Loading...
HomeMy WebLinkAbout20201372 Ver 1_DF16012.2023801_Permit Package_2021 February 3_20210203 I Ij' Mla North Carolina Department of Transportation Highway Stormwater Program STORM WATER MANAGEMENT PLAN — (Version 2.08;Released April 2018) FOR NCDOT PROJECTS WBS Element: DF16012.2023801 TIP No.: County(ies): Cleveland Page 1 of 1 General Project Information WBS Element: DF16012.2023801 TIP Number: Project Type: Bridge Replacement Date: 1/5/2021 NCDOT Contact: Steven D.Rackley,PE Contractor/Designer: Marc T.Shown,PE Address: 1710 E.Marion St. Address: 1000 Birch Ridge Dr Shelby,NC 28151 Raleigh,NC 27610 Phone: (980)552-4216 Phone: (919)707-6751 Email:srackley@ncdot.gov Email: mshown@ncdot.gov City/Town: Earl County(ies): Cleveland River Basin(s): Broad CAMA County? No Wetlands within Project Limits? No Project Description Project Length(lin.miles or feet): 0.180 miles Surrounding Land Use: Rural Proposed Project Project Built-Upon Area(ac.) 0.5 ac. 0.5 ac. Typical Cross Section Description: SR 1226:Two eleven feet wide paved lanes(total 22 feet wide),four feet wide shoulder SR 1226:open shoulder section,two nine feet wide paved lanes(total eighteen feet on each side(eight feet wide with guardrail). wide) Annual Avg Daily Traffic(veh/hr/day): Design/Future: 1300 Year:2040 Existing: 1100 Year: 2016 General Project Narrative: This project is the replacement of the NCDOT Structure Bridge#220072.The existing bridge length is 300 feet(6 @ 50'RC Deck on I-Beams)while the proposed bridge spans (Description of Minimization of Water will be 300 feet(3 @ 100'39"Box Beam).A temporary causeway is needed to remove the debris and collapsed spans due to the February 6,2020 rain event.The proposed Quality Impacts) bridge will have deck drains both sides of the bridge that are outside top of banks and not over the water.The road runoff will be discharged onto rip rap pads located as far away from the creek as practicable. Waterbody Information Surface Water Body(1): Buffalo Creek NCDWR Stream Index No.: 9-53-(5) NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: Other Stream Classification: None Impairments: None Aquatic T&E Species? No Comments: NRTR Stream ID: 9-53-(5) Buffer Rules in Effect: N/A Project Includes Bridge Spanning Water Body? Yes Deck Drains Discharge Over Buffer? N/A Dissipator Pads Provided in Buffer? N/A Deck Drains Discharge Over Water Body? No (If yes,provide justification in the General Project Narrative) (If yes,describe in the General Project Narrative;if no,justify in the (If yes,provide justification in the General Project Narrative) General Project Narrative) 1 II II 1 1 `tl "�1 • �'Q q 11 ` STATE STATE PROJECT REFERENCE NO. ��� � See Sheet � A For Index of Sheets ST A I , • • ° li ( \ Is • `� \ i T S No T T TOTAL 1 (s �CE N . C . B-5848 i II 122019 VISI * N * I ' HI ( ili \ V STATE PROJ.NO. F.A.PROJ.NO. DESCRIPTION 22�G'_� DF16021 .20 PE il 1 124O \�� DF16021 .20 ROW, UTILS il [22O8 * il il CLE VELA ND CO UNTY , 1 G II 236G' -n CIO 226 [221 [2334 -� PROJECT 1 II il M' 221 ' � VICINITY 00 'S> 1 235 • 0 il il II kr? 221 o 1230 _. LOCATION: REPLACE BRIDGE 72 OVER BUFFALO CREEK 1 II z21111 � 4II ' ON SR 2226 (LA VENDER ROAD) 1 .-----..,.\�O '1 222�7 • � � ip .„,,,, ii 4:11 „,,__,,,„- II �--'� /4.,' �''i'w� TYPE OF WORK: GRADI11tG, DRAI11tAGE, GUARDRAIL, II EI41 II 198 tII II C,..) � �- � � PAVING, AND STRUCTURE t � h104 II II I 222 • � ' hi....L1414 2301 ,`<v 0�A ' II 1 1_, 1 , II 198 I. r� l\lD- .�tiw7 P �. . . r V;' . '• TF F' M PA s: Ttir LIF R Mei,'"1I' —� • II 1 180 �II 5 C4 .,..- ,- , 1 U � 198 ./* ') 1 II _ J _ \ , c, . /.. `') 1 II . I , II u II 1 ,o, ki V C \ T " VAP4- 1 II 0, , II 1 II m , II 0 3EG \ 3DCE ENS 3DCE II II U - L - STAD 3 + 30 + / - - L - STA0 6 + 3O + / - II c il y II 0 I U il O 2226 LAVE \ 3E OA3 II 0 U - L - I E 1 0 1 II J TOEAL TO GOVE . II 0, I 1 , II 1 . . . FFALO C 'REEK II 1 II 1 STA . 9 + 50 . 00 — L — STAo 0 + 00 . 00 — � — II ,_, BFC \ T —) —) ROJI— CT B - 5848 I— \ D T D DRO CT B5878 1 II _, 1 II 1 00 UD 0 0 oL L DOCUMENT NOT CONSIDERED FINAL I n UNLESS ALL SIGNATURES COMPLETED U • • CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD III . il Eiti4 1 ° � V HYDRAULICS ENGINEER II il IL co) GRAPHIC SCALES DESIGN DATA PROJECT LENGTH Prepared in the Office of: -r il o� ADT 2016 = 1 ,100 DIVISION OF HIGHWAYS L7 $0 25 0 $0 10o 1000 Birch Ridge Dr., Raleigh NC, 27610 NONp 1 co ADT 2040 = 1 ,300 LENGTH OF ROADWAY TIP PROJECT B-5848 = 0.123 MILES �� °� � �� il U r`'� iiiii�_� K = 11 % 2018 STANDARD SPECIFICATIONS �@ it �j PLANS D = 60 % LENGTH OF STRUCTURE TIP PROJECT B-5848 = 0.057 MILES P.E.II ��Un 5O 25 O 5O BOO o * _ SIGNATURE: � '' ) II � _ _ _ T = 4 �o TOTAL LENGTH OF TIP PROJECT B-5848 — 0.180 MILES RIGHT OF WAY DATE: STEVE RACKLEY, PE (E* � � �~ � Er� I ��� PROJECT E1�GINEER ROADWAY DESIGN �' �'' Z° QV = 50 MPH DECEMBER 16, 2020 ENGINEER � �@ il o + F� PROFILE (HORIZONTAL) * TTST = 1 % DUAL 3% N � � O 10 5 0 10 20 FUNC CLASS LETTING DATE: THAD F. DUNCAN , PE il PROJECT DESIGN ENGINEEII R° � � l COLLECTOR TBD III n �� � , � PROFILE (VERTICALS SUBREGIONAL TIER P.E. I � c�� N \ � \_ i � 1 � SIGNATURE: ,i J� 0- ' PROJECT REFERENCE NO. SHEET NO. 0, 1. Using turbidity curtains, maintain the post-storm stream flow around the storm debris but at no point RNJ SHEET NO. 2PHASE 1 during Phase 1 shall more than 50% of the post-storm stream flow be impacted. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER . As the work pad is constructed, remove debris from the upstream side of the work pad and work downstream. INCOMPLETE ONOTUSE FOR 2/W ACQUISITION 3. After removing the bridge components and the debris from the stream, minimize the impacts to the post-storm stream flow while drilling the borings for the proposed interior piers.(see Geotechnical Special provisions) 4. After approval of final foundation recommendations by NCDOT Geotech unit, install drilled piers for both interior bents while maintaining the post-flood stream flow as directed by the engineer DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SI URES COMPLETED a do 5. After completing all interior bent work, remove the work pad and turbidity curtains in a manner that allows a` the stream to return to its pre-storm channel. a 6. Temporary pipe is to be removed when causeway is removed. / O =Q p9 E M SSOq 00 \ . 1 TEMPORARY IMPACTS / IN SURFACE WATERS \ s.:.) v.,.. .,. LAWRENCE A.NORTH DB 1600 PG 999 PB 25 PG 44 , EXISTING NON-JURISDICTIONAL RICKY R.L AMOUNT AIN b / & TERRY L AMOUNT A1N o DRAINAGE DITCH 2 DB 1146 PG 1998 6 o Seven HP I _ 1 / TEMPORARY WORKPAD S to be driven at each 12 x 53 steel piles JACOUELINE H.LAVENDER I ) end bent. ESTATE FILE I3E PG 409 DB 6W PG 365 Each end bent will Seven HP 12 x 53 steel piles require approximately J.PENN to be driven at each one week to drive WOODS .- B 1702 PG 2105 / WOODS PB 25 PG 44 end bent. piles to bearing. / �. Each end bent will �, require approximately �oM .J . WOODS one week to drive T. °P�! // �� , iy'� M. TYPE-III CL'B'RIP RAP piles to bearing. _ p'' AT-1 REBAR * E%ISTSG R/W / __ _ s� EMS G PAY 6, cONC no. OM 6 / r arnarnnn5 luo' Al-hIS �"�, '� ffIIANNVAM �� .. .. ._ .. —— _ PVC. EOL r` ,u n'a I' nrmrn!nr ' <" N 1 • - � _ .- 8.1 { z N — — 1 1iffi P�) i ,irimillivifr� B 2GI 115�� s LAveNDeR poa0 yJsosa+i-�l' o= w (J TB 2GI �,, II 1111B�22G1rII --- l-8'PAVED ROADWAY _f� N TO'S OURT ExISnrvG Riw ��' ._ BGREU TLC 3' - ir�i�EB •' _REBAR �1 �A ' EOL � ry REBAR Ex sT ROB'S COURT .. .. .. .. .. .. .. .. .. .. N.. ..�p061353'2 R�}\ R u un —w � C Riw ZIMPI • 1� ' .:r,e .. .. I I ii / .. .. .. ., ••.i \\ // INV=607.80' 1�1 INV.610.94' TYPE-III If TYP-III - % t o I CL'B'RIP RAP ` 1 Cjr, � r /'���/ Vn WOODS WOODS 1/ 1jj I A `;, /P� 1 Al S 66°22'54'W '-'1 C2/ 21 89.22'(RW-COR) �C�' WOODS // r rn 90.00'(REBAR-COR) //�� '�� / WOODS BOBBIE JO DAGGERHART / / / DB 1663 PG 2359 —' 3 /.- 23°37'O6 w . PB16PG17 / / 5.00' / BROWNING PROPERTIES,INC. / poem DB 1206 PG 345 mh ry.,• / PB 20 PG 156 r*"....*-- zzp.o\ BROW DB 120 PGR345 INC. REBAR PB 20 PG 156 \G S 2,1°239'13'E REBAR 0 168.92' / --- N Nt0 m h 0ON� 70 SO `'~ JS PRE-STORM STREAM ,_,aa q q 00"K' •�'hp'ofP V J��/1N ,r. POST-STORM STREAM Wen \I/ ��{.�� �/ DENOTES TEMPORARY oho ' � IMPACTS IN SURFACE WATER PERMIT DRAWING i SHEET 3 OF 10 Z 50.00' 4,o .444 442 WETLAND AND SURFACE WATER IMPACTS PERMIT _.a }�a uGGILL *.0 49d)ff a'�- /b(.'—�' \ \\\%�/% bz 2 � ' I" L 4,V: i/ / /1 • `' V \ - v' J \ 4 6. �r PROJECT EFER C N SHEET PLO. - ZZ:- o �\\//� ��� ����1 ���\� ' ( / (f�/ 11 ff 9 �` f // 1 rm c r art flow arol�r�d t�i toy ( s l ) _ / - \\ _ )��/// 1Jsiii turbl c I re thahin st 4 a de ris bid a \nt 2' SHEET d./ ( _ _ IIYY ost- t tre rTs flo�Y e I ac ed.=ec\ - 0 �E � �� \\ ° / �� d�,ri�g Pha T s a �e than aleMs h��� g l sl t - cal �o Y DESIG YDRAULIC /l40 � <\ \e�\�\ I 1 \\ �-� `��1 U9// 9 S( "Q �isOr cted, 4 pseam ,sltge cf the�✓ r-k iad' cSi v3ork /)//\ ` / L `/ / az ) n, Q IMF i I ��- i� b`J\'7\ \ \ \\ \ 1N I v �\ \�J� V 'll 6 '\ ` ,. �� - .. 't '' ( DO NOTTJ,4E OR 2/ ACU ON \ - 3J `\ \ \\ \\�"') I�1/lll ( eft movin ' >Com onen t e,debris fr t stream, i ize 114i \ '- - _ =bbo b�1___2--- _ d° \e'\ \\ 1 w �y� p \ �. 