Loading...
HomeMy WebLinkAbout20120096 Ver 1_401 Application_20120212o�0F WA lzz o h O T 20120096 Office Use Only Corps action ID no DWQ project no Form Version 1 4 January 2009 Page 1 of 10 PCN Form — Version 14 January 2009 Pre - Construction Notification (PCN) Form A Applicant Information 1 Processing la Type(s) of approval sought from the Corps ❑ Section 404 Permit ❑ Section 10 Permit lb Specify Nationwide Permit (NWP) number or General Permit (GP) number 1c Has the NWP or GP number been verified by the Corps? ❑ Yes ❑ No 1 d Type(s) of approval sought from the DWQ (check all that apply) ❑ 401 Water Quality Certification — Regular ❑ Non 404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑X Ripanan Buffer Authonzation� le Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification ❑ Yes ❑ No For the record only for Corps Permit ❑ Yes ❑ No if GIs payment into a mitigation bank or in lieu fee program proposed for __ mitigation of impacts? If so_ attach_the acceptance letter from mitigation bank nor in lieu fee program _ ❑Yes X❑ No _ �1 g Is the protect located in any of NC s twenty coastal counties If yes answer 1 h� ,below, � J ❑ Yes) ❑X No 1 h Is the protect located within a NC DCM Area of Environmental Concern (AEC)? ) Yes X❑ No) 2 Project Information �2a Name of project Eric Brock Streambank Protection 2b County r Wilson �2c Nearest municipality / town) Sims p ,2d Subdivision name N/A 2e NCDOT only T I P or state project no FER 3 j -Owner Information) ,3a Name(s) on Recorded Deed l Vickie Thompson Brock WE VDaAND S7 AI M '3b Deed Book and Page No 2007E/121 3c Responsible Party (for LL_C if applicable) '3d Street address 6324 Old Davis Road 3e City state zip Sims NC 27880 3f Telephone no ' 252 373 0472 3g Fax no 1 N/A 3h Email address N/A Page 1 of 10 PCN Form — Version 14 January 2009 �4 f (Applicant Information (if different from_owner) 4a Applicant is- Elf-Agent ❑,Other specify,' 4b Name) Ac Business name; (if applicable) Ad Street address; 4e City state zip 1 4f Telepho_ne no 4g Fax no 4h Email address 5 LAgent/consultant information (if apphcable)i 5a iName, �5b Business name, '(if applicable) i 67c Street address j 5d City state zips 5e Tei_ephone no r5f Fax no ; '5g Email address Page 2 of 10 B Project Information and Prior Project Hlstory (1I �ProperEy Identification 1a Property identification no (tax PIN or parcel ID) Pin # 2793 37 1403 000 1b Site coordinates (in decimal degrees I Latitude] 35 7672 (Longitudel78 0121 1 c Property size 44 7 acres 12) Surface Waters l2a Name of nearest body of water to proposed protect i Bloomery Swamp 2b Water Quality Classification of nearest receiving water r C NSW 2c River basin; Neuse 4 Project Description ,3a�_Describe the existing conditions on the site and the general land use in the vicinity of the protect at the time of this, �apphcation , _ _ _ _ _ _ _ 500 ft of stream being wooded on the east side and cropland on the west side 3b List the total estimated acreage of all existing wetlands on the property 40 3c List the total estimated linear feet of all existing streams (intermittent and perennial) on the property 500 3d Explain the purpose of the proposed protect I Re slope stream bank to help eliminate erosion taking on stream bank After re sloping the area will be seeded and will become established with grass +3e Describe the overall protect in detail including the type of equipment to be used) Banks will be sloped bank iAth the use of a bulldozer and excavator 4 Jurisdictional Determinations 4a Have jurisdictional wetland or stream determinations by the' Corps or State been requested or obtained for this property _/ project (including all prior phases) in the ast ?i ❑ Yes, f4No` ❑ Unk_nown Comments - -- 4b If the Corps made the jurisdictional determination what type of determination was made? Preliminary El Final 4c If yes who delineated the jurisdictional areas? Name (if known) ` (Agency /Consultant Company Other 4d + If yes list the dates of the Corps jurisdictional determinations or State determinations and attach documentation i 5 Project History+ 5a Have permits or certifications been requested or obtained for this project (including all prior phases) in the past ?i ❑Yes ❑X No, El Unknown` 5b If yes explain in detail according to help file instructions ` 6 Future Project Plans 6a Is this a phased project?