out Section D of this form 6a ® Neuse ❑ Tar Pamlico ❑ Other Project is in which protected basin? ❑ Catawba ❑ Randleman 6b 6c 6d 6e 6f 6g Buffer impact number — Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) for impact Stream name mitigation (square feet) (square feet) or Temporary T required? B1 ®P ❑ T Road crossing Unknown ❑ Yes ❑ No 11 289 6 653 B2 ®P ❑ T Road crossing Unknown Yes ❑ No 7 301 4 780 B3 ® P ❑ T driveways Unknown Q Nos 4 918 1 280 6h Total buffer impacts 23 508 12 713 61 Comments Roadway culvert (see attached map of zones) Page 5 of 10 PCN Form — Version 13 December 10 2008 Version D Impact Justification and Mitigation 1 Avoidance and Minimization 1a Specifically describe measures taken to avoid or minimize the proposed impacts in designing project The stream crossinn were design to minimize the number of crossing and meet local zoning ordinances 1 b Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques erosion control basins and other necessary measures to protect water body form nutrients and silt 2 Compensatory Mitigation for Impacts to Waters of the U S or Waters of the State 2a Does the project require Compensatory Mitigation for impacts to Waters of the U S or Waters of the State? ❑ Yes ❑ No 2b II yes mitigation is requited by (check all that apply) ❑ DWQ ❑ Corps 2c If yes which mitigation option will be used for this project? ❑ Mitigation bank ❑ Payment to in lieu fee program ❑ Permittee Responsible Mitigation 3 Complete if Using a Mitigation Bank 3a Ngme of Mitigation Bank 3b Credits Purchased (attach receipt and letter) Type Quantity 3c Comments 4 Complete If Making a Payment to In lieu Fee Program 4a Approval letter from in lieu fee program is attached ❑ Yes 4b Stream mitigation requested linear feet 4c If using stream mitigation stream temperature ❑ warm ❑ cool []cold 4d Buffer mitigation requested (DWQ only) square feet 4e Riparian wetland mitigation requested acres 4f Non riparian wetland mitigation requested acres 4g Coastal (tidal) wetland mitigation requested acres 4h Comments 5 Complete if Using a Permittee Responsible Mitigation Plan 5a If using a permittee responsible mitigation plan provide a description of the proposed mitigation plan Page 6 of 10 PCN Form — Version 13 December 10 2008 Version 6 Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a Will the project result in an impact within a protected riparian buffer that requires ❑ Yes ® No buffer mitigation? 6b If yes then identify the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the amount of mitigation required 6c 6d 6e Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 Roadway crossing 23 508 3 (2 for Catawba) 70 524 Zone 2 Roadway Crossing 12 713 1 5 19 070 6f Total buffer mitigation required 89 594 6g If buffer mitigation is required discuss what type of mitigation is proposed (e g payment to private mitigation bank permittee responsible riparian buffer restoration payment into an approved in lieu fee fund) Payment to an approved mitigation bank at this time 6h Comments Page 7 of 10 PCN Form — Version 13 December 10 2008 Version E Stormwater Management and Diffuse Flow Plan (required by DWQ) 1 Diffuse Flow Plan 1 a Does the project include or is it adjacent to protected riparian buffers identified ® Yes ❑ No within one of the NC Riparian Buffer Protection Rules? 1 b If yes then is a diffuse flow plan included? If no explain why Comments This is the Preliminary diffused flow plan will be provided with ❑ Yes ® No construction documents 2 Stormwater Management Plan 2a What is the overall percent imperviousness of this project? f i 6% 2b Does this project require a Stormwater Management Plan? ® Yes ❑ No 2c If this project DOES NOT require a Stormwater Management Plan explain why 2d If this project DOES require a Stormwater Management Plan then provide a brief narrative description of the plan Plan will include necessary measures to control stormwater runoff ® Certified Local Government 2e Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program ❑ DWQ 401 Unit 3 Certified Local Government Stormwater Review 3a In which local government s jurisdiction is this project? Durham ® Phase II ❑ NSW 3b Which of the following locally implemented stormwater management programs ❑ USMP apply (check all that apply) ❑ Water Supply Watershed ❑ Other 3c Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ® No attached? 