91 @ n-im pa -to/the N \ f ' \ _ -QS-- � \� _— \\\\\\ \\,r �I I I 1111 //// //I i -( 6 L stream-fl Ovhile fu I� b ringvfor fl prop sefd nor ler e.G btechrycal Spe / > > ' . _ �� --/ _ IS \ - - \ \ \\ d \ ft/ I ' 1111/II II IJ (-' \N", s) —zso _ o a \ ^c�\\ , —_—_- - \ \ \ \ ��� ill\ \\\\11 (IIIJ �� j(I(111111111 �� \\9 �� � ��jJ�f/ / �)I))16 I ` �° S t / t � � � y9ti � ,�L�� , �J J ��� , Ga3— \ \ ° � 59— \ \ V 1 6 \ \ \ I( /�/ 9/(//// I/l.� - Tenats oval of final fq tion recoup r5d�lons�iPy NCDO G�te� unit, install drilled pler��h bo#f ��a/ �,�u / �_ - / bso\ \ -... ..1-/ r 0 `, \\\1 II 1 1I /�I} ///// P white maj n the �l�l�c�gJ ureari flow r-d rested trot engineer �� ° �/ iyG—-GSG \ \ \ \ I I \ a 1 U I I I(( ) cnri 1 N I //////�,2- / w l ) g ` 11 �g' -_\ �d.' `� �Q Y� gL- 1 D ES NT 9 C S COM LINA , _ Sl IIIII 1�)II///lII I�/�� ao �l I eI p ll\\�( a ) / rILESS SI)Cl1�TlfREgC9MPLE* - / \ \ \ \�\ ' � I ii?"'NtI1 // y itAe rksceam In retulrnttoZ Ye-3tbrkm nnblhe r� any turbidi e+�l°i�ains in a manner that alldDvsa/ °S1 �� Il 3/_ / -bso \ \ \ c c49 / l�/ i a� g�F g ejr I� p _ 5� �v_ ; / / b °� \ \ \\ 1I , ! / a,// (I1I / I\jl P\) (� p d s / �� — \ 9 /. Ga \ \ \ 1 \ / /) // J/ l/// �# )(l / a ,�,a �l \ � /�7 \ J / \ ( \ � / � 6 / —',.71 �� / ,Ga�1' z / / 1 I ( � ll� 1 1i. ry pipe is to � olv �d�wl�el�C� usewpq 1A r mgv�dJ / s l > t \ — \ \ I I j / / / / /��I IjI !\\ �� � (��, .� ��G �Qp�„ZII if% �l �\i l , L> >_-1 cod -- ..._ \. 2 \ > >� ( v I"I I I ��� I , � P ( G 5)llll�1 ,/ / \ / 6\s� " -J,qd r — sL L 5a o / c! / N ) I I / / ) / / r0 11 ti \ \\\\ \\\ wII \ '7 ��2 / / s ( � / I I \ l ) 1 / I \\ 1 II it / //// 01 )J 11 I l `� ti6 9a Ili/ \ K�.4WMl'®-RAR1 IMPA V`I-L ���aJ �/ a //��= — GG1 — '_ �GGa'/ ( / / I \ l\ ` ( / / 11 :h� )( / ) / -, ( I II /_ _ / ) } / ) ) ( \ \ \ ` / ,31 1 ) I) /1/l II�II///(//////)I (�` c0---, -c �� / 6` 15 m i y�'I NU S AE WA 9 1/` r—// / — / ��° � \ I 1z\ )\ \\ )/6� U//// / l///// / / 1 e� / / // /, / / �� // � / Goa l / l // // / /// 111/1()11\ Q ) ( / l� N ��I)5� ��� 1 A L 9q 9 P J � r ., cJ {�// // / / / 1 1 1 \ ec // / / ,? ) \ '9 L\ / l l �l� 5� N1 —9 v 5q9 ' / 43 ��, / — / / \ \ I ( \ >}'I(M//(I .1 I((ll/2�/i/ /i l l�L b \- P Via— / —> I ) ) / ci - - % /— G� / —_ — a= / )(lI 1 ) /( (1111I �1`N\\\\\l ) )l\ \ 1 \�>/ \ / 4fAcrE` \ �� / 21 c _/ / / \G —/ � NM 1 IN , ) \ \1 ),9 t / � / \ a H s 1 /� / \ � ( 1 �h / //G/ // /l,) 11 ��I((\� ll�\I� \ �, \\\\ 11 ( �/ �` 9 < r y / �� >�-,> // _ / /� > ( � \ \\ 1 \\k`', \\\`���\\\\\�� ,�°/�_< > l/� 1 1 �B PG 44 / /�-AAy !e / / /tip I \ � v CJG55- - // // / ` � / 1 ) 1111\�1��\ \\\��'\\\\\� \h / 9 � tI / i//'`- ti -,( ti ) � / y / / sP� 6d /J ( / / = —G44� — „ I a' o c,,\-- ` 6'/ , (~C 1'1 )))ll d l l/.. /' / a ti ,y /ve/p 'L' / G5 ^ — / 1 I I \ \\\ \ \'\ I) Gaa 99/\ 1 / r 9 ���� / / / /// -- - ) ( \\\\ \ \\\ \\\\\\ \ 1 \-r�� eo (I /i Z zao �/ E AL / \ 1 RIMY R.LAMOUN.TAK/ ��li \cF \ \\ \\ \ \ \\\��,`,\ II ( �\J / \ I �)11JI��� `� I�/J, ,,( / qq/ DSIS I' �RISDIC .. �H / w� // �_ Z �& oe w6 T m/ /// � /�` � _ — \ / \ \ \ \\ \\\ 'f'V\\\I I�I\`� ��(�a�'' �/j ))/ / oN (` �Y Z� �/ J / ` 1 ` / `_ - /P � 6 P 9 A, h DRAINAGE ITCH / �— o ti _ o /,// / cs Seven P 1 53/ t��P it \ \ \\� �\ III\ �1� C�)t9 � /ll��s .44/ i ' .. _ /� r-1 /�G�'a/// /c'POb /// �i �GG3 riv�eli'�t e'a hl > R � \\ \ \ \\� �N ,,•. • 9 )/J II)f �/cc _ �� / \ " " y / •. o� 1 -- - -GRq ,/ // // //_k-r(c � ett— g// �/ ` 2\� 6 N/ �4 )/ / 9� l i / — / �° i / �� / °I \�T,d bier well o / '�\1 11 // �/ -. / -(,) / ° // r Seven H� L b5 st D iles�S �� �� '°/ /�/ /� �)� • a)((��re�u`e 4RQxr�r�ately w / \ II�IIIII`�11 0- ,. . ') / \ g , J.PEN, Z to be driven at ea h,�p� C /If a / woods / / / — , epd-bent_ , /0P0— / / / \\\ _ / I �) j0 t0`dG1v / / / ) \ I �/ / I S/ ./ / PBT25 PG c��J / Ii1OIII l' ..✓ 35 / ti//G�/ ',co ,III II II r. I I 7— / /., 6 , //.7 y �� / �/ IIF' ^ \\ �/ / � - - - 1 / J N `3 _ = / �. �zA t:. I s / b� E ch end blend' /\ — — — /— / c a �. - - %// //. -- ..r .o m / \ \ \`= - -__ _ � �� l / I � \ \ /- _ � a 1J/� 1 � l ( / l /N;. .. LD_ /J �/ i �`�-a[[��Praxim elY Gag / 4 f / ( l \ \ / 'L///J �� ( ( m I/ Jr ^i I 1„ / < C MOODS S CJ /j / \ =� 3q- � ��— / / (� 1, �(�,� \\ f 1' ��_/ � /� ti/���:(��Jl'1 ip� \'\ ` \ /// /�y(lI'r -i+f'� �'�// OD9 5q9 CL'B'RIP RAP li � � / /�v/b��w'e �b I IV�,�-�. � //� \\ �... — _ 3� — \ 1 \ l\ `C3�/ �� =fit-��/ .,.9'� , `�&! / ) , /' /.�/ /,lyir ;r'�/I��,'� O.*� v/ i-bb �/ J / / '� / I .�tVy.-.� ==--- vo -- 3q_ —�� J \ 1 C\ _�/ i— /i 'H ? 16 ) (/ lc7 e/q'r• —4.�W o... TYPE Illi /— —/� / / __. ri / /" ,.....2 tom_.- �'\��� 7 ____ "/_\ Gg5—J = �� 1-J- -sr. =' .-4' �j/ �'` l/--/ C 1 /�'' I4,L. .ii ,'Fh _ _ __ �__L- —N� /� �8"L ^ --- 1 -� -- i \\ /� ,7 3 L. RE:,.; :-. /\EwsHwc snw-_ — =_—r:tT/ .