� ❑ Yes ❑X No 6b If yes explain. Page 3 of 1O_L_i _ PCN Form — Version 1 4 January 2009 C Proposed Impacts Inventory 1 Impacts Summary 1a Which sections were completed below for your project (check all that apply) ❑ Wetlands ❑ Streams —tributaries ❑X Buffersl ❑ Open Waters ❑ Pond Construction 2 Wetland Impacts If there are wetland impacts proposed on the site then complete this question for each wetland area impacted 2a Wetland impact number Permanent (P) or Temporary 2b Type of impact 2c Type of wetland 2d Forested 2e Type of jurisdiction Corps (404 10) or DWQ (401 other) 2f Area of impact (acres) W1 Choose one Choose one Yes /No W2 Choose one Choose one Yes /No W3 Choose one Choose one Yes /No W4 Choose one Choose one Yes /No W5 Choose one Choose one Yes /No W6 Choose one Choose one Yes /No 2g Total Wetland Impacts 2h Comments 3 Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site then complete this question for all stream sites impacted 3a Stream impact number Permanent (P) or Temporary (T) 3b Type of impact 3c Stream name 3d Perennial (PER) or intermittent (INT)? 3e Type of jurisdiction 3f Average stream width (feet) 3g Impact length (linear feet) S1 Choose one S2 Choose one S3 Choose one S4 Choose one S5 Choose one S6 Choose one 3h Total stream and tributary impacts 31 Comments Page 4 of 10 PCN Form — Version 14 January 2009 4 Open Water Impacts If there are proposed Impacts to lakes ponds estuaries tributaries sounds the Atlantic Ocean or any other open water of the U S then indivi ually list all open water impacts below 4a Open water Impact number Permanent (P) or Temporary 4b Name of waterbody (if applicable) 4c Type of Impact 4d Waterbody type 4e Area of Impact (acres) 01 Choose one Choose 02 Choose one Choose 03 Choose one Choose 04 Choose one Choose 4f Total open water Impacts 4g Comments 5 Pond or Lake Construction If pond or lake construction proposed the complete the chart below 5a Pond ID number 5b Proposed use or purpose of pond 5c Wetland Impacts (acres) 5d Stream Impacts (feet) 5e Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f Total 5g Comments 5h Is a dam high hazard permit required? ❑ Yes ❑ No If yes permit ID no 51 Expected pond surface area (acres) 5j Size of pond watershed (acres) 5k Method of construction '6 Buffer Impacts (for Dwq) If project will Impact a protected riparian buffer then complete the chart below If yes then individually list all buffer Impacts below If any impacts require mitigation then vou MUST fill out Section D of this form 6a Project Is In which protected basin? ❑X Neuse ❑ Tar Pamlico ❑ Catawba ❑ Randleman ❑ Other 6b Buffer Impact number — Permanent (P) or Temporary 6c _ Reason for impact 6d ,Stream name; 6e Buffer mitigation' required? 6f Zone 1 impacts ((square feet ) 6g _ Zone 2' Impact (square feet B1 P Sloping eroding banks Tributary of Bloomery Swamp No 15 000 B2 Yes /No B3 Yes /No B4 Yes /No B5 Yes /No B6 Yes /No 6h Total Buffer Impacts 15 000 61 Comments Plan to slope banks to help reduce erosion on banks Page 5 of 10 D Impact Justification and Mitigation 1 Avoidance and Minimization 1a 1Specifically describe mea_sure_s taken to avoid or minimize the proposed Impacts In designing project) Design for this will not impact the stream _ 1 b' Specifically describe measures taken to avoid or minimize the proposed