HomeMy WebLinkAbout20210034 Ver 1_Pre-Filing Meeting Information_20210203DWR Pre-Fil ing Meeting Req u est Form
Contact Name *
Contact Email Addre ss *
Proje ct Owne r *
Proje ct Name *
Proje ct County *
Owne r Addre ss:*
Is this a transportation proje ct?*
Type (s) of approv al sought from the DWR:
Doe s this proje ct hav e an e xisting proje ct ID#?*
Do you know the name of the staff me mbe r you would like to re que st a me e ting with?
Ple ase giv e a brie f proje ct de scription be low.*
Kevin Thomas
kthomas@cecinc.com
City of Hickory: POC, Shawn Pennell
ROBINSON ROAD / SHORT ROAD CONNECTORS
Catawba
City
Hickory
State / Province / Region
NC
Postal / Zip Code
28603
Country
United States
Street Address
76 N. Center Street
Address Line 2
Yes No
401 Water Quality Certification -
Regular
401 Water Quality Certification -
Express
Individual Permit Modification
Shoreline Stabilization
Yes No
Alan Johnson
Please give a couple of dates you are available for a meeting.
Ple ase attach the docume ntation you would like to hav e the me e ting about.
Site #1:
The City of Hickory Plans to construct approximately 1,907LF of
public roadway extending from the existing end of Eller Drive to the
existing end of Short Road in Catawba County, North Carolina. The
construction of the public roadway includes the construction of an
approximate 80’ clear span bridge, crossing Muddy Creek , erosion
control measures (i.e. silt fence, etc.), roadway construction, utility
installation and drainage network installation. Equipment to complete
the installation of the above mentioned items include but not limited to
a mechanical dozer, track hoe, and compaction roller. This crossing
does not impact Muddy Creek.
Site #2:
The City of Hickory Plans to construct approximately 1,765LF of
public roadway extending from the existing end of Lutz Boulevard to
the proposed Short Road Extension (Site 1) in Catawba County,
North Carolina. The construction of the public roadway has proposed
impacts of approximately 145LF of an existing Tributary to Muddy
Creek. This impact includes two (2) 72”Diameter CMP culverts buried
1’ below nominal streambed elevation with inlet headwall, rip rap
dissipater, erosion control measures (i.e. silt fence, skimmer basins,
pump around steam impact area, etc.), roadway construction, utility
installation and drainage network installation. Equipment to complete
the installation of the above mentioned items include but not limited to
a mechanical dozer, track hoe, and compaction roller.
1/7/2021
1/8/2021
1/12/2021
1/13/2021
1/14/2021
Robinson_Startown Road Connectors WoUS
Report.pdf
15.99MB
303168-Robinson-Short Road Connectors
Preliminary Plans.pdf
1.35MB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
· This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
· I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing
meeting request.
· I also understand that DWR is not required to respond or grant the meeting request.
Your project’s thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired, and you can submit an
application.
Signature *
Submittal Date 1/5/2021