Loading...
HomeMy WebLinkAboutNCC200454_NOT Closeout Documents_20210202North Carolina Department of Environmental Quality Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094 (910) 433-3300 Juniper Ridge, Phase Three - Lots 62 & County: Moore Project: 63 River basin: Cape Fear Person financially responsible: H&H Constructors, Inc. -Brian Walker, Division project N: MOORE-2020-039 Manager & Agent Address: 2919 Breezewood Avenue, Suite 400, Fayetteville, NC 1. Project Location: Mountain Run Drive, Mioneral Springs Pictures: No 2. Weather and soil conditions: sunny/workable soils 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes 5. Violations: 6. Is the site in compliance with the NPDES Permit? Yes Describe: Initial inspection: No If no, check violations below: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Inspection report: Sent Report 9. Corrective action needed: Title: Date given/sent: July 08, 2020 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance with the SPCA and released. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities should be requested by the permittee via a Notice of Termination_ Please note that this correspondence must be uploaded as part of completing the Notice of Termination process. Reported by: Penny Markle Others present: Date of inspection: July 01, 2020 Time arriving on site: 11:29 AM Time leaving site: 11:50 AM cc: