Loading...
HomeMy WebLinkAbout20051354 Ver 2_401 Application_20120123January 19 2012 Ian McMillan, 401 Coordinator Division of Water Quality 401 Wetlands Unit 1650 Mail Service Center Raleigh NC 27699 1650 DS -13sq U a- Re Permit Application Watts Property Stream and Wetland Restoration Project, Perquimans County Dear Mr McMillan Attached for your review 3 copies of the mitigation plan and (2) NW 27 for Bear Creek stream restoration project in Chatham County I have also included an electronic copy Please feel free to contact me with any questions regarding this plan (715 1616) Thank you very much for your assistance Attachment Mitigation Plans PCN CD containing all electronic files Sincerely Wya Brown, LSS D 2012 �s�� Aura �B�►VCH Yv -" A 6' '-Vo Owl "34-s vA NCDEHR North Carolina Ecosystem Enhancement Program 1652 Mail Service Center Raleigh HC 27699 1652 1 919 715 0476 / www nceep ne i oS -1354 031 Office Use Only Corps action ID no DWQ project no Form Version 1 3 Dec 10 2008 Page 1 of 10 PCN Form — Version 1 3 December 10 2008 Version Pre - Construction Notification PCN Form A Apphcant Information 1 Processing la Type(s) of approval sought from the Corps ®Section 404 Permit El Section 10 Permit lb Specify Nationwide Permit (NWP) number 27 or General Permit (GP) number 1c Has the NWP or GP number been verified by the Corps? ❑ Yes ® No 1 d Type(s) of approval sought from the DWQ (check all that apply) ® 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification ❑ Yes ® No For the record only for Corps Permit ❑ Yes ® No 1f Is payment into a mitigation bank or in lieu fee program proposed for mitigation of impacts? If so attach the acceptance letter from mitigation bank or in lieu fee program ❑ Yes ® No 1g Is the project located in any of NC s twenty coastal counties If yes answer 1 h below ❑ Yes ® No 1h Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ® No 2 Project Information 2a Name of project Watts Property stream & Wetland Restoration 2b County Perquimans 2c Nearest municipality / town Hertford 2d Subdivision name 2e NCDOT only T I P or state project no 3 Owner Information 3a Name(s) on Recorded Deed NCEEP 3b Deed Book and Page No Book 156 Page 654 Book 271 Page 589 NJ 3c Responsible Party (for LLC if applicable) ' 3 ?O'� 3d Street address 2728 Capital Blvd Suite 1H 103 DSgryOST Qkm 3e City state zip Raleigh NC27604 3f Telephone no 919 715 1616 3g Fax no 919 715 2219 3h Email address wyatt brown @ncdenr gov Page 1 of 10 PCN Form — Version 1 3 December 10 2008 Version 4 Applicant Information (if different from owner) 4a Applicant is ❑ Agent ❑ Other specify 4b Name 4c Business name (if applicable) 4d Street address 4e City state zip 4f Telephone no 4g Fax no 4h Email address 5 Agent/Consultant Information (if applicable) 5a Name 5b Business name (if applicable) 5c Street address 5d City state zip 5e Telephone no 5f Fax no 5g Email address Page 2 of 10 PCN Form — Version 1 3 December 10 2008 Version B Project Information and Prior Project History 1 Property Identification 1 a Property identification no (tax PIN or parcel ID) 8808 69 9972 1 b Site coordinates (in decimal degrees) Latitude 36 1652 Longitude 762676 (DD DDDDDD) ( DD DDDDDD) 1 c Property size 48 09 acres 2 Surface Waters 2a Name of nearest body of water (stream river etc ) to Little River proposed project 2b Water Quality Classification of nearest receiving water Class SC 2c River basin Pasquotank 3 Project Description 3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application degraded rural channel poor buffer mostly farm fields 3b List the total estimated acreage of all existing wetlands on the property 06 acres 3c List the total estimated linear feet of all existing streams (intermittent and perennial) on the property 1505 3d Explain the purpose of the proposed project restore and stabilize degraded portions of the stream provide buffers restore wetlands 3e Describe the overall project in detail including the type of equipment to be used restore pattern dimension and profile creating undulating bedform forest the buffer track hoes dump trucks 4 Jurisdictional Determinations 4a Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / ® Yes ❑ No El Unknown project (including all prior phases) in the past Comments 4b If the Corps made the jurisdictional determination what type ❑ Preliminary ® Final of determination was made 4c If yes who delineated the jurisdictional areas? Agency /Consultant Company Ecological Engineering Name (if known) Lane Sauls Other 4d If yes list the dates of the Corps jurisdictional determinations or State determinations and attach documentation 9/13/2010 Bill Biddlecome 5 Project History 5a Have permits or certifications been requested or obtained for ❑ Yes ® No ❑ Unknown this project (including all prior phases) in the past? 5b If yes explain in detail according to help file instructions 6 Future Project Plans 6a Is this a phased project? ❑ Yes ® No 6b If yes explain Page 3 of 10 PCN Form — Version 1 3 December 10 2008 Version C Proposed Impacts Inventory 1 Impacts