Loading...
HomeMy WebLinkAbout20111120 Ver 1_More Info Received_20120201Strickland, Bev From: Witherspoon, Lauren Sent: Wednesday, February 01, 2012 11:17 AM To: Strickland, Bev Subject: FW: Eagle Rock Concrete DWQ Project #11 -1120 Attachments: Eagle Rock PCN.pdf For the laserfiche file. Thanks, lc - - - -- Original Message---- - From: Freeman, Hunter fmailto:HFreeman c_i; «- ithersrai-enel.coml Sent: Wednesdav, February- 01, 2012 11:16 AM To: Witherspoon, Lauren Subject: RE: Eagle Rock Concrete DWQ Project 411 -1120 I didn't catch that, here's a revised scan. - - - -- Original Message---- - From: Witherspoon, Lauren [ mailto: lauren.«- itherspooncincdenr.Qoi-1 Sent: Wednesdav, February 01, 2012 11:00 AM To: Freeman, Hunter Subject: RE: Eagle Rock Concrete DWQ Project 411 -1120 Sorn -, I just realized that but could you scan in page 2 and send it over. It looks like it didn't go through. Thanks, lauren - - - -- Original Message---- - From: Freeman, Hunter fmailto:HFreeman ci «- ithersrai-enel.coml Sent: Wednesdav, February- 01, 2012 10:59 AM To: Witherspoon, Lauren Subject: RE: Eagle Rock Concrete DWQ Project 411 -1120 Adam signed the form, he's the owner - - - -- Original Message---- - From: Witherspoon, Lauren [ mailto: lauren.«- itherspoon cincdenr.Qoi-1 Sent: Wednesdav, February- 01, 2012 10:58 AM To: Freeman, Hunter Subject: RE: Eagle Rock Concrete DWQ Project 411 -1120 I need an agent authorization form also. Thanks, lauren - - - -- Original Message---- - From: Freeman, Hunter fmailto:HFreeman ci «- ithersrai-enel.coml Sent: Wednesdav, February- 01, 2012 9:10 AM To: Witherspoon, Lauren Subject: RE: Eagle Rock Concrete DWQ Project 411 -1120 Lauren - here's the signed PCN form. Hunter - - - -- Original Message---- - From: Witherspoon, Lauren [ mailto: lauren.«- itherspooncincdenr.Qoi-1 Sent: Sundae, January- 29, 2012 12:43 AM To: Freeman, Hunter Subject: RE: Eagle Rock Concrete DWQ Project 411 -1120 thanks. i -will look for this information. lauren From: Freeman, Hunter [ HFreemanldNNithersrai-enel.com] Sent: Friday, January- 27, 2012 8:55 PM To: Witherspoon, Lauren Subject: Re: Eagle Rock Concrete DWQ Project 411 -1120 Lauren - thanks for the email. I thought I did sign and date that but I guess I missed it. Ill send it to you next ,reek along -with the agent letter. Have a good -weekend. On Jan 27, 2012, at 12:36 PM, "Witherspoon, Lauren" <lauren. «- itherspoon crncdenr. Qoi-< mailto: lauren . «- itherspoon ,-incdenr.Qoi>> wrote: Hunter, I ,vas just ,N- riting the approval letter for Eagle Rock Concrete buffer authorization and noticed that the application has not been signed or dated. Can you supply- me -with the last page of the PCN application signed and dated? Also, if you sign it, -, e -will need an agent authorization form. If you can get it to me early- next -week I -won't need to send an on -hold letter for it. Thanks, lauren s f Ss Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Page 1 of 10 PCN Form — Version 1.3 December 10, 2008 Version Pre - Construction Notification (PCN) Form A. Applicant Information 1. Processing la. Type(s) of approval sought from the Cor s: p F-1 Section 404 Permit ❑Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ❑Yes ❑ No 1d. Type(s) of approval sought from the DWQ (check all that apply): ❑ 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ® Riparian Buffer Authorization le. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes ® No For the record only for Corps Permit: ❑ Yes ® No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes ® No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ❑ Yes ® No 1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ® No 2. Project Information 2a. Name of project: Eagle Rock Concrete 2b. County: Wake 2c. Nearest municipality / town: Garner 2d. Subdivision name: Greenfield 2e. NCDOT only, T.I.P. or state project no: 3. Owner Information 3a. Name(s) on Recorded Deed: Greenfield 40 Assoc. LLC 3b. Deed Book and Page No. 12054 pg 0742 3c. Responsible Party (for LLC if applicable): 3d. Street address: 901 Old Knight Road 3e. City, state, zip: Knightdale, NC 27545 3f. Telephone no.: 3g. Fax no.: 3h. Email address: Page 1 of 10 PCN Form — Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ® Other, specify: Developer 4b. Name: Adam Loftin 4c. Business name (if applicable): Eagle Rock 4d. Street address: 8310 Bandford Way 4e. City, state, zip: Raleigh, NC 27614 4f. Telephone no.: 919- 819 -1100 4g. Fax no.: 4h. Email address: ajloftin @gmail.com 5. Agent/Consultant Information (if applicable) 5a. Name: Hunter Freeman 5b. Business name (if applicable): Withers & ravenel 5c. Street address: 111 MacKenan Drive 5d. City, state, zip: Cary, NC, 27511 5e. Telephone no.: 919 - 469 -3340 5f. Fax no.: 919 - 467 -6008 5g. Email address: hfreeman @withersravenel.com Page 2 of 10 PCN Form — Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 1. Property Identification 1 a. Property identification no. (tax PIN or parcel ID): 1730125497 1 b. Site coordinates (in decimal degrees): Latitude: 78.56 Longitude: - 35.68 (DD.DDDDDD) (- DD.DDDDDD) 1c. Property size: 5.77 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to White Oak Creek proposed project: 2b. Water Quality Classification of nearest receiving water: C, NSW 2c. River basin: Neuse 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Undeveloped Parcel within an industrial subdivision 3b. List the total estimated acreage of all existing wetlands on the property: 0.11 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 875 3d. Explain the purpose of the proposed project: Ready Mix Concrete Plant 3e. Describe the overall project in