Loading...
HomeMy WebLinkAbout20160629 Ver 1_Information Letter_20120201e�n copv Q A North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Charles Wakild P E Governor Director February 1 2012 MEMORANDUM TO James F Bridges P E Bridge Project Planning Engineer NCDOT FROM Michael R Parker NCDWQ Asheville Regional Office SUBJECT Bridge Scopmg Review Comments B 5398 Bridge No 21 NCSR 1803 Burke County B 5397 Bridge No 51 NCSR 2213 Rutherford County B 4823 Bridge No 12 NCSR 1538 Transylvania County In reply to your letters dated December 22 2012 in which you requested comments for the above referenced project the NCDWQ offers the following Protect Specific Comments B 5398, Bridge No 21 over Henry Fork, Burke County 1 Henry Fork is class C waters of the State 2 There are two unnamed tributaries to Henry Fork on the north side of the study area where NCDWQ will claim Jurisdiction 3 NCDWQ has no specific comments for this bridge project B 5397, Bridge No 51 over Floyds Creek, Rutherford County Floyds Creek is class C waters There is a small unnamed tributary to Floyds Creek that starts south of NCSR 2295 and flows under NCSR 2295 to Floyds Creek Also there are adjacent wetlands between NCSR 2295 and Floyds Creek A small pocket of wetlands also exist on the south side of NCSR 2295 along the unnamed tributary NCDWQ has no specific comments for this bridge project B 4823, Bridge 12 over Hogsed, Transylvania County 1 Hogsed Creek is class C trout waters NCDWQ recommends that the most protective sediment and erosion control BMP s be implemented to reduce the risk of turbidity violations in trout waters In addition all disturbances within trout buffers shall be conducted in accordance with the NC Division of Land Resources and NC Wildlife Resources Commission Dee Freeman Secretary SURFACE WATER PROTECTION SECTION Asheville Regional Office One 2090 U S Highway i0 Swannanoa North Carolina 28778 8211 NorthCarohna Phone 828 296 -4500 i FAX 828 299 7043 J Internet www ncwaterquality org �% �t�r�ll An Equal Opportunity Atfirmative Action Employer s V 2 Should NC Wildlife Resources Commission (NCWRC) identify these waters as naturally reproducing trout waters NCDOT will be required to observe the NCWRC — recommended moratoria for trout In additions NCDWQ will require that NCDOT strictly adhere to North Carolina regulations entitled Design Standards in Sensitive Watersheds [15A NCAC 04B 0124] throughout design and construction of the project General Comments Regarding Bridge Replacement Projects 1 NCDWQ is very concerned with sediment and erosion impacts that could result from these projects NCDOT shall address these concerns by describing the potential impacts that may occur to the aquatic environments and any mitigating factors that would reduce the impacts 2 If foundation test borings are necessary it shall be noted in the document Geotechnical work is approved under General 401 Certification Number 3687/Nationwide Permit No 6 for Survey Activities Low Impact Bridge Projects must fall under Nationwide Permit No 3 to qualify for Low Impact otherwise standard permitting procedures will be required Example (Regional General Permit No 31 Nationwide Permit No 23 Nationwide Permit No 13 etc ) 4 Whenever possible NCDWQ prefers spanning structures Spanning structures usually do not require work within the stream or grubbing of the stream banks and do not require stream channel realignment The horizontal and vertical clearances provided by bridges shall allow for human and wildlife passage beneath the structure Fish passage and navigation by canoeists and boaters shall not be blocked Bridge supports (bents) should not be placed in the stream when possible 5 Bridge deck drains shall not discharge directly into the stream Stormwater shall be directed across the bridge and pre treated through site appropriate means (grassed swales pre formed scour holes vegetated buffers etc ) before entering the stream Please refer to the most current version of NCDWQ s Stormwater Best Management Practices 6 Strict adherence to the most recent version of NCDOT s Best Management Practices For Bridge Demolition and Removal approved by the US Army Corps of Engineers is a condition of the 401 Water Quality Certification 7 Bridge piles and bents shall be constructed using driven piles (hammer or vibratory) or drilled shaft construction methods More specifically betting or other methods of pile driving are prohibited without prior written approval from NCDWQ first 8 No drill slurry or water that has been in contact with uncured concrete shall be allowed to enter surface waters This water shall be captured treated and disposed of properly 9 All pile driving or drilling activities shall be enclosed in turbidity curtains unless otherwise approved by NCDWQ in this certification 10 All bridge construction shall be performed from the existing bridge temporary work bridges temporary causeways or floating or sunken barges If work conditions require barges they shall be floated into position and then sunk The barges shall not be sunk and then dragged into position Under no circumstances should barges be dragged along the bottom of the surface water (2) A !, 11 All work in or adjacent to stream waters shall be conducted in a dry work area Approved BMP measures from the most current version of NCDOT Construction and Maintenance Activities manual such as sandbags rock berms cofferdams and other diversion structures shall be used to prevent excavation in flowing water 12 If concrete is used during construction a dry work area shall be maintained to prevent direct contact between curing concrete and stream water Water that inadvertently contacts uncured concrete shall not be discharged to surface waters due to the potential for elevated pH and possible aquatic life and fish kills 13 Heavy equipment shall be operated from the banks rather than in the stream channel in order to minimize sedimentation and reduce the introduction of other pollutants into the stream This equipment shall be inspected daily and maintained to prevent contamination of surface waters from leaking fuels lubricants hydraulic fluids or other toxic materials 14 If temporary access roads or detours are constructed the site shall be graded to its preconstruction contours and elevations Disturbed areas shall be seeded or mulched to stabilize the soil and appropriate native woody species shall be planted When using temporary structures the area shall be cleared but not grubbed Clearing the area with chain saws mowers bush hogs or other mechanized equipment and leaving the stumps and root mat intact allows the area to re vegetate naturally and minimizes soil disturbance 15 Sediment and erosion control measures sufficient to protect water resources must be implemented and maintained in accordance with the most recent version of North Carolina Sediment and Erosion Control Planning and Design Manual and the most recent version of NCS000250 16 In most cases the NCDWQ prefers the replacement of the existing structure at the same location with road closure If road closure is not feasible a temporary detour shall be designed and located to avoid wetland impacts minimize the need for clearing and to avoid destabilizing stream banks If the structure will be on a new alignment the old structure shall be removed and the approach fills removed from the 100 year floodplain Approach fills shall be removed and restored to the natural ground elevation The area shall be stabilized with grass and planted with native tree species Tall fescue shall not be used in riparian areas Thank you for the opportunity to provide comments at this time NCDOT is reminded that issuance of a 401 Water Quality Certification requires that appropriate measures be instituted to ensure that water quality standards are met and designated uses are not degraded or lost If you have any questions or require additional information please contact Mike Parker at 828 296 4500 cc Lori Beckwith USACE Asheville Field Office Garry Moore NCDOT Division 13 Bridge Manager Roger Bryan NCDOT Division 13 Environmental Officer Josh Deyton NCDOT Division 14 Bridge Manager Mark Davis NCDOT Division 14 Environmental Officer Marla Chambers NCWRC Transportation Permitting Unit NCDOT Bridge Scopmg Burke Rutherford Transylvania (3 )