Loading...
HomeMy WebLinkAbout20120090 Ver 1_401 Application_20121212r Dewberry 2 0 1 2 0 0 9 0 January 30 2012 Ms Amy Chapman Buffer Coordinator NC Division of Water Quality 401 /Wetlands Unit 1650 Mail Service Center Raleigh North Carolina 27699 1650 Dewberry & Davis Inc 2301 Rexwoods Drive Suite 200 Raleigh NC 27607 3366 919 881 9939 919 8819923 fax www dewberry corn QPM(7�1 12odR- 0 FFB - 2 2012 DENR WATER QUALITY WETLANDa AND STORIMATER BRANCH Reference City of Raleigh 1304 Marlowe Rd Bank Stabilization & Lakestone Sanitary Sewer Repair Dewberry Project No 50022492 Dear Ms Chapman Enclosed are five copies of a Buffer Only Pre Construction Notification (PCN) Permit Application Package for the City of Raleigh 1304 Marlowe Rd Bank Stabilization & Lakestone Sanitary Sewer Repair projects These documents are provided for the record only for 401 Certification and Corps Notification because written approval is not required however the work takes place within unmaintained sanitary sewer easements therefore buffer authorization is sought For your review we have enclosed the following • Five copies of the PCN Application Form • Five copies of USGS Map • Five copies of the bank stabilization detail The project titled 1304 Marlowe Rd Bank Stabilization consists of replacing an exposed 12 clay pipe with DIP and stabilizing the bank The project titled Lakestone Sanitary Sewer Repair consists of replacing an exposed 8 clay pipe with DIP Ms Amy Chapman Project 50022492 January 30 2012 Page 2 of 2 The construction described in this permit application results in a total of approximately 4 200 square feet of Zone 1 buffer impact 800 square feet of Zone 2 buffer impact and less than 80 linear feet of stream disturbance Please contact me with any questions regarding this project Sincerely Dewberry & Davis Inc X, I,,a — 7 Mary T Brice P E LEED AP Project Engineer Enclosures P \50022492 \Adm \P mt \M I (1304) \20120130 DWQC Ltt d It Dewberry O� W A O�TF9�G O Y 20120090 Office Use Only Corps action ID no DWQ project no Form Version 1 3 Dec 10 2008 Page 1 of 11 PCN Form — Version 1 3 December 10 2008 Version Pre Construction Notification (PCN) Form A Applicant Information 1 Processing 1 a Type(s) of approval sought from the Corps El Section 404 Permit ❑Section 10 Permit 1b Specify Nationwide Permit (NWP) number or General Permit (GP) number 1c Has the NWP or GP number been verified by the Corps? ❑ Yes ❑ No 1d Type(s) of approval sought from the DWQ (check all that apply) ❑ 401 Water Quality Certification — Regular ❑ Non 404 Jurisdictional General Permit ❑ 401 Water Quality Certification— Express ® Riparian Buffer Authorization 1e Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification ® Yes ❑ No For the record only for Corps Permit ® Yes ❑ No if is payment into a mitigation bank or in lieu fee program proposed for mitigation of impacts? If so attach the acceptance letter from mitigation bank or in lieu fee program ❑ Yes ® No 1g Is the project located in any of NC s twenty coastal counties If yes answer 1 h below ❑ Yes ® No 1h Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ® No 2 Project Information 2a Name of project 1304 Marlowe Rd Bank Stabilization & Lakestone Sanitary Sewer Repair 2b County Wake 2c Nearest municipality / town Raleigh VL�31(919uwe n. 2d Subdivision name 2e NCDOT only T I P or state project no B — 2 2012 3 Owner Information L NR WATER QUALITY 3a Name(s) on Recorded Deed BRANCH 3b Deed Book and Page No 3c Responsible Party (for LLC if applicable) City of Raleigh (Public Utilities Department) One Exchange Plaza 3d Street address 3e City state zip Raleigh NC 27602 3f Telephone no 919 996 4540 3g Fax no 919 857 4545 3h Email address Page 1 of 11 PCN Form — Version 1 3 December 10 2008 Version 4 Applicant Information (if different from owner) 4a Applicant is ❑ Agent ❑ Other specify 4b Name 4c Business name (if applicable) 4d Street address 4e City state zip 4f Telephone no 4g Fax no 4h Email address 5 Agent/Consultant Information (if applicable) 5a Name Mary T Brice P E 5b Business name (if applicable) Dewberry & Davis Inc (Dewberry) 5c Street address 2301 Rexwoods Drive Suite 200 5d City state zip Raleigh NC 27607 5e Telephone no 919 424 3704 5f Fax no 919 881 9923 5g Email address mbrice @dewberry com Page 2 of 11 PCN Form — Version 1 3 December 10 2008 Version B Project Information and Prior Project History 1 Property Identification The 1304 Marlowe Rd Bank Stabilization project is within a sanitary sewer easement located on PIN 1705291105 1 a Property identification no (tax PIN or parcel ID) The Lakestone Sanitary Sewer Repair project is within a sanitary sewer easement located on PIN 1705289973 and PIN 1705381841 Latitude 1304 Marlowe Rd 35 8355 Lakestone 35 8348 lb Site coordinates (in decimal degrees) Longitude 1304 Marlowe Rd 78 6560 J Lakestone 78 6524 (DD DDDDDD) ( DD DDDDDD) is Property size acres 2 Surface Waters 2a Name of nearest body of water (stream river etc) to Unnamed tributaries to Crabtree Creek proposed project 2b Water Quality Classification of nearest receiving water C NSW 2c River basin Neuse 3 Project Description 3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application 1304 Marlowe Rd Exposed 12 clay pipe in stream bank and bed will be replaced with DIP and bank will be stabilized Property is residential Lakestone 8 clay pipe crossing stream is exposed and will be replaced with DIP Property is residential 3b List the total estimated acreage of all existing wetlands on the property 0 3c List the total estimated linear feet of all existing streams (intermittent and perennial) on the property 3d Explain the purpose of the proposed project To repair sanitary sewer and stabilize stream bank 3e Describe the overall project in detail including the type of equipment to be used A sanitary sewer bypass ( pump around ) will be installed if necessary using pumps flexible hose and generators Conventional construction equipment (trackhoes dump trucks trench box) will be used for the installation Sediment control devices will be installed A temporary stream diversion will be installed if necessary and work will be performed in the dry 4 Jurisdictional Determinations 4a Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / ❑ Yes ® No ❑ Unknown project (including all prior phases) in the past? Comments 4b If the Corps made the jurisdictional determination what type 1:1 Preliminary El Final of determination was made 4c If yes who delineated the jurisdictional areas? Agency /Consultant Company Name (if known) Other 4d If yes list the dates of the Corps jurisdictional determinations or State determinations and attach documentation Page 3 of 11 PCN Form — Version 1 3 December 10 2008 Version 5 Project History 5a Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑ Yes ❑ No ® Unknown 5b If yes explain in detail according to help file instructions 6 Future Project Plans 6a Is this a phased project? ❑ Yes ® No 6b If yes explain l Page 4 of 11 PCN Form — Version 1 3 December 10 2008 Version C Proposed Impacts Inventory 1 Impacts Summary la Which sections were completed below for your project (check all that apply) ❑ Wetlands ® Streams tributaries ® Buffers ❑ Open Waters ❑ Pond Construction 2 Wetland Impacts If there are wetland impacts proposed on the site then complete this question for each wetland area impacted 2a 2b 2c 2d 2e 2f Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps 404 10 Area of impact Permanent (P) or (if known) DWQ —non 404 other) (acres) Temporary T W1 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W2 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W3 ❑ P ❑ T Yes ❑ Corps No ❑ DWQ W4 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W5 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W6 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ 2g Total wetland impacts 2h Comments 3 Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site then complete this question for all stream sites impacted 3a 3b 3c 3d 3e 3f 3g Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number (PER) or (Corps 404 10 stream length Permanent (P) or intermittent DWQ — non 404 width (linear Temporary (T) (INT)? other) (feet) feet) S1 ®P ❑ T Stream Stabilization Unnamed tributary to ❑ PER ❑ Corps 5 60 at 1304 Marlowe Rd Crabtree Creek ®INT ❑DWQ S2 ® P [--IT Replacement of Sanitary Sewer Unnamed tributary to ® PER [:1 Corps <5 <20 Crossing at Lakestone Crabtree Creek INT El DWQ S3 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S4 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S5 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S6 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ 3h Total stream and tributary impacts <80 31 Comments Page 5 of 11 PCN Form — Version 1 3 December 10 2008 Version 4 Open Water Impacts If there are proposed impacts to lakes ponds estuaries tributaries sounds the Atlantic Ocean or any other open water of the U S then individually list all open water impacts below 4a Open water impact number — Permanent (P) or Temporary T 4b Name of waterbody (if applicable) 4c Type of impact 4d Waterbody type 4e Area of impact (acres) 01 ❑P ❑T 02 ❑P ❑T 03 ❑P ❑T 04 ❑P ❑T 4f Total open water impacts 4g Comments 5 Pond or Lake Construction If pond or lake construction proposed then complete the chart below 5a Pond ID number 5b Proposed use or purpose of pond 5c Wetland Impacts (acres) 5d Stream Impacts (feet) 5e Upland (acres) Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f Total 