4 DWQ Stormwater Program Review ❑ Coastal counties ® HQW 4a Which of the following state implemented stormwater management programs apply ❑ ORW (check all that apply) ❑ Session Law 2006 246 ❑ Other 4b Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ® No 5 DWQ 401 Unit Stormwater Review 5a Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 8 of 10 PCN Form — Version 13 December 10 2008 Version F Supplementary Information 1 Environmental Documentation (DWQ Requirement) la Does the project involve an expenditure of public (federal /state /local) funds or the ❑ Yes ® No use of public (federal /state) land? lb If you answered yes to the above does the project require preparation of an ❑ Yes ❑ No environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c If you answered yes to the above has the document review been finalized by the State Clearing House? (If so attach a copy of the NEPA or SEPA final approval Yes ❑ No letter ) Comments 2 Violations (DWQ Requirement) 2a Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500) Isolated Wetland Rules (15A NCAC 2H 1300) DWQ Surface Water or Wetland Standards ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 2B 0200)? 2b Is this an after the fact permit application? ❑ Yes ® No 2c If you answered yes to one or both of the above questions provide an explanation of the violation(s) 3 Cumulative Impacts (DWQ Requirement) 3a Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ® No additional development which could impact nearby downstream water quality? 3b If you answered yes to the above submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy If you answered no provide a short narrative description 4 Sewage Disposal (DWQ Requirement) 4a Clearly detail the ultimate treatment methods and disposition (non discharge or discharge) of wastewater generated from the proposed project or available capacity of the subject facility Sewage will be treated through individual septic systems for each home Page 9 of 10 PCN Form — Version 13 December 10 2008 Version 5 Endangered Species and Designated Critical Habitat (Corps Requirement) 5a Will this project occur in or near an area with federally protected species or ❑ Yes ® No habitat? 5b Have you checked with the USFWS concerning Endangered Species Act ❑ Yes ® No impacts? ❑ Raleigh 5c If yes indicate the USFWS Field Office you have contacted ❑ Asheville 5d What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? 6 Essential Fish Habitat (Corps Requirement) 6a Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ® No 6b What data sources did you use to determine whether your site would impact Essential Fish Habitat? topographic map showing distance to Falls lake 7 Historic or Prehistoric Cultural Resources (Corps Requirement) 7a Will this project occur in or near an area that the state federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ® No status (e g National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b What data sources did you use to determine whether your site would impact historic or archeological resources? National historic register 8 Flood Zone Designation (Corps Requirement) 8a Will this project occur in a FEMA designated 100 year floodplain? ❑ Yes ® No 8b If yes explain how project meets FEMA requirements 8c What source(s) did you use to make the floodplain determination? Panel 3720022800J William C Credle 12/15/11 Applicant/Agents Printed Name Applicant/Agents Signature Date (Agents signature is valid only if an authorization letter from the applicant is provided Page 10 of 10 PCN Form — Version 1 3 December 10 2008 Version N N�Y lL LLJ LL- 0 z x � H N z U z L cr z z w S CE 2 W z Z rn U) 2 U "i" p N R 8 � 3� e 7 A S� 3� a Y G wg r� �J 0 0 m M T-T O Cr) \ �€ i i i � \ r, p \ r Ilk ,t ro � cs ro-o ao ua s K !Op rob eo r w Y ba �� 603w31 3 JI suNV W31 At 1m w 1 F16�� sa a nrosa Ha Q S3 n so -a 50 I /pi I if t n eoe At g'ur'u _NVnaHS w r, p \ r Ilk ,t ro � cs ro-o ao ua s K !Op rob eo r w Y °o n ba �� 603w31 3 JI suNV W31 At 1m w 1 F16�� sa a °o n N F- W O Z W It- 0 z 7) V) 0 ry U ■ U� O 0 �f' V 0 G o L w LL Z N N �� W M C U O) N U) (J) O N '- N ch to N F- Z LLJ w Z V) ry U ■ C Cn 00 � 1 1 1 \ LIWj1 �ai� � C i N E U � ry n 0 0 Ln \ \ � 1 \ Q .j w 0 LO .t: u G.' P U a 0 u O U �1� 5 y� X V w a z° W5 Qw Wz CL� z Va a w m z 0 z w Cgs) VP IP \ � G � N LL cn In N m N t LL LL LL N 0, W, O W —0 W CO O z0 zoco Om Ovn Nn NN f \ \ � 1 \ Q .j w 0 LO .t: u G.' P U a 0 u O U �1� 5 y� X V w a z° W5 Qw Wz CL� z Va a w m z 0 z w Cgs) VP IP \ � G � N N FS cr 0 z W H z w U ry Q U z w 0 LL - LL O ZC, iN N N(D t O \\ w \ \P CL P 0 M r 0► S —&rQf7r r - O` 7r2,5 F 94081 8 O 0 w, 0 U O N >1�]b1 �N (M /1,09) w 0 Z W, F- z LL) U Q O U z W ■ 0 0 1 1 w co N W C) II LO N N U t N LL LL LL o Lu0)U) ict) OO'N-' N Nc�v- co 1 1 w co