` �I - - `{a "�E - _ `' _- c a,w / C<I I %'l�S' - - --:. �- ,12,1 7n,- ..24 �}-vve- / i 6,,A, d •. ainainnn (��f� a s _ u �! c6 `J� /`O —bl Y it - `fmmmo -' . -/- �t try. s. .� .65 =t�=— —=£i`J J 1 /cam `i� Z� _ _ �I - �� • _�. . T�r. �� 1y/ /`Jl`J — / /Q 1 � I 1 1 r r i • I A/ B 2GI =�I �b7'� I— 5 226 LAVENDER(tOaD1,—,'..-7005R 230B� ( } / L ) / -�I'Ira.. yE _ ��' T� / 8'PAVED ROADWAY ROB'S COURT \ _ C� �C ✓ -- . C " r 6I3.53' . — �' .Y = / ����,C� n. _ 1"� `-yl yi �, T=� -� _ �`J� '�. ._.� r. Alf V. �\ _� bZ �\ V 3 .. .. . ^., I IAW,.: J , � Y IR I F, r / �INV 607 8.'� -M -/ -_ _ ,\ r am- _—_ — , ___,\_ `J— `\��\� \ =1 A 4,\\ /// g / f u _ _lid r,1U. . /�- v 1 4 / /�� l L 1, �/4 , \ — — 7. // / // 1 ��/ // �,' 9 0 `, TYP I,` / i I TYPE III 1 I,l / _ T��� _ •- / �/� ( i a 9.B'RIP / (( .' " �'.r F ;:n )j' iQ�y , i /(I� ) / /// /ii j��`\1` 1 -- \ \ �_ -11/ / / ci, �• � �'. :y ( � /� .N tf � f Ga 611/'' o 6 � ��/ / J , � ; _ _ — , _ \� \ -Gi ��ti 1// J// (1 / I�,/f-, w000��b:r �.)/'�.h''`%� / /v�iws l c� % �6 / m ✓ / ^ ,,' ., �I`/"' 6 y ' i Z�)/ i — — _ -\ �Gl -// J / A! �, (c Q c,//t �P/ / / l 1 / 4'1�-mil/ 2 R, �, `— _i /G0 — \ Nam\ — i cz9�/ / / // / �((( >>— /� L ',fp� 11a2 J ,2� / F� �° mobs o iv/ // // i l/ ,.'w. ° /��� � b/ —zeo- \ �- G29— / // / I \\\ < G T �Gla� 'll/GaG'— 1 �0 m �� /`o 7 �O /// / f' ' / i- \ — ii _ G� — \ _ ee0 N= -= _ -s,2 P/ I /09 :\� / }�' / �� "� / °' ////'/ / / —w».DQ / / f� �� /A -,,, / L�' //1£�— ` _ 133 " _ _ J= /� I ��/ 1 Ip pi cEr�FURr 1 Qoj `�`:. / ///' /Iii j / ,l z '', - / = / - - \ _ -c -/��� �_ J)/ j� J f / 3 2359 / \// ) „ )f /b,, /// , / / . ./;"-----"- /'%/ i N •w� b�`� / — bed i �+l-i iii lGa 1 /i*', �S 17 ,_ �1� P 1 ��,J��I�A 1 / m / / / / ////// `//--, 6Eo— //^= ., \ \ //-G1G G1->✓ / 9 ✓ �\ I7n '9 I1 // '' 3 �` `� ,/ /j %=ylG ///// /0,,/� /,,, ww J/ 2t.� �6 \ _ ( ( //t — \ , 1 GaA 14'y9L 4�A. °/ /4 1 / //( r <\BRove 5.NC9'�//-���— / 7/// %,�'� �/� //I J�i J b — �,\ ` e� \ , / I �r� / � Ga �w /B 5GU /� 0l;;;''' 2 "H / /� / \ \� \ —G% \ � � �a� )S 7.� �a� � (�"�. 1 \d �/ ,,. � / � 156- /�o/ / ��/ "��% // /�a / o, o ` o—i _ tam o e / /( 1 // / / / / / // 2 /� //� / o—//w ✓ �040— \ Pb/ O, �_ -�-� 0, 1//� o��i \ ( _ / // /// / % / / /j /ice `' o —�_ — �� \\ — J/ J 1 1 /J/// 7) / �� /�/�// ///� i / ce /i/ Rres, o — / / — / �a/1 �/1 L�9 a �� \ Iwo ✓ /�/ / ,qq /J l/ / C/ / // c° / 3�5/ ✓- _ '2,_-___- — — i / J / / a ✓P�j �EB4� 5 2P23'13'E L_�A � �J` / / ( // / �/ 1//S / / f //9�� // / /1/l/ �%"i� / �`° \� \ \� rGbU / / / /'' / / / T� �EBARG�tC��ya.-- S �/ 1/�/� / / /) /// r/////�.> `2 /n�'//// //Q ��/ �jj6 9 �` / \ �Is� Jbb �LbU` i 0 / 16�g2. \.G 61'.CC9- ��� / / -o�J ` G 6 / b )/ // �/ j --- Z50/l / ( / J /V9°' / �-- -���% _ c,� / e�1 70,4-i�I l �, //) ( '/T// i, ( <-'�/J) ', // n///// col / �,�01— \— so �._ N1° 3 w m E e 0 \\- / /// / < /✓/�� es '_� // /vti /// / J l /1'�1 /� i \ bo \ \ bbo—/ /' ✓/ / � °e/ \ / ^ 1 Oz• b 1 / \ti a ) )) ) � � �y/. : . STOPp�,-y�� / / n / a /�i_ / ` � �\ / � \� \ f / /�0''i// %/ ////\- J-�.,4-t-,"4 POST T � / //// // 1 //° - \\ / J1/� /��✓/� / a/ \ � Vj l //� �t— // // / 9 / / g / ,( /- / �/ o"q/ i/ 1J J — l ( `' � co J� �� 7/,/ J ) /1�� - ` /% / /( )( ( /l/ �l ///�/i/ �� v- /ti(t') K�%�% OTE e4iRiE /�i 2,, (// /�/////�/�/„T,4/ � = -0- �\ \,� ,\___� \ \ ) ,4� // l �{,,�y $/E RA / / / co 1 O // ✓ r / \ \ �-�� / //W�p. /� // \� ` PACT / �A //�E / / w / d '•O/ 41 r____ — 6 rn rpa� / A f/ / , w� w / // b%�/% w r_ / :---______-1--...f_-__; / =— — \\1Qa / / ( a// -N / (�6¢� I ) ��" %i / //� \\�L )/j/j m /- / I/ �1 1 1 1�1//I ( / ) / ��/ //�n f�) j �— \ \ l \ \ \ �I \) l / �/ 00.��A��� 1 ,9a � '` I � / / 6 ~/�/% r1 ��1� / /PfLI M sI 1 I )/ / /,' (r// ` ( \ \ \ 1 k 1�( / //I9 al / / / \� ///( / 1II I ) 1 II( I / ///1)1VIl //ll lll/ �// / // 1 ) / / > // / /\ \\\ \ ) �� / < )li/�`56� / :�Ga4 (0-� SHEEJ w/) f lbI 1 IIIIJ 1 /l l� /l / fli l - ~ 1 c \ 5 a / / a�/�, 1( I/ 1 ) l 11 J 1 3.37'06'E / / �/ 1 ICY�o ,\ \ \\\���\\� \ � \ % — ) ��e3 /lll�l%( l 1 / ��baf / GaG 6} !i i� /l >1(, 1 I11 ICl/ IIIIl1/ 1/�/l �l s {� s.DD' ( 1 fi> / ) i� J //97/ / \ \ v V l �� �// l _ /�/� / / �l( I l /I (OtHi / l I(((/l S( < < / ///(/ /( /a/i93 / ��P� ,Pti\ — A / A ,-/; E /`�Y /��' / / 11` 1111(I/ i t f \ �,�///// // /�/ //// - -_ �� �f°� �\� �' D / 1`� Li � � �1��� l� �1� ) / � 1 < II < 00./ / /////// // //)/// �b�v'i�c / II LA Il i 11 / / /' m L I / 0� ) 1 \ \ / oW �I I ///(/ (I I /L� / G�' // / / v /''U / / / )' / _ _ �x ( / _ � 1 1 l ( sI/ Il ( (l///// ////// /l / ��7 / //%1 = yl1 ( � / ,"% % `�ri Gat �) \(lam v v�l�� ( 1 )II11 l l� �//IC w)/JIw 1111 lJ 111115 I I I A — 3 / ))/,//// /////// /lam / ::� \ P (// /, / 19�_� / ,�� 1 / , ////// I / / . .'