5g Comments 5h Is a dam high hazard permit required ❑ Yes ❑ No If yes permit ID no 51 Expected pond surface area (acres) 5j Size of pond watershed (acres) 5k Method of construction Page 6 of 11 PCN Form — Version 1 3 December 10 2008 Version 6 Buffer Impacts (for DWQ) If project will impact a protected riparian buffer then complete the chart below If yes then individually list all buffer impacts below If any impacts require mitigation then you MUST fill out Section D of this form 6a ® Neuse ❑ Tar Pamlico ❑ Other Project is in which protected basin? ❑ Catawba ❑ Randleman 6b 6c 6d 6e 6f 6g Buffer impact number — Reason for Buffer Zone 1 impact Zone 2 impact Permanent (P) impact Stream name mitigation (square feet) (square feet) or Temporary required? T 1304 ` Marlowe Rd Access for B1 ®P ❑ T bank Unnamed tributary to ❑ Yes 3000 stabilization Crabtree Creek ® No in unmaintamed easement Lakestone Sanitary B2 ® P ❑ T Sewer repair at stream Unnamed tributary to ❑ Yes 1200 800 Crabtree Creek ® No crossing in unmamtained easement B3 ❑ PEI T El Yes ❑ No 6h Total buffer impacts 4200 800 61 Comments D Impact Justification and Mitigation 1 Avoidance and Minimization la Specifically describe measures taken to avoid or minimize the proposed impacts in designing project Project is an emergency repair to an existing sanitary sewer line that is in disrepair and fading lb Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques Erosion control devices will be installed prior to construction All construction will take place within existing easement The disturbed area will be stabilized by seeding and mulching immediately after completion 2 Compensatory Mitigation for Impacts to Waters of the U S or Waters of the State 2a Does the project require Compensatory Mitigation for ❑ Yes ® No impacts to Waters of the U S or Waters of the State? 2b If yes mitigation is required by (check all that apply) ❑ DWQ ❑ Corps ❑ Mitigation bank 2c If yes which mitigation option will be used for this project? ❑ Payment to in lieu fee program ❑ Permittee Responsible Mitigation 3 Complete if Using a Mitigation Bank 3a Name of Mitigation Bank 3b Credits Purchased (attach receipt and letter) Type Quantity Page 7 of 11 PCN Form — Version 1 3 December 10 2008 Version 3c Comments 4 Complete if Making a Payment to In lieu Fee Program 4a Approval letter from in lieu fee program is attached ❑ Yes 4b Stream mitigation requested linear feet 4c If using stream mitigation stream temperature ❑ warm ❑ cool ❑cold 4d Buffer mitigation requested (DWQ only) square feet 4e Riparian wetland mitigation requested acres 4f Non riparian wetland mitigation requested acres 4g Coastal (tidal) wetland mitigation requested acres 4h Comments 5 Complete if Using a Permittee Responsible Mitigation Plan 5a If using a permittee responsible mitigation plan provide a description of the proposed mitigation plan 6 Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWO 6a Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes ® No 6b If yes then identify the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the amount of mitigation required Zone 6c Reason for impact 6d Total impact (square feet) Multiplier 6e Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1 5 6f Total buffer mitigation required 6g If buffer mitigation is required discuss what type of mitigation is proposed (e g payment to private mitigation bank permittee responsible riparian buffer restoration payment into an approved in lieu fee fund) 6h Comments Page 8 of 11 PCN Form — Version 1 3 December 10 2008 Version E Stormwater Management and Diffuse Flow Plan (required by DWQ) 1 Diffuse Flow Plan la Does the project include or is it adjacent to protected riparian buffers identified ® Yes ❑ No within one of the NC Riparian Buffer Protection Rules? lb If yes then is a diffuse flow plan included? If no explain why ❑ Yes No Comments Protect does not necessitate stormwater collection 2 Stormwater Management Plan 2a What is the overall percent imperviousness of this project? 0 / 2b Does this project require a Stormwater Management Plan? ❑ Yes ® No 2c If this project DOES NOT require a Stormwater Management Plan explain why Project will disturb less than an acre 2d If this project DOES require a Stormwater Management Plan then provide a brief narrative description of the plan ❑ Certified Local Government 2e Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program ❑ DWQ 401 Unit 3 Certified Local Government Stormwater Review 3a In which local government s jurisdiction is this project? City of Raleigh ❑ Phase II 3b Which of the following locally implemented stormwater management programs ❑ NSW ❑ USMP apply (check all that apply) ❑ Water Supply Watershed ® Other not required 