Summary 1a Which sections were completed below for your project (check all that apply) ® Wetlands ® Streams tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2 Wetland Impacts If there are wetland impacts proposed on the site then complete this question for each wetland area impacted 2a 2b 2c 2d 2e 2f Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps 404 10 Area of impact Permanent (P) or (if known) DWQ — non -404 other) (acres) Temporary T W1 ❑ P ®T planting ❑ Yes ❑ No ® Corps ❑ DWQ 058 W2 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W3 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W4 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W5 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W6 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ 2g Total wetland impacts 058 2h Comments please refer to table 5 page 30 3 Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site then complete this question for all stream sites impacted 3a 3b 3c 3d 3e 3f 3g Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number (PER) or (Corps 404 10 stream length Permanent (P) or intermittent DWQ — non 404 width (linear Temporary (T) (INT)? other) (feet) feet) S1 ®P ❑ T Restoration Reach 1 &2 ® PER ❑ INT ® Corps ® DWQ 5ft 1505 S2 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S3 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S4 ❑ P ❑ T ❑ PER ® Corps ❑ INT ® DWQ S5 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S6 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ 3h Total stream and tributary impacts 1505 31 Comments please refer to table 5 page 30 Page 4 of 10 PCN Form — Version 1 3 December 10 2008 Version 4 Open Water Impacts If there are proposed impacts to lakes ponds estuaries tributaries sounds the Atlantic Ocean or any other open water of the U S then individually list all open water impacts below 4a 4b 4c 4d 4e Open water Name of waterbody impact number— (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary T 01 ❑P ❑T 02 ❑P 03 ❑P 04 ❑P 4f Total open water impacts 4g Comments 5 Pond or Lake Construction If pond or lake construction proposed then complete the chart below 5a I 5b I 5c 5d 5e Pond ID Proposed use or purpose number of pond Wetland Impacts (acres) I Stream Impacts (feet) Flooded I Filled I Excavated I Flooded I Filled I Excavated P1 P2 5f Total 5g Comments 5h Is a dam high hazard permit required ❑ Yes ❑ No If yes permit ID no Upland (acres) Flooded 51 Expected pond surface area (acres) 5j Size of pond watershed (acres) 5k Method of construction 6 Buffer Impacts (for DWQ) If project will impact a protected riparian buffer then complete the chart below If yes then individually list all buffer impacts below If any impacts require mitigation then you MUST fill out Section D of this form 6a Project is in which protected basin? 6b 6c 6d Buffer impact number — Reason Permanent (P) or for TemDorary (T) impact B1 ❑P ❑T B2 ❑P ❑T B3 ❑P ❑T 61 Comments ❑ Neuse ❑ Tar Pamlico ❑ Other ❑ Catawba ❑ Randleman 6e I 6f I 6g Buffer Stream name mitigation required? ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No 6h Total buffer impacts Zone 1 impact I Zone 2 impact (square feet) (square feet) Page 5 of 10 PCN Form — Version 1 3 December 10 2008 Version D Impact Justification and Mitigation 1 Avoidance and Minimization 1a Specifically describe measures taken to avoid or minimize the proposed impacts in designing project 1b Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques follow the approved sediment control plan seed mulch and plant 2 Compensatory Mitigation for Impacts to Waters of the U S or Waters of the State 2a Does the project require Compensatory Mitigation for impacts to Waters of the U S or Waters of the State? ❑ Yes ® No 2b If yes mitigation is required by (check all that apply) ❑ DWQ ❑ Corps 2c If yes which mitigation option will be used for this project ❑ Mitigation bank ❑ Payment to in lieu fee program ❑ Permittee Responsible Mitigation 3 Complete if Using a Mitigation Bank 3a Name of Mitigation Bank 3b Credits Purchased (attach receipt and letter) Type Quantity 3c Comments 4 Complete if Making a Payment to In lieu Fee Program 4a Approval letter from in lieu fee program is attached ❑ Yes 4b Stream mitigation requested linear feet 4c If using stream mitigation stream temperature ❑ warm ❑ cool ❑cold 4d Buffer mitigation requested (DWQ only) square feet 4e Riparian wetland mitigation requested acres 4f Non riparian wetland mitigation requested acres 4g Coastal (tidal) wetland mitigation requested acres 4h Comments 5 Complete if Using a Permittee Responsible Mitigation Plan 5a If using a permittee responsible mitigation plan provide a description of the proposed mitigation plan Page 6 of 10 PCN Form — Version 1 3 December 10 2008 Version 6 Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a Will the protect result in an impact within a protected riparian buffer that requires buffer mitigation9 ❑ Yes ® No 6b If yes then identify the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the amount of mitigation required Zone 6c Reason for impact 6d Total impact (square feet) Multiplier 6e Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1 1 5 6f Total buffer mitigation required 6g If buffer mitigation is required discuss what type of mitigation is proposed (e g payment to private mitigation bank permittee responsible riparian buffer restoration payment into an approved in lieu fee fund) 6h Comments Page 7 of 10 PCN Form — Version 1 3 December 10 2008 Version E Stormwater Management and Diffuse Flow Plan (required by DWQ) 1 Diffuse Flow Plan 1a Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes ® No within one of the NC Riparian Buffer Protection Rules? 