/ 11° (1 / / /r 1 . �I cGA9�� v�/ I r )l \ \ ,1A11,I (\Ill(II/Bill"//lllll4ii1 l 1 \�� -��: I-/.// /z/////2IJI, / /l( , !i// s 7 // a' PROJECTENGINEER REFERENCE NO. SHEET NO. 0 B-5848 5 ROADWAY DESIGN HYD ENGINEERRAULICS . .. ... . .. ... PHASE 1 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED I 1 I I I I I I _ L _ • . . . . . EI — ' /= ITY-b0.W 'ill r , _-,,- K 3 K = 236 q 620 11iN...•„•.• ... ._ ►�.a i :. tJti N �Ill� t . I . . . _, i,Wt ialaPlI_PIM_M_E10-1 MMMiI EEEiNNNNiIM-_-OMI_P___.MN _MI 610 :::: lid_!III - 1 R.C" II Ir■1!■�III ;I1 I 111111111 ::: EM NW> aq 5 Iii • L • 111111 580 TOP Cr TrMre RARY -AV WAY PAD Al aLkV.SYI.5' ' 11 TIIIIIIIIII 16 17 18 570 560 II 111111 550 .. . ■•=■■■■ nu� �_1 1111111 II V.71-I■W'III.�Ii1•LM.�■�liri•Iii .W�1 �1 .11M. � �)•■,WI WAW�■l�•1mlINT,V■• NIMIIII /&/■MEINW_:a■.`IN V'i`-■w__i�NI►‘ r=eMIIM,I 1 /_�■- ii i,a�_eww --;& /i•.... ta�� �.� i�.11�.� �I�\�.� �.__�__��• ��_.--J �\ IW M=M ■. _-■--.�M_.--��-- ■ I M II- 44 ER :::: IIM-= ' :: - i Ig1:Ig.,!r/M .mw.�I • ��-La 1\Is AI• I L, AaI II �1�111 1 e, ...__ _._._. ----r�.i— .�. u 11 y .. .Y K. wkaLL *F r*cr ..Cr1 111111111 1 111111111 I O' PROJECT REFERENCE NO. SHEET NO. 0, 1) BANK STABILIZATION HATCHING IS NOT SHOWN OVERLAPPING IMPACTS FOR CLARITY PURPOSES.co RNJ SHEET NO. PHASE 2 ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER INCOMPLETE PLANS DO NOT USE FOR 2/W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SI URES COMPLETED ry0 U P / _ 400, �� BANK STABILIZATION / 050 BANK STABILIZATION / \ o "SI .,,,cli LAWRENCE A. ORTH / \ .:: ' DB 1600 P' 999 PB 25 44 / EXISTING NON-JURISDICTIONAL RICKY R.LAMOUNTAIN w / & TERRY LAMOUNTAIN • g DRAINAGE DITCH POT Sto.191-6879 Z DB 1146 PG 1998 6_ o Seven HP 12 x 53 steel piles I S to be driven at each JACOUELINE H.LAVENDER ce end bent. ESTATE FILE I3E PG 409 I ) DB 6W PG 365 Each end bent will Seven HP 12 x 53 steel piles require approximately MIRIAM J.PENN to be driven at each one week to drive WOODS ,;; ✓ WOODS DB 1702 PG 2105 end bent. nr .7 PB 25 PG 44 piles to bearing. Each end bent will �`� ' require approximately "'M �'o�' WOODS i {�i1s' one week to drive OR/ / -}I} m° i t CL'B'RIP RAP gP-�. / 1i,i. �i i/ TYPE-III piles to bearing. m „1 r / 6 AT-1 / '111', 0 py 6 A CABLE : 1 eY,�ijii Bel REBAR - EXISTING R/wW- PVC EOL® GATE ` },/ O� '�'��� Iii REAR ii U A ExIS G R/M . . - coNc RP 1�i ' _ .._-tT I �_ - IOU' Inr'trt m ` Z IN -- 1 1 !, (,�I RI 6 7 Tr�' 5�i fl B 2GI I 1 �226 LAVENDER(Y - OOSR 230 —�I_ W IIIJ TB 2GI 1• : T li / BRII E•72 / } } / 'i# B 2GI 8'PAV AV ROADWAY ROBES COURT , 1 ,'�.I OBE /-� � -O 7 T N INS 613 53 94)0'TAR R�. I BGREU TL-3 3_' pi maul J.Y Y ,� -_---n � �=EOL _u un --q——�a r V�.s3 �- EXIST rvC R/w .�� 1y� Y REBAR; -REBA .i ;EBA• IB' MPI REBAR EXISTING R/w y qi 1T / .. .. .. .. I " , _} ii n n .. .. \ INV 607.80' INV=610 94 IMTLI TYPE-IIII �.in� $ IV TYPE III • I ,/ - I%I TAGS -I� CL'B'RIP RAP � o it I OQ�/ \mI y • WOODS I• o I WOODS air d- m % Jam, I�I .� S 66°22'54'W � Qv .,- A11;/ 'c; }ml 89.22'(RW-CDR) �F J WOODS / 90.00'(REBAR-CDR) BEGIN PROJECT POT ST 10+110.00 Ai 7 END BRIDGE WOODS E PROJECT POT STA. 19+50.110 BEmari.; A. l,t,i,`.:_t RT ;,I / —L— STA. 16+30 +/— >Z —L /'i. +30 +/ 1.�I / lv 23°37'06'W / 15.00' 3 ' BROWNING PROPERTIES.INC. / poem / DB 1206 PG 345 mh ry.,• / PB 20 PG 156 097)'S9. = aCr zzp. Lal r............S oo\ BROWNING 120PROPERTIES. PGR345 INC. REBAR PB 20 PG 156 \ S 21°23'13'E REBAR 40 h OON- S02o20pe Ptipa JS PRE-STORM STREAM ,_,aa /9/,y2. k' VJ1N v.. / . j ' POST-STORM STREAM oamo a DENOTES IMPACTS IN 41 // SURFACE WATER 41 PERMIT DRAWING SHEET 6 OF 10 Z co 150.00' .4o EA,,,,ss ..0 2 WETLAND AND SURFACE WATER IMPACTS PERMIT _.a (A.LL *.0 4.94 — 1s_;,,---__--_-_-_—_ --- ��\\ /� //^63�l2� � _ .� / L 4, 9 » I«/ / ^ Ji�t'�» UI ^V \ - rC, 2J �\ J( ^ / ,r / PROJECT EFERkIdE-N6. SHEET tab. T -P£D i - \\�\� ��//// 1 \ \� ` 1 / (I I lam/" \I / / `7 1 �O• I _ V \ — moo— //�_— �\ �\\N / �� �\ �Z�Z� �� A ll II (� ( �� / �' d / Z£o_ �=_ �,� — .\,.,.-._--___._� )IJ)l (� J 1 BANK STAJBI),I§N HAT IS ITT O OVERLA�N_G P FbR CL I " I P RPOSE�. ( �✓ / -� ",,,."!-',',7\� ///// / I / )) )) / c� u 1 _ ` � r�'J 2� `R.-SHEET c �£0 - �/ d / I ` l I( \ < 'D` o 2 i - \ U / O Y DESIG / YDRAU ILC 1 _ �Y/s---;'" �1 \\ \\-\� \\ \` /'1'( ` -\ .,`ti ,9ti1 1 IIIII S 7 `U ) ` -1 l_// � c Gal � INE 1 I YIJGINEER� °-=� - _�0� \�9\ \\I 1 `� I 1 --- ----:-,- _1 >% 1 ` 1111115 2) Z (� I .Z'\ / 1 <� // 9 ��1— i �;� s�Ga,1 ` I` \ • \ /�`-bb0= / - _�\fa = i �\\ �\ \\`f I I(I f1�� \A\-..( ( 1� N `� 1\ Z.)I 1, 9\ / / 1 ,�ti/ s ✓ l / //= �, c �� !