Loading...
HomeMy WebLinkAboutNCC200655_Notice of Termination_20210202Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 2/2/2021 2:33:32 PM (NOT Submittal) Approve by Morman, Alaina 2/3/2021 4:42:28 PM (NOT Request Review- NCC200655) • The task was assigned to Morman, Alaina. The due date is: February 5, 2021 5:00 PM 2/2/2021 2:33 PM 1 � NORTH CAROLINA Enrlronmenral Quallly Certificate of NCC200655 Coverage (COC) Enter the Certificate of Coverage Nmber No.* 2020 Annual Fee Status 2021 Annual Fee Status OPEN May be blank (if not yet billed). Information associated with this permit: Project Name Structures 75 & 82 Reroute - Pea Island 115kV Transmission Line Address NC-12, Rodanthe, NC County Dare Latitude 35.7184 Longitude -75.4946 Permittee Listed Cape Hatteras Electric Cooperative Legally Responsible Mark Rhyne Individual NC Reference No. NCG01-2020-0655 E&SC Plan ID Dare-2020-006 Original NOI 21970 Tracking No. Date COC Issued 2/19/2020 Prior Rescission Date populates only if COCwas already rescinded at time of submittal. Date Reason for Rescission/Termination Request: Reason for r Project Closed -Out Termination of r Sale (Another Owner/Operator will apply for a new COC) Coverage * r Mistake or Invalid Coverage r Other Addional Nbre information about the basis of this request, if needed. Explanation Supporting upload Supporting Documentation if applicable. Documentation NlastbeRYforrrat Project Close-out Information: Final Close-out 8/14/2020 Inspection Approval Project Close-out Grabowski _Dare-2020-006 Closed.pdf 1.32MB Approval Must be FDFforrrat Documentation North Carolina General Statute 143-215.66 (1) provides that: Anyperson who knowinglymakes any false statement, representation, or certification in anyapplication, record, report, plan, or other documentfiled or required to be maintained under this Article or a rule implementing this Amide; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring deice or method required to be operated or maintained under this Article or rules of the Commission implementing this Artcle shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand dollars ($10,000). rJ I, as an authorized representative, hereby request rescission of coverage under the NPDES Stormwater Permit for the subject facility. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true, complete and accurate. *This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature 1�1-04Y Ar- Type Name* J. Mark Rhyne Title * Manager of Engineering Organization * Cape Hatteras Electric Cooperative Date * 02/02/2021 Email for MarkR@chec.coop Confirmation * Contact Telephone* 252-995-5616 NOT Certification NCG01-eNOT-Certification-Form-20201215- Form DEMLR-SW CHEC.pdf Mist be FDF Forrrat Is this COC Already Ensure this CCChas not been rescinded since subrrittal! Rescinded? Additional Email CCd on Notification Errails (Optional) harrislr@booth-assoc.com Original Permittee CCdonWificationErrails Email MarkR@chec.coop Original Site Contact CCd on Notificaiton BTails Email MarkR@chec.coop 30.9KB