3c Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4 DWO Stormwater Program Review ❑ Coastal counties 4a Which of the following state implemented stormwater management programs apply ❑ HQW ❑ ORW (check all that apply) ❑ Session Law 2006 246 ❑ Other 4b Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ❑ No 5 DWO 401 Unit Stormwater Review 5a Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 9 of 11 PCN Form — Version 1 3 December 10 2008 Version F Supplementary Information 1 Environmental Documentation (DWO Requirement) la Does the project involve an expenditure of public (federal /state /local) funds or the ® Yes ❑ No use of public (federal /state) land? lb If you answered yes to the above does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ® No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c If you answered yes to the above has the document review been finalized by the State Clearing House? (If so attach a copy of the NEPA or SEPA final approval ❑ Yes ❑ No letter) Comments 2 Violations (DWQ Requirement) 2a Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500) Isolated Wetland Rules (15A NCAC 2H 1300) DWQ Surface Water or Wetland Standards ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 2B 0200)? 2b Is this an after the fact permit application? ❑ Yes ® No 2c If you answered yes to one or both of the above questions provide an explanation of the violation(s) 3 Cumulative Impacts (DWO Requirement) 3a Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ® No additional development which could impact nearby downstream water quality? 3b If you answered yes to the above submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy If you answered no provide a short narrative description Project is replacement of existing sanitary sewer and does not increase capacity 4 Sewage Disposal (DWQ Requirement) 4a Clearly detail the ultimate treatment methods and disposition (non discharge or discharge) of wastewater generated from the proposed project or available capacity of the subject facility Project is the replacement of sanitary sewer which conveys wastewater to the City of Raleigh s Neuse River Waterwater Treatment Plant The project will generate no wastewater Page 10 of 11 PCN Form — Version 1 3 December 10 2008 Version 5 Endangered Species and Designated Critical Habitat (Corps Requirement) 5a WIII this project occur in or near an area with federally protected species or ❑ Yes ❑ No habitat? 5b Have you checked with the USFWS concerning Endangered Species Act ❑ Yes ❑ No Impacts? 5c If yes Indicate the USFWS Field Office you have contacted E:1 Raleigh ❑ Asheville 5d What data sources did you use to determine whether your site would Impact Endangered Species or Designated Critical Habitat? 6 Essential Fish Habitat (Corps Requirement) 6a WIII this project occur in or near an area designated as essential fish habitat? ❑ Yes ❑ No 6b What data sources did you use to determine whether your site would impact Essential Fish Habitat? 7 Historic or Prehistoric Cultural Resources (Corps Requirement) 7a WIII this project occur in or near an area that the state federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ❑ No status (e g National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b What data sources did you use to determine whether your site would impact historic or archeological resources? 8 Flood Zone Designation (Corps Requirement) 8a WIII this project occur in a FEMA designated 100 year floodplain? ❑ Yes ® No 8b If yes explain how project meets FEMA requirements r 8c What source(s) did you use to make the floodplain determination? North Carolina Floodplain Mapping Firm # 3720170500J dated 05/02/2006 J Russell Allen City Manager City of Raleigh Post Office Box 590 n !�� /�u� -(' C l -070 I z- Raleigh North Carolina 27602 Apllcant/Agent s Printed Name Applicant/Agent s Signature Date (Agents signature is valid only if an authorization letter from the applicant is provided Page 11 of 11 PCN Form — Version 1 3 December 10 2008 Version DATE SHEET NO �►`IS CROSS SECTION DETAIL ll;� *- Dewberr 01/28/10 STREAM BANK Dewberry & Dam Inc e 230 RE%WOODSDRNE PROJ NO STABILIZATION e K-2 UTE 00 RALE GH NC 760 FAX 91 50022492 FAX PHONE: ,o„ RALEIGH NORTH CAROLINA Cl J_ � O U N d W c U Z � m J r ag —O N V W � W O J O 0_ W p U W � � Z Q p r Z � g 0 W � Q N Q 0_ � � Z U- 0- Q a zN m Q p z Q p W U ao x w O 00 c cD d d' N N O O N cD l lqt N O O p z D W O p � Q c� o z � o W w i= w Q ir x O N Q r r W ir 3 ON J � LLI Z r _ 0_ 0= W W 0_ L Ld p az o- Z W W Q p �W M W N N W p r J p mQ u uj O 0 jo .- 00 c cD 1 1* N r r N O O 00 C Co I It N O O j Q a zN m Q p z Q p W U ao x w �ii~� gr I P -err i W1 Vim Zone 1: 12011 Z u4/vQW1- 2: 800 TA 00 131; 1304 Marlowe Rd. Zone 1: 3000 ft2 TW7 V11: - ;I