�, \ \ \` l \ ,� II _I \ J � l\� �a ` II �� \ \6 ` ��, c� al INC�p �IA�NS `- -�- �_ b��\ �/ - �s\ \\ \\ I \ l (a �' /1?, - 1 I \ nr / 6 , L "CY-' / ` 2\ , 'fin, DO xa a on ti. PI ox , \ ----_-.--7-_- _ _ yyb_ \ N u 0 >__,_ __ / _ _ _bb, b\_\—_ \=/ \,.,, .7 \s�.2\\ \\�__. 111t'J III(//l dl /�a i 9 /) S \ �,� °� \ _ \ ✓ -@50- �\\\Lb _ - i \\ \\\<A �\� I I 11 // I 9/ 1 �£' 4 /, \lii, ` /�, \ / -1/ O \ / r9 / \ _ r— / — — \ �_ - - - \\ \ \ \1 I II�� I III1//(( / 2�� ( 1 �S� )�111 / f �ae° v �� � / > l\ \ — _ —Zsb _ c a \ \ ^ce4 \ \ \\ � 1 I I I I I1 //--- 9 ¢ � �11/ / � p 111�4 ( / f � /—t / � a 1 '- ., a - / - - - - � ��� 9 e9 / / / \ � -N/ � I C\ \ ti� �- \ \ ��� ill\ \\\ 11 I IJ) �l (((/ III 1 ✓�\\ U < 11� / 0�)Ill\\�/- \ S 1J �� Ga3— \ sA. - -_ -_ - b \ --� \,�� 1 11 I 1 J 1 '\‘/i })/ 1 111/l 1/1( ;9` > 1 �11111 f ^ � 1> Y e C>a �-�� /yy°�-JS`J \ \ \ \ 1 \ <1 a I I J( 1 n' I Co,/ //////j /�//0.,�.�A/ ' 11��(�1 `1111��' c' l ti �QP�J/ ( �' 1 // /D,UfiU NT NaT C DERED iIN /_ — > S l I I 1 1�I I I ///,,11/Y/ 1�/� Ga / v' v ��//( 1 l l�` IS I L �a L 4NLE3'3 SIC TIERE.gC9MPLE // / _bC \ \ \ \ � o /G4,,/ ) l I ) 11 //1 //// %� v' r / J i r \\*,1 ), l)III ) /,� U99 i. a/ USA J \C I�3 � � / � 65p\ \ \ \ \ � 1 // j/Jai// llll II )1 �c1 (r � `,) � (ll � \�/ ( �<\ / / C \ e/ -\4.,, c9 // ��a/' 7 / �ti I \ \ \ 1 I I /( ) / °/ f//1 1 ` « r 1 /�1�)AC j���ll\� 1c. \ �5)/ �� A MN I( S��ABIL, ATION / (, \ \ I J I I ( / / / �JIIrII�I\\I `I 1 \� 1 � ( G91111(1( // / �� > > ( 9 a� � s �°� L � � 9 I / / / 4 1 i.401-,I 1� \ \ \ \1\ ) n )1 1 ( ) S \�� \�4�) / a r L So / ( 0 / / \ / / / / / \ 1 ( / M I U �� I I( \ / /r U fc col ) U9 / / / siGG1 , — _GGa' / 1 ) ) \ `` \ ( / Q( l 1 ))//1/l) lI)I(/I////////)1 )h� �0�-, �-� �,�C � )�(I w c, / ��>/ 9 < r / / // / /\� — / /��° �� I \ / I\ I\ l \��0 ////)//1,,,/////�//)1) IllO\K'"`'0 / V ))5/ '',04 599a J r ti, cJ // //�\'b� // / // - / 1 �\ \ M // // //// '6"� \ 9L / 1-/ � 5Th 9/I �9 � U / � 9 / �9 VU9 m �a U 8 / ` ) / �_0�% — / /�3/ ��J� � ) I1 < < 1 4( 6 11 { Ill (( ,,\// fr \ \S"-- < A\ f =� K4 0r z� �- � �� —> ( I 1 U_ \—_ — / / -- - a— / III /( (1 �111 •1N \\\\� \\l(1l , ` 1 \���/- / ���`jA, i 11 \ s // / ! 11 /� �J ( � C — \ - - i — / / / �0 —/ , MI 1 1 I ,, 11 \1 )9 / \ a 3 / l \ h / //6/ // / /C ✓ o-) " I <�Il�\\�\\�� 1 ``?\Il \ ` \\\\ I �/j �,„1 l `f Arts ..+ 49,9 'D of A��H / 7��� L�'/ ,�Qn \ .-Ga�N � �-c> / \ / 1 I ( \ \\\ 1 "N k��\\\\01 \\*\c.0° �� > 1/ I )Z11 > y / / / I \ Cr, - -) // / ; � -\--- -r J 1 � 11 Il1 \ 6 \\�A\ I / 9 � 1�� J / 11✓ ti / y sP.9 6z ec G55 / / / 1 1 \\`' t, \ I1,�' { \\ ti U/ ) I eve 'L' _G54^ �J 11 // / '- -G44 I I I�I I \\\\\\\\\ \;;N.,4\\ \ \\\ 1\ U p�\� \ /w, \ (~P �II��// / /) / z, 1� Gaa 599/� 3,l ( r� / r 9��A / / /// / ^ — 1l \ \\\\ \ \\ , \\\ \ 1 \1 r1j P/ �'' II w lrf l ZNp /I om 6�/ // ~�i IRl�ilr e.ia N lr/ ��l/ _- -_— �cF \\ \\ \\ \` �\�1\���I (��J d2� / � I �)f1JJl��� / = Il a c v�/ qq/ EDSIS I �RISDIC E�NAL —`� , Ca z — —& MSL T a/ /// /�` -- \ / M\ \ \\ \\\I \� r <� (3)JI o (l M Iv 9 a, lh DRAINAGE DITCH T S�o�9 8 / \' / Pc'nja // / ��GssSeve►a P� __ t��l ni \ \ \ �\ III I l� ` �� ( I �6 P 1tkp,-,� �� / ` J I 7 ~ - J_G5a // //Uw`Va // / /�G3Gfr -3#3�be ri\On?t e'aghl > \)-' \,��\ v, 1 \ `J �� /)llJ'/))f . - �' / \ -/ /� �i / -'-� / / �'f ,C x- -GRQ//�/ / // /In_I�r� t\ 4 /// �U/ ) \\ �� � h / n 9 S�)/. /µ`;�' )/ U'� / _ 95� / / / / e _ ,^ / / I end bier sell o / �\1 11 /i�, ) L�< l �' // P .\ ) r 0 Seven HP 12 �-b54 st,l nest o> v C.' // /�7/-a) (� re�uie R xnnately / 1 A III I�III / \ �z �s \ -/ _ J ' i I ` G ��� 1 UIRIAI,1 J.PENI - t0 be driven at ea h, _ / / vo•/ U U I �)(� \ j s FW /wpo4s / ) 1 ` I`I�11 /9� C✓ J �� / , �� • / DB 1T02 PG 2105/ / / / J / I I 1 I f JI O 9 /�✓ { I�� I \ r V b ' b/ ° / woaos / / e ld'�f�Ylt� IIH /� �\ j / l/ \ - - ' J 1 / f 35 -' - , G�/mil JII Il g : / d-7/1 ( s / y• •' ) PB 25 Pc�aa �� �n ch end blend' v V / / / / ))1N3z� V / 1 // 9 e I �; / b �a�pr,�xim ely L 4 / \Vc4s= - - 1 I( // ((� >l\\ v // - �o't�//J ) / F 1/ , o L Pr'�. / boos U / /// - / f S \ f - / / L / \� �• / / 9 q J /_/ t VY'eb I IV-�� / \� -_- � � ( J I \ � /V O''1'♦� P � /'/ /` r� (m m / �.� / ♦ 4D �5q CL'B'RIP RAP� �� _ \G` Z3`� - (\\ C 1 \, l\ `G3�/ �=�3-j/ /. - / rq p \ / > ./ l�'17 S99 F ,•OO� ` /2 i. T'PE-ILL-• / 5�/ / /„' / �J��l �I J,� 't�T�' Q/ \ 5-J - G3�� "���-�-s/ . �alto =�/�� — �j.ice/ 2� G ��+ // V C 1 a . / .'y .rir -a' _ TO v,�0^ i�/j//� L //- ` = -:-...,-s,-,-...„-____---__—_____ / i \ \ /G3/ �-` 3/- l.. RE �. - //�''Tsuwc sr�.—- _ -4-ntT///��T.` _ r.. �. _ r f ,Q .:� - _ _ __ - - ' _ c a/ / /` \ C^��-1'bI�JI r %'� - = -- rS z8'-.%i .- -__ _ `m"t5'ni _ -n ye'�EUr�S ••' M. Yes y_ I�r�r .-q/._ -� U �!, �p�G��i% �bl� _ x r /� '.% Y -� �- /r�- w-- M. / ' s S5 - . �= =£t`JN- - - J v tl /cam i�' Z/ I - � I 1CSIL - r�--r� _ 1y 3 i010 f - / / /Q 7. � 11 1 of l[' ' / 1 s ' r • A��S/B 2GI 1� �b�'� 1 5 226 LAVENDER(LOAD 306d+/- / / L ) / JIW� ill,, -- �) J - ✓ �70 SR 230B�r ` l -- � r ses' 1 , Na" -�Gl ROB'S COURT U _ \__ ___ ,•„,. l 2 4-- 8'PAVED ROADWAY 1f C y / q _ _ .A.A s3-..� i --jr,a'A Y _ DD" r� / ' / �-y�.ti: ZP — >� _�J - ° -_--r y-_ '� xisnrvc a/w Tam 7 V: I/ ARE:,. L.'L.*. 'SyI:�\` �� �. M, i c��,,.-, -__�� g`�- ''O�S ��� _ \� �Z� _ � •-1.;;'... \ ..�\ _ �6„ '� � P r,J/ ,i �'r +N. •\ 1 / /� 4 y�..� / - ,l -m r- - ^ b �0-\� LZO- —\ \ _— —_._ L �� 1 // INV 6078s _� /I r �� �\ -1 — _ /M _ // o x s%" /• / c /�- c� I_ ' "/ / GSA // 1,, / _ / / // \ �\ / , ��^ 9\ P ti TYP L'. pa o o TYPE III • \ w • /i - I" O T /�/ -1 r \ *t- // / / v B'RIP 4yl o /' n Py / I Ay TAGS„..-- \ \ / J U —ct �� /� `, ( J/ / w o /f GO 61J/'' o/ /,\ / 6 ,1/ / /► / \�— � � � — \ _ T \� , >- —�/ 11(( / /�/f,— T 4,�_ a '� f ..QS 1 `)"� �� i' J )j//%l/ // — • /j 1(� �l) J���= / i 1��1� z ) £0 — — — — / -/------/j ��� 1 J I�� s\ -i/,- �I /// /A / A:t o room / , 0 m qqi � �� e /Po-/ /'. -, / / / �` - v V J� l )n♦a r ev h /r s i61 ��y q m �" / / / /,-::-._ w 2. GpR, �V- 4 -Z£D- \ V- /i-G29 // / �.�'; // 1a2 �9,� nxro Q ,/ Ob5 w .�/ l/ 5 �'r "'r p r /9 0, -��=c ✓ bze //j// BE l I-1"li. T -1,.- `1 .4SI 1• (a3/ ,, 1 ,es ,� ri ��� i l dBR��iE � % ��� /% poi//o/ %J�r�• �"�' �Jll �'� � .%mil �bo — — --,,coV N ==_ _c --______---,_--IT__ Pecr / T li % �; //N —bey \ ��- :7.--- G /i %� a_U J// / I / \ �. C` t �° --') v 4 T,„ / / .'`�� i �� / -----/1, I'�§•3`7r:•w� -- / b4• 0— i / ~ - \\ \ '_ i - �.,�//i / lGag/ �/ -� , -i .4 . .�./'_� f )P ".,� ,/ �A 1 /o, `� / // % j///// '�/�'/ r� 6E0- //�i \ \ \ a CA j -G�. /i/ W2 /` / _ I \., - // `� +l�r 3 J J �- /�, / 1 / / /l / 4, / ` / J V �`'' _ \ \ \ _ / 61 <1 ( ir` /// / Iw a ba �/ tyl,P J/%/// ( BR6N,�f ,�;/ �i/ otb'��/% j %e / i // /j�� mob/ e ___— /.�/ � _ eJ�taa� oe a /r /( 1 ( // / ' ) / �/ � / // / /� /// � °-//w ✓ _Dbb- \ --, \ 57 Pb c3J/ J 1 1 /J/)/ �) / �� /�/0// //// iz�/i /i/ice /i/ RTes. 0 — \\ / /� / �a/1 v1 :...B:,/.. �� \ IUD ✓ //� / /J l/ / �/ / // .- / / 3E5/ �- ' ' _ \ \ _ - / / / / L _ / \ L �_ti� ( /// / ^ \ // /Sgg (cyC"/i /// )I/ // // / // 7/ �/ pp �� - -n6i / J7 / m / Leo/ 5 21.23'13.E L_�P �. ` / / ( // / �/ //S l /J //9�� �/ //l/ %"i_/ �`° \� \ \ � rGb U / / /U / l (-7.,__ T� �EBARG�tC��ya.-- S �) 1/�/� / / 1) /// /////�.> `2 / �'//// //QC�/ �� b 9 �` / \ DISC $J bb\\LbC` i 0 / 16�g2. \.G �61'.CC9- , ���, / -o�J ` 6 / b )/ // / j --Z50 \ \/l / / -, Iz / �o�% _ v, � - -� ' `"`/� l / / �//� /T// i i /J) /l / //%�/ ,off / ��Qy— — so �—1° 3 w m E e—/ /// / ✓/�[) es /// /�ti / / / J 1 /1'�uw �� -- bo�\ \ \ dbG—/ /' ✓/ - / °e/ \ / ^ 1 Oz• b 1 / \tio, ) )) ) -- �- : • ST / / n / a /A__ ` �\ / \ \� \ / / /Gazes / / °, / // /// / / /,_-/ q "//t' / / / / l� ✓/tea o/ �. \\ \ — / / ✓o / / / cat // /////�/ j. �i -�i� POST R�, T i'//��// /V�///�It- 1 //e - - -_— ,- - \ \ \\ ~ .. „ </ 1 /� / �/ 1 V� /l /////��'�— /— // / 9 /. j V /� ° ` r'�/ww / �/ o" f 1J J � I ( //_ ) 1 �z —� 1 /l/ / by/// // /Aj, v ti5° r ,: D IOTES/• s/ /////� / />//ti(/J /?// //�//,/ ' /� / _ — — — _ -- \ ��s�f k- _ 3 \ \ / �A,7J// ✓/ r J // J ` / /\ \ °>I )l9/l�`^' �m j �/ % \Li / �/ y�(//1/I Sy,RFAC, / / / /U// )/ �4' ///),vw� 7/.n/ % �Ij�1\SS f \ ` l 1 1 UA / / ) ) i' p _��jySf / / l )� w /w / // I bg / /!lpb / /w / i= \ l ( / \ / J / 6 I ) I f�'� / //�� \\ lL - // o, I/ N I Ill 11 / / I //%// //tip �) ///------,_----_\ \ �\ I I! / / oa �" d' U9 1 / / / '`6 I / <� /%�/'(Af 6 \ / 1 ; \/ / - ' ,�r ;�`�,,� s / n, _ \ �6 / v \ � I � %� � Gal / / /6 6�//// e/ �� �� � �� ///( / �1 I ) 1 II( 1 / llll)I�JI //j1 WI )// ///// � �� s � 1 ) l / I )( ll � /i \\ \ ) \ a9 �r / < )/i/�`Ssl ( / ��c G ,,` SHEEJ / w�) iu 1 I IIIIJ ti 11 ( /) 4fli / / / � l c 15 ✓ a /� /,�a�// / I( I l I ) l �l J I 3'37'06'E \\ / / //, 1 ICY �o ,\ \ \\���\\\ � � � % — ) �ce3 1 i., /lll�l%� / 1 / ��a / GaG �� � i f // �\(, 1 I I III/ l/IIII I/ 1///l �l s {� 1-: ----- 1 s.bo' ( 1 fi> 1 / ) /� J //�/ / \ \ \ U9 l ��� �// l _ �> /./� / / �(( I) /I l wll Il 11 / l I(((/l ( 1 / ///(/ /( /a 93 // ___ ati 1 TiAls4D— A / /`1 '/, /; /`�Y / / / /1` �IIIJ(1/ J�If \ //i/// �i /// /ice/ - -_ v'i�� / I I i �. 1 // /' m L x / 0v , 1 1 / g 'W 1 (/ �I I (//(/ (I ) /L� G�' // / / v / ��U / / / Ia / — _ _ / �� �x� �� 411/ _ � 1 1 l I s rj I/ 11 1 1 (l///// //////U/l / ANNL / // I = �l� � < / � / / ,"%1% `�ri 302 �) 1\(// v vo,l�? . 11111 \ 11 �r/Ik �-w)/JIw 1III lI I1111S I 1 11 7<\ — 3 / / 7 //•6//// /////// //) , / �E� \ P (/1 /, / I;a�_� , ,�� 7 / ///// I � � i�,i l �° (� / / /, 1 Ni / �Ac�� �till��l , �111 ,1A11,! itlllll�lliillh//lI H i� lsl I \�� —��� 1_/.