detail, including the type of equipment to be used: The project includes site development of the proposed concrete plant, general site construction equipment will be used 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / Yes ❑ No Unknown project (including all prior phases) in the past? Comments: 4b. If the Corps made the jurisdictional determination, what type El Preliminary Final of determination was made? 4c. If yes, who delineated the jurisdictional areas? Agency /Consultant Company: Name (if known): Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for ❑ Yes ® No ❑ Unknown this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes ® No 6b. If yes, explain. Page 3 of 10 PCN Form — Version 1.3 December 10, 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑ Wetlands ❑ Streams - tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ — non -404, other) (acres) Temporary (T) W1 P T ❑ ❑ El Yes [:1 Corps No DWQ W2 P T ❑ ❑ El Yes [:1 Corps No DWQ W3 ❑ P ❑ T ❑ Yes ❑ Corps ❑No [:1 DWQ W4 P T ❑ ❑ El Yes ❑ Corps No DWQ W5 P T ❑ ❑ El Yes ❑ Corps No DWQ W6 P T ❑ ❑ El Yes ❑ Corps No DWQ 2g. Total wetland impacts 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ — non -404, width (linear Temporary (T) (INT)? other) (feet) feet) S1 P T ❑ ❑ ❑ PER ❑ Corps INT DWQ S2 P T ❑ ❑ ❑ PER ❑ Corps INT DWQ S3 P T ❑ ❑ ❑ PER ❑ Corps INT DWQ S4 P T ❑ ❑ ❑ PER ❑ Corps INT DWQ S5 P T ❑ ❑ ❑ PER ❑ Corps INT DWQ S6 P T ❑ ❑ ❑ PER ❑ Corps INT DWQ 3h. Total stream and tributary impacts 3i. Comments: Page 4 of 10 PCN Form — Version 1.3 December 10, 2008 Version 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number - (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary (T) 01 ❑P ❑T 02 ❑ P ❑ T 03 ❑ P ❑ T 04 ❑ P ❑ T 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, then complete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f. Total 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. ® Neuse ❑ Tar - Pamlico ❑ Other: Project is in which protected basin? ❑ Catawba ❑ Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number - Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary (T) impact required? B1 P T ® ❑ Bypass Channel Trib to White Oak El Yes E No 387 164 B2 P T ❑ Yes ❑ No B3 P T ❑ Yes ❑ No 6h. Total buffer impacts 6i. Comments: Page 5 of 10 PCN Form - Version 1.3 December 10, 2008 Version D. Impact Justification and Mitigation 1. Avoidance and Minimization 1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Impact is require per standards for constructed wetland BMP 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Channel size was minimized 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ❑ Yes ❑ No 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps 2c. If yes, which mitigation option will be used for this roJ p �ect? ❑ Mitigation bank E:1 Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ❑ warm ❑ cool ❑cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non - riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form — Version 1.3 December 10, 2008 Version 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes ® No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Page 7 of 10 PCN Form — Version 1.3 December 10, 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified ® Yes ❑ No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ® Yes ❑ No Comments: 1 constructed wetland for stormwater runoff 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 78% 2b. Does this project require a Stormwater Management Plan? ® Yes ❑ No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: Runoff from non - industrial areas will be treated by a constructed wetland, there are no areas of untreated impervious. The industrial portion of the site contains one discharge point which will be permitted under NCG14. Approval of stormwater plan from garner is pending bt there are no major comments at this time.There is no comingling of stormwater and wastewater. ® Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program ❑ DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? Garner ® Phase 11 3b. Which of the following local) -im lemented stormwater management programs ® NSW El USMP apply (check all that apply): ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ® No attached? 4. DWQ Stormwater Program Review ❑ Coastal counties ❑ HQW 4a. Which of the following state - implemented stormwater management programs apply ❑ 0 R (check all that apply): ❑ Session Law 2006 -246 ❑ Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes El 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ® Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ® Yes ❑ No Page 8 of 10 PCN Form — Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal /state /local) funds or the ❑ Yes ® No use of public (federal /state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑ No (North Carolina) Environmental Policy Act (NEPA /SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑ Yes F1 No letter.) Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after - the -fact permit application? ❑ Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ® No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non- discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. The wastewater discharge will be permitted under NCG14. Settling bins, TSS, and pH control are all included in the wastewater treatment design in accordance with the requirements of the permit. A monitoring plan is also being developed for the wastewater discharge. there is no co- mingling of stormwater and wastewater. Page 9 of 10 PCN Form — Version 1.3 December 10, 2008 Version Page 10 of 10 PCN Form — Version 1.3 December 10, 2008 Version