Loading...
HomeMy WebLinkAbout20210034 Ver 1_Pre-Filing Meeting Information_20210203DWR Pre-Fil ing Meeting Req u est Form Contact Name * Contact Email Addre ss * Proje ct Owne r * Proje ct Name * Proje ct County * Owne r Addre ss:* Is this a transportation proje ct?* Type (s) of approv al sought from the DWR: Doe s this proje ct hav e an e xisting proje ct ID#?* Do you know the name of the staff me mbe r you would like to re que st a me e ting with? Ple ase giv e a brie f proje ct de scription be low.* Kevin Thomas kthomas@cecinc.com City of Hickory: POC, Shawn Pennell ROBINSON ROAD / SHORT ROAD CONNECTORS Catawba City Hickory State / Province / Region NC Postal / Zip Code 28603 Country United States Street Address 76 N. Center Street Address Line 2 Yes No 401 Water Quality Certification - Regular 401 Water Quality Certification - Express Individual Permit Modification Shoreline Stabilization Yes No Alan Johnson Please give a couple of dates you are available for a meeting. Ple ase attach the docume ntation you would like to hav e the me e ting about. Site #1: The City of Hickory Plans to construct approximately 1,907LF of public roadway extending from the existing end of Eller Drive to the existing end of Short Road in Catawba County, North Carolina. The construction of the public roadway includes the construction of an approximate 80’ clear span bridge, crossing Muddy Creek , erosion control measures (i.e. silt fence, etc.), roadway construction, utility installation and drainage network installation. Equipment to complete the installation of the above mentioned items include but not limited to a mechanical dozer, track hoe, and compaction roller. This crossing does not impact Muddy Creek. Site #2: The City of Hickory Plans to construct approximately 1,765LF of public roadway extending from the existing end of Lutz Boulevard to the proposed Short Road Extension (Site 1) in Catawba County, North Carolina. The construction of the public roadway has proposed impacts of approximately 145LF of an existing Tributary to Muddy Creek. This impact includes two (2) 72”Diameter CMP culverts buried 1’ below nominal streambed elevation with inlet headwall, rip rap dissipater, erosion control measures (i.e. silt fence, skimmer basins, pump around steam impact area, etc.), roadway construction, utility installation and drainage network installation. Equipment to complete the installation of the above mentioned items include but not limited to a mechanical dozer, track hoe, and compaction roller. 1/7/2021 1/8/2021 1/12/2021 1/13/2021 1/14/2021 Robinson_Startown Road Connectors WoUS Report.pdf 15.99MB 303168-Robinson-Short Road Connectors Preliminary Plans.pdf 1.35MB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: · This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. · I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing meeting request. · I also understand that DWR is not required to respond or grant the meeting request. Your project’s thirty-day clock started upon receipt of this application.  You will receive notification regarding meeting location and time if a meeting is necessary.  You will receive notification when the thirty-day clock has expired, and you can submit an application. Signature * Submittal Date 1/5/2021