// ////////! /Ji / /lr , !i// s // �' PROJECT REFERENCE NO. SHEET NO. 4 B-5848 5 ROADWAY DESIGN HYDRAULICS In I ENGINEER ENGINEER y �11 I1111 ,\ �NI �Ir 111 ''i DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 11111111111 11111111111111111111111111111111111111111111 1111111111 1111111 11111111111111M 11111 111 111 . ■■■ . . i ,. , 1111111111 11111111111111111111111111111111111111111111 111111111 iiiimmimmimmimminimmmm. 1111 . ■..■ ■..■ 1111111111 11111111111111111111111111111111111111111111l II II 111111111 I11111111111111111111111111111111111111111111111111 1111 ■... U... HHHH 0110010000000001100011000110001 100/1101100000000000000000000001rill� �� r.a Ia 0�: : . `I 1�1 11 1 620 .1111 1IIIIlilliillllllllllll IMP1111111111iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiillllllll RillIa ilidlijiiiiii 111111111W111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 ■■1111111111111 �R..,-,_ I:. v...1111111111111111111111111111111111111111111111111111111I1ii1i1'.4ii1�'Yi111111111111111111111111�11111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111���1111111111111 IIIIIIIIIIIIIIIiiifiiiih IIIiiiiiiii IAi11iII11I1I11111i1iiilii iiiliiiliiiliillululliiiliillnlliillilliiiliilliilliilli�ii 111111i�1 I'•��� 1 ::1i��� t ::11::11:111111111111111:1111ii1111i llillllllllllllllllllllllllllllllllllllllllllllllllllllllllllnr�lllllllllllll 6,0 ���,��1 lid' :Dill.ii� � ill --Ilr-����,��1.� -- -- --. � III I III 1►� �� Ii11 ���I ��II� �I� .y�_���►,� �� � ��� II� 1 .11� �t1 I � I ��� I 600 � 1 1 r. 11 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIiiiiiiIIbiiIIi!iiIIiI '' I' I ' ¢L m LIB •' — .. :r. 1.l. • IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIiililiiiiii 1111i111111 ..�1 11!ii. II.� .�� .■1I - - 11111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 11111111111111111111111111111111111111111111111111111111Iii1 iIIIII II IIIIIIIIII IIIIIIIIII IIIIIIIIII IIIIIIIIII Iliiiiiill ii111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 A111111111111111111 580 !IIIIIIIIIII..l...P! II ill.. • II II II II II II 560 •■■— I�� �—III� 5• 1111111 i111111ii11i111iiiiiiiiiiiiiiiii111i11111i111iiiiiiiiiiiiiilliiiiiiiilliiiiiiiiii11111111iiimi111ii�II111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 m1 iiiiii..II1I ii IIIIIIII. 11111111111111111111111111i111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 111111111 ....000011 00 001 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII.IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII ,..,.,. .... .. ....I. IIII 7.1 •.....1... ■■I UU•I■I■.. I....INN.I I.1■ ■■■■F UU ANIMA .......,..'..J■.'A. MEN I■■I■■■I ■. .II\■■r.■I.1.■F.1■■I....■■I■. .I.'.I■■■IN,..7■F■■I I .1�a'.,■I--,■I.■I.■■.',.\■I.•..I.I■■.I r..■...•..IN I■■.I •.■.INN II••AN --,.,1\■I ........A MEN I■■— .I - I■I,1.,IN,••..'.•■I I■..• .••.. --■I••..,1W,I■I I .. 111111111111111111111'/1'l1111111111111�_:1111''II Ills 1111111/__:1111 111111/1111111D`l'111111:11 111'_:1.111A1 111111111':11'';11:_'11:II 1111 ::1111111'Ii' '1 Ill',_'1LIIU11 Ihi!b711111 III III l.11'1;',11'I it 1111111111111 +A I.■■I,■■I I■I.■I r I■■.1I.■■..I. ,■■.7 I■■..I. --I■.--i■I...7 ■■I J■■.,■..__J. r.■■I.■I■■ ■I ■.. urn ■I■■F ■■.\...--J■■IUU I I■■. ■I■..I■.•■I I I 11111111111111ii1����1��ii��������ii1��11111ii�ilifiliii ilifi��iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiii��������ii����1 III 11 III I I IiiiiiiilliilIll F 1111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 : : : JII 'I� ,'" III IIIIIIIIIIIIIIIIIIIIIinniIIIII insi iiii1i 'YYI aiiiiiiii lllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllll � ,1 . �. ' 111111111111111111111111111111111111111111111111111111111111111111111111111111111111 I EI: IIIIIIIIIIIIIIIIIIIIIIIIIII 49. 49.: TEMPORARY WORKPAD DETAIL TEMPORARY WORKPAD ► 20 FT MIN . ______________----- CLASS A i � RIP RAP rhttl„,1 . 5 . < <1 . • A ?AEU Istawanlitititil Uwe. Attelattaitlittenettalt ******* st tam fit., CLASS II RIP RAP TYPICAL SECTION TO( NOT SCALE) WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size/Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 1 -L-14+12 to 15+22 Causeway 0.30 201 2a -L-13+53 to 14+62 Bank Stablization 0.03 284 (Begin Bridge Side) 2b -L- 14+53 to 15+33 Bank Stablization 0.03 - (End Bridge Side) TOTALS*: 0.06 0.30 284 201 0 *Rounded totals are sum of actual impacts NOTES: Bank stablization length measured along the centerline of the stream from the extents of the impacts. NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 1/14/2021 Cleveland DF16012.2023801 Revised 2018 Feb SHEET 1 OF 1