Impacts through construction techniques) Stream bank well be sloped away from channel bottom and the sediment vnll be pulled away from the channel Area will be seeded and site will become established with grass shrubs and trees 2 Compensatory Mitigation for Impacts to Waters of the U S or Waters of the State 2a Does the project require Compensatory Mitigation for impacts to Waters of the U S or Waters of the State? ❑ Yes ❑ No 2b If yes mitigation Is required by (check all that apply) ❑ DWQ ❑ Corps 2c If yes which mitigation option will be used for this projects ❑ Mitigation bank ❑ Payment to in lieu fee program f ram y p g ❑ Permittee Responsible Mitigation 3 Complete if Using a Mitigation Bank 3a Name of Mitigation Bank 3b Credits Purchased (attach receipt and letter) Type Choose one Type Choose one Type Choose one Quantity Quantity Quantity 3c Comments 4 Complete if Making a Payment to In lieu Fee Program 4a Approval letter from in lieu fee program is attached ❑ Yes 4b Stream mitigation requested linear feet 4c If using stream mitigation stream temperature Choose one 4d Buffer mitigation requested (DWQ only) square feet 4e Riparian wetland mitigation requested acres 4f Non riparian wetland mitigation requested acres 4g Coastal (tidal) wetland mitigation requested acres 4h Comments 5 Complete if Using a Permittee Responsible Mitigation Plan 5a If using a permittee responsible mitigation plan provide a description of the proposed mitigation plan Page 6 of 10 PCN Form — Version 14 January 2009 6 , Buffer Mitigation (State Regulated Riparian Buffer Rules) —required by DWQI `6a Will the project result in an impact within _a protected riparian buffer that requires) 'buffer mitigations bu Yes X No 6b * yes then identify the square feet of impact to each zone of the riparian buffer that regwres mitigation Calculate the) amount of mitigation required 'Zone_) - -� 16c _ LReason for impact �6d _ Jotal impact ,(square feet)) Multiplier 6e) _ ~Required mitigation !(square feet)) Zone 1 3 (2 for Catawba) Zone 2 15 6f Total buffer mitigation required_) 6g (If buffer mitigation is required discuss what type of mitigation is proposed (e g payment to private mitigation bank ,permittee responsible riparian buffer restoration payment into an approved in lieu fee fund) v 6h Comments i Page 7 of 10 E Stormwater Management and Diffuse Flow Plan (required by DWQ) 1 Diffuse Flow Plan 1 a_ Does the project include or is it adjacent to protected riparian buffers identified) within one of the NC Riparian Buffer Protection Rules ❑X Yes; El' Noi v 1 b If yes then is a diffuse flow plan included? If no explain why ❑ Yes ❑X No 2 Stormwater Management Plan 2a What is the overall percent imperviousness of this project? ova 2b Does this project require a Stormwater Management Plan? ❑ Yes ❑ No 2c If this project DOES NOT require a Stormwater Management Plan explain why 2d If this project DOES require a Stormwater Management Plan then provide a brief narrative description of the plan 2e Who will be responsible for the review of the Stormwater Management Plan? 3 Certified Local Government Stormwater Review 3a In which local governments jurisdiction is this project? 3b Which of the following locally implemented stormwater management programs apply (check all that apply) ❑ Phase II ❑ NSW ❑ USMP ❑ Water Supply Watershed ❑ Other 3c Has the approved Stormwater Management Plan with proof of approval been attached? El Yes ❑ No 4 DWQ Stormwater Program Review 4a Which of the following state implemented stormwater management programs apply (check all that apply) ❑Coastal counties ❑HQW ❑ORW ❑Session Law 2006 246 ❑Other 4b Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ❑ No 5 DWQ 401 Unit Stormwater Review 5a Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 8 of 10 PCN Form — Version 14 January 2009 F Supplementary Information 1 Environmental Documentation (DWQ Requirement) la Does the project involve an expenditure of public (federal /state /local) funds or the ❑ Yes ❑ No use of public (federal /state) land? 1b If you answered yes to the above does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)*? 1c If you answered yes to the above has the document review been finalized by the State Clearing House? (If so attach a copy of the NEPA or SEPA final approval letter) ❑ Yes ❑ No Comments 2 Violations (DWQ Requirement) 2a Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500) Isolated, Wetland Rules (15A NCAC 2H 1300) DWQ Surface Water or Wetland Standards i — µ El Yes Q No 4 or Riparian Buffer Rules (15A NCAC 2B 0200) ?) 2b Js this an after the fact permit apphaU con�� ❑Yes ❑X No 2c If you answered yes to one or both of the above questions provide an explanation of the violation(s) 3 Cumulative Impacts (DWQ Requirement) 3a 'Will this project (based on past and reasonably anticipated future impacts) result ins ❑Yes Q No additional development which could impact nearby downstream water quality 3b If you answered yes to the above submit a qualitative or quantitative cumulative impact analysis in accordance with the) most recent DWQ policy If you answered _no provide a short narrative description ' T 4 Sewage Disposal (DWQ Requirement) 4a Clearly detail the ultimate treatment methods and disposition (non discharge or discharge) of wastewater generated from the proposed project or available capacity of the subject facility G Page 9 of 10 PCN Form — Version 14 January 2009 5 Endangered Species and Designated Critical Habitat (Corps Requirement) 5a Will this project occur in or near an area with federally protected species or habitat? ❑ Yes ❑ No 5b Have you checked with the USFWS concerning Endangered Species Act impacts? ❑ Yes ❑ No 5c If yes indicate the USFWS Field Office you have contacted 5d What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? 6 Essential Fish Habitat (Corps Requirement) 6a Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ❑ No 6b What data sources did you use to determine whether your site would impact Essential Fish Habitat? 7 Historic or Prehistoric Cultural Resources (Corps Requirement) 7a Will this project occur in or near an area that the state federal or tribal governments have designated as having historic or cultural preservation status (e g National Historic Trust designation or properties significant in North Carolina history and archaeology)? ❑ Yes ❑ No 7b What data sources did you use to determine whether your site would impact historic or archeological resources? 8 Flood Zone Designation (Corps Requirement) 8a Will this project occur in a FEMA designated 100 year floodplain? 7-13 Yes ❑ No 8b If yes explain how project meets FEMA requirements 8c What source(s) did you use to make the floodplain determination? Vickie Thompson Brock 'Applicant/Agent s Printed Name; 7 f )1.210- 'Date) Applicant/Agent s Signature (Agents signature is valid only if an authonzatiori� letter from the applicant is provided Page 10 of 10 Customer(s): ERIC F BROCK, VICKIE L BROCK PCN Map Date: 1/31/2012 Field Office: WILSON SERVICE CENTER Agency: Wilson Soil and Water Assisted By: Ricky Hayes State and County: NC, WILSON Legend brockconplan — Streams Roads 0 Soils v 225 0 225 450 675 900 Feet '--7F- PCN Map Date: 1/31/2012 Customer(s): ERIC F BROCK, Field Office: WILSON SERVICE CENTER VICKIE L BROCK Agency: Wilson Soil and Water Assisted By: Ricky Hayes State and County: NC, WILSON -for + it nP Lh d 02 'r —' bd ,r a j Vickie Brock Fa`mv� + j Tract 3205 - Streambank Protection (500ft) umhl f •• d I r � Uni e St r a ' s Ni hwa 26 Ica Ca ti {L fr i # r Legend brockconplan Roads drg_s_ncl95.sid RGB N O Red: Band -1 230 0 230 460 690 920 kaj Green: Band 2 Feet Blue: Band-3