HomeMy WebLinkAbout20090566 Ver 3_Stormwater Approval_20120127Beverly Eaves Perdue
Governor
Mr Joe Poole
Caterpillar
954 NC 42 East
Clayton NC 27520
Subject Property
lJ1OEM
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Charles Wakdd P E
Director
January 27 2012
Caterpillar Access Road
UT to Neuse River [030402 27 (39 7) WS IV NSW]
STORMWATER MANAGEMENT PLAN APPROVAL
Dear Mr Poole
Dee Freeman
Secreta y
DWQ Project # 09 0566
Johnston County
1\
On May 21 2009 the Division of Water Quality (DWQ) issued a 401 Water Quality Certification to
impact 192 linear feet of perennial stream 15 003 square feet of Zone I Neuse River basin protected
riparian buffers and 9 700 square feet of Zone 2 Neuse River basin protected riparian buffers
In order to meet Conditions (6) and (7) of the 401 Certification for this protect a stormwater
management plan (SMP) for the Caterpillar site were approved by the DWQ on November 16 2010
and December 10 2010 An SMP specific to the office building and shop dated October 27 2011
was received by the DWQ on November 1 2011 Updates to the SMP for the office building and
shop dated December 20 2011 were received by the DWQ on December 20 2011
The DWQ approves the SMP for the office building and shop (with subsequent revisions received
December 20 2011) to satisfy the stormwater condition required by the General Water Quality
Certification This approval is for the purpose and design that you described in your application If you
change your project you must notify us and you may be required to send us a new SMP If the property
(or a lot on the property) is sold the new owner must be given a copy of this approval letter and is thereby
responsible for complying with all conditions This approval requires you to follow the conditions
listed in the General Water Quality Certification for the protect and the following additional
conditions listed below
The SMP approved by the DWQ for the office building and shop consists of a wet detention basin
and all associated stormwater conveyances inlet and outlet structures vegetated shelf planting
plan and the grading and drainage patterns depicted on plan sheets dated December 20 2011 -The
approved SMP must be maintained in perpetuity No changes to the structural stormwater
practices shall be made without written authorization from the DWQ The stormwater
management structures shall have maintenance access and at least a 10 foot drainage easement on
each side to allow for the ability to maintain the structures and to perform corrective actions The
stormwater easements shall be recorded to provide protection of the structures from potential
alterations by future property owners
Wetlands Buffers Stormwater Compliance and Permitting Unit (WeBSCaPe)
1650 Mail Service Center Raleigh North Carolina 27699 1650
Phone 919 807 6300 1 FAX 919 807 6494
Internet hftp //portal ncdenr org /web /wq /ws
An Equal Opportunity 1 Affirmative Action Employei
Caterpillar
Page 2 of 2
January 27 2012
2 Operation and Maintenance of BMP Maintenance activities for the proposed wet detention basin
shall be performed in accordance with the notarized wet detention basin O &M agreement signed
by Mr Johnson Tilghman on October 27 2011 The O & M agreement must transfer with the sale
of the land or transfer of ownership /responsibility for the BMP facility DWQ must be notified
promptly of every transfer
Thank you for your attention to this matter If you have any questions or wish to discuss these matters
further please do not hesitate to contact me at 919 807 6381
Sincerely
Annette M Lucas P E
Wetlands Buffers and Stormwater Compliance and
Permitting Unit
AML /aml
cc Lauren Witherspoon DWQ Raleigh Regional Office
USACE Raleigh Regulatory Field Office
DLR Raleigh Regional Office
Matt Matthews DWQ Section Chief
File Copy
Grant Livengood McKim &Creed 1730 Varsity Drive Raleigh NC 27606
Robert B Hunt 1441 NC Highway 42 East Clayton NC 27527
Filename 090566Caterpolar (Johnston)_SW_Approve