Loading...
HomeMy WebLinkAboutNCC200215_NOT Closeout Documents_20210202North Carolina Department of Environmental Quality Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094 (910) 433-3300 Revision of Harris Place, Sec 4 - Lots County: Cumberland Project: 12, 16, 204-207 & 235 River basin: Cape Fear Person financially responsible: H&H Constructors, Inc. -Brian Walker, Division Project #: CUNME-2020-084 Manager & Agent Address: 2919 Breezewood Avenue, Suite 400, Fayetteville, NC NCC200215 1. Project Location: Woodmark Driove, Seventy First Twsp Pictures: No 2. Weather and soil conditions: foggy, workable soils Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Inspection report: Sent Report 9. Corrective action needed: Title: Date given/sent: October 28, 2020 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self monitoring or self inspections are required. Project is released under SPCA of 1973. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities should be requested by the permittee via a Notice of Termination. Reported by: Lori Britt Others present: Date of inspection: October 27, 2020 Time arriving on site: 8:18 AM Time leaving site: 8:24 AM cc: