HomeMy WebLinkAbout20011102 Ver 1_Public Meeting Notice_201111101°
.+. STA7[
i �nn
Gr puM od
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
BEVERLY EAVES PERDUE
GOVER \OR
November 4 2011
MEMORANDUM
TO Secretary Gene Conti
FROM Eileen A Fuchs FIrAll-)
Public Hearing Officer
Human Environment Section
EUGENE A CONTI JR
SECRErARY
Nov oe
�H
RE Notice of a Pre Hearing Open House and Corridor Public Hearing for the
Proposed U S 70 Havelock Bypass
Craven County
The following Notice is furnished for your information
R 1015 NCDOT proposes to construct a bypass on new location on the southwest side of
Havelock and US 70
EAF /dnh
Attachment
cc Mr
Hugh Overholt — Division 2
Ms
Leigh McNairy At Large Member — Division 2
Mr
Jon Nance, P E
Ms
Deborah M Barboui P E
Mr
C W Leggett P E
Mr
Mated Al Ghandour P E
Mr
Terry Gibson P E
Mr
Greg Thorpe PhD
Mr
Rob Hanson P E
Ms
Teresa Hart, P E
Mr
Eric Midkiff P E
Mr
Art McMillan P E
Mr
Jay Bennett P E
Mr
J Victor Barbour P E
Mr
Kevin Lacy P E
Ms
Sharon Lipscomb
MAILING ADDRESS
TELEPHONE 919 707 6000
NC DEPARTMENT OF TRANSPORTATION FAX 919 212 5785
HUMAN ENVIRONMENT SECTION
1598 MAIL SERVICE CENTER WEBSITE WWW NCDOT ORG
RALEIGH NC 27699 1598
LOCATION
PROJECT DEVELOPMENT &
ENVIRONMENTAL ANALYSIS UNIT
CENTURY CENTER BUILDING B
1020 BIRCH RIDGE DRIVE
RALEIGH NC 27611
l
Ms Tammy Denning
Mr Everett Ward
Mr Mike Bruff, P E
Mr John Hennessy
Mr Charles Brown P E , PLS
Mr Doug Askew Right of Way Agent — Division 2
FHWA
""low
sIk
E
I-
NOTICE OF A PRE - HEARING OPEN HOUSE
AND CORRIDOR PUBLIC HEARING
FOR THE PROPOSED U S 70 HAVELOCK BYPASS
TIP Project No R 1015
Craven County
The North Carolina Department of Transportation ( NCDOT) will hold a Corridor
Public Hearing for the proposed U S 70 Havelock Bypass on Tuesday Dec 6 2011 at
the Havelock Tourist and Event Center located at 201 Tourist Center Drive
An informal Pre Hearing Open House will be held prior to the public hearing in
the lobby of the Center NCDOT representatives will be available to answer questions
and receive comments about the proposed project The opportunity to submit written
comments or questions will be provided and is encouraged Interested citizens may drop
in anytime during the open house between 4 30 6 30 p in
The public hearing will begin at 7 p m and will explain the proposed project
corridor locations Citizens will be able to speak ask questions and /or turn in comments
immediately following the formal presentation The presentation and public comment
period will be recorded and a written transcript will be prepared
Anyone wishing to speak at the public hearing may register at the sign in table
during the pre hearing workshop hours Speakers will be called in the order they sign in
and have a three minute time limit This way everyone who would like to speak will
have an oppoiumty to do so
Anyone who would like to speak and did not sign in will have the opportunity
after those who iegistered have spoken Written comments bear the same weight as
spoken comments
The proposed project will be constructed on a new location (bypass) on the
southwest side of Havelock and U S 70 The proposed road begins north of the Havelock
city limits and extends south for about 10 miles to the Craven Carteret County line
The proposed road will be a four lane median divided highway that will provide
a high speed alternative to the heavily congested existing U S 70 through Havelock The
project is currently scheduled for right of way acquisition to begin in 2013, followed by
construction starting in 2015 These dates are tentative and subject to change
NCDOT presented three bypass alternatives to the public in May 1998 Corridor 3
was originally selected as the preferred alternative Preliminary design plans were
prepared for Corridor 3 and the associated potential impacts were further assessed and
evaluated Based on the magnitude of the potential impacts from Corridor 3 it was
determined that another environmental study was needed to further evaluate all three
corridors in greater detail
The new findings of potential impacts to all three corridors are now included in a
new environmental document that was prepared and approved by the Federal Highway
Administration in September This document known as the Draft Environmental
Impact Statement (DEIS) and the revised corridor maps displaying the proposed
location(s) of the U S 70 Havelock Bypass are currently available for public
review at the following locations
City of Havelock — City Clerk s Office 1 Governmental Drive Havelock and
Havelock Tourist and Event Center 201 Tourist Center Drive Havelock
The snaps can also be found online at
I()] k oh r�(.Oh',t Glc! h ),k iy I0 Id', ik Iic H i i,ill 1 , 1) OW t
For more information please contact Eileen Fuchs NCDOT Human
Environment Unit by phone at (919) 707 6067 of via email at c,afuchs(cencdot i;ov
Additional written comments regarding the proposed project may be submitted to Ms
Fuchs until Jan 6 2012
NCDOT will provide auxiliary aids and services under the Americans with
Disabilities Act for disabled persons who want to participate in this hearing Anyone
requiring special services should contact Ms Fuchs as soon as possible so that