1 b If yes then is a diffuse flow plan included? If no explain why ❑ Yes ❑ No Comments 2 Stormwater Management Plan 2a What is the overall percent imperviousness of this project? % 2b Does this project require a Stormwater Management Plan? ❑ Yes ® No 2c If this project DOES NOT require a Stormwater Management Plan explain why 2d If this project DOES require a Stormwater Management Plan then provide a brief narrative description of the plan ❑ Certified Local Government 2e Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program ❑ DWQ 401 Unit 3 Certified Local Government Stormwater Review 3a In which local government s jurisdiction is this project? ❑ Phase II 3b Which of the following locally implemented stormwater management programs ❑ NSW ❑ USMP apply (check all that apply) ❑ Water Supply Watershed ❑ Other 3c Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4 DWQ Stormwater Program Review ❑ Coastal counties ❑ HQW 4a Which of the following state implemented stormwater management programs apply ❑ ORW (check all that apply) ❑ Session Law 2006 246 ❑ Other 4b Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ❑ No 5 DWQ 401 Unit Stormwater Review 5a Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 8of10 PCN Form — Version 1 3 December 10 2008 Version F Supplementary Information 1 Environmental Documentation (DWQ Requirement) la Does the project involve an expenditure of public (federal /state /local) funds or the ® Yes ❑ No use of public (federal /state) land? lb If you answered yes to the above does the project require preparation of an environmental document pursuant to the requirements of the National or State ® Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c If you answered yes to the above has the document review been finalized by the State Clearing House? (If so attach a copy of the NEPA or SEPA final approval ® Yes ❑ No letter ) Comments see restoration plan 2 Violations (DWQ Requirement) 2a Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500) Isolated Wetland Rules (15A NCAC 2H 1300) DWQ Surface Water or Wetland Standards ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 213 0200)? 2b Is this an after the fact permit application? ❑ Yes ® No 2c If you answered yes to one or both of the above questions provide an explanation of the violation(s) 3 Cumulative Impacts (DWQ Requirement) 3a Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ® No additional development which could impact nearby downstream water quality? 3b If you answered yes to the above submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy If you answered no provide a short narrative description 4 Sewage Disposal (DWQ Requirement) 4a Clearly detail the ultimate treatment methods and disposition (non discharge or discharge) of wastewater generated from the proposed project or available capacity of the subject facility Page 9 of 10 PCN Form — Version 1 3 December 10 2008 Version 5 Endangered Species and Designated Critical Habitat (Corps Requirement) 5a Will this project occur in or near an area with federally protected species or ❑ Yes ® No habitat? 5b Have you checked with the USFWS concerning Endangered Species Act ® Yes ❑ No impacts? ® Raleigh 5c If yes indicate the USFWS Field Office you have contacted ❑ Asheville 5d What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? 6 Essential Fish Habitat (Corps Requirement) 6a Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ® No 6b What data sources did you use to determine whether your site would impact Essential Fish Habitat? 7 Historic or Prehistoric Cultural Resources (Corps Requirement) 7a Will this project occur in or near an area that the state federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ® No status (e g National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b What data sources did you use to determine whether your site would impact historic or archeological resources? 8 Flood Zone Designation (Corps Requirement) 8a Will this project occur in a FEMA designated 100 year floodplain? ❑ Yes ® No 8b If yes explain how project meets FEMA requirements 8c What source(s) did you use to make the floodplain determination? Wyatt Brown bi'e— January 19 2 012 Applicant/Agent s Printed Name Date A i ant/Age s Signature (Agents signature is falid only if an authorization letter from the applicant is provided Page 10 of 10 PCN Form — Version 1 3 December 10 2008 Version